Barge Superintendent NPCC
Barge Superintendent NPCC
Barge Superintendent NPCC
Objective:-
Area of expertise: - logistical operations, operations planning leadership, job anchor patterns
Pipe lays, barge and anchor repositioning, tower operation management, heavy lift operation
on DP barges, full knowledge of subsea construction.
Personnel information:-
EDUCATIONAL ATTAINMENT:-
*As the Barge Superintendent's representative, supervise and issue work instructions to
construction crew for the overall safe installation of the project, as specified by the
project Installation Procedures.
*Directly reports to the Vessel Superintendent and responsible for all deck activities
Will organize via his respective subordinates anchor patterns, run anchors and moor
barge at work locations in accordance with job requirements, Company and Client
procedures
* Responsible for refusing unsafe work and for carrying out all work in accordance with
established HSES Safety Standards and work practices
*Responsible for following the instructions and fulfilling the responsibilities within the
Emergency Response procedures and advising crews on their responsibilities
Second responsible person in charge of above deck operations crew, and other support
vessels assigned within spread. ROV Intervention, Sub Sea construction projects
*ensure continuity of works and to report on progress
*Responsible for refusing unsafe work and for carrying out all work in accordance with
the established HSES Safety Standards and Work Practices
*Familiarity with the contents of the offshore operations HSES procedures, ensuring
that all supervisory personnel are also aware of the procedures
*Following the instructions and responsibilities within the Emergency Response
*Procedures and advising crew of their responsibilities
Chair interface meetings/pre shift meetings with all shift supervisors to discuss planned
events, and to ensure regular lines of communications are adhered to by all supervisors
to maximize safety/efficiency/productivity
Ensuring manning levels are maintained for safe operations of the projects
*in charge of positioning of anchors and setting up the barge for construction
operations.
* Monitors position of the barge in repositioning anchors onto the seabed with Anchor
Handling Tugs (AHT) in order for the barge to maintain heading and bearing as barge
lays the pipeline, final laydown and moving location.
*Assist the Barge Foreman in setting up the barge on work locations.
* Prepare anchors, pennant wires and different types of buoys during barge
mobilization. • Check the condition of the barge mooring system i.e. anchor winches
and anchor wires, and report findings to the Barge Foreman.
* Plot anchor positions as depicted in the approved anchor pattern; in the absence of
such a pattern, plan and plot positions with the concurrence of senior colleagues.
* Monitor the position of a barge during repositioning of anchors onto the seabed with
Anchor Handling Tugs (AHTS) to ensure that the barge is well positioned through all
phases of the lay operation.
*In charged and involved with all marine spread movements inside the field.
*worked as Tower Operator and winch operator from 1989 to 1997.
Computer Skills:
Diploma in computer applications, MS Office (word, excel) and full knowledge about
all internet and E-mail applications.
-Working onboard SEP-750 for EPC Work for Umm Lulu Field
Development project (Client: ADNOC OFFSHORE)
-Worked onboard SEP-750 for EPC Work for Umm Lulu Field
Development project (Client: ADNOC OFFSHORE)
-Worked at Bu Haseer field lying of pipe line and raiser installation and cable lay
-Worked onboard DLB-750 for EPC Work for Sectional Replacement
Of 42" N mol Oil Pipeline from ZCC to Zirku (Client: ADNOC OFFSHORE)
-Worked at Npcc jetty with full responsible about the load-out of umm lulu super complex
-Worked onboard DLB-1000 for EPC work For Umm Lulu Field
Development Project (Client: ADNOC OFFSHORE)
-Worked onboard SEP-350 for UZ750 EPC-1 Pipe laying, cable laying
Off. Structure & Brownfield Work (Client: ZADCO)
-Worked onboard HLS-2000 for MHNRD Phase-III Wellhead Platform Project at Mumbai
Offshore (Client: ONGC)
Worked onboard PLB-648 for Zakum Oil Line Replacement Project Phase I (Client
ADMA OPCO.
-Worked onboard PLB-648 for Zakum Field Development Project, UZ-750 EPC-1 Pipe laying
Cables, and Offshore Structure & Brownfield Works (Client: ZADCO)
-Worked onboard PLB-648 for Zora Gas Development Project in Sharjah offshore -
Laying and Pre-commissioning of Offshore and Onshore Pipe Line. (Client: DANA GAS, Sharjah)
-Worked onboard DLB-1000 for Zakum Field Development Project, UZ-750 EPC-1
Pipe laying, Cables, Offshore Structure & Brownfield Works. (Client: ZADCO)
-Worked onboard DLB-1000 for Zakum Field development Project, UZ-750 EPC-1
Pipe laying, Cables, Offshore Structure & Brownfield Works (Client-Zadco)
-Worked onboard DLB-1000 for Zakum Field development Project, UZ-750 EPC-1
Cables, Offshore Structure & Brownfield Works (Client: ZADCO)
-Worked onboard DLB-1000 for barge preparation for ZADCO Brownfield Project
-Worked onboard PLB-648 for Subsea Pipelines, Cables, Offshore Structure & Brownfield Work (EPC1)
(Client: ZADCO)
-Worked onboard DLB-1000 for Al Nasr & Umm Lulu Phase-1 Development Project
Offshore Jacket, Pipeline and Deck Installation (Client: L&T / ADMA OPCO)
-Worked onboard DLB-1000 for pipe laying job of Satah Full Field Development Project (Client :
ZADCO)
-Worked onboard PLB-648 for pipe laying job of Satah Full Field Development Project (Client :
ZADCO)
-Worked onboard DLB-1000 for Replacement of Water Injection Lines In Zakum & Umm Shaif Fields
(Client: ADMA-OPCO)
-Worked onboard PLB-648 and SEP-150 for ZCSC DE mothballing Project in Zakum field (Client :
ADMA-OPCO)
-Worked onboard PLB-648 for Integrated Gas Development Project (IGD-HAP in Abu Dhabi
Field (Client: Adma Opco)
-Worked onboard PLB-648 for Integrated Gas Development Project (IGD-HAP in Abu Dhabi
Field.(Client: Adma Opco)
-Worked onboard DLB-1000 for Integrated Gas Development Project (IGD-HAP in Abu Dhabi
Field (Client: Adma Opco)
-Worked onboard DLB-1000 for Integrated Gas Development Project (IGD-HAP in Abu Dhabi
Field (Client: Adma Opco)
-Worked onboard DLB-1000 for US 40/56 and 40/24 Jacket Installation Project at Umm Shaif
Field (Client: Adma Opco)
-Worked onboard DLB-750 for pipelaying, Riser & Tie-in installation of B-22 Field Development Projec
In Mumbai offshore (Client: ONGC)
-Worked onboard DLB-750 for Adma Opco WHT US-251 and Associated Pipelines- USGIF
-Worked onboard DLB-1000 for Adma Opco Project – GPF Jacket Piles Installation, Flare tripd
B11 Bridge Support Tripod & Protective Shroud installation
-Worked onboard HLS-2000 for Installation of US 40/56 and 40/24 Jacket Installation – Adma opco
-Worked onboard DLB-750 for EPC Project 2 – Offshore Pipe Line Project for OAG Project –Adma
-Worked onboard DLB-1000 for EPC Project 2 – Offshore Pipe Line Project for OAG Project
-Worked onboard DLB-750 for QG-II Development Project at Qatar Oil Field – Qatar Gas
-Worked onboard DLB-750 for ONGC C-Series Well Platform Project at Mumbai High – India
-Worked onboard DLB-1000 for Sime Darby Engineering- Pipe Lay, Jacket and Deck
Installation at BH&MM
-Worked onboard DLB-1000 for pipe laying 6 nos at Zakum Field – Adma Opco
-Worked onboard PLB-648 for 42’’ pipeline shore pull activities at Safaniya field – Saudi
Aramco
-Worked onboard DLB-750 for laying of 20’’ pipeline & SPM installation for Maersk – Qatar
-Worked onboard DLB-1000 pipe laying of 42” / 30” lines in Aramco & installation of jacket in
Aramco Laying of 42” P/L in Umm Shaif (ADMA-OPCO)
-Worked onboard DLB-750 laid 3 pipelines in Bombay High for ONGC and shifted the
Pipeline
-Worked onboard DLB-1000 at Umm Shaif Arab-D Project of ADMA-OPCO installed 7 decks
Lay of several crossing pipelines, Installed 14 risers different sizes, repaired damage
Pipelines
- Worked onboard DLB-750 & HLS-2000. Pipeline, Cable lay, Jacket & Bridge installation at
Al Shaheen Field for Maersk Oil, Qatar
-Worked onboard Rosamund for Installation of Riser and laid 12” P/L at Port Harcot, Nigeria
-Worked onboard “Regina 250” VM Ltd. Installation of Deck & Jacket “India”
Worked onboard Rosamund Sirrpi Alustee Nigeria Laying of 12” 6” pipe lines and
Installation of risers and hook up works
-Worked onboard Regina 250 VM for installation of SBM, India Sipem – Jam Nagar
-Worked onboard DLB-750 pipeline, Riser, Tie-in & Plem installation at Tapti Field for Enron
India.
-Worked onboard HLS-2000 star jacket & deck installation at Al shaheen field for Maersk Oil,
Qatar.
-Winch Operator – Load out Deck to LB for Qatar Gas at Mussafah Base.
-Worked onboard DLB-750, removal of old SBM & installation new SBM & pipe lay - Jabal
Dana for ADCO
HLS-2000 Oil Loading Berth & Loading arms for ADNOC, Abu Dhabi.
DLB-750 Pipeline, Flexible, Hoselay, riser, tie-in & Plem installation at Heera field & Bombay
High Field
-Worked Onboard DLB-750 pipelines and risers at Heera Field for ONGC, India
DLB-750 riser, Tie-in job, sleepers & free span correction (grouting) – Zuluf Safania & Berri
Field for Saudi Aramco
-HLS-2000 Jacket, Deck & Hook Up job at Bombay High & Field for ONGC.
-Worked onboard HLS-2000 deck installation and hook up job Heera Field and Bassin Field
For ONGC - India
:
-PLB-648 pipe lay & risers & tie-in & sleepers set up – at Umm Shaif field for ADMA-OPCO,
Abu Dhabi.
-Worked onboard HLS-2000 deck installation at Zuluf Field for Aramco, Saudi Arabia
-Construction barge (CB-II) sleeper’s setup & risers & tie-in at Zakum Field for ZADCO, Abu
Dhabi
-DLB-1000 Pipe laying Das Island to Umm Shaif Field for ADMA – OPCO, Abu Dhabi.
-PLB-648 Pipeline, riser & tie-in at Umm Shaif Field for ADMA-OPCO, Abu Dhabi.
-DLB-1000 Recover of old living quarters (module) and installation of new modules at
Bulhaninem Mydam Mazham & Al Idd Al Sharqi Field for QGPC, Qatar
-Worked onboard HLS-2000 jacket & deck installation Zuluf field for Aramco, Saudi Arabia
-HLS-2000 deck installation & hook up job Bombay High Field for ONGC, India.
-PLB-648 pipeline & riser Free span Correction (grouting) Umm Shaif field for ADMA OPCO,
Abu Dhabi.
Computer Skills:
Diploma in computer applications, MS Office (word, excel) and full knowledge about all
internet and E-mail applications