This document contains 6 assignment questions for 6 student groups on the topic of trigonometric leveling and setting out of construction works. It includes questions on corrections for refraction, determining elevation differences between points, setting out structures like bridges, culverts and tunnels. Students are asked to derive equations, explain concepts with diagrams, and solve numerical problems involving trigonometric leveling observations.
This document contains 6 assignment questions for 6 student groups on the topic of trigonometric leveling and setting out of construction works. It includes questions on corrections for refraction, determining elevation differences between points, setting out structures like bridges, culverts and tunnels. Students are asked to derive equations, explain concepts with diagrams, and solve numerical problems involving trigonometric leveling observations.
Unit No:-06 Trigonometric leveling & setting out of work (2018-19 ,Sem-VI)
Student group –I ( Roll No . 1 to 12 )
Que. Question details CO Bloom PO
No Level Que.01 Write a short note on Correction for refraction 06 02 Que.02 Explain with the sketch axis signal correction 06 02 Que.03 Derive an equation to determine difference in elevation between two 06 03 points having great distance between them and the observed vertical angle is an of elevation. Que.04 Determine the difference in level between two points P and Q from 06 03 the following observation: i) Horizontal distance PQ = 5620m ii)Reduced level of P =415.5m iii)Height of instrument at P=1.5m iv)Height of instrument at Q = 1.45 v) height of signal at P = 6.50m vi) height of signal at Q =4.54m vii)The angle of elevation from P and Q = 2020'24'' viii) The angle of elevation from Q and P = 2020'34'' Que. 05 Explain with neat sketch setting out of bridge 06 02
Student group –II (Roll No. 13 to 24)
Que. Question details CO Bloom PO
No Level Que.01 Explain the setting out work by centre line method for load bearing 06 02 structure Que.02 Explain the setting out work by centre line method for framed 06 02 structure Que.03 Derive the expression for the difference of level between two point A 06 03 and B a distance D apart , with the vertical angle as the angle of elevation from A to B . The height of the , Instrument at A and that of the signal at B are equal Que.04 Determine the difference in level between two points A and B from 06 03 the following observation: i)Height of instrument at A=1.45m ii)Height of instrument at B = 1.55 iii) height of signal at A= 4.5m iv) height of signal at B =3.6m v)The angle of elevation from A and B = 1054'42'' vi) The angle of elevation from B and A = 1054'30'' horizontal distance between A and B =5800m Find the difference in level between A and B and the refraction correction. Take R sin 1''=30.88m Que. 05 Describe in brief location survey of along bridge. 06 02 Student group –III (Roll No . 25 to 36 )
Que. Question details CO Bloom PO
No Level Que.01 Explain the setting out work for culvert. 06 02 Que.02 Write a short note on Correction for Curvature 06 02 Que.03 Derive an equation to determine difference in elevation between two 06 03 points having great distance between them and the observed vertical angle is an of elevation. Que.04 The vertical angle of elevation was observed from a station P as 06 03 2032'25''. Determine its true value if the height of instrument at P is 1.2m and height of signal at other station Q is 5.2m. The two station P and Q are 5200 m apart . Take Rsin1" =30.88m. Que. 05 Explain the effect of curvature & refraction. 06 02
Student group –IV ( Roll No . 37to 48 )
Que. Question details CO Bloom PO
No Level Que. Define Coefficient of refraction with formulae 06 02 01 Que. Write a short note on combined Correction 06 02 02 Que. The following observation were taken in a trigonometric levelling survey 06 03 03 angle of depression to P at Q =1025'22'' , Height of instrument at Q = 1.35 m, Height of signal at p =4.25 m , Horizontal distance between P and Q =6945m Coeff. Of refraction =0.07 . If the R.l. of Q is 455.32 m, calculate R.l.of P Que. The following reciprocal observation were made from two points A &B 06 03 04 i)horizontal distance between A and B=4950m ii)The angle of Elevation of B at A= 1005'20'' iii) The angle of Elevation of A at B= 1001'05' iv) height of signal at A = 6.25m v) height of signal at B=6.35m Vi)Height of instrument at A=1.45m Que. Explain the a neat sketch how to the alignment of tunnel is transferred 06 02 05 from surface to the underground ?
Student group –V (Roll No . 49 to 60 )
Que. Question details CO Bloom PO
No Level Que.01 Describe in brief location survey of along bridge . 06 02 Que.02 What do you understand by setting out of work ? 06 02 Que.03 Determine the difrence in level between two points P and Q from the 06 03 following observation: i) Horizontal distance PQ = 5620m ii)Reduced level of P =415.5m iii)Height of instrument at P=1.5m iv)Height of instrument at Q = 1.45 v) height of signal at P = 6.50m vi) height of signal at Q =4.54m vii)The angle of elevation from P and Q = 2020'24'' viii) The angle of elevation from Q and P = 2020'34'' Que.04 Explain with the sketch axis signal correction. 06 03 Que. 05 Explain the setting out work for culvert. 06 02
Student group –VI (Roll No. 60 to 68)
Que. Question details CO Bloom PO
No Level Que.01 Explain in details setting out of tunnel site. 06 02 Que.02 Describe the survey for transferring the surface alignment through the 06 02 shaft . Que.03 Derive an equation to determine difference in elevation between two 06 03 points having great distance between them and the observed vertical angle is an of elevation. Que.04 Find the difference of level of the point P and Q and the R L of P 06 03 from following data i)horizontal distance between P and Q =7118m ii)The angle of elevation from Q at P = 1032'12'' iii) height of signal at P = 3.87m iv) height of signal at Q =1.27m v) Co -efficient of refraction =0.07 R.L. of Q =417.860 m take R sin1" =30.88 Que. 05 Describe the brief how location survey for pier of a bridge is carried 06 02 out at site.