Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Cand's Pack

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

Occupational Code: EIS HNS 4

Ministry of Education
Sector: Economic Infrastructure
Sub Sector: Information Technology
Occupation: Hardware and Network Servicing
Level IV
Candidate’s Package
The assessment covers the following units of competence:
1. EIS HNS4 01 0811 Plan and Organize Work
2. EIS HNS4 02 0811 Assist with Policy Development for Client Support
3. EIS HNS4 03 0811 Build Internet Infrastructure
4. EIS HNS4 04 0811 Migrate to New Technology
5. EIS HNS4 05 0811 Determine Maintenance Strategy
6. EIS HNS4 06 0811 Establish Quality Standards
7. EIS HNS4 07 0811 Utilize Specialized Communication Skills
8. EIS HNS4 08 0811 Develop Team and Individuals
9. EIS HNS4 09 0811 Manage and Maintain Small/Medium Business Operations
10. EIS HNS4 10 1012 Manage Continuous Improvement System

Candidate’s instructions and worksheets


 Instructions to Candidate
 Methods of Assessment
1 Observation /Demonstration
2 Knowledge assessment ( Oral interview/written)
Candidate name
Registration number
Name of assessment center
Name of training provider

Type of Assessment applied:


Qualification – based
Competency based

INSTRUCTIONS TO THE CANDIDATE


Candidate’s Package for Hardware and Network Servicing Level IV
(Qualification Based)
Occupational Code: EIS HNS 4

Occupation: Hardware and Network Servicing Level IV


1. For Qualification-based assessment, you are to perform all the projects in this
package together with the written tests.
2. For competence-based assessment, you are required to perform the specific
project/s where the competencies to be certified are included.
3. Read the Project package/s and Written test (if applicable) properly.
4. All your questions and clarifications should be addressed to the assessor only.
5. Complete the task/project described in the project package.
6. You are given fifteen (15) minutes reading time for each project and the number of hours
allocated for each project is indicated in the Project Information Sheet.
7. After you finish this assessment, you are required to submit all the project packages
and written tests questions provided to you.
8. You are allowed to use your tools/ instruments with the permission of the Assessor,
and this must be presented to the assessor before start of the test.
9. After you finish the assessment, you are required to sign the Competency
Assessment Results Summary, and return to the stock room all the tools and
materials borrowed.
10. You are also required to clean up your work station after completion of your work.

Project Information
Given the necessary tools, equipment and information, you are expected to
perform the following Three practical projects.
The assessor should ask oral questions on which s/he is not satisfied by yours
performance
Assessment Venue: Well Equipped Assessment Centre or real work place
Total Time Allotted for all Projects: 6:00hrs

Project I: Build Internet Infrastructure and Migrate to new Technology.


Total time for the project: 3:40hrs
Competences Covered:-
1. EIS HNS4 03 0811 Build Internet Infrastructure
2. EIS HNS4 04 0811 Migrate to New Technology

Instruction: - Under this project you are expected to perform the following three
tasks based on the information provided:-

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4
Task 1: Set up Client-Server network and configure internet
Time Allotted: - 1:30hrs

Instruction: - Under this task you are to have three computers and the
necessary software so expected perform the following activities
based on the information provided:-
 Set up Client-Server network (Hint: Start from clear installation of each
PC, Use domain name ict.gov and configure internet connection to all
Pcs).

Task 2: Manage Users and Group


Time Allotted: - 0:50 hrs
Instruction: - Under this task you are expected to perform the following activities
tasks based on the information provided:-
 Create three organizational units(OU) named by Developer , Support
and Analyst
 Create three groups named by Principal, Senior and Junior.
 Create four users named Seifu, Tina, Ahmed and Feven.
 Add Seifu and Tina to the group Principal.
 Add Ahmed and Seifu to the group Senior.
 Add Feven to the group Junior.
 Add the group Principal to Developer OU.
 Add the group Junior to Support OU.
 Add the group Senior to Analyst OU.

Task 3: Install and Upgrade Software


Time Allotted: - 1:20 hrs
Instruction: - Under this task you are expected to perform the following activities
tasks based on the information provided:-
 Install Microsoft office word 2007 and Microsoft office Visio 2007 on client
1 pc
 Upgrade Client 2 to windows 8.1.
 Write the new features you analyse in windows 8.1 comparing with
windows 7 and save using notepad on Client 2.

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

Project II: Design company network and Internet Infrastructure


Total time for this project: 1:20hrs
Competences Covered:-
1. EIS HNS4 01 0811 Plan and Organize Work
2. EIS HNS4 02 0811 Assist with Policy Development for Client Support
3. EIS HNS4 03 0811 Build Internet Infrastructure
In this project you are required to design Company Network and Internet
Infrastructure for PARROT Plc.
The company is expandable and dedicated for Importing and Distribution of
drugs and medical equipments for resellers using Company’s Application
Software, it has 5 departments: Sales, Maintenance, HRM, Public Relation and
Marketing.

The Company has two buildings, G+2 and G+3 in a compound with a distance of
30m between them. Each building has 15 users in each floor including the
ground.

The Company wants to implement centralized network infrastructure that include:


1. Resource Sharing between different departments
2. 10 MB internet connection for the whole employees
3. Company Mailing System
4. System Security
Instruction: - Under this project you are expected to perform the following two
tasks based on the information provided:-

Task1. Identify the basic resources required to implement this project

Time Allotted: - 0:25 hrs


Instruction: - Under this task you are expected to perform the following activities
tasks based on the information provided:-

 Identify Hardware needed to built the infrastructure


 Identify Software needed to built the infrastructure
 Identify Type of internet connectivity needed to built the infrastructure
Task2. Design the infrastructure of network using Microsoft office Visio 2007
Time allotted: 0:55 min

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4
Instruction: -Under this task, you should prepare logical design for the
infrastructure using Microsoft Visio 2007 that considers:
 Appropriate network devices
 Suitable type of cable to be used.
 Internet connectivity
Project III. Prepare Service Level Agreement

Total time for this project: 1:00hrs


Competences Covered:-
1. EIS HNS4 05 0811 Determine Maintenance Strategy
2. EIS HNS4 06 0811 Establish Quality Standards

XY Company needs annual maintenance service for all PCs. The company posts
the announcement for interested bidders.
Instruction: - Under this project you are expected to perform the following two
tasks based on the information provided:-
Task1. Prepare SLA of XY Company using Microsoft Word.
Time Allotted: - 0:35 hrs

Instruction: - Under this task you assume as an ICT Solution provider PLC who
wins the bid and expected to prepare SLA of XY Company using Microsoft
Word. (Hint: - Use the following points to prepare the SLA)
 Objective of the Service
 Service provider’s responsibilities:
 Customer responsibilities:
 Service Measurement
 Modification and review of the agreement:
Task2. Prepare a format that monitors the quality of maintained computer
and network.

Time Allotted: - 0:25 hrs


Instruction: - Under this task you assume as a technician of XY Company and
invited to monitor the quality of maintained computer and network
so you are expected to prepare a format that helps to monitor
using Microsoft Word
Materials and supplies per candidate

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4
No Item description Quantity unit Specification

1 Windows Server 2008 R2 1 DVD 32/64 bit


2 Windows 8.1 1 DVD
3 Windows 7 1 DVD 32/64 bit
4 MS Office 2007 1 CD
5 MS Visio 2007 1 CD
6 Driver Software 1 DVD
7 Broadband Internet connection Good performance
Tools, Instruments & Equipment

No Item description Quantity unit Specification

1 Client Computer 2 Pcs 1GHz Processor


1GBB RAM
80 GB HDD

2 Server Computer 1 Pcs 2GHz Processor


2GB RAM
80 GB HDD

Note: Materials and tools may be modified by the Assessor, depending on the actual
job performed, and location & the standard installation practices of the country.

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)

You might also like