Bagmati Irrigation Project: Department of Water Resources and Irrigation
Bagmati Irrigation Project: Department of Water Resources and Irrigation
Measurement
S.N. Description No. Lengt Width Height Quantity unit Rate Amount Remarks
h (m) (m)
1 Earthwork in excavation in BMS soil
for foundation work.
Wall 4 2.90 0.90 1.00 10.44
10.44 m3
for 1 nos house 10.44 m3 m
3
1,063.20 11,099.80
2 Earthwork in back filling 60% of excavation work 6.26 m3
for 1 nos house 6.26 m3 m
3
195.44 1,223.45
3 Stone soling work.
Wall foundation 4 2.90 0.65 0.20 1.50
for flooring works 1 2.00 2.00 0.15 0.60
2.10 m3
for 1 nos house 2.10 m3 m
3
2,904.90 6,100.29
Brick .Masonry in 1:4 cement sand
mortar including supply of materals all
4 complete.
Foundation to plinth 1 9.80 0.46 1.20 5.40
Main wall 1 9.80 0.23 2.20 4.95
Foot step 2 0.75 0.30 0.20 0.09
Sub-Total 10.44
Deduct door 1 0.87 0.23 2.00 0.40
Deduct Ventilator 1 0.60 0.23 0.45 0.06
Lintel 12 2.40 0.23 0.10 0.66
Deduction total 1.12
Net Quantity of Masonry 9.32
for 1 nos house 9.32 m
3
12,941.57 120,615.43
PCC work for RCC in 1:3:6 cement
3
5 concrete. 4 2.90 0.65 0.10 0.75 m 12,030.02 9,070.63
PCC work for RCC in 1:2:4 cement
6 concrete.
Roof slab with sun shade(0.5)m 1 3.60 2.70 0.10 0.97
Floor 1 2.00 2.00 0.10 0.40
Lintel 12 2.90 0.23 0.10 0.80
Beam 4 2.90 0.45 0.30 1.56
3.73
4 1.90 0.15 0.15 0.17
for 1 nos house 3.90 m
3
13,674.59 53,344.57
Supplying and fitting metal doors and
ventilator frame and shutter including
two coat of painting with locking
7 mechanism all complate
for 1 nos house 120.0 kg 161.00 19,320.00
9 Reinforcement steel works.
10mm dia. Main bar for Roof slab 54 3.90 0.62 130.572
10mm dia.dist.bar 54 3.90 0.62 130.572
12mm dia. Main bar for Beam 16 2.95 0.89 42.008
8mm dia. Ring bar 118 1.50 0.39 69.030
10mm dia.main bar for lintel 6 11.60 0.62 43.152
Measurement
S.N. Description No. Lengt Width Height Quantity unit Rate Amount Remarks
h (m) (m)
8mm dia. Ring bar for lintel. 155 0.55 0.39 33.247
4 3.10 0.62 7.650
456.23 Kg.
for 1 nos house 456.23 130.02 59,319.02
10 Wooden formwork all complete.
Lintel 6 11.60 0.15 10.440
Slab 1 2.00 2.00 4.000
Slab outer side 4 3.60 0.10 1.440
Slab around 1 13.80 0.50 6.900
Beam Outer 4 2.95 0.30 3.540
Beam Inner 4 2.00 0.30 2.400
28.720
for 1 nos house 28.720 m
2
834.00 23,952.48
12.5mm thick 1:4 cement sand plaster
11 works.
upto plinth 4 2.90 0.60 6.960
step 1 1.15 0.30 0.345
floor 1 2.00 2.00 4.000
Door -2 0.75 2.00 -3.000
Ventilator -2 0.60 0.45 -0.540
Wall inside 4 2.00 2.30 18.400
Wall outside 4 2.90 2.30 26.680
Ceilling 1 3.90 3.90 15.210
Deduction walls -4 2.90 0.40 -4.640
Slab edges 1 15.60 0.10 1.560
Door around 1 5.50 0.30 1.650
Ventilator around 2 2.10 1.30 5.460
2
72.09 m
for 1 nos house 72.09 m
2
384.76 27,735.42
Measurement
Lengt
S.N. Description No. Quantity unit Rate Amount
h Width Height
(m) (m) (m)
1 E/W excavation for foundation in ordinary soils
wall foundation
4 1.50 1.50 1.20 10.80
Total 10.80 m3 781.77 8,443.12
2.a E/W in back filling (50% of item no 1)
5.40
Total 5.40 m3 195.44 1,055.38
2.b Earthwork Excavetion & filling With sprnkling of
water inside the elevated header tank upto
plinthlevel.
1 3.700 3.700 1.300 17.79
Total 17.79 m3 390.88 6,953.76
3 Blind Concrete ( 1:3:6)
Bed concrete 4 2.20 0.35 0.10 0.308
Deduction of openings
Doors
1 1.00 - 1.800 -1.80
Windows
4 0.70 - 0.900 -2.52
Total 126.80 m2 384.76 48,787.57
6.b 12.5mm thick 1:3 cement plaster
GL & First floor ceilings
2 2.200 2.200 - 9.68
Outsides of Elevated Header Tank
1 10.800 - 1.50 16.20
Inner side of Elevated Header Tank
1 9.600 - 1.41 13.53 H=0.15+1.05+0.21
Bed of Elevated Header Tank
1 2.250 2.250 - 5.06
Total 44.47 m2 384.76 17,110.28
7 3mm thick cement punning works
GL & First floor Floors
2 2.200 2.200 - 9.68
Inner side bed of Elevated Header Tank
1 9.600 - 1.41 13.53
Bed of Elevated Header Tank
1 2.200 2.200 - 4.84
Projcted portion of First floor
1 0.700 1.800 - 1.26
Projcted portion of II nd floor (tank level)
1 0.700 3.400 - 2.38
Total 31.69 m2 271.92 8,617.14
8 Two coat snocent paint
(Same as item 7.a & 7.b except Bed & inner side of tank) 152.68
(444.16+263.41-77.76-30.37=599.44) Total 152.68 m2
9.a Form works Below 5 m
Footings
16 1.200 - 0.200 3.84
Columns
16 - 0.250 9.700 38.80
Beams & Slabs
Plinth level beams
4 2.20 0.700 - 6.16 B=3*0.25
Projection beam
Measurement
Lengt
S.N. Description No. Quantity unit Rate Amount
h Width Height
(m) (m) (m)
1 0.70 0.750 - 0.52
First floor Beams
4 2.20 0.700 - 6.16 L=2.2+.70
Projection beam
1 0.70 0.650 - 0.45
First floor Slabs
1 2.20 2.200 - 4.84
First floor Projection Slabs
1 2.00 0.700 - 1.40
Staging works for Construction of E.H.Tank
PL level
1 14.80 0.750 - 11.10 2*(4.7+2.7)
First Floor Level
1 20.80 0.750 - 15.60 2*(6.7+3.7)
Staging works for Construction of E.H.Tank
At the Bottom and top of tank level
2 12.40 0.210 5.20 2*(3.5+2.7)
Total 94.07 m2 834.00 78,454.38
8mm dia.Main bars @ 200mm C/C (6*2*52) 104 3.02 314.08 0.395 124.06 2*(2*1.32+2*11)+20Φ
8mm dia.Dist. bars @ 200mm C/C (6*2*5) 10 10.7 107 0.395 42.26
8mm dia splay bars@300mmC/C (6*1*34 ) 34 0.77 26.18 0.395 10.34
Total 934.39 kgs 130.02 121,489.39
11 Supply, fitting,fixing of all necessary items of
M.S.staircase and railings of (25mm*25mm*5mm)
Angles and of 200mm width and 2mm thick Strips
including painting all complete.
1 1.00 - 200.00 Kg
Total 200.00 Kg 130.02 26,004.00
12 20 gauge MS.Plain sheet supplying, fitting,
fixing all complete for door work and ventilation
1 1.000 - 100.000 100.00
Total 100.00 kg 130.02 13,002.00
15 Double coats of Prepared Enamel Painting works:
Doors and Windows
705,637.14
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
S.No. Details of work No. Length Breadth Height Quantity Unit rate Amount
1 Earthwork excavation for foundation
in ordinary soil for plate form 1 1.70 1.70 0.30 0.86
For cut off 1 0.66 0.50 0.50 0.16
for support pillar 9 0.60 0.60 0.90 2.91
Sub total 3.93
For 1 Lift Total 3.93 m3 781.77 3,072.36
1.b Earthwork in back filling ( 50% of Item 1 ) 1.97
Sub total 1.97
3
For 1 Lift G.Total 1.97 m 195.44 384.04
2 1:2:4 P.C.C work
Washout plate base 1 1.660 1.660 0.150 0.413
Cut off for opening 1 0.660 0.150 0.500 0.049
Embedding of M.S fitting & UPVCpipes for support 2 0.450 0.450 1.500 0.607
M.S fittings,Base for posts and Washout plate
support 7 0.360 0.360 1.500 1.360
Sub total 2.429
For 1 Lift Total 2.429 m3 13,674.59 33,215.58
3 Form work
Washout plate base 4 1.660 0.150 0.990
Cut off for opening 1 0.660 0.500 0.330
Embedding of M.S fitting & UPVCpipes for support 8 0.450 1.500 5.400
M.S fittings,Base for posts and Washout plate
support 28 0.360 1.500 15.120
Sub total 21.84
For 1 Lift Total 21.84 m2 834.00 18,214.56
4 1st Class brick masonry work 1:4 cm
Walls of washout plate 1 4.620 0.230 0.300 0.318
Sub total 0.318
For 1 Lift Total 0.318 m3 12,941.57 4,115.42
5 12.5mm thick (1:3) cement sand mortar
For walls of plate 4 1.00 0.53 2.12
Sub total 2.12
For 1 Lift Total 2.12 m2 384.76 815.69
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Main, Sub-Main and Tertiaries
250 mm dia 4 kg/cm 2 0.00
200 mm dia 4 kg/cm 2 5000.00
180 mm dia 4 kg/cm 2 0.00
160 mm dia 4kg/cm 2 0.00
140 mm dia 6kg/cm 2 0.00
110 mm dia 6kg/cm 2 0.00
90 mm dia 6kg/cm 2 0.00
75 mm dia 6kg/cm 2 0.00
63 mm dia 6 kg/cm 2 0.00
63 mm dia 10kg/cm 2 0.00
50 mm dia 6kg/cm 2 0.00
40 mm dia 6kg/cm 2 0.00
32 mm dia 10kg/cm 2 0.00
25 mm dia 10kg/cm 2 0.00
20 mm dia 10kg/cm 2 0.00
5000.00
1 Earthwork excavation in gravel mix 30% 5000.00 0.40 0.60 360.00 Cum. 1,063.20 382,752.00 WUA
soil
2 Foundation excavation in soft soil 70% 5000.00 0.40 0.60 840.00 Cum. 781.77 656,686.80 WUA
3 Back fill
90 % of Excavation 1080.00 Cum. 195.44 211,075.20 WUA
4 Supply, laying and fitting of HDPE pipe
of
250 mm dia 4 kg/cm2 1.1 0.00 0.00 Rm 3,297.47 - 10% extra
200 mm dia 4 kg/cm2 1.1 5000.00 5502.00 Rm 2,149.99 11,829,244.98 10% extra
180 mm dia 4 kg/cm2 1.1 0.00 0.00 Rm 1,757.40 - 10% extra
160 mm dia 4kg/cm2 1.1 0.00 0.00 Rm 1,421.20 - 10% extra
140 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 1,110.04 - 10% extra
110 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 896.70 - 10% extra
90 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 663.06 - 10% extra
75 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 479.88 - 10% extra
63 mm dia 6 kg/cm2 1.1 0.00 0.00 Rm 362.47 - 10% extra
63 mm dia 10kg/cm2 1.1 0.00 0.00 Rm 508.30 - 10% extra
50 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 193.43 - 10% extra
40 mm dia 6kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
32 mm dia 10kg/cm2 1.1 0.00 0.00 Rm 120.42 - 10% extra
25 mm dia 10kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
20 mm dia 10kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
Total 13,079,758.98
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
FY 2077/2078
Name of Project: Bagmati Lift Irrigation Project,
Location: Rautahat
Quantity Estimate of Distribution Line (First Lift)
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Main, Sub-Main and Tertiaries
250 mm dia 4 kg/cm 2 0.00
200 mm dia 4 kg/cm 2 5000.00
180 mm dia 4 kg/cm 2 0.00
160 mm dia 4kg/cm 2 0.00
140 mm dia 6kg/cm 2 0.00
110 mm dia 6kg/cm 2 0.00
90 mm dia 6kg/cm 2 0.00
75 mm dia 6kg/cm 2 0.00
63 mm dia 6 kg/cm 2 0.00
63 mm dia 10kg/cm 2 0.00
50 mm dia 6kg/cm 2 0.00
40 mm dia 6kg/cm 2 0.00
32 mm dia 10kg/cm 2 0.00
25 mm dia 10kg/cm 2 0.00
20 mm dia 10kg/cm 2 0.00
5000.00
1 Earthwork excavation in gravel mix 30% 5000.00 0.40 0.60 360.00 Cum. 1,063.20 382,752.00 WUA
soil
2 Foundation excavation in soft soil 70% 5000.00 0.40 0.60 840.00 Cum. 781.77 656,686.80 WUA
3 Back fill
90 % of Excavation 1080.00 Cum. 195.44 211,075.20 WUA
4 Supply, laying and fitting of HDPE pipe
of
250 mm dia 4 kg/cm2 1.1 0.00 0.00 Rm 3,297.47 - 10% extra
200 mm dia 4 kg/cm2 1.1 5000.00 5502.00 Rm 2,149.99 11,829,244.98 10% extra
180 mm dia 4 kg/cm2 1.1 0.00 0.00 Rm 1,757.40 - 10% extra
160 mm dia 4kg/cm2 1.1 0.00 0.00 Rm 1,421.20 - 10% extra
140 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 1,110.04 - 10% extra
110 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 896.70 - 10% extra
90 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 663.06 - 10% extra
75 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 479.88 - 10% extra
63 mm dia 6 kg/cm2 1.1 0.00 0.00 Rm 362.47 - 10% extra
63 mm dia 10kg/cm2 1.1 0.00 0.00 Rm 508.30 - 10% extra
50 mm dia 6kg/cm2 1.1 0.00 0.00 Rm 193.43 - 10% extra
40 mm dia 6kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
32 mm dia 10kg/cm2 1.1 0.00 0.00 Rm 120.42 - 10% extra
25 mm dia 10kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
20 mm dia 10kg/cm 2 1.1 0.00 0.00 Rm - 10% extra
Total 13,079,758.98
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Length : 0.50 m
Breadth: 0.90 m 5 nos
Thickness at base : 0.15 m
Thickness of wall : 0.15 m
Height : 0.9 m
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
1 Dry foundation excavation in gravel mix
soil including disposal
5 0.80 1.20 0.90 4.32
4.32 Cum. 1,063.20 4,593.02
2 Dry stone Soling
5 0.80 0.65 0.15 0.39
0.39 Cum. 2,904.90 1,132.91
3 RCC in (1:2:4)
bed 5 0.80 0.65 0.15 0.39
wall 3 2.30 0.15 0.50 0.51
cover 5 0.80 0.65 0.15 0.39
1.29 Cum. 13,674.59 17,640.22
4 Reinforcement steel
1% of concrete 101.27
101.27 Kgs 130.02 13,166.47
5 Formwork
wall 10 2.30 0.65 14.95
14.95 sqm. 834.00 12,468.30
6 Pipe fitting with control valve 5 5.00 25,000.00 125,000.00
Total 174,000.92
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
2 Stone soling
41 0.50 0.50 0.15 1.53 m3
Total 1.53 2,904.90 4,444.49
2 PCC in (1:2:4)
base 41 0.50 0.50 0.80 8.20
floor 41 0.50 0.50 0.15 1.53
Total 9.73 m3 13,674.59 133,053.76
3 GI fittings supplying & fitting
Supplying , fitting and fixing of 41 41 NO 14,950.00 612,950.00
10" mm Butterfly valve
Supplying , fitting and fixing 10" 41 41 No 6,210.00 254,610.00
dia dia flange set
Supplying , fitting and fixing of 41 41 No 5,955.00 244,155.00
10" dia 1.5 m long GI pipe
Supplying , fitting and fixing of 41 41 No 5,000.00 205,000.00
10" dia Tee
Total 1,455,839.94
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1. Site clearance
Excavating 15-20 cm of the top soil including Labour Unskilled 0.160 MD 660.00 105.60
1.8 1.1 1 sq.m 108.77 16.32 125.08 125.08
disposal outside of the construction site Tools & equipment @ 3% of Unskilled Labour 3.17
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Earth filling, including a lead of 10 m, with
0.250
ordinary soil in 15 cm thick layers, spreading Labour Unskilled MD 660.00 165.00
2.25b 2.7 1 Cu.m 169.95 25.49 195.44 195.44
and manual compaction after each layer without
sprinkling water Tools & equipment @ 3% of Unskilled Labour 4.95
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Brick work
Dry brick laying (soling) -Flat Skilled Mason 0.500 MD 880.00 440.00
Labour
Unskilled 1.000 MD 660.00 660.00
Cement 0.000 MT 15,918.50 -
11 4.1 1 sq.m 7,200.30 1,080.04 8,280.34 82.80
Sand 0.710 Cu.m 1,866.05 1,324.90
Materials
Brick 420.000 No 11.37 4,775.40
Brick (chimney) masonry work upto 5 m height Skilled Mason 1.500 MD 880.00 1,320.00
Labour
of wall including supply of materials, Unskilled 2.200 MD 660.00 1,452.00
preparation of cement mortar I all and a lead of Cement 0.100 MT 15,918.50 1,591.85
5 4.2 1 Cu.m 11,253.54 1,688.03 12,941.58 12,941.57
cement in 1:4 Cement sand mortarMortar Sand 0.280 Cu.m 1,866.05 522.49
Materials
Brick 560.000 no 11.37 6,367.20
-
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Concreting of super structure, vertical faces,wall Skilled Mason 0.800 MD 880.00 704.00
Labour
of ratio 1:1.5:3(M20) including of supply of Unskilled 7.000 MD 660.00 4,620.00
materials and haulage distance up to 30m with Cement 0.400 MT 15,918.50 6,367.40
7.4 b 5.3 crushed aggregate for headworks 1 Cu.m Aggregate: 14,959.90 2,243.98 17,203.88 17,203.87
Materials 20mm 0.570 Cu.m 2,878.40 1,640.69
10mm 0.290 Cu.m 2,878.40 834.74
sand 0.425 Cu.m 1,866.05 793.07
Concreting of super structure, vertical faces,wall Skilled Mason 0.800 MD 880.00 704.00
Labour
of ratio 1:1:2 (M25) including of supply of Unskilled 7.000 MD 660.00 4,620.00
materials and haulage distance up to 30m with Cement 0.610 MT 15,918.50 9,710.29
7.4c 5.4 crushed aggregate for ring 1 Cu.m Aggregate: 18,274.00 2,741.10 21,015.10 21,015.09
Materials 20mm 0.640 Cu.m 2,878.40 1,842.18
10mm 0.210 Cu.m 2,878.40 604.46
sand 0.425 Cu.m 1,866.05 793.07
Concreting of found ...vert. faces, walls and Skilled Mason 0.300 MD 880.00 264.00
Labour
abutments (plum concrete) 1:2:4 including Unskilled 4.000 MD 660.00 2,640.00
supply of materials & haulage distance up to Cement 0.320 MT 15,918.50 5,093.92
30m Stone (225 mm) 0.130 Cu.m 1,280.00 166.40
00-07 5.4 1 Cu.m 9,116.31 1,367.45 10,483.76 10,483.75
Aggregate: Cu.m
Materials
20mm 0.570 Cu.m 160.00 91.20
10mm 0.190 Cu.m 160.00 30.40
sand 0.445 Cu.m 1,866.05 830.39
Cutting, bending, placing in position according Skilled Mason 12.000 MD 880.00 10,560.00
Labour
to the drawing and binding of M.S. rod for Unskilled 12.000 MD 660.00 7,920.00
7.5 5.6 1000 KG 113,061.03 16,959.15 130,020.18 130.02
R.C.C. works including a lead of 30 m M.S.Bar 1.050 MT 88,642.50 93,074.63
materials
Binding Wire 10.000 KG 150.64 1,506.40
6. Formworks
Making wooden forms for floor and slab Skilled Mason 1.440 MD 880.00 1,267.20
Labour
including supply & selection of material, fixing Unskilled 2.100 MD 660.00 1,386.00
8-2b 6.2 10 sq.m 7,252.26 1,087.84 8,340.09 834.00
nailing, placing separators, dismantalling forms nails 2.500 KG 120.64 301.60
materials
and hauling up to 30m distance( no of use = 6 Timber framework 0.065 CUM 66,114.70 4,297.46
7. Wood works
Carpenter 1.500 MD 880.00 1,320.00
Labour
Supplying and fitting sal wood frame for doors unskilled 0.150 MD 660.00 99.00
10.1.a 7.1 and windows. (Door Size - 900 x 2100 mm. ) = 0.045 Cu.m salwood 0.044 CUM 165,175.80 7,267.74 8,846.74 1,327.01 10,173.75 226,083.23
0.045 m3 materials Holdfast 4.000 No. 30.00 120.00
Screw 8.000 No. 5.00 40.00
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Carpenter 10.000 MD 880.00 8,800.00
Labour
unskilled 1.000 MD 660.00 660.00
salwood 0.084 CUM 165,175.80 13,874.77
Supplying and fitting sal wood panneled door
Hinges 6.000 No. 25.00 150.00
10.2 7.1 shutter.~2.5cm thick, 2.12 sq.m 24,057.77 3,608.67 27,666.43 13,050.20
Bolts 2.000 No. 37.00 74.00
(Door Size - 1.07 x 1.982mm. ) = 2.12 m2 materials
Locking set 1.000 No. 325.00 325.00
Handles 2.000 No. 37.00 74.00
Screw Approx No. 100.00 100.00
8. Flooring works
Filling by stone in the foundation and levelling Skilled 0.000 MD 880.00 -
Labour
including haulage distance upto 30m (stone Unskilled 1.500 MD 660.00 990.00
6.5 8.2 1 Cu.m 2,526.00 378.90 2,904.90 2,904.90
soling) Block stone 1.200 cu.m 1,280.00 1,536.00
materials
Sand 0.000 cum 1,866.05 -
9. Plastering Works
12.5mm thick cement plastering works in 1:3 Skilled 12.000 MD 880.00 10,560.00
Labour
ratio in wall and floor Unskilled 16.000 MD 660.00 10,560.00
12.1b 9.1 100 sq.m 33,457.61 5,018.64 38,476.25 384.76
Cement 0.625 MT 15,918.50 9,949.06
materials
Sand 1.280 cum 1,866.05 2,388.54
20mm thick cement sand plastering works in 1:3 Skilled 14.000 MD 880.00 12,320.00
Labour
ratio in wall and floor Unskilled 19.000 MD 660.00 12,540.00
12.4a 9.2 100 sq.m 43,780.56 6,567.08 50,347.64 503.47
cement 0.960 MT 15,918.50 15,281.76
materials
Sand 1.950 cum 1,866.05 3,638.80
3mm thick fine cement rubbing work Skilled 10.000 MD 880.00 8,800.00
Labour
14.8 9.3 100 sq.m Unskilled 10.000 MD 660.00 6,600.00 23,645.78 3,546.87 27,192.65 271.92
materials cement 0.518 MT 15,918.50 8,245.78
10. HDPE Pipeline works
Supply, laying, levelling, jointing of 250 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 250/4 50.000 m 2,780.37 139,018.50 139,018.50 20,852.78 159,871.28 3,197.42
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Supply, laying, levelling, jointing of 200 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 225/4 50.000 m 1,782.56 89,128.00 89,128.00 13,369.20 102,497.20 2,049.94
Supply, laying, levelling, jointing of 180 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 180/4 50.000 m 1,441.18 72,059.00 72,059.00 10,808.85 82,867.85 1,657.35
Supply, laying, levelling, jointing of 160 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 160/4 50.000 m 1,148.83 57,441.50 57,441.50 8,616.23 66,057.73 1,321.15
Supply, laying, levelling, jointing of 140 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 140/4 50.000 m 878.26 43,913.00 43,913.00 6,586.95 50,499.95 1,009.99
Supply, laying, levelling, jointing of 110 mm Plumber 1.500 M.D 880.00 1,320.00
dia. (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,350.13 652.52 5,002.65 100.05
17.2 10.1 50 m materials Petrol 1.000 ltr 91.59 91.59
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 110/4 50.000 m 692.74 34,637.00 34,637.00 5,195.55 39,832.55 796.65
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 90 mm(6 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Unskilled 2.000 M.D 660.00 1,320.00
2,853.60 428.04 3,281.65 65.63
17.2 10.2 50 m materials Petrol 0.050 ltr 91.59 4.58
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 90/6 50.000 m 519.51 25,975.50 25,975.50 3,896.33 29,871.83 597.43
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 75 mm(6 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 2.000 M.D 660.00 1,320.00
2,853.60 428.04 3,281.65 65.63
17.2 10.3 50 m materials Petrol 0.050 ltr 91.59 4.58
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 75/6 50.0 m 360.22 18,011.00 18,011.00 2,701.65 20,712.65 414.25
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 63 mm (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 2.000 M.D 660.00 1,320.00
2,882.91 432.44 3,315.35 66.30
17.2 10.4 50 m materials Petrol 0.370 ltr 91.59 33.89
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 63/6 50.0 m 257.54 12,877.00 12,877.00 1,931.55 14,808.55 296.17
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 63 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 2.000 M.D 660.00 1,320.00
2,882.91 432.44 3,315.35 66.30
17.2 10.4 50 m materials Petrol 0.370 ltr 91.59 33.89
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 63/10 50.0 m 384.35 19,217.50 19,217.50 2,882.63 22,100.13 442.00
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Supply, laying, levelling, jointing of various Plumber 1.500 M.D 880.00 1,320.00
diameter 50 mm (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,292.43 643.86 4,936.29 4.93
17.2 10.5 1000 m materials Petrol 0.370 ltr 91.59 33.89
Tools & Eqpt. 1 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 50/6 1000 m 163.92 163,920.0 163,920.00 24,588.00 188,508.00 188.50
Supply, laying, levelling, jointing of various Plumber 1.500 M.D 880.00 1,320.00
diameter 40 mm (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 3.000 M.D 660.00 1,980.00
4,292.43 643.86 4,936.29 4.93
17.2 10.6 1000 m materials Petrol 0.370 ltr 91.59 33.89
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 4,125.00 103.54
HDPE 40/6 1000 m 105.70 105,700.00 105,700.00 15,855.00 121,555.00 121.55
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 32 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 3.000 M.D 660.00 1,980.00
3,548.49 532.27 4,080.76 4.08
17.2 10.7 1000 m materials Petrol 0.250 ltr 91.59 22.90
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 3,410.00 85.59
HDPE 32/10 1000 m 101.17 101,170.00 101,170.00 15,175.50 116,345.50 116.34
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 25 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 2.000 M.D 660.00 1,320.00
2,871.92 430.79 3,302.71 3.30
17.2 10.8 1000 m materials Petrol 0.250 ltr 91.59 22.90
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 25/10 1000 m 61.13 61,130.00 61,130.00 9,169.50 70,299.50 70.29
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 880.00 880.00
diameter 20 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 550.00 550.00
Unskilled 2.000 M.D 660.00 1,320.00
2,871.92 430.79 3,302.71 3.30
17.2 10.9 1000 m materialsPetrol 0.250 ltr 91.59 22.90
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 2,750.00 69.03
HDPE 20/10 1000 m 40.85 40,850.00 40,850.00 6,127.50 46,977.50 46.97
Supply laying, levelling, jointing of (125mm) 5 Plumber 2.000 M.D 880.00 1,760.00
inch GI pipes as per specification Labour Plumber Helper 2.500 M.D 550.00 1,375.00
Unskilled 5.000 M.D 660.00 3,300.00
7,239.38 1,085.91 8,325.28 277.50
17.2 10.10 30 m materials Red level paint 10.00% LC 6,435.00 643.50
Supply laying, levelling, jointing of (100mm) 4 Plumber 1.750 M.D 880.00 1,540.00
inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 550.00 1,100.00
Unskilled 4.000 M.D 660.00 2,640.00
5,940.00 891.00 6,831.00 227.70
17.2 10.11 30 m materials Red level paint 10.00% LC 5,280.00 528.00
Supply, laying, levelling, jointing of (65,80mm) Plumber 1.250 M.D 880.00 1,100.00
3 inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 550.00 1,100.00
Unskilled 3.000 M.D 660.00 1,980.00
4,702.50 705.38 5,407.88 180.26
17.4-1 10.12 30 m materials Red level paint 10.00% LC 4,180.00 418.00
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Supply laying, levelling, jointing of (40, 50mm) Plumber 0.750 M.D 880.00 660.00
2 inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 550.00 1,100.00
Unskilled 2.000 M.D 660.00 1,320.00
3,465.00 519.75 3,984.75 132.82
17.2 10.13 30 m materials Red level paint 10.00% LC 3,080.00 308.00
Supply, laying, levelling, jointing of (25, 32mm) Plumber 0.500 M.D 880.00 440.00
1 inch GI pipes as per specification Labour Plumber Helper 1.500 M.D 550.00 825.00
Unskilled 1.500 M.D 660.00 990.00
2,536.88 380.53 2,917.41 97.24
17.2 10.14 30 m materials Red level paint 10.00% LC 2,255.00 225.50
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
12. Dismentaling work
Demolishing cement mortar masonry wall and Skilled M.D -
Labour
19-2 12.1 removing demolished materials 10m. aWay 1 Cu.m Unskilled 2.120 M.D 660.00 1,399.20 1,399.20 209.88 1,609.08 1,609.08
from the site. materials Cu.m -
Distemper paint works two coats with base coat Skilled 5.800 MD 880.00 5,104.00
Labour
of cement primer white and additional costs all Unskilled 5.800 MD 660.00 3,828.00
complete Cement Primer
13.3 13.1 100 sq.m 8.000 12,050.50 1,807.58 13,858.08 138.58
White Ltr 362.50 2,900.00
materials
Dry Distemper
11.500
Powder Kg 19.00 218.50
Prepared enamel paint two coats with base coat Skilled 12.000 MD 880.00 10,560.00
Labour
of wood primer all complete Unskilled 8.000 MD 660.00 5,280.00
13.50 14.1 100 sq.m 25,687.30 3,853.10 29,540.40 295.40
Wood primer 8.100 Ltr 313.00 2,535.30
materials
Enamel paint 16.000 Ltr 457.00 7,312.00
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Bagmati Irrigation Project
Karmaiya , Sarlahi
Transportation Cost
Rate of Labours
S.N. Labour Type Unit District Rate Collection rate Remarks
1 Skilled md 880.00
2 Unskilled md 660.00
3 Semi Skilled md 550.00
Transportation
Market
S.N. Description of work Unit Rate (NRs)
Location
Vehicular Transportation- Easy Materials
1 Metalled road ton/ Km 19.00
2 Gravelled road ton/ Km 36.50
3 Earthen road ton/ Km 24.50
Vehicular Transportation- Difficult Materials
4 Metalled road ton/ Km 28.50
5 Gravelled road ton/ Km 73.00
6 Earthen road ton/ Km 36.75
Manual Transportation'
7 Manual- Easy materials kg/ Kosh 2.32
8 Manual- Difficult materials kg/ Kosh 3.52
9 Loading & Unloading- Easy material Quintal 10.00
10 Loading & Unloading- Difficult material Quintal 11.00
HDPE Pipe-weight-force relation
Rate per Kg 302.00 0.95 gm/cm3
Outer Diameter mm 2kgf/cm2 2.5kgf/cm2 4kgf/cm2 6kgf/cm2 10kgf/cm2 Internal Diameter mm
ominal Dia m Minimum Maximum Average wt/m v cm3/m tk mm ID I II III IV V V
16 16 16.3 16.15 0.092 27.784 11.60 11.9
20 20 20.3 20.15 0.135 40.770 14.90 15.2
25 25 25.3 25.15 0.202 61.004 18.90 19.2
32 32 32.3 32.15 0.226 68.252 0.335 101.170 26.90 24.10 24.37
40 40 40.4 40.2 0.251 75.802 0.350 105.700 0.514 155.228 35.60 33.70 30.30 30.7
50 50 50.5 50.25 0.378 114.156 0.542 163.684 0.797 240.694 44.70 42.20 38.00 38.5
63 63 63.6 63.3 0.403 121.706 0.586 176.972 0.851 257.002 1.270 383.540 424.2105 2.210365 58.57927 58.60 56.50 53.30 47.80 48.4
75 75 75.7 75.35 0.483 0.557 168.214 0.846 255.492 1.191 359.682 1.783 538.466 586.3158 2.564097 69.87181 70.60 69.90 67.10 63.60 57.10 57.8
90 90 90.8 90.4 0.634 0.799 241.298 1.221 368.742 1.717 518.534 2.569 775.838 841.0526 3.065399 83.8692 85.20 83.90 80.50 76.30 68.50 69.3
110 110 111 110.5 0.952 1.185 357.870 1.777 536.654 2.545 768.590 3.891 1175.082 1247.368 3.718332 102.5633 104.10 102.60 98.70 93.40 83.30 84.3
125 125 126.2 125.6 1.229 1.530 462.060 2.289 691.278 3.293 994.486 4.963 1498.826 1610.526 4.223609 116.5528 118.30 116.60 112.20 106.10 94.80 96.3
140 140 141.3 140.65 1.560 1.897 572.894 2.902 876.404 4.100 1238.200 6.210 1875.420 1996.842 4.674478 130.651 132.40 130.70 125.50 119.00 106.60 107.9
160 160 161.5 160.75 1.972 2.453 740.806 3.796 1146.392 5.355 1617.210 8.080 2440.160 2582.105 5.286845 149.4263 151.90 149.50 143.40 136.00 122.00 123.5
180 180 181.7 180.85 2.484 3.148 950.696 4.762 1438.124 6.801 2053.902 10.258 3097.916 3313.684 6.033637 167.9327 170.60 168.00 161.50 152.90 137.10 138.8
200 200 201.8 200.9 3.082 3.875 1170.250 5.890 1778.780 8.392 2534.384 12.623 3812.146 4078.947 6.685224 186.6296 189.50 186.70 179.40 169.90 152.50 154.3
225 225 227 226 3.896 4.822 1456.244 7.431 2244.162 10.544 3184.288 16.017 4837.134 5075.789 7.390692 210.2186 213.20 210.30 201.90 191.40 171.40 173.4
250 250 252.3 251.15 4.771 6.012 1815.624 9.187 2774.474 13.041 3938.382 19.761 5967.822 6328.421 8.294645 233.4107 237.00 233.50 224.30 212.60 190.50 192.8
280 280 282.6 281.3 6.042 7.471 2256.242 11.455 3459.410 16.328 4931.056 24.713 7463.326 7864.211 9.199756 261.6005 265.60 261.70 251.40 238.20 213.60 216.2
315 315 317.8 316.4 7.584 9.417 2843.934 14.508 4381.416 20.695 6249.890 31.239 9434.178 9912.632 10.30831 294.3834 298.60 294.50 282.80 267.90 240.40 243.3
355 355 358.2 356.6 9.641 11.957 3611.014 18.382 5551.364 26.245 7925.990 39.643 11972.186 12586.32 11.61304 331.7739 337.20 331.90 318.80 302.00 271.00 274.2
400 400 403.6 401.8 12.213 15.221 4596.742 23.343 7049.586 33.311 10059.922 50.353 15206.606 16022.11 13.12137 373.7573 379.20 373.90 359.20 340.30 305.30 308.9
450 450 454.1 452.05 15.394 19.163 5787.226 29.485 8904.470 42.067 12704.234 63.609 19209.918 20171.58 14.68052 420.639 426.70 420.80 404.20 383.00 343.70 347.8
500 500 504.5 502.25 18.939 23.836 7198.472 30.406 9182.612 51.903 15674.706 78.749 23782.198 25090.53 16.43967 467.1207 474.20 467.30 449.10 425.60 381.50 386
Marking Colour 0.939335 0.948211 0.951707 Red Blue Green Yellow