Pump Room AC-Layout1
Pump Room AC-Layout1
Pump Room AC-Layout1
R R R R R R
R R R R R
R R R R
SHADED P A R K I N G SHADED P A R K I N G
LANDSCAPED AREA R R R R
R
G F* F E*
DRIVEWAY
DRIVEWAY
WALKWAY / PAVEMENT
GROUND COVER R
WALKWAY / PAVEMENT
SHRUBS ROCK FEATURES
PRECAST PAVERS
1%
SLOPE 1%
SLOPE 1% SLOPE SLOPE 1%
SLOPE
1% 1% SLOPE
SHADED SLOPE
SLOPE
1%
1%
RWO RWO 100Ø RAIN WATER SLEEVE
R
PARKING SLOPE
1%
SLOPE
1% C. NEW EXTENSION BUILDING
SLOPE
1%
SLOPE
1%
RWO
SLOPE
1%
SKYLIGHT PRECAST PAVERS
R
SLOPE
ROCK FEATURES
RIDGE LINE RIDGE LINE
1%
1%
SLOPE
RIDGE LINE
SLOPE
1%
NEW SUBSTATION SKYLIGHT SKYLIGHT SKYLIGHT
WALKWAY / PAVEMENT
1%
SLOPE
RWO RWO
SLOPE
1%
100Ø RAIN WATER SLEEVE
SLOPE
1%
1%
1%
SLOPE
1%
SLOPE
SLOPE
SLOPE SLOPE
1%
SLOPE 1%
1%
SLOPE
1% R
ROCK FEATURES
PRECAST PAVERS
GREEN
R
WALKWAY / PAVEMENT
SHADED PARKING
B. EXISTING ORIGINAL BUILDING
SHADED PARKING
R
DRIVEWAY
R
WALKWAY / PAVEMENT
RAMP
H G* G F* F E* E D* D WALKWAY / PAVEMENT
WALKWAY / PAVEMENT
R
R
EXISTING DRIVEWAY
4.83% SLOPE R R
ROOF
R
WALKWAY / PAVEMENT R
GUARD GREEN
ROOM GREEN
R R
ROOF
VEHICULAR RAMP UP
R
WALKWAY / PAVEMENT
GREEN GREEN GREEN R
GREEN GREEN
R R R R
R
UP
R
WALKWAY / PAVEMENT
NEW CARPARK R R R R R R R
GREEN
EXISTING DRIVEWAY
WALKWAY / PAVEMENT
R
WALKWAY / PAVEMENT
EXISTING EXISTING
WALKWAY / PAVEMENT WALKWAY / PAVEMENT SHADED SHADED
PARKING PARKING
LINE OF BASEMENT CARPARK
GUARDHOUSE
EXISTING R
BELOW
SUBSTATION
WALKWAY / PAVEMENT
GREEN
WALKWAY / PAVEMENT GREEN
R R
ELECTRIC R
ROOM GREEN
EXIT ENTRY
R R R
R R R R R
R
WALKWAY
/ PAVEMENT
R R / PAVEMENT
R R R R WALKWAY R
R R R R R R
R R R R R R
R R R R R R R
CABLE ENTRY R R GREEN
ENTRY
R R R R
EXIT
WALKWAY / PAVEMENT
WALKWAY / PAVEMENT
WALKWAY / PAVEMENT LIMIT OF WORKS
CCTV RACK
600 (W) X 600 (D) X 635 (H)
FILING PRINTING
KEY PLAN
FB FB FB 600 (W)
WATER
DISPENSER
800
PANTRY
MALE SB-003
HOT PLATE
WORKSTATION
FIRE PUMP
WATER PUMP
FB FB FB
FB FB FB
TOILET
1**
TOILET MANAGER
MALE
MANGER'S
OFFICE
SB-006
FIRE PUMP
WATER PUMP
FB
FB
SENIORS
TV FB
2
FB
FB
WORKSTATION
945
1320
1010
FB
1170
520
1010
FB
PLANT ROOM
1320
945
1350 2105
FB FB FB
FB FB FB
FACP
610 (W) X 296 (D) X 1442 (H)
2*
FEMALE
WORKSTATION
RECEPTION/SECRETARY
FB FB FB
FB
FB FB FB
PLANT ROOM
H G F E" E
IFC Drawings Reference No:
blow up 1
+3050
ROOF
SHOP DRAWING
ACTION CODE
2
A APPROVED AS SUBMITTED
SLO
%
SL
SL
PE
OP
OP
PE
E
1%
E
SL
1%
G
ROOF C REVISED / RESUBMIT
%
E1
OPEN TO SKY
OP
+2850
D DISAPPROVED - RESUBMIT
SL
ROOF
DRAWING STATUS
blow up 2
PM M.A REV
PROJ CHK DRWN PURPOSE OF ISSUE
APPROVED ENG BY BY DATE NO.
3 Date of Submittal: Project number:
J-553
CLIENT:
CORNICHE
CONSULTANT:
MAIN CONTRACTOR:
TEL. +974 4878-921; FAX: +974 4878-924 P.O BOX 18419 DOHA-QATAR
E-mail: info@salamenterprises.com
+3050 BLOW UP 1
ROOF
DRAWING TITLE: