Bill of Quantities: Index
Bill of Quantities: Index
Bill of Quantities: Index
The bill of quantities provided herewith were compiled from inputs obtained from a few
leading quantity surveying firms in Viet Nam. The information should be regarded as
indicative and for general guidance only. PMH makes no representation, expressed or
implied, with regard to the accuracy of the information herein and cannot accept any
responsibility or liability for any errors or omissions that may be made.
The bill of quantities include allowances for contractor’s overheads and profit and all
necessary labour, goods and materials, and plant & equipment costs unless stated
otherwise.
Index
3 Excavation
4 Concrete Work
6 Roofing
8 Ironmongery
9 Structural Steelwork
10 Metal Work
11 Wall Finishes
12 Ceiling Finishes
13 Floor Finishes
14 Plumbing
15 Glazing
16 Painting
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
1.3 Shoring
2 ALTERATIONS
Page 2/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 BAKAU PILES
Page 3/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
4 BORED PILES
Page 4/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 5/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 6/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
7 TESTING WORKS
Page 7/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
8 DIAPHRAGM WALLS
Page 8/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
8.7 Reinforcement
8.8 Formwork
8.9 Waterproof
III EXCAVATION
1 SITE CLEARANCE
2 GENERAL EXCAVATION
Page 9/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 10/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
3.1 Backfilling
4 DISPOSAL
Allow for keeping the Site and all excavation area item
free from all water by pumping or otherwise
6 ANTI-TERMITE TREATMENT
IV CONCRETE WORK
1 IN-SITU CONCRETE
Page 11/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 REINFORCEMENT
3 FORMWORK
Page 12/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
5 EXPANSION JOINTS
Page 13/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
6 WATERPROOFING
Page 14/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
7 INTEGRATED FINISH
2 CONCRETE BLOCKS
3 GLASS BLOCKS
Page 15/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
VI ROOFING
1 TILE ROOFING
2 BUILT-UP ROOFING
Page 16/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
3 METAL ROOFING
Page 17/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
4 RAINWATER GOODS
4.1 Flashings
5 SUNDRIES
Page 18/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 FRAMING
Page 19/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
3 LININGS
3.4 Plywoods
Page 20/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
4 WALL INSULATION
5 PANELLING
6 FLOORING
Page 21/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 22/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
A 1/2 hour fire-rated single leaf door; to suit structural No 982.50 982.50 982.50 982.50
opening of 1040 x 2220mm high
B 1/2 hour fire-rated double leaf door; to suit structural No 1,433.30 1,433.30 1,433.30 1,433.30
opening of 1640 x 2220mm high
C 1 hour fire-rated single leaf door; to suit structural No 1,167.50 1,167.50 1,167.50 1,167.50
opening of 1040 x 2220mm high
D 1 hour fire-rated double leaf door; to suit structural No 1,721.30 1,721.30 1,721.30 1,721.30
opening of 1640 x 2220mm high
E 2 hour fire-rated single leaf door; to suit structural No 1,485.00 1,485.00 1,485.00 1,485.00
opening of 1040 x 2220mm high
F 2 hour fire-rated double leaf door; to suit structural No 2,141.70 2,141.70 2,141.70 2,141.70
opening of 1640 x 2220mm high
H 1/2 hour rated double leaf door; to suit structural No 1,376.70 1,376.70 1,376.70 1,376.70
opening of 1640 x 2220mm high
I 1 hour rated single leaf door; to suit structural No 1,106.70 1,106.70 1,106.70 1,106.70
opening of 1040 x 2220mm high
J 1 hour rated double leaf door; to suit structural No 1,661.70 1,661.70 1,661.70 1,661.70
opening of 1640 x 2220mm high
Page 23/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
L 2 hour rated double leaf door; to suit structural No 2,093.30 2,093.30 2,093.30 2,093.30
opening of 1640 x 2220mm high
INTERNAL WALLS
8 PARTITIONS
D 100mm thick walls with gypsum plasterboard on m2 82.00 82.00 82.00 82.00
both sides
E 100mm thick walls with fibrous plasterboard on both m2 91.30 91.30 91.30 91.30
sides
F 100mm thick walls with calcium silicate board on m2 99.70 99.70 99.70 99.70
both sides
8 PARTITIONS (CONT'D)
VIII IRONMONGERY
Page 24/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
1 Window Ironmongery
2 Door Ironmongery
3 Sundry Ironmongery
Page 25/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
X METAL WORK
1 ALUMINIUM WINDOWS AND DOORS
Page 26/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 27/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 Metal Cladding
2.1 Aluminium
3 Metal Doors
A single leaf; size: 900 x 1900mm high no 1,133.30 1,133.30 1,133.30 1,133.30
B single leaf; size: 1000 x 2055mm high no 1,300.00 1,300.00 1,300.00 1,300.00
Page 28/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
4 RAILINGS
Page 29/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
XI FLOOR FINISHES
1 IN-SITU FINISHES
Page 30/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 31/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 CARPET FINISHES
2.1 Labour
3 VINYL FINISHES
3.1 Labour
4 STONE FINISHES
4.1 Labour
5 TILE FINISHES
5.1 Labour
Page 32/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
7 GLASS BLOCKS
8 RAISED FLOORING
9 SUNDRIES
Page 33/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 TILE FINISHES
2.1 Labour
3 STONE FINISHES
3.1 Labour
Page 34/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
4 SHEET FINISHES
4.1 Labour
2 SUSPENDED CEILINGS
A 600 x 600 x 15mm thick Mineral fibreboard, pre- m2 31.30 31.30 31.30 31.30
finished face pattern panels with a white paint finish
B 600 x 600 x 15mm thick Acoustical mineral m2 33.70 33.70 33.70 33.70
fibreboard, pre-finished face pattern panels with a
white paint finish
C 600 x 600 x 20mm thick Acoustical mineral m2 35.30 35.30 35.30 35.30
fibreboard, pre-finished face pattern panels with a
white paint finish
D 600 x 600 x 9mm thick calcium silicate board m2 35.50 35.50 35.50 35.50
E 600 x 600 x 13mm thick calcium silicate board m2 39.20 39.20 39.20 39.20
F 600 x 600 x 9mm thick cement board m2 35.20 35.20 35.20 35.20
G 600 x 600 x 12mm thick cement board m2 41.20 41.20 41.20 41.20
H 600 x 600 x 9mm thick fibrous gypsum board m2 32.20 32.20 32.20 32.20
Page 35/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
XIV PLUMBING
The work in each different type of installation shall
be given separately under following or similarly
appproriate sub-heading
(i) Sanitary installation
(ii) Trade waste, acid or similar special installation
(iii) Cold water installation
(iv) Fire service installation
(v) Hot water installation
(vi) Gas installation
Page 36/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
XV GLAZING
1 STANDARD GLASS
1.1 In Panes
Page 37/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
1.2 In Louvres
1.3 In Panels/Doors
2 SPECIAL GLASS
2.1 Mirrors
Page 38/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
3 SHOWER SCREEN
XVI PAINTING
1 INTERNAL PAINTING
Page 39/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
B two coats of zinc chromate primer, one undercoat m 3.20 3.20 3.20 3.20
and two finishing coats of synthetic enamel paint
Page 40/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
2 EXTERNAL PAINTING
3 GENERAL
3.1 Labour
Page 41/42
Shedule of Works
Last Updated on 01 February 2021
[The data will be updated on a quarterly basis]
Page 42/42