Work at Height Survey
Work at Height Survey
Work at Height Survey
com
2. Control Room Cable installation / structure painting -FBH with 2m long lanyard, Safety Goggles,
/ structure maintenance Hard Hat/, Safety Shoes
60 m horizontal cable tray -Horizontal steel life line attached (detachable
section behind control room type) with fixed anchor rings along the cable
tray section anchored at both ends and in
between to permanent structures, with FBH
connected to the life line
3. Chimney & Storage Tank Outside Painting / maintenance -FBH with 2m long lanyard, Safety Goggles,
Hard Hat/, Safety Shoes
-Working Aluminum saddle attached to
vertical steel life line, descending device ,
manual operation
4. Urea Plant B Electrical lamp replacement -FBH with 2m long lanyard, Safety Goggles,
Hard Hat/, Safety Shoes
Pipe Rack -Use ‘A’ type retractable ladder, FBH lanyard
attached to the top section of pipe rack
through a fall arrest device
5. Compressor Train B Painting work -FBH with 2m long lanyard, Safety Goggles,
Hard Hat/, Safety Shoes, safety net (install
43.1 m elevation from 7 ‘ from the permanent structure) with
more tie-points, without joints in nets
7. Ammonia Storage Tank A Maintenance / repair / painting work -FBH with 2m long lanyard, Safety Goggles,
at the tank dome area Hard Hat/, Safety Shoes, safety net (install
Refrigerated, dome shaped from 7 ‘ from the permanent structure) with
tank more tie-points
- Install a ladder to the dome centre from the
nearest working platform, install a permanent
anchor point at the dome centre,
-Install a lifeline anchored to the dome anchor
point to work around the dome, with FBH
lanyard attached to this lifeline with a fall
arrest device
8. Ammonia Storage Tank B Maintenance / repair / painting work - -FBH with 2m long lanyard, Safety
at the tank sides Goggles, Hard Hat/, Safety Shoes, safety
Refrigerated, dome shaped net (install from 7 ‘ from the permanent
tank structure) with more tie-points
10. Communication Tower Painting / Repair Work / Cable - All required PPE including FBH, etc.
replacement - Retractable cable fall arrest device
attached to vertical lifeline, fixed to the
tower top section
11. Urea Conveyor Maintenance of AC sheet work -FBH, safety shoes, goggles, Hard Hat,
(replacement of broken sheet, etc.) - - Man basket lift using crane, FBH lanyard
Covered with AC sheet roof anchored to crane hook (& if possible
& sides attached to the near by permanent
structure), with an optional retractable
cable fall arrestor & vertical life line kept in
the man basket, use of qualified rigger,
crane operator, tag lines
- As an option, ABCD can consider
installing a horizontal life line along
the conveyor housing with various
anchor points (similar to the
recommendation provided for the
15. Bagging Area / Ware Light fixture repairs / lamp - All required PPE
House / Other replacements - Use ‘U’ end ladders (for better grip)
inaccessible locations positioned in between belt conveyor
where lights are installed streams
- ABCD may consider re-locating lights to
the wall sides for ease of maintenance
16. Naphtha Wagon Work atop rail wagon top side for - All required PPE
unloading Area opening of manholes, etc. - FBH attached to horizontal life line
anchored at 5 m interval,
Abbreviations:
Notes:
1. FBH with double lanyards are supposed to provide the ultimate in WAH protection to workers so long as you
ensure that:
o The worker does not remove both lanyard anchor points when he is shifting locations. As an auditor, I have
witnessed this unsafe practice being followed by some scaffolders when they have to climb up / down tall
scaffold structures; and
o Beware of ‘Pendulum effect’ (swinging and hitting nearby structure) and ‘Bottoming Out’ effect (hitting the
ground when the FBH is anchored at a short distance from ground).