Production Part Approval Process Aiag Ppap 4 Edition
Production Part Approval Process Aiag Ppap 4 Edition
com
Production Part
Approval Process
AIAG PPAP 4th Edition
A JSJ Business
What IS PPAP?
www.ghsp.com
It is NOT:
• For the customer (GHSP, Chrysler, etc…)
• A singular “event”
• A method of torture
• A test for the SDE / SQE / Quality person
• A one day activity (on either end)
A JSJ Business
When to PPAP??
www.ghsp.com
A JSJ Business
Elements of PPAP
www.ghsp.com
GHSP defaults to level 4 unless otherwise specified. SDE or SQE determines what
evidence they want submitted.
ELEMENTS OF PPAP LEVEL
I II III IV V
1 Design Records R S S R* R
2 Engineering Change Documents, if any R S S R* R
3 Customer Engineering Approval, if required R R S R* R
4 Design FMEA R R S R* R
5 Process Flow Diagrams R R S R* R
6 Process FMEA R R S R* R
7 Control Plan R R S R* R
8 Measurement System Analysis Studies R R S R* R
9 Dimensional Results R S S R* R
10 Material, Performance and Test Results R S S R* R
11 Intitial Process Studies R R S R* R
12 Qualified Laboratory Documentation R S S R* R
13 Appearance Approval Report (AAR) if applicable S S S R* R
14 Sample Product R S S R* R
15 Master Sample R R R R* R
16 Checking Aids R R R R* R
17 Records of Compliance with Customer-Specific Requirements R R S R* R
18 Part Submission Warrant (PSW) Note Bulk Material Checklist S S S R*S R
R* The Supplier (Organization) shall retain AND submit to the customer upon request
Very important!!!!!!
* Fourth Edition PPAP Manual, 200; 2nd printing November 2009, A JSJ Business
Reason for Training?
www.ghsp.com
4.5 100%
4 90%
# of total non conformances
80%
3.5
70%
3
60%
2.5
50%
2
40%
1.5
30%
60%
1
20%
0.5 10%
0 0%
“The organization shall meet all specified PPAP requirements…elements 1 thru 18.
The organization shall also meet all customer-specific PPAP requirements.” PPAP 4 Edition, March 2006, p3
th
A JSJ Business
1. Design Records
www.ghsp.com
• The supplier shall have all design records for saleable product
– Includes an approved design record for components or details
– There is only one design record regardless of who has design responsibility
– If the supplier is design responsible, GHSP may release the supplier’s design
records into our system for documentation and data control. This may include
supplier performance specifications.
– For catalog parts, the design record may only consist of functional specs or a
recognized industry standard . Example: MOSFET 60V, 3a, AEC 201 qualified
• When the “master” design record is in electronic format, hard copy must be supplied
A JSJ Business
2. Engineering Change
Documents www.ghsp.com
A JSJ Business
3. Customer Engineering
Approval www.ghsp.com
A JSJ Business
4. Design FMEA
www.ghsp.com
• Suppliers shall have a Design FMEA for parts for which they are design-
responsible
• Compliant to Potential Failure Mode and Effects Analysis reference manual
4th Edition
– Need to have RPN values calculated for each item
– Need to have actions identified with dates and results for those items
that are considered high risk
• Need to have all critical , significant and pass thru characteristics identified
in the appropriate column In other words: There needs to be a
GHSP SDE/SQE Responsibilities: DFMEA and SC/CC’s identified
Hint: only applies to design responsible
• If GHSP is design responsible, provide a copy of GHSP DFMEA(s) to
suppliers
• If Supplier is design responsible, review the DFMEA and check that
recommended actions have been completed, all special characteristics are
represented and look for evidence of past problem history (PTR references)
as appropriate. A JSJ Business
5. Process Flow Diagrams
www.ghsp.com
A JSJ Business
8. Material Performance Test
Results www.ghsp.com
A JSJ Business
9. Initial Process Studies
www.ghsp.com
An initial process study must be completed for all agreed-upon GHSP Significant and Critical
characteristics. If no Special characteristics are designated select a part characteristic that is an
indicator of the process.
Process capability studies need to be evaluated for statistical control, stability and normality before
one can even consider doing a initial process study in order to ensure the capability calculations are
accurate.
GHSP Defaults to 125 parts in 25 subgroups, subgroup size = 5.
Control charts need to be submitted to show evidence of statistical control
If process is not normal, further analysis is required such as transforming the data or looking to long
term historical data from a like process with similar level of precision requirements. Minitab Capability
Six Pack does an efficient job at showing all the needs in 1 snapshot.
Index> 1.67 is acceptable. GHSP requirement is Ppk> 1.67
Index>1.33 but < 1.67 may be acceptable. Contact Customer; GHSP requires 100% verification
through gauging, testing, poke-yoke or alternate method agreed upon. Why? GHSP Deviates from
this as our expectation is 0 PPM & index of 1.33 = 34 PPM
Index < 1.33 not acceptable
Suppliers should validate their method of calculating initial capability. GHSP offers an input data set
on their website with known capability outcomes. Suppliers should verify this data set, when ran
through their software, calculates the same capabilities.
A JSJ Business
9. Initial Process Studies
www.ghsp.com
A JSJ Business
10. Measurement System
Analysis www.ghsp.com
MSA studies e.g., Gage R&R, bias, linearity, stability for all new or modified gages, measurement and
test equipment shall be completed and acceptable.
ANOVA based Gage R&R should be used as it includes Operator interactions
Acceptability criteria may be found in the MSA manual.
• Generally <10% error is acceptable; 10%-30% may be acceptable depending on the initial
process capability, importance of the application or cost of measurement device.
• Number of distinct categories needs to be greater than or equal to 5.*
• %Study Variation (%SV) denotes the gauge’s ability for use for process control (SPC)
• %Tolerance Variation (%TV) denotes the gauge’s ability to determine if parts are in
tolerance
• %TV alone may be used in special cases where capability is over 2.5 Ppk
• Typical issues we are finding are around missing linearity, bias and stability studies
• Parts used for Gage R&R must be representative of the capability of the process. Process variation
is a significant component of the R&R study.
• We are also finding parts in the study that are outside the process variation that was submitted in the
initial process capability studies. This raises questions over the integrity of the Cpk studies.
* While this is a requirement, we need to look at the MSA in a holistic sense and if there is a
rational reason such as understanding the sensitivity of the GRR over various degrees of
variation then we are open to deviating from this as long as the science supports the situation.
A JSJ Business
10. Measurement System
Analysis www.ghsp.com
A JSJ Business
11. Qualified Laboratory
www.ghsp.com
A JSJ Business
13. Control Plan
www.ghsp.com
• The control plans define the specific methods used to control the Process and Product
requirements. Take note:
• SPC is NOT control method; Xbar/R control chart is a method.
• Include Sample sizes & frequencies that are specified in performance specifications.
• Product requirements include performance and annual validation
• References to other quality system documents are not sufficient.
• Must include special characteristics
• The control plans required at launch are to include safe launch/flawless/GP-12 with
increased inspection frequencies / sample sizes.
• An exit strategy from safe launch/flawless/GP-12 is also required. An example is 60
consecutive production runs with 0 defects found at inspection.
• Control Plans for “families” of similar parts are acceptable if the new parts have been
reviewed for commonality.
• Include the following sections: Incoming, in process, finished part audit, containment,
annual verifications (eg: performance or dimensional)
• Certain OEM customers may require Control Plan approval
• Customer signature on the Control Plan for Ford Inverted Delta Designed
Components
A JSJ Business
13. Control Plan
www.ghsp.com
– PSW are completed once ALL other PPAP elements have been completed.
– All fields must be filled out appropriately.
– The PSW shall be completed for each CUSTOMER part number. GHSP does
not deviate on this.
– The organization shall verify that all the measurement and test results show
conformance with customer requirement and that all required documentation
(elements 1-18) are available.
– PSW’s are legally binding documents, admissible to legal proceedings and
declare conformance. Definition of Affirm: Means to declare positively
something to be true; Confirm something as binding or valid. Let’s consider the
following statements:
“Declaration: I affirm that the samples represented by this warrant are representative
of our parts which were made by a process that meets all PPAP Manual 4th Edition
Requirements. I further affirm that these samples were produced at the rate of
____/____ hours. I also certify that documented evidence of such compliance is on
file and available for review. I have noted deviations from this declarations below.”
In other words: Legal document
Hint: Fill it out correctly, PO number, Rate
info, GHSP part number and Rev level
A JSJ Business
15. Appearance Approval
Report (AAR) www.ghsp.com
A separate AAR form CFG-1002 is the standard and documents each part or series of parts
meets appearance requirements are on the design record.
GHSP accepts this standard for all OEM’s. We expect all the form to be completed entirely.
Internal GHSP quality professionals can translate the information into customer specific as
needed.
If the part being PPAP’ed does not have a appearance requirement, this section of the
submission should be identified as not applicable.
Multiple reasons for submissions may apply. For example, supplier may be submitting for full
PPAP approval (PSW) AND a re-submission if the prior PPAP was rejected for aesthetic
concerns.
The completed AAR must accompany production parts that represent production process. Use
caution in sending in the best of the best (BOB) if you know that the product process produces
variation is likely to vary. The vendor may accept this risk if they have an internal improvement
plan. When subjective concerns arise later, we ALWAYS go back to the AAR samples as first
reaction to calibrate ourselves. Manage this well.
We encourage duplicate AAR samples to be developed, submitted, tagged and retained by
both manufacture and within GHSP. Why do you think this is a recommended practice?
A JSJ Business
20. Customer Specific
Requirements www.ghsp.com
A JSJ Business
20. Customer Specific
Requirements www.ghsp.com
A JSJ Business
43
www.ghsp.com
ANY QUESTIONS?