CHINA NATIONAL LOGGING CORPORATION

FIT – TRIM BOOK


FOR SWT MAINTENANCE

April 2011

_____________________________________
China National Logging Corporation – Pakistan Branch
House 143, Street 37, F-10/1, Islamabad
Tel: 0092-51-2105901 / 902, Fax: 0092-51-2105903
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FIT – TRIM RECORD

INDEX

SECTION DESCRIPTION NO. OF PAGES

1 Flow Head
Flow Head – FIT Record 2
Flow Head – TRIM Record 2
2 Surface Safety Valve (SSV)
SSV – FIT Record 2
SSV – TRIM Record 2
3 Sand Filter
Sand Filter – FIT Record 1
Sand Filter – TRIM Record 2
4 Choke Manifold
Choke Manifold – FIT Record 3
Choke Manifold – TRIM Record 2
5 ESD
ESD – FIT Record 1
ESD – TRIM Record 1
6 Steam Exchanger
Steam Exchanger – FIT Record 2
Steam Exchanger – TRIM Record 2
7 Heater
Heater – FIT Record 1
Heater – TRIM Record 4
8 Separator
Separator – FIT Record 4
Separator – TRIM Record 7
9 Oil Manifold
Oil Manifold – FIT Record 2
Oil Manifold – TRIM Record 2

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FIT – TRIM RECORD

10 Gas Manifold
Gas Manifold – FIT Record 2
Gas Manifold – TRIM Record 2
11 Gauge Tank
Gauge Tank – FIT Record 1
Gauge Tank – TRIM Record 2
12 Surge Tank
Surge Tank – FIT Record 2
Surge Tank – TRIM Record 4
13 Coflexip
Coflexip – TRIM Record 1
14 Miscellaneous
Texsteam Pump – FIT Record 2
Lab Cabin – TRIM Record 2
Ranarex – TRIM Record 2

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
FLOW HEAD BOOK

SECTION # 01

FLOW HEAD
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FLOW HEAD

FIT CHECK RECORD

Flow Head :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Wash flowhead thoroughly and dry with air.
• Make one cycle opening/closing on manual valves. Number of turns
Count turns in either direction
• Inject WOM Sealing Compound in both upstream and downstream
orifices. On manual valves in closed position.
• Grease valve stem bearings through grease nipple in the bonnet.
• Inspect bonnet valve bleed off ball and seat (threads if NPT bleed off) Replace if worn
• Connect pumping unit to actuator or ESD.
- Pressurization button to ESD unit
- Open Pressure Valve
- Pump Valve Open (Max 2500 PSI HYD PRES).
- Increase pressure to 3500 PSI to check that relief valve
opens. Then decrease to 2500 PSI.
- Release Hydraulic Pressure.
• Inject WOM Compound in both upstream and downstream orifices 20 strokes on bucket pump
with valve in closed position. if empty sealing reservoir
• Check O-rings at bottom X-over and top Pressure Test Adapter. Replace damaged seals.
- Install top, bottom and lateral PTA's
- The flowhead is now ready for FIT-2

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FLOW HEAD
FIT 2 - PRESSURE CHECKS DATE

SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Connect pump to main block PTA.
• Open master valve, swab valve and wing valves.
• Fill with water.
• Increase pressure gradually to 1,000 PSI Hold pressure for 5 minutes. No drop on chart.
• Increase pressure gradually to 10,000 PSI. Hold pressure for 15 No drop on chart.
minutes.
• Bleed off pressure.
• Close valve, swab, kill and wing valve.
• Increase pressure gradually to 1,000 PSI. Hold pressure for 5 minutes. No drop on chart.
• Increase pressure gradually to 10,000. Hold pressure for 5 minutes. No drop on chart.
• Bleed off pressure.
• Close master valve.
• Increase pressure gradually to 1,000 PSI. Hold pressure for 5 minutes. No drop on chart.
• Increase pressure gradually to 10,000 PSI. Hold pressure for 5 No drop on chart.
minutes.
• Bleed off pressure.
• Connect pump to kill valve test plug and close kill valve. Open
master valve.
• Increase pressure gradually to 1,000 PSI. Hold pressure for 5 minutes. No drop on chart.
• Increase pressure gradually to 10,000 PSI. Hold pressure for 5 No drop on chart.
minutes.
• Bleed off pressure.
• Open kill valve. Close master valve.
• Increase pressure gradually to 1,000 PSI. Hold pressure for 5 minutes. No drop on chart.
• Increase pressure gradually to 10,000 PSI. Hold pressure for 5 No drop on chart.
minutes.
• Bleed off pressure.
• Check actuator opening pressure and note pressure. PSI
• Drain water.
• Close valves.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FLOW HEAD

TRIM CHECK RECORD

Flow Head

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Dismantle completely the Swab Valve as per procedures of the Report corrosion to
Maintenance Manual. Supervisor
- Inspect all parts for wear, corrosion and mechanical damages
- Inspect all seats for scars and wash out
- Change all O Rings and Seals
• Check easy rotation of swivel 60-80 ft/lbs
• Check oil level in swivel is ok by opening 1" NPT screw.
• Swivel oil to be changed on every 6-8 jobs.
• Visually check access port between swivel seals.
• Open and check bleeder valves
• Refit bleeder valves into bonnet Replace with new if signs
of wear etc
• Re-assemble and perform FIT 1 checks

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
FLOW HEAD

TRIM 2 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Perform FIT 2 pressure checks, increasing test pressure to 15,000 psi No drop on chart record
for body test only.
• Check actuator opening pressure and note pressure. Under pressure psi
and without pressure, check for hydraulic oil leakage.
• Check actuator closing time under pressure and note time taken secs
• Green tag equipment

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
SSV BOOK

SECTION # 02

SSV
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SSV

FIT CHECK RECORD

SSV :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Clean inside and outside.
• Check fixation of API flanges on inlet and outlet and Threads.
• Inspect bonnet valve, bleed off ball and seat (threads if NPT bleed Replace if worn
off).
• Connect pumping unit to actuator or ESD
- Pressure button to ESD unit
- Open Pressure Valve
- Pump Valve Open (Max 2500 PSI HYD PRES.)
- Release Hydraulic Pressure
• Inject WOM Compound in both upstream and downstream orifices 20 strokes on bucket pump
with valve in closed position. if empty sealing reservoir.
• Install inlet and outlet, pressure test adaptor.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SSV

FIT 2 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
BODY TEST:
• Connect pump to inlet of SSV.
• Pump valve open.
Note: Only half open if W.O.M. valve.
• Increase pressure gradually to Max W.P. of valve.
• Increase pressure gradually to wp. Hold for 5 minutes. No drop on chart.
• Bleed of pressure.
• Close valve by triggering ESD button.
• Check actuator closing time. Secs.
Make sure valve if fully closed.
• Downstream valve test.
• Increase pressure gradually to wp. Hold for 5 minutes. No drop on chart.
• Bleed off pressure.
• Upstream valve test:
• Connect pump to inlet of SSV.
• Increase pressure gradually to 1000 psi. No drop on chart.
• Hold for 5 minutes.
• Increase pressure to max W.P. of SSV.
• Hold for 5 minutes. No drop on chart.
• Bleed off pressure.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SSV

TRIM CHECK RECORD

SSV :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Dismantle completely the stand alone valve. Inspect all parts for
wear, corrosion, scars or other possible damage. Change all O rings
and seals.
• Inspect seat pockets in valve.
• Clean and grease pockets and O-rings in seats with
Omega Hi-Temp grease #3100 425° F.
• Re-assemble the SSV.
• Make one cycle of the valve IE. open at 2000 psi on actuator to make
sure that Gatebore is aligned with Scatbore.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SSV

TRIM 2 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Perform FIT 2 pressure checks
• Touch up paint

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
SAND FILTER BOOK

SECTION # 03

SAND FILTER
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SAND FILTER

FIT CHECK RECORD

Sand Filter :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SAND FILTER

TRIM CHECK RECORD

Sand Filter :

Serial # : Size :

Workshop Job No. : Other Info :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SAND FILTER

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
CHOKE MANIFOLD BOOK

SECTION # 04

CHOKE MANIFOLD
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
CHOKE MANIFOLD

FIT CHECK RECORD

Choke Manifold :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Clean inside and outside
• Check fixation of manifold on skid
• Make one cycle opening and closing the valves. Count the number of
turns to actuate the valves in either position
• Close the valves
• Inject WOM sealing compound in bonnet. 20 strokes on bucket pump
on 3" valves
• Grease the valve stem bearings through the grease nipple provided on
the bonnet.
• Remove the adjustable choke Replace tip and seat if worn
• Check the Sampling / Bleeder points. Report damage
• Check pressure pick points. Report damage
• Check shape of WECO connections and seals. Replace if damaged

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
CHOKE MANIFOLD

FIT 2 - PRESSURE CHECKS DATE


SPECIALIST
When testing WOM valves, use WOM test procedure
TICK ACCEPTANCE
CRITERIA
• Install needle valves instead of bleeder plugs
• Install pressure test adaptors
• Connect HP pump to pressure test adaptor at inlet of the CMF
• Fill up upstream side of the CMF. While circulating water,
momentarily open all sampling points, bleed off valves, pressure pick-
up . . . to make sure they are clean and able to deliver sample later on
• Body test. Open all valves on CMF. Connect test hose to inlet
connection of manifold. If WOM valves to be half open.
• Increase pressure to Max W.P. Hold pressure for 15 minutes No drop on chart
• Release pressure
• Close upstream valves
• Open downstream valves
• Fill with water
• Increase pressure to 300 PSI. Hold pressure for 5 mins. No drop on chart
• Increase pressure to max W.P and hold pressure for 5 mins. No drop on chart
• Release pressure
• Open upstream valves
• Close downstream valves
• Increase pressure to 300 PSI. Hold pressure for 5 mins No drop on chart
• Increase pressure to max W.P and hold pressure for 5 mins No drop on chart
• Release pressure
• Connect H/P pump to test adaptor at outlet of CFM
• Increase pressure to 300 PSI. Hold pressure for 5 mins. No drop on chart
• Increase pressure to max W.P and hold for 10 mins. No drop on chart
• Release pressure.
• Remove needle valves
• Remove pressure test adaptors
• Install thread protectors or protect unions with greased rags or paper
• Inject body filler grease

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
CHOKE MANIFOLD

• Check all spare parts are available in the tool box. Check especially Ready box list
the range and sizes of the fixed chokes and handles.
• Check the tool box is locked
• Check Inspect test cert date. With in 1 year.
• Check load test date With in 5 years.
• Check visual inspection date. With in 1 year.
• Check sling color, date and rating. Inspect test certification.
• Touch up paint.
• Green tag equipment

3
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
CHOKE MANIFOLD

TRIM CHECK RECORD

Choke Manifold :

Serial # : Size : 3-1/16"

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE

SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Dismantle completely the floor choke manifold. Inspect all parts, Report non-conforming
joints, bolts and chokes for wear, corrosion and other damage. items
Change all O rings and seals.
• Inspect adjustable stem tip and seat. Replace if worn or eroded
• Open and check bleeder valve.
• Re-fit bleeder valves into bonnet.
• Re-mount the manifold and perform FIT 1 checks.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
CHOKE MANIFOLD

TRIM 2 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Perform FIT 2 pressure checks
• Touch up paint

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
ESD BOOK

SECTION # 05

ESD
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
ESD

FIT CHECK RECORD

ESD :

Serial # : Options :

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Unit to be cleaned.
• All ESD buttons to be checked for ease of operation.
• Connect Pilot button to console, also Hydraulic hose from console to
Flowhead Actuator.
• Pressure up actuator cylinder and bleed off air pressure at every Pilot
button.
• To check actuator is closing when air is bled off.
• Check level of Hydraulic Oil Reservoir and Green Tag (RITE).
• Check annual survey date. If out of date perform TRIM.

No. of 1 " air hoses


4
No. of pilot buttons
No. of hydraulic hoses

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
ESD

TRIM CHECK RECORD

ESD :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Unit to be cleaned.
• Re-calibrate all pressure gauges.
• Remove pump and refurbish
• Change out interface valves.
• Check air regulators.
• All ESD Buttons to be checked for ease of operation. Correct pilot button
to console, also Hydraulic hose from console to Flowhead actuator.
• Pressure up actuator cylinder and bleed off air pressure at every pilot
button to check actuators are closing when air is bled off.
• Check level of Hydraulic Oil reservoir.
• Green Tag.

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
STEAM EXCHANGER BOOK

SECTION # 06

STEAM EXCHANGER
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
STEAM EXCHANGER

FIT CHECK RECORD

Steam Exchanger :

Serial # : Options :

Workshop Job No. : Other Info : For 10K Steam Exch.

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Steam clean outside of Steam Exchanger.
• Flush coils with soft water.
• Make one cycle opening and closing of inlet, outlet and bypass valves.
- Count the number of turns to actuate valves in either position.
• Inject sealing compound in valves both upstream and downstream
orifices.
• Grease all valve stem bearings through grease nipple on the bonnet.
• Check all spare parts are available in the tool box.
- check especially range and size of chokes.
• Remove the choke.
- Check the shape of tip and seat if adjustable choke was installed.
Install blank choke instead.
• Check thermowells, pressure pick up points for DWT, pilots....
• Check shape of all WECO inlet and outlet connections and seals.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
STEAM EXCHANGER

FIT 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Install pressure test adapters on the coil inlet and outlet.
• Install adjustable choke seat and fixed choke pressure cap.
• Flush coil with water.
• Close by pass and outlet valve.
• Start HP pump. No drop on chart
Increase pressure to 2,000 psi.
Stop HP pump.
Hold pressure for 5 minutes.

• Start HP pump.
Increase pressure to 10,000 psi.
Hold for 15 minutes. No drop on chart
• Release test pressure.
• Close inlet valve. No drop on chart
Re-pressurize to 2,000 psi.
Hold pressure for 5 minutes.
• Start HP pump. No drop on chart
Increase pressure to 10,000 psi.
Hold for 5 minutes.
• Release test pressure.
• Remove fixed choke pressure cap.
Install adjustable choke.
Open adjustable choke.
Flush coil with water.
Open all valves.
• Start HP pump. No drop on chart.
Increase pressure to 2,000 psi against test adapters.
Hold for 5 minutes.
• Start HP pump. No drop on chart.
Increase pressure to 10,000 psi.
Hold for 15 minutes.
• Close inlet and outlet valve.
• Re-pressurize to 2,000 psi No drop on chart.
Hold for 5 minutes.
Start HP pump. No drop on chart
Increase pressure to 10,000 psi.
Hold 5 minutes.
Release test pressure.
Rig down equipment
Check Dnv cert. Date. With in 1 year.
Check Load test date. With in 5 years.
Check visual inspection date.(mpi) With in 1 year.
Check sling color, date and rating.(16 Tons) Mærsk OSP
Green tag equipment.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
STEAM EXCHANGER

TRIM CHECK RECORD

Steam Exchanger :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Perform FIT 1 checks.
• Clean air filter on air supply of the Foxboro controller.
• Connect air supply to the controller and adjust output regulator
pressure to 20 psi. Check that steam inlet valve opens.
• Remove temperature sensors from well and check the coil capillary
tubing for kicks, damages, deformations. Immerse senosr in oil bath
at 175°C. With set point at maximum range, check that steam inlet
valve closes. While oil bath is cooling down, check correct operation
of the controller, i.e. steam inlet valve closes whenever affixed
temperature is reached.
• Dismount, inspect and clean the steam trap at the steam outlet.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
STEAM EXCHANGER

TRIM 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Perform FIT 2 pressure checks.
• Pressure test the vessel if requested by client or after any replacement
of part in the steam circuit. Remove pressure safety valve and replace
by blank flange. Remove if any, the operational rupture disc or the
optional second safety valve and replace by blank flange. Connect air
supply (max 100 psi) to the Foxboro controller to open the steam inlet
valve. Close outlet bleeder valve. Leave steam outlet valve open.
Fill up the vessel via the steam inlet with soft water mixed with
corrosion inhibitor. When water appears at steam outlet valve, close
the valve. Continue filling the vessel until it is full of water. Pressure
test the vessel at 250 psi and hold for 15 minutes. Empty the vessel
and remount the safety valves.
• Touch up paint.

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
HEATER BOOK

SECTION # 07

HEATER
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
HEATER

FIT CHECK RECORD

Heater :

Serial # : Options :

Workshop Job No. : Other Info :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
HEATER

TRIM CHECK RECORD

Heater :

Serial # : Options :

Workshop Job No. : Other Info :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
HEATER

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
HEATER

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

3
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
HEATER

4
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
SEPARATOR BOOK

SECTION # 08

SEPARATOR
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

FIT CHECK RECORD

Separator :

Serial # : Options :

Workshop Job No. : Other Info :

FIT 1 DATE
SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Connect water pump to separator inlet.
• Connect air line to separator air scrubber and ensure ACV's are in Visual check v/v are open.
open position (air output to v/v's 30 PSI to oil & water, 0 PSI to as
v/v).
• Close all oil meter valves and gas outlet v/v and oil and gas by-pass
valves and water meter valve.
• Open needle v/v at highest point on separator.
• Start water pump and fill separator with water. Ensure air follow through
bleed off.
• Once filled with water cycle each manual valve 3 times or until water
is clear.
• Cycle water and oil sight glass inlet and outlet valves. Ensure sight Sight glasses should fill
glass fills freely with water. from bottom.
• Drain vessel.
• Remove back door, water Trol, flange and float.
• Remove flange on water sight glass inlet.
• Inspect inside of vessel for solids and clean out as required.
• Check mesh inside vessel is intact and not corroded.
• Inspect lifting pins on separator frame. Replace if worn.
• Inspect relevant certification of vessel, PSV's and any flange or X- Re-certify if past expiry
over and make thickness checks as required. date. Note thickness
measurements.
• Remove fisher level trol and float.
• Replace back door gasket and refit back door.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

FIT 2 DATE
SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Remove sight glass valve stems.
• Ensure valves operate freely.
• Inspect balls and seats for corrosion .
• Ensure circlip ball retainer or stop is installed in sight glass v/v bodies.
Replace gaskets and refit sight glass valves.
• Ensure Daniel orifice plate carriers are removed from Daniel box.
• Remove top section of box. Inspect gears, orifice surfaces for wear or
corrosion.
• Remove fixed and sliding plate and inspect for wear, corrosion. Zero scratches on plate
Replace as required. sealing surface.
• Install new gasket.
• Install fixed plate and inject sealing compound with grease injector. Sealing compound should
be continuous around
sealing groove compare
with new spring.
• Inspect springs and spring holder for wear corrosion and free length.
• Inspect gasket surfaces on Daniel for wear. Particular attention should
be paid to holes for equalizing v/v and sealing compound injection.
• Rebuild Daniel leaving sliding plate closed.
• Refit water level trol, Fischer Controller and Wizard after calibration
with calibrated units.
• Remove Thermal probes and check for corrosion.
• Check open and closed indicator fitted to Daniel.
• Clean sight glasses and ensure free flow of liquid to glasses.
• Cycle all valves and repair any that are stiff.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR
FIT 3 DATE
SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Install test caps to separator inlet, gas, oil and water outlet
connections. Ensure test cap bleed off v/vs are closed. Connect
airline to air scrubber and ensure ACV's are in open position. (As in
FIT 1).
• Ensure Daniel gate v/v is closed and top gasket and bar removed.
Open needle v/v at highest point on separator.
Connect water line to separator inlet test cap and open v/v and fill
separator with water.
• As separator fills observe a change in output to oil ACV to prove float
attached to torque arm.
• Once separator filled with water close separator test cap inlet v/v and
remove waterhose. No drop on chart recorder.
Install test pump line to separator gas outlet test cap and open v/v.
Close gas outlet v/v and gas by-pass v/v and pressure test to 1250 PSI.
Bleed off pressure after good test.
• Install test pump line to separator inlet. Ensure separator inlet, oil and .As above.
gas by-pass valves are closed, pressure test to 1250 PSI, bleed off
pressure after good test.
Open inlet to separator, close oil meter by-pass, water line meter inlet As above.
v/v, oil meter inlet v/v's and separator high point bleed off v/v. Daniel
sliding plate in (Daniel top is open). Pressure test to 1250 PSI.
• Bleed off pressure after good test.
• Close oil outlet v/vs. Install gasket to top of Daniel and insert bar and
compression plate. Slowly open equalizing valve and equalise across
gate v/v. Once equalized open gate, pressure test to 1250 PSI. Bleed
off pressure. Thus testing bleed off valve and equalising valve
packing.
• Test backup oilline with oil outlet and oil bypass valves closed. No drop on chart recorder
• Close oil outlet v/vs , open oil metering v/vs. Pressure test to 1250 .As above.
PSI, bleed off pressure. Install test line on water outlet test cap. Close
water meter inlet v/v, open water outlet v/v. Pressure test to 1250
PSI. Bleed off pressure. Close water outlet v/v, open water meter
inlet v/v. Pressure test to 1250 PSI. Bleed off pressure. Remove test
caps.
• Close oil ACV (0 PSI output from controllers). Slowly open the 2" oil
outlet v/v, check that the ACV stops the flow of water to a good
degree by operating Wizard, Water Trol and Level Trol. Slowly
increase output to ACV and observe an increase in water flow rate.
Repeat above for all ACV's (gas ACV 30 PSI output to close). Ensure
water drains from sight glasses.
• Fit blank orifice plate into Daniel orifice meter. As above.
• Daniel metering line and open gas outlet v/v. Check water stops Time =
draining after 5-10 mins and pressure bleeds down from 100 PSI to
zero.
• Ensure full set of Daniel plates and their condition are supplied.
Check scrubber pot pipes are supplied. Ensure 2" and 3" valve
handles supplied . Ensure Daniel box has two plate seals that fit
carrier.
3
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR
• Drain vessel thru meters and check counter operates smoothly.

Check Inspect test cert. date. With in 1 year.

Check load test date. With in 5 years.

Check visual inspection date. With in 1 year.
• Green Tag.

4
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM CHECK RECORD

Separator :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Make sure that all metal labels giving the dates of Official Tests are

provided. Clean them if necessary.
1) Check certification of vessel and safety valve
• Remove all Thermometers and Pressure Gauges.
Replace magnets if
• Disconnect all the flow meters.
damaged.
Remove Level Trols for calibration and check if float is still in place.
2)
- Remove Wizard for calibration.
- Replace Level Trol and Wizard after calibration.
Open Daniel, inspect gears and orifice plate.
3)
- Fit new valve seat gasket.
- Check sliding gate (valve strip). If corroded.
- check grease injection.
- Check equalizing valve.
- check springs and carrier. As new.
- Close sliding gate and equalizing valve.
- Leave open sealing bar.
- Check the Safety Valves.
Remove oil and water sight glass valves, inspect check valve and seat.
4)
- Replace, fit new gasket.
Open the man-hole.

- Wash the Man-Hole.
- Wash the oil compartment with fresh water.
- Wash the water compartment.
- Check that oil and water compartments communicate at
the bottom.
- Inspect inside of Vessel and report any abnormal
traces of corrosion.
- Inspect Man-hole Cover Gasket and replace Man-Hole Cover.
• Perform FIT Preliminary Adjustments and Checks.
• Perform FIT 1 if needed at cleaning bay.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR
Inspect all parts of the Liquid Level controller, tubings and normally

Closed Automatic control Valve.
- Look especially for corrosion or dirt at the Nozzle
System.
- Check the Valve Stem.
• Check tubings with fresh water. No leaks
• Fill the separator with fresh water.
Check that Outlet Pressure (Gauge "B") is 6 psi or less, as long as

water level has not reached the float
Check that automatic valve is fully closed.

- Loosen Stem Connector Screws slightly.
- Check that Valve Plug rests on its seat by turning
Lock Nut clockwise.
- Retighten Stem Connector.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
Inspect all parts of the Liquid Level controller, tubings and normally

Closed Automatic control Valve.
- Look especially for corrosion or dirt at the Nozzle
System.
- Check the Valve Stem.
• Check tubings with fresh water. No leaks
• Fill the separator with fresh water.
Check that Outlet Pressure (Gauge "B") is 6 psi or less, as long as

water level has not reached the float
Check that automatic valve is fully closed.

- Loosen Stem Connector Screws slightly.
- Check that Valve Plug rests on its seat by turning
Lock Nut clockwise.
- Retighten Stem Connector.

3
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM 3 - OIL CIRCUIT CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Continue filling separator until Output Pressure is 30 psi.

- Check that Automatic Valve is fully open.
Drain Tank to make sure level Trol Float is not immersed.

Inspect all parts of the Level Trol, tubings and Normally Closed

Automatic control Valves.
- Look for corrosion especially at the Bourdon Tube,
Nozzle System and Valves Stems. Replace corroded parts.
Check tubings for leaks.
• No leaks.
Clean the Restrictor Orifice by pressing Pin "B".

Set the Proportional Band Adjustment "C" at 100%.

Turn Level Setting Dial "D" until an outlet pressure of 6 psi is

reached. (read Pressure Gauge "E")
Check that the two Automatic Valves are fully closed.

- Loosen Stem Connector Screws slightly and check that
Valves Plugs rest on their seats by turning Lock Nuts
clockwise.
- Retighten Stem Connectors
Open the Pilot Circuit Valve of one of the control Valves and close the

other one.
- Restart filling of the Separator until Plunger is totally
immersed.
- Unlock Screws "F" and displace Nozzle Block to obtain
30 psi Outlet Pressure.
- Mark water level.
- Check Control Valve is fully open.
Drain Separator via Water Outlet Valve until Outlet Pressure falls to 6

psi and Control Valve closes.
- Mark water level.
- Set proportional Band Adjustment "C" to 10%.
- Set Level Setting Dial "D" to 50% of scale.
- Refill Separator until water level is at the middle of
the previous marks.
- Adjust Flapper Screws "G" for 18 psi Outlet Pressure.
- Drain Separator again and set Level Setting Dial "D"
just above zero. Check 6 psi or less Outlet Pressure.
- Refill Separator and set Level Setting Dial to 100%.
Check 30 psi Outlet Pressure.
- Close Pilot Circuit Valve and open the other one.
Repeat the above procedure with the second Control Valve.

- Close its Pilot Circuit Valve (Do not empty yet.)

4
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM 4 - GAS CIRCUIT CHECKS: DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Inspect all parts of the Wizard. check for corrosion inside the Wizard
• No leaks.
and at the automatic Valve Stem. Check for tubing leaks.
Clean Restrictor Orifice by depressing pin "B".

Disconnect the Pressure Pick-up Tubing on the Gas Line and connect

a Dead Weight Tester. Close GOV 3.
Set Proportional Band Adjustment "C" at 100%.

Apply maximum nominal pressure of the Bourdon (1500 psi).

- Check GOV 1 moves from fully closed to fully open.
Release pressure.

- Check GOV1 closes.
- Loosen Stem connector Screws of GOV 1.
- Check Valve Plug rests on its Seat by turning Lock Nuts clockwise.
- Retighten Stem Connector.
Turn Pressure Setting Dial "D" until an Output Pressure of 30 psi is

reached (read pressure gauge "E").
Re-apply maximum nominal pressure on the bourdon Tube.

- outlet Pressure should fall to 6 psi.
- If not, unlock screws "F" and displace Nozzle Block "G"
to obtain 6 psi.
Check that application or release of max nominal pressure of the

Bourdon gives the 6-30 psi Outlet Pressure Range.
Set proportional Band Adjustment "C: at 10%.

Set Pressure Setting Dial "D" to 50% of maximum nominal pressure

of the Bourdon.

Apply 50% of the bourdon Tube nominal pressure.



- Loosen Lock Screw "H" and adjust Nozzle "I" to have 18 psi Outlet
Pressure.
- Re-tighten Lock Screw "H".
CAUTION
Do not rise Nozzle more than 0.06" (1.5 mm), to avoid damaging O
Ring Seal with Lock Screw. New Wizard have new but a Teflon Stop
to secure the Nozzle
Check again that:

- With the Pressure Setting Dial "D" just above zero and no pressure
on Bourdon, the Outer Pressure is 6 psi or less.
- With the Dial "D" just below 100% the Outlet
Pressure is 30 psi.
Set Proportional Band adjustment at 25%.

Set Pressure Setting dial to obtain 30 psi outlet Pressure

Apply 25% of Bourdon nominal pressure.

- Check Outlet Pressure is 6 psi or less

5
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM 5 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Replace Rupture Disc and Safety Valve if they have been removed.

Perform FIT 3 Pressure Checks. the Sight Glass Assemblies are tested

at the same time as the Separator. should, however a repair be carried
on these assemblies, then proceed with next step.
Insert blank orifice plate into the Daniel and test against it from 15 psi

to 100 psi.
Release pressure.

Touch up paints.

Check and complete ready box.

Check that pin on frame is in place.

6
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SEPARATOR

TRIM 6 - BARTON CALIBRATION DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Performed in Lab.

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

7
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
OIL MANIFOLD BOOK

SECTION # 09

OIL MANIFOLD
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
OIL MANIFOLD

FIT CHECK RECORD

Oil Manifold :

Serial # : Options :

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
Clean manifold.

Check fixation of manifold on skid

Check valves operate easily.

Check inlet and outlet connections.

Inspect all parts, joints, flanges, bolts for wear, corrosion and other
• Replace as necessary.
damage.
Install pressure test plugs.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
OIL MANIFOLD

FIT 2 - PRESSURE CHECKS DATE


SPECIALIST
TICK ACCEPTANCE
CRITERIA
• Open all valves and tilt manifold slightly.
• Fill in with water.
• With HP pump, increase pressure to Max. WP. If due for annually re- No drop on chart .
certification, test to 1.5 times of WP. Hold pressure for 15 minutes.
• Close valves one after each other and pressure test them to Max. WP No drop on chart
for 5 minutes. Check tightness of each valve, under upstream and
downstream pressures.
• Release test pressure.
• Remove pressure test plugs.
• Install thread protectors.
• Touch up paint.
• Check Inspect test cert. date. With in 1 year.
• Check load test date. With in 5 year.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
OIL MANIFOLD

TRIM CHECK RECORD

Oil Manifold :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Clean manifold.
• Check valves operate easily.
• Check inlet and outlet connections.
• Inspect all parts, joints, flanges, bolts for wear, corrosion and other
damage.
• Install pressure test plugs.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
OIL MANIFOLD

TRIM 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Open all valves and tilt manifold slightly.
• Fill in with water.
• With HP pump, increase pressure to 1440 psi. Hold pressure for 15 No drop on chart.
Min.If manifold due for annually survey increase pressure to 2160 psi.
• Close valves one after each other and pressure test them to 1440 psi As above.
for 5 min. LP test 300 psi for 3 min.
• Release test pressure.
• Remove pressure test plugs, and install thread protectors.
• Check Dnv cert date. With in 1 year.
• Check visual test. With in 1 year.
• Check load test. With in 5 years.
• Check sling date, rating and color code. Mærsk OSP.
• Green tag equipment.
• Touch up paint.

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
GAS MANIFOLD BOOK

SECTION # 10

GAS MANIFOLD
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAS MANIFOLD

FIT CHECK RECORD

Gas Manifold :

Serial # : Options :

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
Clean manifold.

Check valves operate easily.

Check inlet and outlet connections.

Inspect all parts, joints, flanges, bolts for wear, corrosion and other
• Replace as necessary.
damage.
Install pressure test plugs.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAS MANIFOLD

FIT 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Open all valves and tilt manifold slightly.
• Fill in with water.
• With HP pump, increase pressure to 1440 psi. If due for annually re- No drop on chart
certification, test to 2160. Hold pressure for 15 minutes.
• Close valves one after each other and pressure test them to 1440 psi No drop on chart
for 5 minutes. Check tightness of each valve, under upstream and
downstream pressure.
• Release test pressure.
• Remove pressure test plugs.
• Install thread protectors.
• Touch up paint.
• Check Dnv cert date. With in 1 year.
• Check load test date. With in 5 year.
• Check sling date, rating and color code. Mærsk OSP.

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAS MANIFOLD

TRIM CHECK RECORD

Gas Manifold :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Clean manifold
• Check valves operate easily
• Check inlet and outlet connections
• Install pressure test plugs
• Inspect all parts, joints, flanges, bolts for wear, corrosion and other
damage

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAS MANIFOLD

TRIM 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Open all valves and tilt manifold slightly
• Fill in with water
• Connect Pump to inlet
• Pressure test to MAX W.P.
• Hold pressure for 15 minutes
• Release test pressure
• Close valves of GAS manifold
• Pressure test to MAX W.P.
• Hold pressure for 15 minutes
• Release test pressure
• Remove pressure test plugs
• Install thread protectors
• Ensure valve handle is secured to frame
• Touch up paint

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
GAUGE TANK BOOK

SECTION # 11

GAUGE TANK
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAUGE TANK

FIT CHECK RECORD

Gauge Tank :

Serial # : Options :

Workshop Job No. : Capacity :

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Clean sight glasses and glass tubes if necessary.
Check that measuring poles are free of oxydation, easily readable and

correctly fixed.
• Check that tank volume factor is painted on tank body.
• Check ventpipe coupling for corrosion.
• Steam clean flamearrestor. .
• Check roof safety seam. No cracks.
Check inlet and outlet WECO connections, threads and seals. Install
• No damage.
WECO protectors after greasing.
Visually check state of vents, thermowells, sampling points, drain

plugs, ... etc.
Operate inlet manifold valves. Check they open or close freely
• < 20 ft/lbs.
without excessive torque.
• Check manhole cover does not show traces of leaks.
• Check grounding strap and cable. Physically present.
Fill up one compartment with fresh water. No leaks especially at
• No leaks.
outlet manifold. Transfer water in the other compartment.
Pressuretest butterfly valves. 50 - 60 Psi

Check DNV cert. with in 1 year.

Check visual inspection with in 1 year.
Check loadtest with in 5 years.
Check sling color coding, date and weight.
Check ID nos. visual from all four sides and top.
Check load signs.
Green tag equipment.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAUGE TANK

TRIM CHECK RECORD

Gauge Tank :

Serial # : Options :

Workshop Job No. : Capacity :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
Steam clean the tank.

• Dismount and clean flame arrestors.
Open manhole covers. Taking all necessary precautions, inspect
• Report damage/corrosion to
inside of the tank. Look for corrosion or mechanical damages.
supervisor.
• Perform FIT1.
• Touch up paints.

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
GAUGE TANK

TRIM 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
Fill tank with water. Examine for leaks after closing inlet and outlet
• No leaks
manifold valves

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
SURGE TANK BOOK

SECTION # 12

SURGE TANK
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

FIT CHECK RECORD

Surge Tank :

Serial # : Options :

Workshop Job No. : Capacity :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

TRIM CHECK RECORD

Surge Tank :

Serial # : Options :

Workshop Job No. : Capacity :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

Remarks : (Parts changed etc)


Part No. Quan. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

3
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
SURGE TANK

4
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
COFLEXIP BOOK

SECTION # 13

COFLEXIP
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
COFLEXIP

TRIM CHECK RECORD

Coflexip Hose :

Serial # : Size :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Inspect Hose for damage
• Check condition of sealing areas
• Pressure test to working pressure
• Attach pressure test chart to this sheet
• Grease connections and fit thread protectors
• Check clamp test date (must be within 6 months)

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
MISCELLANEOUS BOOK

SECTION # 14

MISCELLANEOUS
EQUIPMNET
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
TEXSTEAM PUMP BOOK

FIT CHECK RECORD

Texsteam Pump :

Serial # : Options :

Workshop Job No. : Other Info :

FIT 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Clean and inspect pump No physical damage
• Clean and inspect tank and hoses No physical damage
• Check oil level
• Identify piston size 1/4"=15K, 3/8"=10K

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
TEXSTEAM PUMP BOOK

FIT 2 - PRESSURE CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Fit manifold (10K or 15K)
• Function pump through hose into sub
• Pressure test pump and outlet hose to 10K or 15K (depends on piston Hold on gauge for 15
size) minutes no drop
• Green tag with job number

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
LAB CABIN

TRIM CHECK RECORD

Lab Cabin :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Check that inlet and extract dampers are open.
• Check condition of rubber seal on inlet and outer cowls
• Check condition of low pressure Pipework.
• Check that all transits are packed
Inspect external hook up junction box for damage, flamepaths.

• Connect wyrem hose from fan to inlet cowl.
• Connect fan motor to supply cable from lab cabin
Check that tappings on main transformers are set to suit incoming

voltage.
• Open inlet and extract ventilation grille.
• Check condition of seals around doors and escape hatch
• Connect 3 phase supply to EXT JB
• Close doors and escape hatch and check rubber seals.
• Turn key switch to normal.
• Press fan start button on main panel
• Check fan rotation.
• Check fan overload setting.
• Set pre purge timer to approx 30 secs
• Set purge timer to time required (e.g. 4 minutes).
Mini Helic gauge should read between .25 and .5 inches of Water.

• Purge light will illuminate after approximately 30 secs.
• After preset time purging cycle will go off.
• Press main start button.
• Switch on main transformers
• Switch on circuit breakers

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
LAB CABIN

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :

2
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
RANAREX

TRIM CHECK RECORD

Ranarex :

Serial # : Options :

Workshop Job No. : Other Info :

TRIM 1 - FUNCTIONAL CHECKS DATE


TECHNICIAN
TICK ACCEPTANCE
CRITERIA
• Remove the Ranarex from the box and clean both.
• Check the desiccant on the left hand side is of a blue colour. If the
desiccant is pink or clear place it in the microwave for 6-8 minutes
until a blue colour is achieved and re-install the desiccant in the
Ranarex.
• Turn the selector dial to the 0 position.
• Check the required voltage of the Ranarex and connect to the
appropriate supply.
• Once the motor has reached its full speed turn the knob on the front to
the UNLOCK position.
• If the pointer does not move at all remove the front cover and place
the tape back on the two wheels.
• Observe the pointer. It should move to a reading of 1.000
• If the needle requires minor adjustment this can be done with the zero
adjust on the front cover.
• Once the pointer is reading 1.000 set the knob to the LOCK position.
• Disconnect the power supply, turn the selector to the OFF position and
return the Ranarex to the box.
• Check the box contains all fittings.
• Repair all handles and clasps as necessary
• Green tag box, ready for offshore

1
China National Logging Corporation
SWT
(Pakistan Branch)
FIT – TRIM
BOOK
RANAREX

Remarks : (Parts changed etc)


Part No. Qty. S/N Batch No. Cost Description of parts

TOTAL

Reasons for replacing parts other than those normally replaced in a TRIM etc :