RISK REGISTER
CONSULTANTS
DESIGN ARCHITECT
Renzo Piano Building Workshop
NUMBER ORIGINATOR DATE AREA / LOCATION DESIGN RISK DESIGN MITIGATION RISK OWNER RESIDUAL RISK/NOTES STATUS 34 Rue des Archives, 75004, Paris, France
tel: +33 1 44 61 49 00 fax: +33 1 42 78 01 98

INTERIOR ARCHITECT
DR-01 AA POSSIBLE ASBESTOS CONTAMINATION. SURVEYS TO BE UNDERTAKEN TO ESTABLISH PRESENCE OF ASBESTOS. ASBESTOS REGISTER TO BE KEPT UP TO DATE AND AECOM / PRINCIPAL CONTRACTOR DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE
State of Craft
CONSULTED.
28 London Bridge Street, London, SE1 9SG
tel: +44 20 3102 3922
REVIEW CONSTRUCTION RECORDS ON SITE TO DETERMINE AREAS AT RISK. DEVELOP METHODOLOGY IN CASE BOMBS ENCOUNTERED
DR-02 AA UNEXPLODED BOMBS ON SITE. AECOM / PRINCIPAL CONTRACTOR DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY. CLOSED
ON SITE. INFORM AND ENQUIRE WITH LOCAL EMERGENCY SERVICES OF LIKELIHOOD OF BOMB DISCOVERY. EXECUTIVE ARCHITECT
PILING AND BASEMENT EXCAVATION WORKS NOW COMPLETE.
Adamson Associates (International) Ltd
6th Floor, One Canada Square, Canary Wharf, London, E14 5AB
tel: +44 20 7418 2068 fax: +44 20 7418 2517
UNDERTAKE SITE INVESTIGATION. IF CONTAMINATED GROUND LIKELY, DEVELOP METHODOLOGY TO REMOVE, CONTAIN AND TREAT AECOM / PRE CONSTRUCTION
DR-03 AA CONTAMINATED GROUND. DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY CLOSED
WASTE SAFELY. ADVISOR / PRINCIPAL
PILING AND BASEMENT EXCAVATION WORKS NOW COMPLETE.
CONTRACTOR PROJECT MANAGER
Turner & Townsend
LIMIT CRANE MOVEMENTS WITH INTERLOCKS TO EXCLUDE POSSIBLE OVER SAIL. ALERT WORKERS ON SITE OF RISKS. ENSURE AECOM / PRE CONSTRUCTION One New Change, London, EC4M 9AF
DR-04 AA DAMAGE TO NEIGHBOURING PROPERTIES / INFRASTRUCTURE FROM FALLING OBJECTS DURING CONSTRUCTION. DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE tel: +44 20 7544 4000
THAT ALL FLOORS ARE FULLY ENCLOSED DURING DEMOLITION. INSTALL CRASH NETS WHERE APPROPRIATE. ADVISOR / PRINCIPAL
CONTRACTOR
STRUCTURAL ENGINEER
AECOM / PRE CONSTRUCTION WSP
DR-05 AA PROTECTION OF LIVE UTILITY SERVICES AROUND SITE. REVIEW EXISTING UTILITY DRAWINGS OF SITE. COMPLETE GAP SURVEY ANALYSIS OF AREAS OF UNCERTAINTY. DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE
ADVISOR / PRINCIPAL WSP House, 70 Chancery Lane, London, WC28 1AF
CONTRACTOR tel: +44 20 7314 5000 fax: +44 20 7314 5111

WORKING WITH A PRE-CONSTRUCTION ADVISOR AND / OR THE DEMOLITION CONTRACTOR, PREPARE METHODOLOGY PHASING AECOM / PRE CONSTRUCTION
PROTECTION OF PUBLIC PEDESTRIANS, ROAD USERS, BUSES, WAITING PASSENGERS AS WELL AS SITE WORKERS, ALL OF WHOM MEP ENGINEER
DR-06 AA PLANS. PROMOTE A PUBLIC UNDERSTANDING OF THE CONSTRUCTION, LIMITING POSSIBLE DISRUPTION AND CONFUSION TO THE ADVISOR / PRINCIPAL DEMOLITION CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE
WILL CONTINUE TO USE LONDON BRIDGE DURING DEMOLITION AND CONSTRUCTION. Chapman BDSP
PUBLIC. INSTAL A ROBUST APPROPRIATE HOARDING . PROTECT PUBLIC PASSAGEWAYS FROM ANY POTENTIAL HAZARDS. CONTRACTOR
Saffron House, 6-10 Kirby Street, London, EC1N 8TS
tel: +44 20 7618 4800 fax: +44 20 7618 4801
INSTALL AND MONITOR GROUND MOVEMENT PRIOR TO DEMOLITION. CONTINUE MONITORING DURING CONSTRUCTION. DEVELOP AECOM / PRE CONSTRUCTION
DR-07 AA DAMAGE TO LUL INFRASTRUCTURE RESULTING FROM GROUND MOVEMENT. GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE
METHODOLOGY TO LIMIT MOVEMENT TO ALLOWABLE NORMS. ADVISOR / PRINCIPAL LANDSCAPE ARCHITECT
CONTRACTOR Dan Pearson Studio
The Nursery, The Chandlery, 50 Westminster Bridge Road, London, SE1 7QY
tel: +44 20 7928 3800 fax: +44 20 7928 3854
DR-08 AA ALL LUL ASSETS INCLUDING FIRE EXITS, VENT SHAFTS AND PLANT ROOMS TO REMAIN OPERATIONAL AT ALL TIMES. SAFE, ROBUST DEMOLITION METHODOLOGY TO BE DEVELOPED. INSPECT LUL ASSETS AT REGULAR INTERVALS DURING AECOM / PRINCIPAL GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY. LIVE
CONSTRUCTION. REFER TO DGW. EA-100 CONTRACTOR CONSTRUCTION REQUIRED WITH LUL PRIOR TO ANY WORKS ADJACENT TO LUL ASSETS.
QUANTITY SURVEYOR
CONSTRUCTION METHODOLOGY DEVELOPED WITH APPROPRIATE PROTECTION. WHERE POSSIBLE, PROVIDE TEMPORARY TIE BACKS TO GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY. Gardiner & Theobald LLP
ERECTION OF LEVEL 04 TRANSFER FLOOR REQUIRING TEMPORARY SUPPORT DURING CONSTRUCTION. REF. TO DWG. CORE TO MINIMISE CONCOURSE LEVEL TEMPORARY PROPPING. DESIGN ALL COLUMN NODES AS BOLTED CONNECTIONS, ACCESSIBLE WSP / AECOM / PRINCIPAL FABRICATOR HAS DEVELOPED A CONSTRUCTION SEQUENCE THAT ENSURES FRAME 10 South Crescent, London, WC1E 7BD
DR-09 AA LIVE tel: +44 20 7209 3000
EA-1040. FORM FLOOR PLATE. LEVEL 2 TRUSSES EXPECTED TO ARRIVE ON SITE AS PRE ASSEMBLED PIECES TO AVOID MID SPAN PROPPING. CONTRACTOR STABILITY DURING ERECTION. TEMPORARY BRACES AND COLUMN STAYS TO BE DESIGNED
LEVEL 02 REQUIRES TEMPORARY SUPPORT DURING CONSTRUCTION, REFER TO DWG. EA-1020 LEVEL 4 TRUSSES TO BE ERECTED AFTER THE MAIN STEEL CORE TO ENSURE STABILITY AND MINIMISE PROPPING FROM LEVEL 02 AND 00 BY TEMPORARY WORKS ENGINEER.
RPBW / THORNTON TOMASSETTI /
DESIGN WING WALLS AS A PANELISED SYSTEM ABLE TO BE PRE-ASSEMBLED ON THE GROUND AND CRANED INTO PLACE. LIMIT FACADE ACCESS CONSULTANT
DR-10 AA ERECTION OF CANTILEVER WING WALLS AND OTHER STRUCTURE OUTSIDE OF TYPICAL FLOOR PLATE. LEVELS 04 - 15 AND 16 - TRADE CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE NOTES
CONNECTION POINTS TO THE EDGE OF SLAB. PRINCIPAL CONTRACTOR / TRADE
ROOF. REF. TO GA's DWG EA-1040 - 1270. 1. Do not scale drawings. Dimensions govern.
CONTRACTOR

DEVELOP APPROPRIATE CONSTRUCTION METHODOLOGY. USE TEMPORARY INFILL PANELS TO PERMIT THE INSTALLATION OF THE CURTAIN 2. All dimensions are in millimetres unless noted otherwise.
RPBW / WSP/ PRINCIPAL CONTRACTOR /
DR-11 AA WINTER GARDEN CONSTRUCTION IF NOT CONSTRUCTED WITH TYPICAL CONCRETE SLAB. REF. TO DWG EA-1050 - 1260. WALL. DESIGN ALL WINTER GARDEN PANELS WITH APPROPRIATE LIFTING POINTS. USE MOBILE LIFTING EQUIPMENT TO MOVE WINTER GARDEN GENERAL CONTRACTOR TO BE INFORMED OF CHANGE IN DESIGN. CLOSED
TRADE CONTRACTOR
CONCRETE PANELS. CONSTRUCTION METHODOLOGY REVISED, WINTER GARDEN SLAB NOW BEING CAST WITH BUILDING FLOOR SLAB. 3. All dimensions shall be verified on site before proceeding.

4. The author shall be notified in writing of any discrepancies.


CONSTRUCTION METHODOLOGY DEVELOPED WITH APPROPRIATE PROTECTION. WHERE POSSIBLE, PROVIDE TEMPORARY TIE RPBW / WSP/ PRINCIPAL
DR-12 AA CONSTRUCTION OF HUNG FLOORS, L01 & L03, REQUIRING TEMPORARY PROPPING. REF. TO GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY LIVE
BACKS TO CORE TO MINIMISE CONCOURSE LEVEL TEMPORARY PROPPING. CONTRACTOR / TRADE CONTRACTOR 5. This drawing is protected by copyright.
DWG. EA-1010 AND EA-1030.

LOCATE LIFTING POINTS AROUND SITE AND VERIFY LOADING CAPACITY OF GROUND. ENSURE LIFTING PERMITS SAFE OPERATION OF BUS GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY. WSP TO PROJECT NORTH
H
STATION AND HIGHWAYS. REMOVABLE LOUVERS TO L04 PLANT ROOMS INCORPORATED INTO THE DESIGN TO AID INSTALLATION/ WSP/ PRINCIPAL CONTRACTOR / INDICATE POSSIBLE LIFTING ZONES.LIFTING ZONE, PLANT SIZE AND WEIGHTS TO BE INCLUDED IN RT
DR-13 AA INSTALLATION OF LARGE PLANT EQUIPMENT REQUIRING CRANAGE FROM GROUND FLOOR. LIVE E NO
REPLACEMENT OF LARGE PLANT ITEMS. LIFTING BEAM WITH SLIDING HOIST PROPOSED TO BE FIXED TO THE UNDERSIDE OF L05 SLAB TO TRADE CONTRACTOR THE PLANT REPLACEMENT STRATEGY AND H&S FILE. SWL OF BEAM AND HOIST TO BE CLEARLY T RU 23.21
˚

FACILITATE INSTALL AND REPLACEMENT OF PLANT. LOADS TO BE CHECKED BY WSP AND CHAPMAN BDSP. INDICATED ON STEEL AND LIFTING EQUIPMENT AND INCLUDED IN PLANT REPLACEMENT
STRATEGY
DEVELOP BUILDING MANAGEMENT GUIDELINES AND MANUALS FOR PLANT MAINTENANCE. DESIGN PLANT SPACE TO BE RPBW / CHAPMAN BDSP / BUILDING MANAGER AND TENANTS TO BE INFORMED OF RISK AND TRO STRICTLY FOLLOW
DR-14 AA SAFE AND EFFICIENT PLANT MAINTENANCE. LIVE
COMPLIANT WITH BUILDING REGULATIONS. GANTRIES AND ACCESS LADDERS HAVE BEEN DETAILED BY AA AND INCLUDED IN BUILDING MANAGER / REM DESIGNER'S GUIDELINES AND MAINTANANCE PLANS
THE SUNDRY METALS SPECIFICATIONS.

SPECIALIST FACADE ACCESS CONSULTANT, APPOINTED AT STAGE 3 TO PROVIDE DESIGN ADVICE AND DETAIL DESIGN OF FACADE RPBW / FACADE ACCESS GENERAL CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE ACCORDINGLY.
DR-15 AA FACADE ACCESS AND CLEANING STRATEGY. CONSULTANT / PRINCIPAL DUNBAR & BOARDMAN TO PRODUCE FACADE ACCESS & MAINTENANCE STRATEGY FOR LIVE
ACCESS SYSTEM. DUNBAR & BOARDMAN HAVE BEEN APPOINTED AS THE FACADE ACCESS & MAINTENANCE CONSULTANT. CLEANING
WILL BE VIA BMU WITH BOOMING JIB ON L27. DESIGN OF BMU UNDER REVIEW TO AVOID OVERSAILING OF CHP FLUE. CONTRACTOR / TRADE CONTRACTOR INCLUSION IN THE H&S FILE. DRAWING STATUS
RPBW / THORNTON TOMASSETTI /
DR-16 AA GLASS REPLACEMENT STRATEGY.
SPECIALIST FACADE ACCESS CONSULTANT, APPOINTED AT STAGE 3 TO PROVIDE DESIGN ADVICE AND DETAIL DESIGN OF FACADE
ACCESS SYSTEM. SPECIALIST FACADE CONSULTANT, THORNTON TOMASETTI, APPOINTED AT STAGE 3. FACADE REPLACEMENT
FACADE ACCESS CONSULTANT
PRINCIPAL CONTRACTOR / TRADE
TRADE CONTRACTOR TO BE INFORMED OF RISK AND TO PREPARE FULL GLASS REPLACEMENT
STRATEGY
LIVE STAGE 4
STRATEGY DEVELOPED IN STAGE 3. ALL CW GLAZING SECURED WITH FOUR SIDED SSG AND FRAMING . WHERE POSSIBLE, RE- CONTRACTOR
GLAZING TO BE FROM INSIDE BUILDING WITH GOODS LIFT DIMENSIONED ACCORDINGLY. FINAL LIFT DOOR OPENINGS TO BE SIZED
ACCORDINGLY TO TAKE INTO ACCOUNT DIMENSIONS OF GLAZING UNITS. LIFT OPENINGS TO ACCOMMODATE 2600 GLAZED UNIT
LENGTH. DUE TO THE REDESIGN OF FLOORS TO ACCOMMODATE MORE APARTMENTS DUNBAR & BOARDMAN TO UNDERTAKE
FURTHER TRACKING EXERCISE TO ENSURE ANY GLAZED UNIT REQUIRING REPLACEMENT THROUGH APARTMENTS AND COMMUNAL
AREAS TO CORRIDORS IS STILL VIABLE.

CLEAR ROAD SIDE ACCESS TO BE DESIGNED, COMPLIANT WITH UTILITY SUPPLIER'S GUIDELINES. THERE IS A RISK THAT THIS ACCESS WILL
CONFLICT WITH THE ST THOMAS ST RED ROUTE. THE TEMPORARY IMPACT OF THIS SHOULD BE REVIEWED. UKPN REQUIRE ACCESS ADJACENT RPBW / CHAPMAN BDSP / UKPN / UTILITY SUPPLIERS AND TFL SHOULD BE INFORMED OF POSSIBLE RISK AND PLAN ACCORDINGLY .
DR-17 AA REPLACEMENT OF UTILITIES PLANT. REFER TO DWG. EA-0610 & EA-1000. UKPN REQUIREMENTS TO BE INCLUDED IN PLANT REPLACEMENT STRATEGY. LIVE
TO HATCH FROM THE SIDE TO INSTALL/ REPLACE UKPN ASSETS. HVM BOLLARDS PROPOSED TO BE REMOVABLE TO ALLOW DIRECT ACCESS TO AECOM
UKPN HATCH. SLAB AND FINISHES TO BE CHECKED REGARDING LOADINGS OF LOW LOADER WITH HIAB AND PLANT - 32000KG.

SPECIALIST FACADE ACCESS CONSULTANT, APPOINTED AT STAGE 3 TO PROVIDE DESIGN ADVICE AND DETAIL DESIGN OF RPBW / FACADE ACCESS CONSULTANT BUILDING MANAGER AND TENANTS TO BE INFORMED OF RISK AND TO STRICTLY FOLLOW
DR-18 AA LAMP REPLACEMENT STRATEGY, MINIMISING BULB REPLACEMENT IN AWKWARD AREAS. REF. TO DWG EA-1030. LIVE
FACADE ACCESS SYSTEM. THE SAME MEWP VEHICLES CAN BE USED TO ACCESS LAMPS. / BUILDING MANAGER / REM DESIGNER'S GUIDELINES .

PLANT TO BE DESIGNED TO BE EASILY ACCESSIBLE. ALL REPLACEABLE FILTERS ETS, ABLE TO BE MOVED WITHOUT BUILDING MANAGER AND TENANTS TO BE INFORMED OF RISK AND TO STRICTLY FOLLOW
DR-19 AA MANUAL HANDLING OF EQUIPMENT IN PLANT AREAS, RISERS AND CEILING VOIDS. WSP / BUILDING MANAGER LIVE
MECHANICAL ASSISTANCE. DESIGNER'S GUIDELINES .

THE REFUSE STORES ON RESIDENTIAL LEVELS ARE LOBBY PROTECTED; THIS LOBBY SHOULD BE KEPT CLEAR OF FIRE LOAD AT
ALL TIMES TO PREVENT A FIRE AFFECTING THE COMMON CORRIDORS. THIS REQUIREMENT MUST BE COMMUNICATED TO THE BUILDING MANAGER AND TENANTS TO BE INFORMED OF RISK AND TO STRICTLY FOLLOW LEASE
DR-20 AA FIRE LOAD WITHIN REFUSE STORAGE AREA BUILDING MANAGER LIVE
OCCUPANTS AND MANAGED BY BUILDING MANAGEMENT WHERE POSSIBLE. AGREEMENT.
BUILDING MANAGEMENT PROPOSE TO DO REGULAR CHECKS AND REMOVE ANY RUBBISH LEFT BY THE STORES.

WIND STUDIES REQUIRED TO DETERMINE LIKELYHOOD OF ITEMS FALLING FROM TERRACES. INCREASE GUARDRAILING
DR-21 AA FALLING ITEMS FROM ROOF TERRACES (LEVEL 16 & 27). HEIGHTS TO IMPROVE RISK OF FALLING OBJECTS FROM TERRACE AREA. BALUSTRADE HEIGHTS INCREASED TO MINIMUM OF RPBW LIVE
1350 ON L16.

BUILDING MANAGER / M+B LANDLORD TO ENSURE FURNITURE ADJACENT TO GUARD


DR-22 AA FALLING ITEMS FROM PUBLIC ROOF TERRACE (LEVEL 03) INCREASE GUARDRAIL HEIGHT TO IMPROVE RISK OF FALLING OBJECTS FROM BAR TERRACE AREA. RPBW / M+B LANDLORD RAILS ENSURING USERS ARE ALWAYS WITHIN THE HEIGHT SAFETY ZONE. CLOSED
TERRACE NOW ENCLOSED. TERRACE NOW ENCLOSED, NO RESIDUAL RISK.

ALL AREAS WITH RESTRICTED ACCESS TO BE FITTED WITH LOCKS. ACCESS IS BY PROTECTED LADERS AND PLATFORMS WITH
DR-23 AA FALLING FROM HEIGHT AT VERTICAL DISCHARGE FROM LUL VENTILATION SHAFTS LUL INSPECTIONS BY CONTROLLED ACESS WILL BE CARRIED OUT LUL BY LUL CLOSED
GUARD RAILS. NOTED THAT VERTICAL CONNECTION TO EXISTING SHAFTS IS DENIED BY MEANS OF TURNING VANES IN THE
SHAFTS

BUILDING MANAGEMENT TO SCHEDULE AND SUPERVISE ALL CLEANING OPERATIONS.


DR-24 AA RISK OF FALLING DURING CLEANING OF CANOPIES AND LAMP REPLACEMENT CANOPY DESIGN INCLUDES AN ACCESS WALKWAY WITH FALL RESTRAINT SYSTEM. CURRENT DESIGN TO BE CHECKED. BUILDING MANAGER LIVE
INFORMATION TO BE INCORPORATED INTO CLEANING AND MAINTANANCE STRATEGY.

INFREQUENT ACCESS REQUIRED DUE TO HEIGHT OF RAINWATER GOODS ACCES CAN BE GAINED VIA TEMPORARY ACCESS EQUIPMENT.
CHECK ACCESS IS POSSIBLE TO GUTTER AND HOPPERS FROM WITHIN THE CHILLER ENCLOSURE. ALTERNATIVE ACCESS PROPOSED TO BE BUILDING MANAGEMENT TO SCHEDULE AND SUPERVISE ALL CLEANING OPERATIONS. PROVIDE
DR-25 AA WORKING AT HEIGHT, ACCESS TO RAINWATER GUTTER AND HOPPER ON CORE ROOF LEVEL FOR MAINTENANCE. RPBW / AA / BUILDING MANAGER LIVE
FROM FIXED LADDER TO STEEL GRATING OVER CHILLERS. OPERATIVES WOULD BE REQUIRED TO CLIP ON TO SAFETY WIRE SYSTEM TO TIE BOLTS FOR ACCESS EQUIPMENT
REFER TO DWG. EA-1280.
ACCESS AREA OF REMOVABLE STEEL GRATING TO ACCESS GUTTER AND HOPPERS FROM ABOVE. ONGOING.
RPBW / FACADE ACCESS
BMU CRADLE CLASH WITH LIGHTING BRACKETS ON LEVEL 03 SOFFIT. EMERGENCY ESCAPE FROM BMU CRADLE - CRADLE REVIEW REQUIRED BY DESIGN TEAM. DESIGN REVIEW UNDERTAKEN AND LIGHTING BRACKETS NO LONGER CLASH WITH BMU CRADLE. BUILDING MANAGER AND TENANT TO BE INFORMED OF RISK AND TO STRICTLY FOLLOW
DR-26 AA CONSULTANT / REM / AA / CLOSED
CANNOT REACH GROUND LEVEL, OPERATIVES STRANDED IN THE EVENT OF AN EMERGENCY. DAMAGE TO BUILDING FABRIC. LIGHTING BRACKET NOW MOUNTED ON THE INSIDE FACE OF THE DOUBLE SKIN FACADE, RISK DESIGNED OUT. DESIGNER'S GUIDELINES.
BUILDING MANAGER / CHAPMAN
BDSP
REVIEW REQUIRED BY DESIGN TEAM. LOOK AT CONTAINING BINS WITH RAILING. BINS LOCATED IN DEDICATED AREA WITH WHEEL BUILDING MANAGER AND TENANT TO BE INFORMED OF RISK AND TO STRICTLY FOLLOW
DR-27 AA MAIN REFUSE STORE LOCATED ADJACENT TO VEHICULAR RIGHT OF WAY SERVING HOTEL AND UKPN STORAGE ROOMS - RPBW / REM / AA / BUILDING CLOSED
LOCKS ENGAGED. LOCATION OF BIN STORES HAS MOVED DUE TO DESIGN CHANGES. REFUSE STORE NOW LOCATED WITHIN DESIGNER'S GUIDELINES.
INCREASED FIRE LOADING AND RISK OF BINS ROLLING INTO VEHICULAR ROUTE. MANAGER
FIRE PROTECTED ARE IN THE BUIDLING CORE REFER TO DWG. EA-1000 - LEVEL 00 PLAN ST THOMAS STREET LEVEL.
CLEANING OF INTERNAL LOW LEVEL GLAZING AND ADJACENT RECESSED FLOOR LEVEL IN APARTMENT ENTRANCE LOBBY, DESIGN OF AREA UNDER REVIEW. FOR THE CLEANING, PROPOSAL TO MOVE NORTH FACADE OUTWARDS TO ALIGN THE OUTER FACE OF THE
LONDON BRIDGE STREET ELEVATION - FRAMED WOODEN SLATED SCREEN CURRENTLY CLASHES WITH UPSTAND AND FLOORING PROFILE TO THE JOINT OF STONE. THE STEP WOULD STAY WHERE IT IS (COOR'D W/ MULLION & JOINTS). FRAMES WOULD HAVE RPBW / FACADE ACESS G STAGE 4 16 APR 2018
DR-28 AA INFROMATION TO BE INCORPORATED INTO CLEANING AND MAINTANANCE STARTEGY. CLOSED
BALUSTRADE, INSUFFICIENT AREA FOR CLEANING AND MAINTENANCE OPERATIVES RESULTING IN RISK OF MORE SPACE TO OPEN, AND IT WOULD ALLOW FOR AT LEAST A 400mm PATH AT FEET LEVEL, BUT MORE OPEN AT SHOULDER LEVEL SINCE THE CONSULTANT / REM / AA F INFORMATION UPDATE 15 SEP 2017
MUSCULOSKELETED DISORDERS AND GLASS AND RECESSED FLOOR NOT BEING CLEANED PROPERLY. REF. TO DWG EA-1020 BALUSTRADE WOULD BE OFF GRID. FURTHER DESIGN REVIEW UNDERTAKEN AND FRAMED WOODEN SLATS HAVE BEEN MOVED TO FALL IN LINE E BLOCKWORK TENDER 11 AUG 2017
AND EA-0641. WITH STEP ELIMINATING REQUIREMENT FOR BALUSTRADE AND GIVEN A 600mm CLEAR AREA FOR CLEANING GLASS AND RECESSED FLOOR. D STAGE 4 PROGRESS ISSUE 27 JAN 2017
C STAGE 4 PROGRESS ISSUE 02 SEP 2016
REPLACEMENT OF GLAZING ABOVE CANOPY (HIGH LEVEL) IN APARTMENT ENTRANCE LOBBY, LONDON BRIDGE STREET
B STAGE 4 PROGRESS ISSUE 22 APR 2016
DR-29 AA ELEVATION - GLAZING CANNOT BE REPLACED EXTERNALLY DUE TO THE STRUCTURE FOR THE CANOPY OBSTRUCTING DIRECT A FINAL STAGE 4 ISSUE 27 NOV 2015
ACCESS FROM OUTSIDE AND THE SOFFIT OBSTRUCTING THE WAY FOR BRINGING IT IN FROM ABOVE. Rev No. Modification Date
DESIGN OF AREA UNDER REVIEW. RPBW / FACADE ACCESS LIVE
INTERNAL REPLACEMENT WOULD REQUIRE SPIDER CRANE / GLASSBOY BEING POSITIONED INSIDE AND THE GLASS UPDATE REQUIRED FROM FACADE ACCESS CONSULTANT. CONSULTANT / REM / AA
MANIPULATOR DIRECTLY ON THE END OF THE SPIDER CRANE JIB, THE PANEL PASSED THROUGH THE APERTURE AND
BROUGHT BACK INTO POSITION. THIS WOULD REQUIRE THE INTERNAL SLATES WOODEN SCREEN AND SUPPORTING
STRUCTURE TO BE REMOVED. ALSO POTENTIAL CLASH WITH INTERNAL LOBBY LIGHTING. REFER TO DWG. EA-1020 & EA-1030.

OPEN EDGES AROUND FUTURE STAIRS, HOISTS, LIFTS AND MEZZANINE FOR FUTURE RETAIL USE ON LEVELS B1, SOLID TEMPORARY HOARDING TO BE ERECTED AROUND THESE AREAS. ALL TEMPORARY HOARDING TO COMPLY WITH CHAPMANS AND AA
DR-30 AA BUILDING MANAGER INFROMATION TO BE PASSED TO BUILDING MANAGER. LIVE
00, 01,02, 03. REF. TO DWG EA-0990, EA-1000, EA-1010, EA-1020, EA-1030. FIRE STRATEGY DOCUMENTS AND DRAWINGS. MINIMUM 2HRS PROTECTION REQUIRED FOR LIFT OPENINGS AND STAIR CORES.

PROPOSED GENERATOR UNDER REVIEW, STRUCTURAL ENGENEER TO CONFIRM FLOOR LOADING AND MEP TO CONFIRM APPROXIMATE SIZE
AND WEIGHT OF GENERATOR. TO BE DEVELOPED. GENERATOR LOCATION HAS NOW BEEN MOVED TO UNDERSIDE OF PUBLIC STAI AT LEVEL WSP / CHAPMAN BDSP / PRINCIPAL MEP TO CONFIRM APPROXIMATE SIZE AND WEIGHT OF GENERATOR FOR INCLUSION IN
DR-31 AA PROPOSED GENERATOR INSTALLATION IN LEVEL 04, ASSECC FOR INSTALLATION AND REPLACEMENT. LIVE
00 (PART OF LOADING DOCK). THIS NOW SIMPLIFIES ACCESS FOR INSTALATION AND REPLACEMENT AS ACCESS CAN NOW BE ACHIVED CONTRACTOR / TRADE THE PLANT REPLACEMENT STRATEGY FOR THE H&S FILE.
DIRECT FROM THE LOADING DOCK. MEP TO CONFIRM APPROXIMETA SIZE AND WEIGHT OF GENERATOR. CONTRACTOR
MCC

EMERGENCY VEHICLE ACCESS TO BE MAINTAINED TO LONDON BRIDGE HOTEL DURING AND POST CONSTRUCTION AT ALL TIMES. PRINCIPAL PRINCIPAL CONTRACTOR TO ENSURE THEIR FIRE PLAN INCORPORATES REQUIREMENTS.
PRINCIPAL CONTRACTOR / FIRE
DR-32 AA EMERGENCY VEHICLE ACCESS TO LONDON BRIDGE HOTEL. REF. TO DWG EA-1000. CONTRACTOR MUST INCLUDE THIS IN THEIR FIRE PLAN WITHIN THEIR CPP. FIRE CONSULTANT AND BUILDING MANAGEMENT TO INCORPORATE FIRE STRATEGY FOR COMPLETED BUILDING TO BE INCORPORATED INTO H&S FILE AND LIVE
CONSULTANT / BUILDING
REQUIREMENT INTO COMPLETED BUILDING FIRE STRATEGY. BUILDING MANAGEMENT TO MAINTAIN ACCESS/EGRESS AT ALL TIMES.
MANAGEMENT
CHECKED

DR-33 AA BMU OVER SAILING CHP FLUE - RISK OF DAMAGE/ FAILURE TO BMU JIB AND CONTROLS AND RISK OF INJURY TO
CLEANING OPERATIVES IN THE BMU CRADLE.
DESIGN AND OPERATING PARAMETERS OF BMU REQUIRES REVIEW. DESIGN TEAM LIVE SHARD PLACE
FIRE STRATEGY - DUE TO INCREASE IN APARTMENT NUMBERS AND THEREFORE POTENTIAL INCREASE IN CHAPMAN BDSP/AA/BUILDING
DR-34 AA BUILDING OCCUPANTS THERE IS A RISK THAT CURRENT FIRE STRATEGY IS NON-COMPLIANT. AA AND CHAPMAN BDSP (FIRE LIFE SAFETY CONSULTANT) TO REVIEW CURRENT STRATEGY IN CONSULTATION WITH SOUTHWARK BUILDING LIVE
CONTROL (SBC) AND LONDON FIRE BRIGADE (LFB). MANAGEMENT/REM
16 APR 2018

REFUSE ROUTE - LOADING DOCK. RISK TO OPERATIVES OF INJURY/IMPACT WITH VEHICLES DUE TO MOVING DESIGN TEAM TO INVESTIGATE IF PEDESTRIAN/VEHICLUAR SEGREGATION IS VIABLE WITH HATCHED AREA AND BOLLARDS. STUDY TO BE LOADING DOCK AREA WILL BE A MANAGED SPACE.
DR-35 AA AA/WSP/BUILDING LIVE
REFUSE THROUGH UNSEGREGATED LOADING DOCK AREA. UNDERTAKEN FOR POSITIONING OF MIRRORS TO ELIMINATE BLIND SPOTS - ONGOING DESIGN MANAGEMENT/REM
C:\Revit Local Files\X-Misc\1428-AAI-01-FST-M3-ARC-Central_GasparD.rvt

DRAWING TITLE
LOCATION OF PLANT REPLACEMENT HATCH ON PRIMARY FIRE ESCAPE ROUTE L04 - RISK TO PERSONS IMPACT TO BE ASSESSED ASAP. CHAPMAN BDSP/WSP/AA/BUILDING
DR-36 AA EVACUATING BUILDING IN EMERGENCY SITUATION IF PLANT REPLACEMENT HATCH IS OPEN LIVE
MANAGEMENT/REM
DATE

24 AUG 2017 BATHROOM BATHROOM POD TYPES G&H (4360 X 1750MM) ARE TOO LARGE TO GO THRU THE NORMAL DOORS AND GOODS PODS CAN BE BROUGHT TO THE SITE IN TWO COMPONENTS AND JOINED WITHIN THE APARTMENT AS PER THE DEBA/AA/CHAPMAN BDSP/MACE TRADE CONTRACTOR TO PROVIDE DETAILED METHOD STATEMENT FOR THE INSTALLATION.
DR-37 AA LIFT (2350 X 1750MM). MANUFACTURES INSTRUCTIONS. LIVE

RISK REGISTER
DPG

DISCLAMER LEGEND - RISK REGISTER


DRAWN

INDICATES A RESIDUAL RISK INDICATES A RESIDUAL RISK


THIS DESIGN RISK / HAZARD REGISTER IS TO BE READ IN CONJUNCTION WITH THE OTHER CONSULTANTS RISK / HAZARD REGISTERS. THIS REGISTER IS A LIVE DOCUMENT AND WILL BE UPDATED AND COORDINATED WITH RELEVANT CONSULTANTS AND CONTRACORS TO IDENTIFY AND DOCUMENT SIGNIFICANT HAZARDS / RISKS WHICH MAY HAVE AN IMPACT ON THE SAFE XX XX REQUIRING A PROHIBITIVE ACTION
XX FOR REF. NUMBER SEE EA-0015
REQUIRING A COMPULSORY ACTION
CONSTUTCION, MAINTENANCE, OPERATION AND EVENTUAL DEMOLITION OF THE STRUCTURE.

ALL SIGNIFICANT RESIDUAL RISKS WILL BE RECORDED AND IN CONSULTATION WITH THE DESIGN TEAM AND PRINCIPAL CONTRACTOR, MITIGATION MEASURES WILL BE IDENTIFIED SO FAR AS IS REASONABLY PRACTICABLE, TO CONTROL THESE RISKS / HAZARDS DURING THE CONSTRUCTION PHASE. INDICATES A RESIDUAL RISK SCALE @ A0 DATE CREATED
XX INDICATES A RESIDUAL
FOR INFORMATION XX RISK AS A WARNING As indicated 11 NOV 2015
16 APR 2018

WHERE RESIDUAL RISKS REMAN ON COMPLETION OF THE CONSTRUCTION PHASE, THESE WILL BE RECORDED ALOGN WITH SUPPORTING CONTROL MEASURES, IN THE HEALTH & SAFETY FILE ISSUED TO THE CLIENT AT THE END OF THE PROJECT.
PROJECT NO.
16/04/2018 14:42:54
QUALITY CHECK

1428-00
DRAWING NO. REV.
DATE

EA-0015 G