Installation Guide
Issue: 05
Part Number: 31504449
Date: 2009-03-05
Safety Information 2
1. Information About the Installation 3
2. Installing the BBU in the APM30 8
3. Installing the BBU in the APM30H 15
4. Installing the BBU in the APM30 (+24 V) 17
5. Installing the BBU in the 19-Inch Cabinet 19
6. Installing the BBU on the Wall 23
7. Installing the BBU in the PS4890 Cabinet 28
8. Installing the BBU in the OMB Cabinet 33
9. Installing the BBU in the TMC 39
10. Installing the BBU in the TMC11H 41
11. Checking the Power-On Status of the BBU 42
12. Reference 43
1
Safety Information
Following All Safety Precautions
Before any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Symbols
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.
Safety of Personnel
• The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
• Non-standard and improper high voltage operations may result in fire and electric shock.
• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
• Power off the device before performing operations on the power supply equipment.
• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
• When working at a height, be cautious about falling objects.
Device Safety
• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
• The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
• The NodeB must be powered on within one week after installation.
2
1 Information About the Installation
a Installation Tools
3
1 Information About the Installation
b Installation Scenarios
1.APM30 2.APM30H
BBU BBU
3.TMC 4.TMC11H
BBU BBU
4
1 Information About the Installation
b Installation Scenarios
BBU
BBU
BBU
BBU
BBU
5
1 Information About the Installation
c BBU Hardware and Cables
1. Appearance of the BBU (Unit: mm)
6
1 Information About the Installation
d Cable connections of the BBU
Alarm Monitoring
Equipment Equipment
Power System
e Procedure
7
2 Installing the BBU in the APM30
a Cable connections
From... To ...
8
2 Installing the BBU in the APM30
b Installing BBU
1 Install the mounting ears at both sides of
the BBU reversely.
PDU
BBU
M6 bolt
c Installing cables
1. Install power cable.
Connect the OT terminal of the power cable to the LOAD3
terminal of the PDU, and then fix the 3V3 connector of the
power cable to the PWR port on the BBU.
LOAD3
NEG(-)
RNT(+)
PWR
9
2 Installing the BBU in the APM30
b Installing the BBU cables
Optical module
Puller
Wrap the fiber tail with the winding pipe till the
first cable tie.
Winding pipe
10
2 Installing the BBU in the APM30
b Installing the BBU cables
3. Install the E1 transfer cable.
Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the
E1/T1 port on the WMPT.
25mm
E1 transfer cable
Shielding layer
of the E1 cable
E1/T1
11
2 Installing the BBU in the APM30
b Installing the BBU Cables
5. Install the FE transfer cable (FE transmission
mode).
FE transfer cable
Strip the jacket off the FE cable near the
grounding point at the lower right corner of the
FE cable cabinet to expose the shielding layer
25mm
INSIDE FE0
OUTSIDE FE0
Shielding layer
of the FE cable
12
2 Installing the BBU in the APM30
b Installing the BBU Cables
MON0
RS485
13
2 Installing the BBU in the APM30
b Installing the BBU Cables
b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the
EMUA monitoring signal cable, and then connect the four exposed bare wires to the
RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and
wires. Fix the DB9 connector to the corresponding port on the EMUA.
Pin on the RJ45 Pin on the DB9 Male Color Type Port on the APMI
Connector Connector
14
3 Installing the BBU in the APM30H
a BBU Cable Connections
The procedure for installing the BBU case in the APM30H is the same as that in the APM30.
For details, see pages 9–14. The following figure shows the cable connections of the BBU.
Page 15 shows how to install the monitoring signal cable between the HEUA and the BBU
in the APM30H.
1 BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
2 E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
4 Monitoring signal COM IN port on the HEUA MON1 port on the BBU
cable
5 CPRI optical CPRI port on the BBU CPRI port on the RRU
cable
15
3 Installing the BBU in the APM30H
b Installing the Monitoring Signal Cable between the HEUA and the BBU
HEUA
COM IN
MON1
UPEU on the
BBU
16
4 Installing the BBU in the APM30 (+24 V)
a BBU Cable Connections
The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For
details, see pages 9–14. The following figure shows the cable connections of the BBU. Page 17
shows how to install the monitoring signal cable of the cabinet.
1 BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
2 E1 surge protection E1/T1 port on the WMPT INSIDE port on the UELP
transfer cable
4 Monitoring signal COM IN port on the HEUA MON1 port on the BBU
cable
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
17
4 Installing the BBU in the APM30 (+24 V)
b Installing the Monitoring Signal Cable of the Cabinet
Pin on the RJ45 Pin on the RJ45 Wire Color Wire Type
Connector Connector
18
5 Installing the BBU in the 19-Inch Cabinet
a BBU Cable Connections
From... To...
5 CPRI optical CPRI port on the RUU CPRI port on the BBU
cable
19
5 Installing the BBU in the 19-Inch Cabinet
b Space Requirements
20
5 Installing the BBU in the 19-Inch Cabinet
d Installing BBU Cables
Grounding bolt
on the right side
of the BBU
PGND cable
PWR
EXT-ALM0 MON1
21
5 Installing the BBU in the 19-Inch Cabinet
d Installing the BBU Cables
E1/T1
E1/T1
Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
Turn outwards the puller on the optical module.
Optical module
Puller
Winding pipe
22
6 Installing the BBU on the Wall
a BBU Cable Connections
External
grounding bar
External power
equipment
External
External transmission grounding bar
equipment
External monitoring
equipment
2 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
5 BBU power cable PWR port on the BBU LOAD6 on the DCDU-03
6 DCDU power cable DC input port on the DCDU-03 External power equipment
23
6 Installing the BBU on the Wall
b Space Requirements
DCDU-03C
BBU
Mounting ear on
the BBU case
Mounting ear
for wall installation
24
6 Installing the BBU on the Wall
c Installing the BBU Case
2. Place the BBU against the wall, and then use the marking pen to mark
the holes of the mounting ears for wall installation.
wall
BBU
Bolt M10×80
Nut
Spring washer 10
Flat washer 10
Expansion tube
55mm~60mm
20mm
25
6 Installing the BBU on the Wall
c Installing the BBU Case
Flat washer
Spring washer
wall
26
6 Installing the BBU on the Wall
d Installing the DCDU-03C Case
3. Install the expansion bolts.
Bolt M10×80
Nut
Spring washer 10
Flat washer 10
Expansion tube
55mm~60mm
20mm
27
7 Installing the BBU in the PS4890 Cabinet
a BBU Cable Connections
From... To...
1 BBU power cable LOAD6 terminal on the PWR port on the BBU
DCDU
3 BBU alarm cable (optional) External transmission ALM port on the UPEU
device
4 Monitoring signal cable RS232/RS422 port on the MON0 port on the BBU
between the PMU and the PMU
BBU
5 CPRI optical cable CPRI port on the RRU CPRI port on the BBU
28
7 Installing the BBU in the PS4890 Cabinet
b Installing the BBU
Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.
29
7 Installing the BBU in the PS4890 Cabinet
c Installing the BBU Cables
LOAD 6
PWR
30
7 Installing the BBU in the PS4890 Cabinet
c Installing the BBU Cables
2 Install the signal cable.
RS232/RS422 MON0
EXT ALM1
31
7 Installing the BBU in the PS4890 Cabinet
c Installing the BBU Cables
3 Installing the CPRI optical Insert the optical module into the CPRI0, CPRI1,
or CPRI2 port.
cable and the E1 cable.
Turn outwards the puller on the optical module.
Optical
module
Puller
E1/T1
Winding pipe
32
8 Installing the BBU in the OMB Cabinet
a BBU Cable Connections
From... To...
1 PGND cable External grounding bar Grounding bar of the OMB
cabinet
2 Input power cable External DC power supply DC input terminal of the DCDU
of the OMB
3 BBU power cable LOAD6 output terminal on the PWR port on the BBU
DCDU
4 E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
6 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
33
8 Installing the BBU in the OMB Cabinet
b Installing the brackets on the metal pole and mounting plate
a.1 Install the brackets on the metal pole.
Use a level bar to adjust the levelness of the brackets to ensure that the front and back brackets are
on the same plane.
Bolt M10×110
Inner hexagon
spanner
255~306kgf·cm
Inner hexagon
spanner
255~306kgf·cm
Bolt M10×110
Flat Spring
washer washer
34
8 Installing the BBU in the OMB Cabinet
c Installing the OMB Cabinet
Slide the BBU case into the OMB
cabinet gently. Then, tighten the four
M6 screws.
35
8 Installing the BBU in the OMB Cabinet
d Installing the BBU Cables
2 Install the input power cable.
NEG(-)
RNT(+)
LOAD6
3. Install the BBU power cable.
36
8 Installing the BBU in the OMB Cabinet
d Installing the BBU Cables
OUTSIDE
E1/T1
INSIDE
Shielding layer
37
8 Installing the BBU in the OMB Cabinet
d Installing the BBU Cables
Optical module
Puller
38
9 Installing the BBU in the TMC
a BBU Cable Connections
The procedure for installing the BBU in the TMC is the same as that in the APM30. For details,
see pages 9–14. Page 39 shows how to install the TMC alarm cable in the TMC.
From... To...
1 BBU power cable LOAD6 terminal of the PDU PWR port on the BBU
2 E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
4 Monitoring signal cable Wiring terminal of cabinet ALM1 port on the BBU
monitoring
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
39
9 Installing the BBU in the TMC
b Installing the BBU
40
10 Installing the BBU in the TMC11H
a BBU Cable Connections
The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For
details, see pages 9–14.
From... To...
1 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
2 E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
4 BBU power cable LOAD6 terminal on the PDU PWR port on the BBU
5 Monitoring signal Wiring terminal of cabinet monitoring MON1 port on the BBU
cable
41
11 Checking the Power-On Status of the BBU
Start
No
Checking whether all LEDs on the
BBU are normal?
Yes
End
a
The normal status of LED on the
WMPT is as follows:
• RUN LED: 1s ON, 1s OFF
(blinking at 0.5 Hz)
• ALM LED: OFF
• ACT LED: ON
The normal status of LED on the
UBFA is as follows:
• STATE LED: Green
1s ON, 1s OFF (blinking at 0.5 Hz)
The normal status of LED on the
UPEU is as follows:
• RUN LED: ON
The normal status of LED on the
WBBP is as follows:
• RUN LED: 1s ON, 1s OFF
(blinking at 0.5 Hz)
• ALM LED: OFF
42
12 Reference
c
a Cable List
Cable Connector Connects to…
CPRI optical cable DLC connector Connect the fiber tails labeled 1A
and 1B to the CPRI_W port on the
RRU
DLC connector Connect the fiber tails labeled 2A
and 2B to one of the CPRI0 to
CPRI3 ports on the WBBP
43
12 Reference
c
a Cable List
44
12 Reference
a Cable List
45
12 Reference
b Engineering Specifications of the BBU
Item Specification
ESD strap
ESD gloves
46
12 Reference
c Checking the DIP Switches of the BBU
2. Set the DIP switches of the BBU.
Settings of the DIP switches on the UELP
75-ohm E1 Mode
Other Modes
T1 Mode
47
12 Reference
ed Pin Assignment of the BBU Signal Cables
75-ohm E1 cable
48
12 Reference
d Pin Assignment of the BBU Signal Cables
120-ohm E1 cable
49
12 Reference
d Pin Assignment of the BBU Signal Cables
FE cable
Pin on the RJ45 Wire Color Wire Type Pin on the RJ45
Connector Connector
Pin on the RJ45 Wire Pins on the Wire Type Port on the
Connector Color X2, X3, X4, APMI
and X5
50
12 Reference
d Pin Assignment of the BBU Signal Cables
Alarm cable
Pin on the RJ45 Pin on the RJ45 Wire Color Wire Type