Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

General Notes:: CGPC Proposed 2 Storey Residential Building

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

GENERAL NOTES: OTHERS: PVC DRAIN PIPE


BRANCH VENT
FINISH FLOOR
R.C. SLAB MAIN VENT
STACK
1. PIPES SHALL BE INSTALLED AS INDICATED, ANY RELOCATION REQUIRED FOR C.O.
MORTAR GROUTING
OFFICE OF THE BUILDING OFFICIAL
1. ALL PLUMBING WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE 2" Ø PVC LOOP VENT
PROPER EXECUTION OF OTHER TRADES SHALL BE PRIOR APPROVAL OF THE PVC WYE CITY OF CEBU
REQUIREMENTS OF PHILIPPINE NATIONAL PLUMBING CODE AND THE RULES AND
ENGINEER. PVC WYE
REGULATIONS OF THE EXISTING LOCAL CODES AND ORDINANCES OR LAWS SANITARY TEE
RECOMMENDING APPROVAL:
2. PROPOSED SANITARY UTILITIES SHALL CONFORM TO ACTUAL LOCATION, DEPTH
GOVERNING THE IMPLEMENTATION OF THE PLUMBING WORKS. PVC DRAIN PVC WYE
AND INVERT ELEVATIONS. C.O.
PIPE PVC DRAIN BENT MAIN VENT
2. REFER TO ALL ELECTRICAL, STRUCTURAL AND ARCHITEDTURALPLANS AND 8 BEND) PIPE STACK
3. ALL FIXTURES SHALL BE VENTED, UNLESS OTHERWISE INDICATED. CHANGE OF HORIZONTAL FLOOR CLEAN OUT
SPECIFICATION AND INVESTIGATE ALL POSSIBLE INTERFERENCE AND CONDITION HORIZONTAL TO
DIRECTION MAJOR SPACE
MAIN VENT STACK
AFFECTING THE PLUMBING WORKS. VERTICAL
FINISH FLOOR
3. IT IS NOT INTENDED THAT THE DRAWING SHALL SHOW EVERY PIPE FITTING, R.C. SLAB FINISH FLOOR
HEAD PLUMBING SECTION DATE
VALVE AND APPLIANCES. FURNISH AND INSTALL, IF NECESSARY, ALL SUCH ITEM LEGEND: FD C.O.
MORTAR GROUTING
CHB WALL
CLEAN OUT PLUG C.O.
R.C. SLAB
MORTAR GROUTING
APPROVED BY :
SPECIALLY MENTIONED OR NOT, OR INDICATED ON THE DRAWING, TO COMPLETE THE WC WATER CLOSET WATER SUPPLY LINE
WYE P-TRAP
SYSTEM IN ACCORDANCE TO THE BEST PRACTICE OF THE PLUMBING TRADE AND LAV LAVATORY WASTE/SOIL LINE BENT
WYE
SATISFACTION OF THE ENGINEER/OWNER. SHO SHOWER HEAD AIR VENT LINE PVC P-TRAP PIPE
PVC DRAIN BUILDING OFFICIAL DATE
PVC DRAIN
4. PERFORM ALL LABOR IN A FIRST CLASS, NEAT, WORKMANLIKE MANNER BY GATE VALVE STORM PIPE LINE PIPE PVC DRAIN
PIPE BENT
SPECIALIST SKILLED IN THEIR TRADES, AND SUCH SPECIALIST AND THEIR WORK CHECK VALVE VTR VENT THRU ROOF PVC WYE
HORIZONTAL TO HORIZONTAL P-TRAP DETAIL WALL CLEAN OUT FLOOR CLEAN OUT
SHALL BE SATISFACTORY TO THE ENGINEER. DS DOWNSPOUT FD FLOOR DRAIN
CO CLEAN OUT FA FAUCET

BASIC MATERIALS: FITTINGS & CONNECTION DETAILS


SCALE NTS
1. PROVIDE MATERIALS THAT ARE NEW AND THAT CONFORM WITH THE STANDARD
OF UNDERWRITERS LABORATORIES. INC.
2. FOR OTHER MISCELLANEOUS REQUIRED MATERIALS NOT SPECIFICALLY
MENTIONED, PROVIDE THE BEST OF THE RESPECTIVE KIND.
3. SUBMIT SAMPLES OF MATERIALS FOR APPROVAL AS REQUIRED BY THE OUTLET
3.88
ENGINEER/OWNER.
0.15 0.82 0.15 0.82 0.15 1.64
PLUMBING FIXTURES:
1. INSTALL ALL PLUMBING FIXTURES FREE AND OPEN IN A MANNER TO ACCESS 10MM PLAIN
10MM REBAR ROUND BAR
FOR CLEANING. FURNISH WITH BRACKETS, CLEATS, PLATES AND ANCHORS REQUIRED 0.15 IN BETWEEN BENT-UP
LIFT BAR 10 mm Ø EXTRA BAR
TO SUPPORT THE FIXTURES RIGIDLY IN PLACE.
2. KEEP AWAY, AT A SUFFICIENT DISTANCE BUT NOT LESS 21" (12.5MM) ALL SERVICE C.I. CO

PIPES, VALVES AND FITTINGS FROM SURFACES AND LOCATIONS WHICH MAY REQUIRE C.I. CO
FINISH COATS OR COVERING. 10 mm Ø @ 0.15 O.C.
3. EXTEND THE PIPING TO ALL FIXTURES, OUTLETS, AND EQUIPMENTS FROM 0.10 1.12 0.82
REQUIRED GATE VALVES INSTALLED IN EACH BRANCH NEAR RISERS.
MANHOLE MANHOLE MANHOLE
0.50m x 0.50m 0.50m x 0.50m 0.50m x 0.50m
SOIL, WASTE, DRAIN AND VENT PIPINGS: 0.20
1. INSTALL ALL PIPING WORKS IN CONFORMITY WITH ALL PROVISIONS OF THE C.I. CO
LATEST EDITION OF THE PHILIPPINE NATIONAL PLUMBING CODE AND APPLICABLE 0.15
0.10
REQUIREMENTS OF THE EXISTING LOCAL CODES. PVC PIPE SPACED @ 0.40m
2. EXCAVATE TO REQUIRE DEPTHS AND GRADES. ALL EXCAVATIONS REQUIRED 10mm Ø BARS O.C.)
FOR THE INSTALLATIONS OF PLUMBING AND DRAINAGE SYSTEM WHEN ROCK IS 0.10 0.40 0.10 10mmØ TEMP. BARS
ENCOUNTERED, EXTEND THE EXCAVATION TO A DEPTH 150MM. BELOW THE PIPE 0.60
BOTTOM OF THE PIPE AND ROCK SURFACE WITH SAND AND APPROVED MATERIAL. PLAN INLET
3. LAY WATER SUPPLY PIPES AND SEWERS IN SEPARATE TRENCHES. 10MM PLAIN
10MM REBAR ROUND BAR 12mmØ BAR
12mmØ LIFT BAR 12mmØ LIFT BAR
LIFT BAR 12mmØ LIFT BAR
PLUMBING PIPES AND FITTINGS: FIN. GRD. LINE C.I. CO C.I. CO C.I. CO C.I. CO
0.075 0.45 0.075
1. ALL MATERIALS TO BE USED MUST BE OF HIGH QUALITY.
2. AIR CHAMBER TO BE PROVIDED FOR ALL WATER LINE OUTLETS. ALL NECESSARY
FITTING SHALL BE PROVIDED. 0.10
0.20M AIRSPACE MINIMUM
3. TEFLON TAPE FOR ALL WATERLINE CONNECTIONS APPLIED TO MALE THREADS INLET
ONLY.
OUTLET
4. MAKE ALL JOINTS AIR AND WATER TIGHT. FOR JOINING PIPES, USE THE
FOLLOWING:
4.1. PVC & CPVC PIPES : USE APPROPRIATE COUPLERS AND GLUE AT JOINTS. 0.60 0.40 4"Ø C.I. PIPE
4.2. PPR PIPES : WHEN CONNECTING WITH OTHER PIPE FITTINGS, DO NOT USE, IF . CHB)
POSSIBLE, MALE PIPE FITTINGS WITH CONIC THREAD AND HEMP AS A SEALING PVC PIPE 1.90 10mmØ VERT. BARS 1.50
MATERIAL TO AVOID BUCKLING STRESSES WHICH ACT ON FEMALE PIPE FITTING. @ EVERY JOINT

GUARANTY AND WARRANTY: 0.10


CEMENT PLASTER
1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS SUPPLIED AND THE LEACHING LEACHING DIGESTIVE CHAMBER PROVIDE WATER PROOF)
WORK TO BE FREE FROM FACTORY DEFECTS AND WORKMANSHIP FOR A PERIOD OF 0.10 0.40 0.10 WELL WELL 10mmØ HOR. BARS
ONE (1) YEAR. 5% SLOPE 5% SLOPE 10% SLOPE 10% SLOPE 10% SLOPE 10% SLOPE @ EVERY 3RD COURSE
0.60
2. ANY MATERIAL FOUND TO BE DEFECTIVE DURING THE TIME OF CONSTRUCTION
SHALL BE REPLACED BY THE CONTRACTOR FREE OF CHARGE.
SECTION 0.20 3-12mmØ TIES CON. BAR

SHUT - OFFS: 10mmØ TIES


O.C.)
PROVIDE THE ENTIRE SYSTTEM WITH VALVE SO LOCATED THAT THE SYSTEM OR CATCH BASIN DETAIL . SLAB)
PORTION OF IT CAN BE OPERATED, REPLACED AND REPAIRED, AS WELL AFFORDING SCALE NTS PROVIDE WATER PROOF)
COMPLETE CONTROL OF WATER SUPPLY TO EACH GROUP OF FIXTURES. WHEN SEPTIC TANK DETAIL 10mmØ BARS
REQUIRED, PROVIDE ALSO PRESSURE REDUCING VALVE. SCALE NTS
O.C.)

CLEAN OUTS:
1. FOR CLEAN OUTS STEMMING FROM PVC, PROVIDE WITH LONG SWEEP QUARTER
BENDS OR ONE OR TWO EIGHT BENDS, EXTENDED TO AN EASILY ACCESSIBLE PLACE,
AND GENERALLY WHERE INDICATED IN THE DRAWINGS

FROM THE OFFICE OF SEAL REG.NO. DESIGNED PROJECT TITLE APPROVED AS PER PLAN SHEET CONTENTS SHEET NO.
REG.DATE DRAWN
CGPC GENERAL NOTES
PTR NO. CHECKED PROPOSED 2 STOREY RESIDENTIAL BUILDING LEGEND
CATCH BASIN DETAIL
PTR DATE ISSUANCE

PTR LOCATION ISSUANCE


DATE LOCATION FITTINGS & CONNECTION DETAILS
SEPTIC TANK DETAILS
P 1
MR. & MRS. MARK MARTINOTE
TIN REV BRGY. SUDLON 2, CEBU CITY, CEBU OWNER
MASTER PLUMBER

You might also like