Method Statement For Near Field Test: DCSM Project 2019
Method Statement For Near Field Test: DCSM Project 2019
0 Issued For
26/09/2019
Approval
Nguyen Gia Annamalai Annamalai
Dinh Natarajan Natarajan
Project Manager
DESCRIPTION
Page 1 of 5
METHOD STATEMENT FOR
Scope of Work
1 3
9 House Keeping 5
1. SCOPE OF WORK:
Page 2 of 5
METHOD STATEMENT FOR
This documented is intended to detect the corossion, erosion, pitting & remaining thickness of pressure
piping, boiler or power piping and made of carbon steels using NFT Equipment with Required probes –
Portable, Dry Cloth.
During Loading the equipment and accessories Leather hand glove shall be worn.
Ensure all equipment is stack away from the edge of the lorry bed and secure properly to prevent
falling.
Ensure provide training on safe handling & manual lift of material to the workforce.
Leather hand glove shall be worn when perform the entire work.
All personnel shall complete Client SIC training prior to enter the site.
Ensure that all the workers had sufficient rest prior starting the task.
Ensure authorized an trained person involved in the live plant work are allowed to enter in the
area.
General Work Permit shall be applied by Permit requestor and approved prior to start the work.
Ensure that the entire worker had sufficient rest prior commencing the task.
Safety glasses, hard hat, pants, protective industrial products hand gloves, safety boots, Safety
Goggle, Ear Plug as per Client PPE safety requirement.
Driver shall follow the Client road safety regulation 15km/h on the road in the plant area.
Page 3 of 5
METHOD STATEMENT FOR
Ensure pickup / van operator shall obtain valid license during the entire work.
Valid Fire Extinguisher with stands. (9kg, ABC type) for vehicle in place.
No vehicle is allowed for parking except for short delivery during working hour. Working hour.
During Loading / unloading the equipment and accessories Leather glove shall be worn.
Ensure all equipment is stack away from the edge of the pickup bed and secure properly to
prevent falling.
Leather hand glove shall be worn when perform the entire work.
Ensure all the obstruction materials shall remove from site immediately.
Ensure the area is free from all obstruction materials prior to start work.
Page 4 of 5
METHOD STATEMENT FOR
Ensure workers maintain communication with each other during passing of material
Always stay away from line of fire when passing on different level of scaffold platform.
Work Permit & WAH Form is issued and approved by relevant parties.
The workers must complete the WAH course before entering to the work site.
Harness & SRL to be inspected with tag and check prior to use.
Ensure proper donning of harness and SRL by workers (Buddy system checks prior to use).
During Loading the equipment and accessories Leather hand glove to be worn.
Ensure all equipment is stack away from the edge of the lorry bed and secure properly to prevent
falling.
Ensure provide training on safe handling & manual lift of material to the workforce.
Leather hand glove shall be worn when perform the entire work.
9. HOUSEKEEPING:
Materials must never be left on the ground but stacked neatly on stillage and hard barricaded.
Page 5 of 5