Muhammad Arif Abdul Hameed (B.Sc. Mechanical Engineering) 27 Years in Construction and Maintenance

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Muhammad Arif Abdul Hameed (B.Sc.

Mechanical Engineering)
27 Years in Construction and Maintenance
AL SHERAZ VILLA - MUHAMMAD AKBAR QURESHI Greenland
Engineering Street Civil Hospital - DASKA District SIALKOT - PAKISTAN.

PHONE: +92 323 7049269

E Mail: < engrmarifm786@gmail.com >

SUMMARY
A qualified and highly experienced engineer with 27 years of working experience as Project
Manager/ Construction Manager/ Engineering Manager (Maintenance and Development)
in Construction and Maintenance in Green and Brown fields in PAKISTAN and SAUDI
ARABIA/ SABIC Plants for New Projects, Upgradation, Revamping, Optimization, De-
Bottlenecking and Expansions of industrial plants in Oil & Gas, Petrochemical and
Chemical plants.

Experience
PROJECTS & MAINTENANCE

 Projects Execution ( Green field ) - Petro Chemical Plants, Oil Refineries, Pure Terephthalic Acid
(PTA) Plant, Chlor-Alkali Plants, Power Plants, Cement Plants, Pulp & Paper Mill, Bio Gas Plant,
Oil Terminal, Spinning Mills
 Revamping / Optimizing/ Upgrading/ Debottlenecking ( Brown Field ) - Petro Chemical Plants,
Alcohol Distillation Unit, LPG skids, CO2 Gas Plant, Bio Gas Plant, Cement Plants, Pulp Mill, Chlor
Alkali Plant.
 Erection/ Installation and Commissioning of Mechanical Equipments.
 Pre commissioning Activities (Air Blowing, Cleaning, Chemical Cleaning and Re-instatement)
 Mechanical Maintenance - ROTATING and STATIC EQUIPMENTS
 Handle TURN AROUND, SHUT DOWN & BREAKDOWN Maintenance of Plants and
Machines.
 Ensuring SAFE, EFFICIENT and OPTIMAL OPERATABILITY of the plant, its operating units
and systems.
 Use of Computer Software (SAP) for inventory control, reporting and indenting of materials for
maintenance of production units and equipments.
 Implementing RCA (Root Cause Analysis) for rotary and static equipments/ machines.
 Preparing YEARLY BUDGET for maintenance activities and Mechanical Equipments.
 Prepare Comparative Statements, Technical Evaluations, Inspections of Mechanical Equipment,
Method Statements, Job Safety Analysis, Departmental Procedures and Job Descriptions
 Active member of Energy Conservation Task Team for Plants.
 Responsible for NEW SOURCE DEVELOPMENT for Materials and Services for Plants.
 Conduct frequent site visits to ensure PROPER EXECUTION OF WORK and check on the
activities of DIRECT HIRED and CONTRACTED TECHNICIANS engaged in maintenance
activities.
 Manage and oversee the day-to-day construction management of the project.
 To plan, develop and organize the construction effort to formulate the most cost-effective plan to
timely completion within budget and to implement the execution of that plan.
 Ensures all changes to specifications, work scope and drawings are documented
 Define clear roles & responsibilities and deliverable requirements in terms of both scope and
schedule to all the team members.
 Monitor construction productivity and schedule performance and investigate reasons for less
than satisfactory performance.
 Provide recommendations and institute measures for improvement by modification to operating
procedures/work instructions.
 Study job specifications to determine appropriate construction methods.
 Adhere to Company Safety Standards and promote safety culture among the ranks throughout the
Company.
 Coordinate with the Mechanical Workshop team to ensure that machining, fabrication and metal
works, such as cutting, threading, slotting, drilling, lathing, milling, turning and painting, are carried
out in timely and quality manner that helps increase the availability and reliability of these equipment.
 Ensure that PREVENTIVE MAINTENANCE PLANS prepared for all rotating and static
mechanical equipment are carried out as per schedule and plan.
 Work closely with Operations Area Supervisor and Engineering supervisors in recommending and
implementing changes aimed at IMPROVING the AVAILABILITY and RELIABILITY of
ROTATING and STATIC MACHINES/EQUIPMENTS within the designated area of
responsibility.
 Ensure that assigned contractor personnel have all needed resources and tools to conduct routine
maintenance activities effectively and according to the contract terms and conditions.
 Preparing COST ESTIMATES, PURCHASE ORDERS and maintenance plans and schedules for
mechanical maintenance activities in coordination with the concerned personnel in planning.

CAREER DETAILS

Company: SENDAN INTERNATIONAL www.sendan.com.sa, www.sabic.com


SABIC –Kingdom Of Saudi Arabia
Position Construction Manager – SADAF / SAFCO/ KEMYA
Period March 23, 2016 to Date

Company: PREMIER INDUSTRIAL CHEMICALS www.premierindustrialchemicals.com


Alcohol, CO2 Gas, Bio Gas Plant
Position Senior Manager Mechanical Projects
Period Jan 2015 to Feb 2016

Company: ITTEHAD CHEMICALS LIMITED www.ittehadchemicals.com


Chlor-Alkali Plant
Position Manager Projects & Engineering
Period August 2002 to November 2012

Company: DESCON ENGINEERING LTD www.desconengineering.com; www.parco.com.pk

Position Senior Project Engineer - PAK ARAB Refinery Co. (PARCO)


Period 2000-2001

Company: ENGINEERING KINETICS LTD www.ekl.com; www.arl.com.pk

Position Senior Project Engineer - Attock Refinery Co. (ARL)


Period 1999-2000
Company: DESCON ENGINEERING LTD www.desconengineering.com; www.lottechem.pk

Position Project Engineer - ICI PTA PROJECT


Period 1998-1999

Company: LUCKY CEMENT LTD www.lucky-cement.com


CEMENT PLANT
Position Assistant Manager Projects
Period 1995-1996

Company: DESCON ENGINEERING LTD www.desconengineering.com

Position Project Engineer - LUCKY CEMENT PLANT


Period 1994-1995

MEMBERSHIP
 Pakistan Engineering Council

SKILLS
Procedure, Method Statement, JDs and Reports writing, Implementation of quality and environmental
systems, Documentation, Estimation, Indenting, follow up and coordination.

SOFTWARES USED
MS PROJECT, PRIMAVERA, SAP, ERP

COMPUTER SKILLS
MS Office, MS OUTLOOK, Using Internet and other tools of Computer.

Trainings & Workshops

 Internal Environmental Audit

 Maintenance Management

 Time Management

 Planning – DESCON Engineering

 Personality and Character Building

 Safety and Loss Prevention ICI –U.K; DESCON Engineering

 Quality Control ISO 9001

 Energy Efficiency in Refrigeration and Air conditioning

 Decision Making

 Workshop on Vibration Analysis Level -1

 Material Problems and Their Countermeasures


 HAZOP Study Workshop

 Budget Preparation; Strategy & Best Practice

 Awareness & Implementation of Energy Management System ISO 50001:2011

 Personal Effectiveness

 Total Productive Maintenance

 The Making of Safety Officer

 Several in House Trainings regarding HSE

PROFESSIONAL QUALIFICATIONS

Degree Institution

B.Sc. Mechanical Engineering University of Engineering & Technology,


Peshawar. In 1989 (1st Division)

F. Sc. (Pre-Engineering) Federal Government Degree College,


Peshawar Cant. In 1983(1st Division)

Matriculation Govt. High School NO. 2, Peshawar City .


In 1980(1st Division)

PERSONAL DETAILS

Name MUHAMMAD ARIF


Father's Name ABDUL HAMEED
N.I.C. No 346011-685331-9
Passport No DG0163311
Religion ISLAM
Date of Birth 1-1-1964
Country PAKISTAN
Gender Male
Languages English, Urdu, Punjabi. Pashto

You might also like