Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
34 views1 page

Chapter 9 Contracting Methods: FHWA NHI-05-039 Micropile Design & Construction I - VII December 2005

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

8.2 INSPECTION ROLES UNDER CERTAIN CONTRACT APPROACHES .................

8 – 1
8.3 PRE-PROJECT PREPARATION................................................................................... 8 – 2
8.4 INSPECTION OF MICROPILE MATERIALS ............................................................. 8 – 5
8.4.1 General............................................................................................................... 8 – 5
8.4.2 Storing and Handling of Cement ....................................................................... 8 – 5
8.4.3 Storing and Handling of Reinforcing Steel........................................................ 8 – 6
8.5 INSPECTION OF CONSTRUCTION ACTIVITIES..................................................... 8 – 8
8.5.1 Inspection of Drilling Activities ........................................................................ 8 – 8
8.5.2 Inspection of Reinforcement Installation Activities .......................................... 8 – 9
8.5.3 Inspection of Grouting Activities..................................................................... 8 – 10
8.6 REQUIRED PROJECT DOCUMENTATION............................................................. 8 – 12
8.6.1 Micropile Load Testing.................................................................................... 8 – 12
8.6.2 Production Micropiles...................................................................................... 8 – 13
8.6.3 Grouting Records for Production Micropiles .................................................. 8 – 13
8.7 REFERENCES .............................................................................................................. 8 – 18

CHAPTER 9 CONTRACTING METHODS


9.1 INTRODUCTION........................................................................................................... 9 – 1
9.2 CONTRACTOR QUALIFICATION.............................................................................. 9 – 1
9.3 METHOD CONTRACTING APPROACH.................................................................... 9 – 2
9.3.1 Standard Design ................................................................................................. 9 – 4
9.3.2 Alternate Micropile Design................................................................................ 9 – 5
9.3.3 Cost Reduction Incentive Proposal (Value Engineering) .................................. 9 – 5
9.4 PERFORMANCE SPECIFICATIONS........................................................................... 9 – 6
9.5 DESIGN/BUILD APPROACH....................................................................................... 9 – 7
9.5.1 General............................................................................................................... 9 – 7
9.3.2 Postbid Design ................................................................................................... 9 – 7
9.5.3 Prebid Design..................................................................................................... 9 – 8
9.6 CONTRACT PLANS...................................................................................................... 9 – 9

CHAPTER 10 COST ESTIMATING


10.1 INTRODUCTION....................................................................................................... 10 – 1
10.2 FACTORS THAT INFLUENCE MICROPILE COSTS ............................................ 10 – 1
10.2.1 Overview........................................................................................................ 10 – 1
10.2.2 Micropile Material Costs ............................................................................... 10 – 1
10.2.3 Equipment Cost.............................................................................................. 10 – 3
10.2.4 Labor Cost...................................................................................................... 10 – 4
10.2.5 Load Testing Costs ........................................................................................ 10 – 4
10.3 MICROPILE COST ANALYSIS ............................................................................... 10 – 5
10.3.1 Overview........................................................................................................ 10 – 5
10.3.2 Effects of Project-Specific Constraints on Cost............................................. 10 – 6
10.3.3 Micropile Cost Estimate Examples................................................................ 10 – 6
10.3.3.1 Sample Problem No. 1 (Bridge Abutment Support).......................... 10 – 6
10.3.3.2 Sample Problem No. 2 (Seismic Retrofit) ......................................... 10 – 8
10.4 MEASUREMENT AND PAYMENT FOR MICROPILES ....................................... 10 – 8

FHWA NHI-05-039
Micropile Design & Construction i - vii December 2005

You might also like