Project Test Plan - IPA
Project Test Plan - IPA
Table of Contents
1 Introduction.........................................................................................................................................3
1.1 Test Strategy................................................................................................................................3
1.2 In Scope.......................................................................................................................................3
1.3 Out of Scope................................................................................................................................3
1.4 Roles & Responsibilities...............................................................................................................3
1.5 Assumptions................................................................................................................................3
1.6 Constraints...................................................................................................................................3
2 Test Methodology................................................................................................................................3
2.1 Features and Functionality to Test...............................................................................................3
2.2 Types of Testing...........................................................................................................................3
2.2.1 Functional Testing................................................................................................................3
2.2.2 Data Testing.........................................................................................................................3
2.2.3 Usability Testing...................................................................................................................3
2.2.4 Performance Testing............................................................................................................3
2.2.5 Quality Testing.....................................................................................................................3
2.2.6 Interface Testing..................................................................................................................3
2.2.7 Regression Testing...............................................................................................................3
2.2.8 Other Testing.......................................................................................................................3
3 Test Deliverables.................................................................................................................................3
3.1 Documents...................................................................................................................................3
3.2 Test Data......................................................................................................................................3
4 Resource & Environment Needs..........................................................................................................3
4.1 Hardware.....................................................................................................................................3
4.2 Software......................................................................................................................................3
4.3 System Access..............................................................................................................................3
4.4 Test Tools.....................................................................................................................................3
Introduction
1.2 In Scope
Identify the systems or solution components to be tested as part of this test plan.
Role Responsibilities
1.5 Assumptions
If applicable, list any assumptions which first must be made in order to complete
this test plan.
1.6 Constraints
If any constraints exist by which the testing team will be held, they should be
listed here.
2 Test Methodology
2.1 Features and Functionality to Test
Identify the major features and functionality to be tested and verified. This
section should identify for the reader the major components to be tested;
allowing them to quickly point out omissions.
Feature/Function User Testing Method
3 Test Deliverables
3.1 Documents
Identify the documents to be created as part of this test plan.
Document Description
Test Plan The Test Plan is derived from the Requirements, Functional
Specs, and detailed Design Specs. The Test Plan identifies
the details of the test approach, identifying the associated test
case areas within the specific product for this release cycle.
Test Schedule The Test Schedule is the responsibility of the Test Lead and
will be based on information from the Project Schedule (done
by Product Manager). The Test Schedule may be done in MS
Project.
Test Cases Test Cases will be created for each major function or feature to
be tested. Test Cases will contain scripts for testing
functionality.
4.2 Software
Describe any software required to perform the tests. This should not include
tools for testing, but only software to be tested.