Republic of the Philippines

Department of Public Works and Highways


Region X
OFFICE OF THE DISTRICT ENGINEER
Lanao del Norte 2nd Engineering District
Seminary Drive, Del Carmen, Iligan City, Tel. No. 221-5703/ Fax No. (063)-221-0217

SITE INSTRUCTION No.2


(Notice To Undertake Works Included In The Contract)

Name of Project : PROVISION OF DRAINAGE CANAL ALONG LINAMON –


ZAMBOANGA ROAD, BRGY. PIGCARANGAN, TUBOD, LANAO
DEL NORTE, K1585+550 – K1585+750

Location : Tubod, Lanao del Norte


Date : June 09, 2021

TO:

JIZAN BUILDERS
Brgy. Poblacion, Balindong, Lanao del Sur

Please be informed that during site inspection last June 09, 2021 the following were
observed:

1. There were no visible safety signage and early warning signs installed on the project
site.
2. Construction workers were not wearing proper Personal Protective Equipment.
3. Provide Mixing pan During concrete mixing.

In this regard, you are hereby instructed to make necessary actions regarding to above
stated deficiencies.

For your compliance.

Your cooperation and compliance will be highly appreciated.

NORODIN T. BATABOR
Project Engineer
DPWH

DPWH | Project Implementation Forms – Project Management Form C-07


Republic of the Philippines
Department of Public Works and Highways
Region X
OFFICE OF THE DISTRICT ENGINEER
Lanao del Norte 2nd Engineering District
Seminary Drive, Del Carmen, Iligan City, Tel. No. 221-5703/ Fax No. (063)-221-0217

SITE INSTRUCTION No.2


(Notice To Undertake Works Included In The Contract)

Name of Project : Off-Carriageway Improvement including Drainage, Flaring


of Intersection along Linamon-Zamboanga Road. KM
1536+701 – KM1545+369 Lanao del Norte

Location : Lanao del Norte


Date : April 12, 2017

TO:

SAIMAN CONSTRUCTION DEVELOPMENT


Block 11 Lot 10 Phase 4 Apitong St., Doña Maria Subdivision
Tubod, Iligan City

Please be informed that during site inspection last April 11, 2017 the following were
observed:

4. There were no visible safety signage and early warning signs installed on the project
site.
5. Construction workers were not wearing proper Personal Protective Equipment.

In this regard, you are hereby instructed to make necessary actions regarding to above
stated deficiencies.

For your compliance.

ALDYN R. QUINTO
Project Engineer
DPWH

DPWH | Project Implementation Forms – Project Management Form C-07


Republic of the Philippines
Department of Public Works and Highways
Region X
OFFICE OF THE DISTRICT ENGINEER
Lanao del Norte 2nd Engineering District
Seminary Drive, Del Carmen, Iligan City, Tel. No. 221-5703/ Fax No. (063)-221-0217

SITE INSTRUCTION No.3


(For Non compliance With Contract Specifications)

Name of Project : Off-Carriageway Improvement including Drainage, Flaring


of Intersection along Linamon-Zamboanga Road. KM
1536+701 – KM1545+369 Lanao del Norte

Location : Lanao del Norte


Date : April 17, 2017

TO:

SAIMAN CONSTRUCTION DEVELOPMENT


Block 11 Lot 10 Phase 4 Apitong St., Doña Maria Subdivision
Tubod, Iligan City

Please be informed that during site inspection last April 18, 2017 the following were
observed:

1. Aggregates delivered on site for subbase does not conformed on Item 200
Material Requirements.
2. There were no visible Vibratory Roller and Motorized Road Grader on site.

This is contrary to the contract plans and specifications specifically on ITEM 200(1)
Aggregate Subbase Course, and the pledge equipment as per POW wherein, on ITEM
200(1) the Aggregate for subbase shall consist of hard, durable particles of fragments of
crushed stone, crushed slag, or crushed or natural gravel and filler of natural or crushed
sand or other finely divided mineral matter and the subbase material shall conform to Table
200.1, Grading Requirements Refer to DPWH Blue Book

In addition, to fast track the project implementation specially the on-going subgrade
preparation, all pledge equipments shall be present on site.

In this regard, you are hereby instructed to make necessary corrections and action
regarding to above stated deficiencies.

Your usual cooperation and compliance to this finding is earnestly desired.

ALDYN R. QUINTO
Project Engineer
DPWH