BILL OF QUANTITIES

RUMAH SAKIT CENTRA BALI


JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI

BIDDER NAME : PT. -


DATE OF TENDER : MARET 2020
ARSITEKTUR
Unit Rate Total Rate
No. Description QTY
(Rp) (Rp)

FINAL SUMMARY

A PRELIMINARIES

B STRUCTURE WORKS

C ARCHITECTURE WORKS #REF!

REAL COST RP. : #REF!


ADDITIONAL PPN 10% : #REF!
TOTAL RP. : #REF!
ROUNDED RP. : #REF!

Note :
* Contractor should not modify the items &
quantity / volume in this BOQ PT. ------------------------------
** Should there any scope of work(s) and or
quantity correction not yet in this BOQ,
contractor should submission in the separate
page(s) as additional page(s).

( NAMA PENANGGUNG JAWAB)


DIRECTOR

Sum-ARS/Page 1
BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI

BIDDER NAME : PT. -


DATE OF TENDER : MARET 2020
STRUKTUR
Unit Rate Total Rate
No. Description QTY
(Rp) (Rp)

FINAL SUMMARY

A PRELIMINARIES #REF!

B STRUCTURE WORKS -

C ARCHITECTURE WORKS

REAL COST RP. : #REF!


ADDITIONAL PPN 10% : #REF!
TOTAL RP. : #REF!
ROUNDED RP. : #REF!

Note :
* Contractor should not modify the items &
quantity / volume in this BOQ PT. ------------------------------
** Should there any scope of work(s) and or
quantity correction not yet in this BOQ,
contractor should submission in the separate
page(s) as additional page(s).

( NAMA PENANGGUNG JAWAB)


DIRECTOR

Sum-STR/Page 2
BILL OF QUANTITIES
PURI BUNDA HOSPITAL
JL. BY PASS KEDIRI, TABANAN - BALI

No. No. Drawing Date Status

A Earthworks
1 site transis cut and fill RSPB Tabanan 13-Mar-2018 Email

A Structure

1 S0-01 12-Feb-2018 For tender


2 S0-02 12-Feb-2018 For tender
3 S1-01 12-Feb-2018 For tender
4 S1-02 12-Feb-2018 For tender
5 S1-03 12-Feb-2018 For tender
6 S1-04 12-Feb-2018 For tender
7 S1-05 12-Feb-2018 For tender
8 S1-06 12-Feb-2018 For tender
9 S1-07 12-Feb-2018 For tender
10 S1-08 12-Feb-2018 For tender
11 S1-09 12-Feb-2018 For tender
12 S1-10 12-Feb-2018 For tender
13 S1-11 12-Feb-2018 For tender
14 S1-12 12-Feb-2018 For tender
15 S1-13 12-Feb-2018 For tender
16 S1-14 12-Feb-2018 For tender
17 S2-01 12-Feb-2018 For tender
18 S2-02 12-Feb-2018 For tender
19 S3-01 12-Feb-2018 For tender
20 S3-02 12-Feb-2018 For tender
21 S3-03 12-Feb-2018 For tender
22 S3-04 12-Feb-2018 For tender
23 S3-05 12-Feb-2018 For tender
24 S3-06 12-Feb-2018 For tender
25 S3-07 12-Feb-2018 For tender
26 S3-08 12-Feb-2018 For tender
27 S3-09 12-Feb-2018 For tender
28 S3-10 12-Feb-2018 For tender
29 S3-11 12-Feb-2018 For tender
30 S3-12 12-Feb-2018 For tender
31 S3-13 12-Feb-2018 For tender
32 S3-14 12-Feb-2018 For tender
33 S3-15 12-Feb-2018 For tender
34 S3-16 12-Feb-2018 For tender
35 S3-17 12-Feb-2018 For tender
36 S3-18 12-Feb-2018 For tender
37 S3-19 12-Feb-2018 For tender
38 S3-20 12-Feb-2018 For tender
39 S3-21 12-Feb-2018 For tender
40 S3-22 12-Feb-2018 For tender
41 S3-23 12-Feb-2018 For tender
42 S3-24 12-Feb-2018 For tender

C Architecture
1 ARS-001 13-Mar-2018 Email
2 ARS-002 13-Mar-2018 Email
3 ARS-003 Rev.03 13-Mar-2018 Email
4 ARS-004 13-Mar-2018 Email
5 ARS-005 Rev.02 13-Mar-2018 Email
6 ARS-006 Rev.03 13-Mar-2018 Email
7 ARS-007 Rev.02 13-Mar-2018 Email
8 ARS-008 13-Mar-2018 Email
9 ARS-009 13-Mar-2018 Email
10 ARS-010 13-Mar-2018 Email
11 ARS-011 13-Mar-2018 Email
12 ARS-012 13-Mar-2018 Email
13 ARS-013 13-Mar-2018 Email
14 ARS-014 13-Mar-2018 Email
15 ARS-015 13-Mar-2018 Email
16 ARS-016 13-Mar-2018 Email

Reff Drawing/Page 3
No. No. Drawing Date Status

17 ARS-017 13-Mar-2018 Email

Reff Drawing/Page 4
No. No. Drawing Date Status

18 ARS-018 13-Mar-2018 Email


19 ARS-019 13-Mar-2018 Email
20 ARS-020 13-Mar-2018 Email
21 ARS-021 13-Mar-2018 Email
22 ARS-022 13-Mar-2018 Email
23 ARS-023 13-Mar-2018 Email
24 ARS-024 13-Mar-2018 Email
25 ARS-025 13-Mar-2018 Email
26 ARS-026 13-Mar-2018 Email
27 ARS-027 13-Mar-2018 Email
28 ARS-028 13-Mar-2018 Email
29 ARS-029 13-Mar-2018 Email
30 ARS-030 13-Mar-2018 Email
31 ARS-031 13-Mar-2018 Email
32 ARS-032 13-Mar-2018 Email
33 ARS-033 13-Mar-2018 Email
34 ARS-034 13-Mar-2018 Email
35 ARS-035 13-Mar-2018 Email
36 ARS-036 13-Mar-2018 Email
37 ARS-037 13-Mar-2018 Email
38 ARS-038 13-Mar-2018 Email
39 ARS-039 13-Mar-2018 Email
40 ARS-040 13-Mar-2018 Email
41 ARS-041 13-Mar-2018 Email
42 ARS-042 13-Mar-2018 Email
43 ARS-043 13-Mar-2018 Email
44 ARS-044 13-Mar-2018 Email
45 ARS-045 13-Mar-2018 Email
46 ARS-046 13-Mar-2018 Email
47 ARS-047 13-Mar-2018 Email
48 ARS-048 13-Mar-2018 Email
49 ARS-049-01 13-Mar-2018 Email
50 ARS-049-02 13-Mar-2018 Email
51 ARS-049-03 13-Mar-2018 Email
52 ARS-049-04 13-Mar-2018 Email
53 ARS-049-05 13-Mar-2018 Email
54 ARS-049-06 13-Mar-2018 Email
55 ARS-050-01 13-Mar-2018 Email
56 ARS-050-02 13-Mar-2018 Email
57 ARS-050-03 13-Mar-2018 Email
58 ARS-050-04 13-Mar-2018 Email
59 ARS-050-05 13-Mar-2018 Email
60 ARS-050-06 13-Mar-2018 Email
61 ARS-050-07 13-Mar-2018 Email
62 ARS-051-01 13-Mar-2018 Email
63 ARS-051-02 13-Mar-2018 Email
64 ARS-051-03 13-Mar-2018 Email
65 ARS-051-04 13-Mar-2018 Email
66 ARS-051-05 13-Mar-2018 Email
67 ARS-051-06 13-Mar-2018 Email
68 ARS-052-01 13-Mar-2018 Email
69 ARS-052-02 13-Mar-2018 Email
70 ARS-052-03 13-Mar-2018 Email
71 ARS-052-04 13-Mar-2018 Email
72 ARS-052-05 13-Mar-2018 Email
73 ARS-052-06 13-Mar-2018 Email
74 ARS-052-07 13-Mar-2018 Email
75 ARS-052-08 13-Mar-2018 Email
76 ARS-052-09 13-Mar-2018 Email
77 ARS-052-10 13-Mar-2018 Email
78 ARS-052-11 13-Mar-2018 Email
79 ARS-052-12 13-Mar-2018 Email
80 ARS-053-01 13-Mar-2018 Email
81 ARS-053-02 13-Mar-2018 Email
82 ARS-053-03 13-Mar-2018 Email
83 ARS-053-04 13-Mar-2018 Email
84 ARS-053-05 13-Mar-2018 Email
85 ARS-053-06 13-Mar-2018 Email
86 ARS-053-07 13-Mar-2018 Email
87 ARS-053-08 13-Mar-2018 Email
88 ARS-053-09 13-Mar-2018 Email

Reff Drawing/Page 5
No. No. Drawing Date Status

89 ARS-053-10 13-Mar-2018 Email


90 ARS-053-11 13-Mar-2018 Email
91 ARS-053-12 13-Mar-2018 Email
92 ARS-053-13 13-Mar-2018 Email
93 ARS-053-14 13-Mar-2018 Email
94 ARS-053-15 13-Mar-2018 Email
95 ARS-053-16 13-Mar-2018 Email
96 ARS-053-17 13-Mar-2018 Email
97 ARS-054-01 13-Mar-2018 Email
98 ARS-054-02 13-Mar-2018 Email
99 ARS-054-03 13-Mar-2018 Email
100 ARS-054-04 13-Mar-2018 Email
101 ARS-054-05 13-Mar-2018 Email
102 ARS-054-06 13-Mar-2018 Email
103 ARS-055-01 13-Mar-2018 Email
104 ARS-055-02 13-Mar-2018 Email
105 ARS-055-03 13-Mar-2018 Email
106 ARS-055-04 13-Mar-2018 Email
107 ARS-055-05 13-Mar-2018 Email
108 ARS-055-06 13-Mar-2018 Email
109 ARS-055-07 13-Mar-2018 Email
110 ARS-055-08 13-Mar-2018 Email
111 ARS-055-09 13-Mar-2018 Email
112 ARS-056-01 13-Mar-2018 Email
113 ARS-056-02 13-Mar-2018 Email
114 ARS-056-03 13-Mar-2018 Email
115 ARS-056-04 13-Mar-2018 Email
116 ARS-056-05 13-Mar-2018 Email
117 ARS-056-01 13-Mar-2018 Email
118 ARS-056-01 (Detail Toilet Kls 3) 13-Mar-2018 Email
119 ARS-056-02 (Detail Toilet Kls 3) 13-Mar-2018 Email
120 ARS-056-03 (Detail Toilet Kls 3) 13-Mar-2018 Email
121 ARS-057-01 13-Mar-2018 Email
122 ARS-057-02 13-Mar-2018 Email
123 ARS-057-03 13-Mar-2018 Email
124 ARS-057-04 13-Mar-2018 Email
125 ARS-057-05 13-Mar-2018 Email
126 ARS-057-06 13-Mar-2018 Email
127 ARS-057-07 13-Mar-2018 Email
128 ARS-057-01 (Detail Toilet Kls 2) 13-Mar-2018 Email
129 ARS-057-02 (Detail Toilet Kls 2) 13-Mar-2018 Email
130 ARS-057-03 (Detail Toilet Kls 2) 13-Mar-2018 Email
131 ARS-058-01 13-Mar-2018 Email
132 ARS-058-02 13-Mar-2018 Email
133 ARS-058-03 13-Mar-2018 Email
134 ARS-058-04 13-Mar-2018 Email
135 ARS-058-05 13-Mar-2018 Email
136 ARS-058-06 13-Mar-2018 Email
137 ARS-058-07 13-Mar-2018 Email
138 ARS-058-01 (Detail Toilet Kls 1) 13-Mar-2018 Email
139 ARS-058-02 (Detail Toilet Kls 1) 13-Mar-2018 Email
140 ARS-058-03 (Detail Toilet Kls 1) 13-Mar-2018 Email
141 ARS-059-01 13-Mar-2018 Email
142 ARS-059-02 13-Mar-2018 Email
143 ARS-059-03 13-Mar-2018 Email
144 ARS-060-01 13-Mar-2018 Email
145 ARS-060-02 13-Mar-2018 Email
146 ARS-060-03 13-Mar-2018 Email
147 ARS-060-04 13-Mar-2018 Email
148 ARS-061-01 13-Mar-2018 Email
149 ARS-061-02 13-Mar-2018 Email
150 ARS-061-03 13-Mar-2018 Email
151 ARS-061-04 13-Mar-2018 Email
152 ARS-061-05 13-Mar-2018 Email
153 ARS-062-01 13-Mar-2018 Email
154 ARS-062-02 13-Mar-2018 Email
155 ARS-062-03 13-Mar-2018 Email
156 ARS-062-04 13-Mar-2018 Email
157 ARS-062-05 13-Mar-2018 Email
158 ARS-063-01 13-Mar-2018 Email
159 ARS-063-02 13-Mar-2018 Email

Reff Drawing/Page 6
No. No. Drawing Date Status

160 ARS-063-03 13-Mar-2018 Email


161 ARS-063-04 13-Mar-2018 Email
162 ARS-063-05 13-Mar-2018 Email
163 ARS-063-06 13-Mar-2018 Email
164 ARS-063-07 13-Mar-2018 Email
165 ARS-063-08 13-Mar-2018 Email
166 ARS-064-01 13-Mar-2018 Email
167 ARS-065-01 13-Mar-2018 Email
168 ARS-065-02 13-Mar-2018 Email
169 ARS-065-03 13-Mar-2018 Email
170 ARS-065-04 13-Mar-2018 Email
171 ARS-065-05 13-Mar-2018 Email
172 ARS-065-06 13-Mar-2018 Email
173 ARS-065-07 13-Mar-2018 Email
174 ARS-065-08 13-Mar-2018 Email
175 ARS-065-09 13-Mar-2018 Email
176 ARS-065-10 13-Mar-2018 Email
177 ARS-066-01 13-Mar-2018 Email
178 ARS-066-02 13-Mar-2018 Email
179 ARS-066-03 13-Mar-2018 Email
180 ARS-066-04 13-Mar-2018 Email
181 ARS-066-05 13-Mar-2018 Email
182 ARS-066-06 13-Mar-2018 Email
183 ARS-066-07 13-Mar-2018 Email
184 ARS-067-01 13-Mar-2018 Email
185 ARS-067-02 13-Mar-2018 Email
186 ARS-067-03 13-Mar-2018 Email
187 ARS-067-04 13-Mar-2018 Email
188 ARS-067-05 13-Mar-2018 Email
189 ARS-067-06 13-Mar-2018 Email
190 ARS-068-01 13-Mar-2018 Email
191 ARS-068-02 13-Mar-2018 Email
192 ARS-069-01 13-Mar-2018 Email
193 ARS-069-02 13-Mar-2018 Email
194 ARS-069-03 13-Mar-2018 Email
195 ARS-070-01 13-Mar-2018 Email
196 ARS-070-02 13-Mar-2018 Email
197 ARS-070-03 13-Mar-2018 Email
198 ARS-070-04 13-Mar-2018 Email
199 ARS-070-05 13-Mar-2018 Email
200 ARS-070-06 13-Mar-2018 Email
201 ARS-070-07 13-Mar-2018 Email
202 ARS-070-08 13-Mar-2018 Email
203 ARS-070-09 13-Mar-2018 Email
204 ARS-070-10 13-Mar-2018 Email
205 ARS-070-11 13-Mar-2018 Email
206 ARS-070-12 13-Mar-2018 Email
207 ARS-070-13 13-Mar-2018 Email
208 ARS-071-01 13-Mar-2018 Email
209 ARS-072-01 13-Mar-2018 Email
210 ARS-073-01 13-Mar-2018 Email
211 ARS-073-02 13-Mar-2018 Email
212 ARS-073-03 13-Mar-2018 Email

Reff Drawing/Page 7
BILL OF QUANTITY
PROJECT : CENTRA BALI HOSPITAL
LOCATION : JL BY PAS DARMA GIRI - GIANYAR
OWNER : PT.SEMESTA USADA BERKARYA
Date : 29 Oktober 2021

NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

I FINAL SUMARY
A PRELIMINARIES #REF! Ls 950,000.00 #REF!
TOTAL A #REF!
B TOWER 1
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 937.00 m2 1,500,000.00 1,405,500,000.00
Basement 937.00 m2 3,500,000.00 3,279,500,000.00
ground floor 891.00 m2 3,000,000.00 2,673,000,000.00
1 st floor 754.00 m2 3,000,000.00 2,262,000,000.00
2 nd floor 754.00 m2 3,000,000.00 2,262,000,000.00
3rd floor 754.00 m2 3,000,000.00 2,262,000,000.00
roof floor 754.00 m2 3,000,000.00 2,262,000,000.00
-
2 ARSITEKTUR 4,844.00 m2 3,500,000.00 16,954,000,000.00
3 MEP 4,844.00 m2 4,500,000.00 21,798,000,000.00
4 FIX LOOSE FURNITURE 4,844.00 m2 1,000,000.00 4,844,000,000.00
5 LIFT CAR ( 5 FLOOR ) 2.00 unit 1,000,000,000.00 2,000,000,000.00
TOTAL B 62,002,000,000.00
C TOWER 2
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 1,904.00 m2 1,500,000.00 2,856,000,000.00
Basement 1,904.00 m2 3,500,000.00 6,664,000,000.00
ground floor 1,525.00 m2 3,000,000.00 4,575,000,000.00
1 st floor 953.00 m2 3,000,000.00 2,859,000,000.00
2 nd floor 931.00 m2 3,000,000.00 2,793,000,000.00
3rd floor 931.00 m2 3,000,000.00 2,793,000,000.00
roof floor 70.00 m2 3,000,000.00 210,000,000.00

2 ARSITEKTUR 6,314.00 m2 3,500,000.00 22,099,000,000.00


3 MEP 6,314.00 m2 4,500,000.00 28,413,000,000.00
4 FIX LOOSE FURNITURE 6,314.00 m2 1,000,000.00 6,314,000,000.00
5 LIFT CAR ( 5 FLOOR ) 2.00 unit 1,000,000,000.00 2,000,000,000.00
TOTAL C 81,576,000,000.00
D TOWER 3
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 1,449.00 m2 1,500,000.00 2,173,500,000.00
Basement 1,449.00 m2 3,500,000.00 5,071,500,000.00
ground floor 851.00 m2 3,000,000.00 2,553,000,000.00
1 st floor 851.00 m2 3,000,000.00 2,553,000,000.00
2 nd floor 851.00 m2 3,000,000.00 2,553,000,000.00
3rd floor 851.00 m2 3,000,000.00 2,553,000,000.00
-
2 ARSITEKTUR 4,853.00 m2 3,500,000.00 16,985,500,000.00
3 MEP 4,853.00 m2 4,500,000.00 21,838,500,000.00
4 FIX LOOSE FURNITURE 4,853.00 m2 1,000,000.00 4,853,000,000.00
5 LIFT CAR ( 5 FLOOR ) 3.00 unit 1,350,000,000.00 4,050,000,000.00
TOTAL D 65,184,000,000.00

E BUILDING SERVICES
1 BALINESSE GATE / TICKETING 4.00 unit 500,000,000.00 2,000,000,000.00
2 BALINESSE TEMPLE 1.00 unit 500,000,000.00 500,000,000.00
3 DROP IN OUT CORRIDOR 88.00 m2 4,500,000.00 396,000,000.00
88.00 m2 TOTAL E 2,896,000,000.00

SOS GROUP 8 dari110


NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

F EXTERNAL WORKS
. soft scape / hard scape / pathway/ wall/ sewerline #REF! m2 1,200,000.00 #REF!
. Boundary Wall 800.00 m1 2,500,000.00 2,000,000,000.00
. box culivert 455.96 m1 3,000,000.00 1,367,880,000.00
TOTAL F #REF!

TOTAL 1 #REF!
II OTHERS OF WORK
B MECHANICAL AND ELECTRICAL
. External MEP #REF! m2 750,000.00 #REF!
. PLN trafo and Panel 1.00 lot 2,500,000,000.00 2,500,000,000.00
. Genzet include automatic 1.00 lot 3,500,000,000.00 3,500,000,000.00
. gas medical sistem and hardware 1.00 lot 9,500,000,000.00 9,500,000,000.00
. Boiler sistem 1.00 lot 2,000,000,000.00 2,000,000,000.00
. Solar shell 50 kva 1.00 lot 3,750,000,000.00 3,750,000,000.00
C SEWAGE AND WATER TREATMENT -
. Deep Well 60m dia 5 inch. Icl cassing, machine, pippe 2.00 unit 350,000,000.00 700,000,000.00
. Gound Tank Concrete w/ ceramic icl pump 1.00 unit 2,500,000,000.00 2,500,000,000.00
. Tower Tank w/ fibre, pump, filter etc 1.00 unit 1,000,000,000.00 1,000,000,000.00
. Sewage treatment ( B3 ), concrete, machine, sistem 1.00 unit 7,000,000,000.00 7,000,000,000.00
TOTAL 2 #REF!

TOTAL CONSTRUCTION #REF!


III HOSPITAL EQUIPMENT, UTILITY, SERTIFIKASI, IJIN
.
Alkes Rawat inap, polyclinic, , ruang operasi, vk bersalin, csso, hcu 1.00 unit 210,000,000,000.00 210,000,000,000.00
etc , unit gawat darurat
. MRI 1.00 unit 35,000,000,000.00 35,000,000,000.00
. CT. Scan 1.00 unit 15,000,000,000.00 15,000,000,000.00
. x-ray ( dental, panoramic, mobile etc ) 1.00 unit 7,000,000,000.00 7,000,000,000.00
. C ARM 2.00 unit 3,000,000,000.00 6,000,000,000.00
. CATH LAB 1.00 unit 35,000,000,000.00 35,000,000,000.00
. Peralatan Lab 1.00 unit 50,000,000,000.00 50,000,000,000.00
. Advance Ambulance 2.00 unit 980,000,000.00 1,960,000,000.00
. Home Care car 2.00 unit 300,000,000.00 600,000,000.00
. Motor Operational 2.00 unit 24,000,000.00 48,000,000.00
. SIM RS ( software, Network, Hardware, SIM Rs ) 1.00 unit 2,500,000,000.00 2,500,000,000.00
TOTAL HOSPITALITY 363,108,000,000.00
IV WORKING CAPITAL
A PROFESIONAL FEES 4.00% #REF! #REF!
. Consultant Architecture / dll 15.00% #REF!
. Consultant Sipil 5.00% #REF!
. Consultant MEP 7.00% #REF!
. Consultant Interior, FL & e 8.00% #REF!
. Consultant Landscape 3.00% #REF!
. consultant QS 3.00% #REF!
. Consultant Marketing / Management / Keuangan 2.00% #REF!
. consultant legal / Hukum 2.00% #REF!
. Consultant Management / dan pengawasan ( MK ) 55.00% #REF!
B SIGNAGE 1.00 ls 1,500,000,000.00 1,500,000,000.00
C Office Equipment and Tools / Rumkit 1.00 ls 9,000,000,000.00 9,000,000,000.00
D Main Kitchen Equipment and Tools 1.00 ls 11,000,000,000.00 11,000,000,000.00
E Government Permit ( ITR, Lokasi, IMB, UKL UPL etc. ) 16,011.00 m2 350,000.00 5,603,850,000.00
F Pre Opening cost 1.00 % 15,650,000,000.00 156,500,000.00
G OPERATIONAL OF COST 2.00 th 12,000,000,000.00 24,000,000,000.00
H OWNER BUDGET EXPENCES 1.00 ls 15,650,000,000.00 15,650,000,000.00
TOTAL WORKING CAPITAL #REF!

TOTAL PROJECT #REF!


GOVERMENT TAX #REF!

SOS GROUP 9 dari110


NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

TOTAL #REF!
ROUNDED #REF!

SOS GROUP 10 dari110


BILL OF QUANTITY
PROJECT : CENTRA BALI HOSPITAL
LOCATION : JL KENAROK - BY PAS DARMA GIRI - GIANYAR
OWNER : PT.SEMESTA USADA BERKARYA

NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

I FINAL SUMARY
A PRELIMINARIES 1.00 Lot - -
TOTAL A -
B STRUCTURE WORKS
EARTHWORKS 1.00 Lot - -
STRUCTURE BUILDING 1.00 Lot - -
STRUCTURE EXTERNAL WORKS 1.00 Lot - -
TOTAL B -
C ARCHITECTURE WORKS
ARCHITECTURE BASEMENT 1.00 Lot - -
ARCHITECTURE GROUND FLOOR 1.00 Lot - -
ARCHITECTURE FIRST FLOOR 1.00 Lot - -
ARCHITECTURE SECOND FLOOR 1.00 Lot - -
ARCHITECTURE THIRD FLOOR 1.00 Lot - -
ARCHITECTURE TOP FLOOR 1.00 Lot - -
TOTAL C -

D MEP WORKS 1.00 Lot 39,858,578,699.20 39,858,578,699.20


E EXTERNAL WORKS 4,153.00 m2 1,000,000.00 4,153,000,000.00
soft scape / hard scape / pathway/ wall
F DRAINAGE / CULVERT WORKS 455.96 m1 5,000,000.00 2,279,800,000.00
TOTAL 1 46,291,378,699.20
II OTHERS OF WORK

A INTERIOR FIX AND LOOSE 17,091.00 m2 2,000,000.00 34,182,000,000.00


B MECHANICAL AND ELECTRICAL -
. External MEP 4,153.00 m2 850,000.00 3,530,050,000.00
. PLN trafo and Panel 1.00 lot 1,500,000,000.00 1,500,000,000.00
. Genzet include outomatic 1.00 lot 2,500,000,000.00 2,500,000,000.00
. gas medical sistem and hardware 1.00 lot 4,500,000,000.00 4,500,000,000.00
C SEWAGE AND WATER TREATMENT -
. Deep Well 60m dia 5 inch. Icl cassing, machine, pippe 2.00 unit 200,000,000.00 400,000,000.00
. Gound Tank Concrete w/ ceramic icl pump 1.00 unit 3,500,000,000.00 3,500,000,000.00
. Tower Tank w/ fibre, pump, filter etc 1.00 unit 4,850,000,000.00 4,850,000,000.00
. Sewage treatment ( B3 ), concrete, machine, sistem 1.00 unit 15,000,000,000.00 15,000,000,000.00
TOTAL 2 69,962,050,000.00

TOTAL CONSTRUCTION 116,253,428,699.20


III HOSPITAL EQUIPMENT, UTILITY, SERTIFIKASI, IJIN
Alkes Rawat inap, polyclinic, laboratories, radiology
. ( Rontgen, USG, CT scan etc. ) ruang operasi, vk 1.00 unit 135,000,000,000.00 135,000,000,000.00
bersalin, csso, hcu etc , unit gawat darurat
. Advance Ambulance 2.00 unit 950,000,000.00 1,900,000,000.00
. Home Care car 2.00 unit 250,000,000.00 500,000,000.00
. Motor Operational 2.00 unit 24,000,000.00 48,000,000.00
TOTAL HOSPITALITY 137,448,000,000.00
SOS GROUP 11 dari110
NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

IV WORKING CAPITAL
A PROFESIONAL FEES 3.00% 116,253,428,699.20 3,487,602,860.98
. Consultant Architecture 15.00% 523,140,429.15
. Consultant Sipil 5.00% 174,380,143.05
. Consultant MEP 7.00% 244,132,200.27
. Consultant Interior, FL & e 8.00% 279,008,228.88
. Consultant Landscape 3.00% 104,628,085.83
. consultant QS 3.00% 104,628,085.83
. Consultant Marketing / Management / Keuangan 2.00% 69,752,057.22
. consultant legal / Hukum 2.00% 69,752,057.22
. Consultant Management / dan pengawasan ( MK ) 55.00% 1,918,181,573.54
B SIGNAGE 1.00 ls 1,200,000,000.00 1,200,000,000.00
C Office Equipment and Tools 1.00 ls 3,000,000,000.00 3,000,000,000.00
D Main Kitchen Equipment and Tools 1.00 ls 4,000,000,000.00 4,000,000,000.00
E Government Permit ( ITR, Lokasi, IMB, UKL UPL etc. ) 17,091.00 m2 350,000.00 5,981,850,000.00
F BIAYA OPERASIONAL 2 Tahun Pertama 2.00 th 50,000,000,000.00 100,000,000,000.00
TOTAL WORKING CAPITAL 117,669,452,860.98
V PEMBEBASAN LAHAN
Lahan 1 1,973.00 m2 4,000,000.00 7,892,000,000.00
Lahan 2 2,490.00 m2 4,000,000.00 9,960,000,000.00
Lahan 3 2,015.00 m2 4,000,000.00 8,060,000,000.00
Lahan 4 397.00 m2 4,000,000.00 1,588,000,000.00
TOTAL PEMBEBASAN LAHAN 27,500,000,000.00

TOTAL PROJECT 398,870,881,560.18


GOVERMENT TAX 10 % 39,887,088,156.02
TOTAL PROJECT 438,757,969,716.19
ROUNDED 438,757,000,000.00

SOS GROUP 12 dari110


BILL OF QUANTITY
PROJECT : CENTRA BALI HOSPITAL
LOCATION : JL BY PAS DARMA GIRI - GIANYAR
OWNER : PT.SEMESTA USADA BERKARYA

NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

I FINAL SUMARY
A PRELIMINARIES #REF! Ls
TOTAL A -
B TOWER 1
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 937.00 m2
Basement 937.00 m2
ground floor 891.00 m2
1 st floor 754.00 m2
2 nd floor 754.00 m2
3rd floor 754.00 m2
roof floor 754.00 m2

2 ARSITEKTUR 4,844.00 m2
3 MEP 4,844.00 m2
4 FIX LOOSE FURNITURE 4,844.00 m2
5 LIFT CAR ( 5 FLOOR ) 2.00 unit
TOTAL B -
C TOWER 2
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 1,904.00 m2 - -
Basement 1,904.00 m2 - -
ground floor 1,525.00 m2 - -
1 st floor 953.00 m2 - -
2 nd floor 931.00 m2 - -
3rd floor 931.00 m2 - -
roof floor 70.00 m2 - -

2 ARSITEKTUR 6,314.00 m2 - -
3 MEP 6,314.00 m2 - -
4 FIX LOOSE FURNITURE 6,314.00 m2 - -
5 LIFT CAR ( 5 FLOOR ) 2.00 unit - -
TOTAL C -
D TOWER 3
1 STRUCTURE OF WORK
Tiang Pancang, sub structure / wall trust etc 1,449.00 m2 - -
Basement 1,449.00 m2 - -
ground floor 851.00 m2 - -
1 st floor 851.00 m2 - -
2 nd floor 851.00 m2 - -
3rd floor 851.00 m2 - -
-
2 ARSITEKTUR 4,853.00 m2 - -
3 MEP 4,853.00 m2 - -
4 FIX LOOSE FURNITURE 4,853.00 m2 - -
5 LIFT CAR ( 5 FLOOR ) 3.00 unit
TOTAL D -

E BUILDING SERVICES
1 BALINESSE GATE / TICKETING 4.00 unit
2 BALINESSE TEMPLE 1.00 unit
3 DROP IN OUT CORRIDOR 88.00 m2
88.00 m2 TOTAL E -

SOS GROUP 13 dari110


NO DESCRIPTION TOTAL AREA UNIT PRICE TOTAL PRICE

1 2 5 6 7

F EXTERNAL WORKS
. soft scape / hard scape / pathway/ wall/ sewerline #REF! m2
. Boundary Wall 800.00 m1
. box culivert 455.96 m1
TOTAL F -

TOTAL 1 -
II OTHERS OF WORK
B MECHANICAL AND ELECTRICAL
. External MEP #REF! m2
. PLN trafo and Panel 1.00 lot
. Genzet include automatic 1.00 lot
. gas medical sistem and hardware 1.00 lot
. Boiler sistem 1.00 lot
. Solar shell 50 kva 1.00 lot
C SEWAGE AND WATER TREATMENT
. Deep Well 60m dia 5 inch. Icl cassing, machine, pippe 2.00 unit
. Gound Tank Concrete w/ ceramic icl pump 1.00 unit
. Tower Tank w/ fibre, pump, filter etc 1.00 unit
. Sewage treatment ( B3 ), concrete, machine, sistem 1.00 unit
TOTAL 2 -

TOTAL CONSTRUCTION -
TOTAL PROJECT
GOVERMENT TAX
TOTAL
ROUNDED

SOS GROUP 14 dari110


BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
PRELIMINARIES
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide


only. It is the responsibility of the Tenderer to
measure and satisfy themselves as to the
accuracy of all quantities for works requiring
payment. The format provided in these Bills
should be followed in order to assist in tender
evaluation.

A PRELIMINARIES

1 Cost of test (concrete cube & iron bar) 1.00 ls


2 Cost of sample material 1.00 ls
3 Site management staff and establishment cost 18.00 month
4 General Cost
- Administration and Documentation 18.00 month
- Weekly Report to Project Management 18.00 month
- Shop drawing 18.00 month
- As build drawing 2.00 books
5 Labour Cost
- Workman Insurance 1.00 ls
- Temporary building for worker 150.00 m2
- Toilet / MCK 5.00 unit
- Retribution to local government "KIPEM" 18.00 month
6 Construction Plant
- Lift Material/mobile crane (diganti Tower Crane 1.00 unit
- Rental Teodolit 1.00 set
- Water pump 1.00 unit
7 Setting out 1.00 ls
8 Temporary Building
- Site office (meeting room, contractor and 100.00 m2
consultant)
- Storage and works shop 75.00 m2
- Temporary fence Type 1 (2500mm high w/ 317.00 m1
Zing
- Temporary steel entrance door (4000mm 1.00 unit
wide)
- Security Pos 2.00 unit
- Sanitation/Toilet 2.00 unit
9 Lighting and Power
- Temporary PLN conection 1.00 ls
- PLN consumption for work 18.00 month
10 Water consumption for work use deep well 18.00 month
11 Telephone consumption for work 18.00 month
12 Cleaning of site 18.00 month
13 Contractor all risk (insurance) 1.00 ls
14 Safety
- Healty for worker (P3K) 1.00 ls
- Safe guarding the work (lighting, Radio HT 1.00 ls
and equipment)
- Self Protection (helmet, boots, safety belt, 1.00 ls
electrical shoes, masker, face shield, etc)
- Sign ( K3 board, K3 Flag, morning briefing, 1.00 ls
evacuation route, floor signage, guard line
15 black
Accessyellow, etc)lime stone
Road ex. 1.00 ls

A PRELIMINARIES Caried to Final Summary

Preliminaries/Page 15
BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI

BIDDER NAME : PT.


DATE OF TENDER
STRUCTURE WORKS
Unit Rate Total Rate
No. Description QTY
(Rp) (Rp)

FINAL SUMMARY STRUCTURE WORKS

1.0. EARTHWORKS 7,313.00 M2

2.0. STRUCTURE BUILDING 19,044.00 M2

3.0. STRUCTURE EXTERNAL WORKS 2,710.00 M2

REAL COST RP. : 19,044.00 M2


ADDITIONAL PPN 10% :
TOTAL RP. :
ROUNDED RP. :

Belum Termasuk
1 Biaya perijinan dan pajak2 yang berlaku …................., …..........................
2 Penyambungan dan pengadaan daya PLN
PT. …..................................
3 Penyambungan dan pengadaan jaringan
telephone/telkom
4 Sistem Management Rumah Sakit
5 Equipment Rumah Sakit
6 Interior Rumah Sakit

Biaya Budgeting bersifat sementara yang akan dihitung


secara detail per item kerja menunggu perhtungan
volume dan spesifikasi hasil gambar DED perencanaan
final lengkap dan detail.

Summary Str/Page 16
BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
EARTH WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY
The following Bills of Quantities are a guide only. It is the
responsibility of the Tenderer to measure and satisfy
themselves as to the accuracy of all quantities for works
requiring payment. The format provided in these Bills should
be followed in order to assist in tender evaluation.

1.0. EARTHWORKS

1 Site clearance incl. removal of grass, shrubs, garbage, 11,994.12 m2


cutting or moving big trees, roots of trees, fertile soil,
dispose off site and permit to governance

Cut and Filling Soil


2 Cutting for preparation elevation surface Building-zone 1 4,640.00 m3
Cutting for preparation elevation surface Building-zone 2 6,646.98 m3
Cutting for preparation elevation surface Building-zone 3 3,421.38 m3
3 Filling up using excavated material including compaction 1,856.00
m3
40mm thk per layer zone 1
Filling up using excavated material including compaction 2,658.79
m3
40mm thk per layer zone 2
Filling up using excavated material including compaction 1,368.55
m3
40mm thk per layer zone 3
4 Filling up using new material including compaction 40mm thk 1,521.97 m3
per layer zone 1
Filling up using new material including compaction 40mm thk 1,637.14 m3
per layer zone 2
Filling up using new material including compaction 40mm thk 1,228.98 m3
per layer zone 3
Remove surplus ex excavation out site (Fertilizing soil) zone
5 4,176.00 m3
1
Remove surplus ex excavation out site (Fertilizing soil) zone
5,982.28 m3
2
Remove surplus ex excavation out site (Fertilizing soil) zone
3,079.24 m3
3

1.0. EARTHWORKS carried to collection

Earthworks/Page 17
BILL OF QUANTITIES STRUCTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy
themselves as to the accuracy of all quantities for works
requiring payment. The format provided in these Bills should
be followed in order to assist in tender evaluation.

2.0. STRUCTURE BUILDING

A SUBSTRUCTURE
Preliminary
1 Bouwplank 443.00 m1

Excavation
2 Excavation for Pit Lift 52.29 m3
3 Excavation for Pilecap Foundation 736.42 m3
4 Excavation for Foundation Genset 2.30 m3
5 Excavation for Tie Beam 395.11 m3
6 Backfilling with excavated material to build up platform 395.37 m3

Compacted sand bed


7 100 mm thick compacted sand layer under foundation and 459.00 m3
slab

Termite prevention
8 Termiban or Previle or equal approved termite protection 15,592.36 m2
applied to building platform and surfaces of excavation

A SUBSTRUCTURE carried to collection

B BORPILE WORKS
Boring including blind boring, lining; as detailed and
specified including remove soil ex Boring
1 Ø350mm Bor Pile P1 5.00 m depth 538.22 m1
2 Ø350mm Bor Pile P2 5.00 m depth 637.89 m1
3 Ø350mm Bor Pile P3 5.00 m depth 1,196.05 m1
4 Ø350mm Bor Pile P4 5.00 m depth 647.86 m1
5 Ø350mm Bor Pile P5 5.00 m depth 837.24 m1
6 Ø350mm Bor Pile P6 5.00 m depth 418.62 m1
7 Ø350mm Bor Pile P7 3.50 m depth 71.36 m1
8 Ø350mm Bor Pile P8 3.50 m depth 71.36 m1
9 Ø350mm Bor Pile P9 5.00 m depth 29.90 m1

K-300 vibrated reinforced concrete to


10 Concrete Ø350mm Bor Pile P1 5.00 m depth 53.05 m3
11 Concrete Ø350mm Bor Pile P2 5.00 m depth 62.88 m3
12 Concrete Ø350mm Bor Pile P3 5.00 m depth 117.89 m3
13 Concrete Ø350mm Bor Pile P4 5.00 m depth 63.86 m3
14 Concrete Ø350mm Bor Pile P5 5.00 m depth 82.52 m3
15 Concrete Ø350mm Bor Pile P6 5.00 m depth 41.26 m3
16 Concrete Ø350mm Bor Pile P7 3.50 m depth 7.03 m3
17 Concrete Ø350mm Bor Pile P8 3.50 m depth 7.03 m3
18 Concrete Ø350mm Bor Pile P9 5.00 m depth 2.95 m3

Supply and install grade BJTD-40 (fy = 400 MPa) hot


rolled deformed bar, reinforcement and BJTP-24 (fy =
240 MPa) plain bar reinforcement in the following
19 Reinforcement Ø350mm Bor Pile P1 5.00 m depth 147 Kg/m3 7,819.69 kg

20 Reinforcement Ø350mm Bor Pile P2 5.00 m depth 147 Kg/m3 9,267.78 kg

21 Reinforcement Ø350mm Bor Pile P3 5.00 m depth 147 Kg/m3 17,377.09 kg

22 Reinforcement Ø350mm Bor Pile P4 5.00 m depth 147 Kg/m3 9,412.59 kg

23 Reinforcement Ø350mm Bor Pile P5 5.00 m depth 147 Kg/m3 12,163.97 kg

Str Building/Page 18
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

24 Reinforcement Ø350mm Bor Pile P6 5.00 m depth 147 Kg/m3 6,081.98 kg

25 Reinforcement Ø350mm Bor Pile P7 3.50 m depth 147 Kg/m3 1,036.70 kg

26 Reinforcement Ø350mm Bor Pile P8 3.50 m depth 147 Kg/m3 1,036.70 kg

27 Reinforcement Ø350mm Bor Pile P9 5.00 m depth 147 Kg/m3 434.43 kg

B BORPILE WORKS carried to collection

C CONCRETE WORKS
K-175 reinforced concrete to
Lean concrete
1 254.47 m3
50 mm thick concrete under pad footing and slab building

K-300 reinforced concrete to


Basement Plan
2 Concrete Pilecap Foundation P1 (3000/3000-800)mm 75.88 m3
3 Concrete Pilecap Foundation P2 (3828/2414-750)mm 97.39 m3
4 Concrete Pilecap Foundation P3 (3000/2000-700)mm 147.54 m3
5 Concrete Pilecap Foundation P4 (2414/2414-600)mm 79.84 m3
6 Concrete Pilecap Foundation P5 (2000/2000-550)mm 81.15 m3
7 Concrete Pilecap Foundation P6 (2000/1632-500)mm 40.14 m3
8 Concrete Pilecap Foundation P7 (4350/3750-500)mm 14.33 m3
9 Concrete Pilecap Foundation P8 (4350/4000-500)mm 15.28 m3
10 Concrete Pilecap Foundation P9 (1000/1000-550)mm 2.90 m3
11 Concrete Foundation Genset (4050/1700-450)mm 5.44 m3
12 Asphalt Sealant for Foundation Genset (400/5)mm thk 20.39 m1
-
13 Concrete Tie Beam BS1 (300/600)mm 179.92 m3
14 Concrete Tie Beam BS2 (300/550)mm 76.04 m3
15 Concrete Tie Beam BS3 (250/450)mm 38.27 m3
16 Concrete Tie Beam BS4 (250/400)mm 2.99 m3
-
17 Concrete Beam B3 (300/650)mm 10.81 m3
18 Concrete Beam B4 (300/600)mm 5.31 m3
19 Concrete Beam B6 (300/500)mm 2.15 m3
-
20 Concrete Column C1 (750/750)mm 18.77 m3
21 Concrete Column C2 (500/500)mm 157.90 m3
22 Concrete Column C3 (450/450)mm 8.89 m3
23 Concrete Column C4 (400/400)mm 4.00 m3
24 Concrete Column C5 (350/350)mm 4.05 m3
25 Concrete Column C6 (250/600)mm 2.50 m3

26 Concrete Slab 3rd Basement 100mm thk 205.54 m3


27 Concrete Slab 3rd Basement 150mm thk 354.88 m3
28 Concrete Slab GWT Basement 3rd 200mm thk, with integral 55.90 m3
waterproofing
29 Concrete Slab Roof GWT Basement 3rd 200mm thk, with 55.90 m3
integral waterproofing

28 Concrete Shear Wall SW1 175mm thk 23.22 m3


29 Concrete Shear Wall SW2 175mm thk 5.06 m3
30 Concrete Shear Wall SW3 233mm thk with integral 14.52 m3
waterproofing
31 31.35 m3
Concrete RC Wall RW1 200mm thk with integral waterproofing
32 29.01 m3
Concrete RC Wall RW2 180mm thk with integral waterproofing
33 121.66 m3
Concrete RC Wall RW3 250mm thk with integral waterproofing
34 18.12 m3
Concrete RC Wall RW4 200mm thk with integral waterproofing

35 Concrete Stair #1 Public Stair, 3rd Basement to 2nd 6.21 m3


Basement
36 Concrete Stair #2 Emergency Stair, 3rd Basement to 2nd 4.96 m3
Basement

Str Building/Page 19
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Ground Floor Plan


37 Concrete Beam B3 (300/650)mm 97.43 m3
38 Concrete Beam B4 (300/600)mm 115.34 m3
39 Concrete Beam B6 (300/500)mm 17.71 m3
40 Concrete Beam B8 (250/500)mm 10.77 m3
41 Concrete Beam B9 (250/450)mm 83.74 m3
42 Concrete Beam B10 (250/400)mm 4.13 m3
43 Concrete Beam B12 (250/350)mm 1.79 m3
44 Concrete Beam BK1 (300/500)mm 0.86 m3
45 Concrete Beam BK3 (250/450)mm 0.86 m3
46 Concrete Beam BK4 (250/400)mm 0.18 m3

47 Concrete Column C1 (750/750)mm 13.44 m3


48 Concrete Column C2 (500/500)mm 101.52 m3
49 Concrete Column C3 (450/450)mm 0.71 m3
50 Concrete Column C5 (350/350)mm 1.46 m3
51 Concrete Column C6 (250/600)mm 1.79 m3

52 Concrete Slab Ground Floor 120mm thk 439.03 m3


53 Concrete Slab Roof Genset Room 120mm thk with integral 13.06 m3
waterproofing
Concrete Slab Ramp #1 Ground Floor to Basement 120mm 13.88 m3
54
thk
Concrete Slab Ramp #2 Ground Floor to Basement 200mm 40.37 m3
55
thk with integral waterproofing

56 Concrete Shear Wall SW1 175mm thk 19.02 m3


57 Concrete Shear Wall SW2 175mm thk 3.80 m3
58 26.87 m3
Concrete RC Wall RW1 200mm thk with integral waterproofing

59 Concrete Stair #1 Public Stair, Ground Floor to 1st Floor 6.05 m3


60 Concrete Stair #2 Emergency Stair, Ground Floor to 1st Floor 4.83 m3

1st Floor Plan


61 Concrete Beam B2 (350/700)mm 10.53 m3
62 Concrete Beam B3 (300/650)mm 89.46 m3
63 Concrete Beam B4 (300/600)mm 87.10 m3
64 Concrete Beam B6 (300/500)mm 17.62 m3
65 Concrete Beam B8 (250/500)mm 10.77 m3
66 Concrete Beam B9 (250/450)mm 63.79 m3
67 Concrete Beam B10 (250/400)mm 10.38 m3
68 Concrete Beam BK1 (300/500)mm 0.86 m3
69 Concrete Beam BK2 (250/500)mm 0.65 m3
70 Concrete Beam BK3 (250/450)mm 0.86 m3
-
71 Concrete Column C1 (750/750)mm 15.81 m3
72 Concrete Column C2 (500/500)mm 43.91 m3
73 Concrete Column C3 (450/450)mm 61.18 m3
74 Concrete Column C5 (350/350)mm 1.72 m3
75 Concrete Column C6 (250/600)mm 2.11 m3
-
76 Concrete Slab 1st Ground Floor 120mm thk 355.90 m3
Concrete Slab Ramp #1 Ground Floor to 1 Basement 120mm 14.13 m3
77
thk
Concrete Slab Ramp #2 1st Floor to Ground Floor 200mm thk 48.05 m3
78
with integral waterproofing

79 Concrete Shear Wall SW1 175mm thk 22.38 m3


80 Concrete Shear Wall SW2 175mm thk 4.81 m3
81 Concrete RC Wall RW1a 200mm thk with integral 26.43 m3
waterproofing

82 Concrete Stair #1 Public Stair, Ground Floor to 1st Floor 6.58 m3


83 Concrete Stair #2 Emergency Stair, Ground Floor to 1st Floor 5.28 m3

Str Building/Page 20
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

2nd Floor Plan


84 Concrete Beam B1 (450/1000)mm 15.16 m3
85 Concrete Beam B2 (350/700)mm 43.64 m3
86 Concrete Beam B2a (350/1100)mm 3.87 m3
87 Concrete Beam B3 (300/650)mm 81.20 m3
88 Concrete Beam B3a (450/650)mm 2.14 m3
89 Concrete Beam B4 (300/600)mm 79.70 m3
90 Concrete Beam B4a (300/1100)mm 11.02 m3
91 Concrete Beam B6 (300/500)mm 15.65 m3
92 Concrete Beam B7 (300/500)mm 21.49 m3
93 Concrete Beam B8 (250/500)mm 5.90 m3
94 Concrete Beam B9 (250/450)mm 53.44 m3
95 Concrete Beam B10 (250/400)mm 7.09 m3
96 Concrete Beam BK1 (300/500)mm 3.50 m3
97 Concrete Beam BK2 (250/500)mm 0.98 m3
98 Concrete Beam BK3 (250/450)mm 0.49 m3

99 Concrete Column C3 (450/450)mm 90.77 m3


100 Concrete Column C5 (350/350)mm 1.89 m3
101 Concrete Column C6 (250/600)mm 2.32 m3

102 Concrete Slab 2nd Floor 120mm thk 332.93 m3


103 Concrete Slab 2nd Floor 200mm thk with integral 218.11 m3
waterproofing
104 14.19 m3
Concrete Slab Ramp #1 2nd Floor to 1st Floor 120mm thk
105 29.78 m3
Concrete Slab Ramp #2 2nd Floor to 1st Floor 200mm thk

106 Concrete Shear Wall SW1 175mm thk 24.61 m3


107 Concrete Shear Wall SW2 175mm thk 5.48 m3

108 Concrete Stair #1 Public Stair, 1st Floor to 2nd Floor 6.58 m3
109 Concrete Stair #2 Emergency Stair, 1st Floor to 2nd Floor 5.28 m3

3rd Floor Plan


110 Concrete Beam B2 (350/700)mm 2.71 m3
111 Concrete Beam B3 (300/650)mm 74.27 m3
112 Concrete Beam B4 (300/600)mm 77.25 m3
113 Concrete Beam B5 (300/550)mm 3.21 m3
114 Concrete Beam B6 (300/500)mm 13.55 m3
115 Concrete Beam B8 (250/500)mm 10.57 m3
116 Concrete Beam B9 (250/450)mm 52.83 m3
117 Concrete Beam B10 (250/400)mm 10.95 m3
118 Concrete Beam BK1 (300/500)mm 6.00 m3
119 Concrete Beam BK2 (250/500)mm 1.35 m3
120 Concrete Beam BK3 (250/450)mm 1.67 m3

121 Concrete Column C3 (450/450)mm 2.56 m3


122 Concrete Column C4 (400/400)mm 55.64 m3
123 Concrete Column C7 (250/450)mm 1.42 m3

124 Concrete Slab 3rd Floor 120mm thk 342.65 m3


Concrete Slab 3rd Floor 120mm thk with integral 28.84 m3
125
waterproofing
14.23 m3
126 Concrete Slab Ramp #1 3rd Floor to 2nd Floor 120mm thk

127 Concrete Shear Wall SW1 175mm thk 20.14 m3


128 Concrete Shear Wall SW2 175mm thk 4.37 m3

Concrete Stair #2 Emergency Stair, 2nd Floor to 3rd Floor 4.43 m3


129

Roof Plan
130 Concrete Beam B4 (300/600)mm 84.64 m3
131 Concrete Beam B5 (300/550)mm 63.93 m3
132 Concrete Beam B6 (300/500)mm 3.20 m3
133 Concrete Beam B8 (250/500)mm 12.62 m3
134 Concrete Beam B9 (250/450)mm 65.14 m3
135 Concrete Beam B10 (250/400)mm 0.23 m3
136 Concrete Beam B11 (200/400)mm 7.64 m3
137 Concrete Beam BK2 (250/500)mm 3.65 m3
138 Concrete Beam BK3 (250/450)mm 3.18 m3

Str Building/Page 21
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

139 Concrete Column C8 (200/400)mm 17.28 m3

140 Concrete Plate Roof 120mm thk 153.10 m3


141 Concrete Plate Roof 120mm thk with integral waterproofing 236.71 m3

142 Concrete Shear Wall SW1 175mm thk 5.87 m3


143 Concrete Shear Wall SW2 175mm thk 1.76 m3

Ring Beam Roof


144 Concrete Beam B11 (200/400)mm 21.53 m3
145 Concrete Beam B12 (200/350)mm 6.84 m3

146 Concrete Plate Roof Lift 200mm thk 6.17 m3


147 Concrete Plate Roof 120mm thk with integral waterproofing 20.46 m3

Supply and install grade BJTD-40 (fy = 400 Mpa) hot


rolled deformed bar, reinforcement and BJTD -24 (fy =
240 Mpa) plain bar reinforcement in the following
Basement Plan
148 Reinforcement Pilecap Foundation P1 91 Kg/m3 6,927.27 Kg
149 Reinforcement Pilecap Foundation P2 96 Kg/m3 9,385.53 Kg
150 Reinforcement Pilecap Foundation P3 109 Kg/m3 16,070.84 Kg
151 Reinforcement Pilecap Foundation P4 122 Kg/m3 9,777.78 Kg
152 Reinforcement Pilecap Foundation P5 140 Kg/m3 11,340.90 Kg
153 Reinforcement Pilecap Foundation P6 156 Kg/m3 6,273.96 Kg
154 Reinforcement Pilecap Foundation P7 125 Kg/m3 1,793.53 Kg
155 Reinforcement Pilecap Foundation P8 124 Kg/m3 1,900.56 Kg
156 Reinforcement Pilecap Foundation P9 193 Kg/m3 558.75 Kg
157 Reinforcement Foundation Genset 110 Kg/m3 599.59 Kg

158 Reinforcement Tie Beam BS1 326 Kg/m3 58,706.66 Kg


159 Reinforcement Tie Beam BS2 284 Kg/m3 21,571.48 Kg
160 Reinforcement Tie Beam BS3 366 Kg/m3 14,015.92 Kg
161 Reinforcement Tie Beam BS4 274 Kg/m3 816.66 Kg

162 Reinforcement Beam B3 308 Kg/m3 3,324.89 Kg


163 Reinforcement Beam B4 302 Kg/m3 1,603.01 Kg
164 Reinforcement Beam B6 334 Kg/m3 718.71 Kg

165 Reinforcement Column C1 354 Kg/m3 6,648.48 Kg


166 Reinforcement Column C2 384 Kg/m3 60,581.93 Kg
167 Reinforcement Column C3 403 Kg/m3 3,578.44 Kg
168 Reinforcement Column C4 345 Kg/m3 1,381.09 Kg
169 Reinforcement Column C5 345 Kg/m3 1,397.31 Kg
170 Reinforcement Column C6 371 Kg/m3 929.51 Kg

171 Wiremesh M7 single layer for Slab Basement 100mm thk 2,055.42 m2
4,731.73 m2
172 Wiremesh M7 double layers for Slab Basement 150mm thk
173 Wiremesh M8 double layers for Slab GWT Basement 200mm 558.95 m2
thk
174 Wiremesh M8 double layers for Slab Roof GWT Basement 558.95 m2
200mm thk

173 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 3,714.40 Kg
174 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 821.05 Kg
175 Reinforcement Shear Wall SW3 233mm thk 120 Kg/m3 1,744.59 Kg
176 Reinforcement RC Wall RW1 200mm thk 317 Kg/m3 9,939.37 Kg
177 Reinforcement RC Wall RW2 180mm thk 223 Kg/m3 6,473.99 Kg
178 Reinforcement RC Wall RW3 250mm thk 317 Kg/m3 38,569.32 Kg
179 Reinforcement RC Wall RW4 200mm thk 140 Kg/m3 2,536.87 Kg

180 Reinforcement Stair #1 Public Stair, Basement to Groun Floor 1,057.70 Kg


170 Kg/m3
181 Reinforcement Stair #2 Emergency Stair, Basement to 845.60 Kg
Ground Floor 170 Kg/m3

Ground Floor Plan


182 Reinforcement Beam B3 308 Kg/m3 29,959.36 Kg
183 Reinforcement Beam B4 302 Kg/m3 34,810.17 Kg
184 Reinforcement Beam B6 334 Kg/m3 5,920.16 Kg
185 Reinforcement Beam B8 344 Kg/m3 3,703.81 Kg

Str Building/Page 22
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

186 Reinforcement Beam B9 319 Kg/m3 26,678.53 Kg


187 Reinforcement Beam B10 343 Kg/m3 1,418.22 Kg
188 Reinforcement Beam B12 283 Kg/m3 507.76 Kg
189 Reinforcement Beam BK1 334 Kg/m3 287.83 Kg
190 Reinforcement Beam BK3 341 Kg/m3 294.10 Kg
191 Reinforcement Beam BK4 343 Kg/m3 61.20 Kg

192 Reinforcement Column C1 325 Kg/m3 4,362.92 Kg


193 Reinforcement Column C2 335 Kg/m3 33,999.80 Kg
194 Reinforcement Column C3 352 Kg/m3 251.01 Kg
195 Reinforcement Column C5 295 Kg/m3 431.03 Kg
196 Reinforcement Column C6 316 Kg/m3 566.49 Kg

197 7,317.13 m2
Wiremesh M7 double layers for Slab Ground Floor 120mm thk
198 Wiremesh M7 double layers for Slab Roof Genset Room 217.59 m2
120mm thk
Reinforcement Slab Ramp #1 Ground Floor to Basement 2,419.03 Kg
199
120mm thk 174 Kg/m3
Reinforcement Slab Ramp #2 Ground Floor to Basement 7,082.24 Kg
200
200mm thk 175 Kg/m3

201 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 3,043.12 Kg
202 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 617.17 Kg
203 Reinforcement RC Wall RW1 200mm thk 317 Kg/m3 8,519.46 Kg

204 Reinforcement Stair #1 Public Stair, Ground Floor to 1st Floor 1,031.29 Kg
170 Kg/m3
205 Reinforcement Stair #2 Emergency Stair, Ground Floor to 1st 823.25 Kg
Floor 170 Kg/m3

1st Floor Plan


206 Reinforcement Beam B2 332 Kg/m3 3,846.25 Kg
207 Reinforcement Beam B3 308 Kg/m3 30,259.55 Kg
208 Reinforcement Beam B4 302 Kg/m3 28,915.30 Kg
209 Reinforcement Beam B6 334 Kg/m3 6,478.86 Kg
210 Reinforcement Beam B8 344 Kg/m3 4,073.76 Kg
211 Reinforcement Beam B9 319 Kg/m3 22,357.28 Kg
212 Reinforcement Beam B10 343 Kg/m3 3,919.56 Kg
213 Reinforcement Beam BK1 334 Kg/m3 316.62 Kg
214 Reinforcement Beam BK2 344 Kg/m3 246.39 Kg
215 Reinforcement Beam BK3 341 Kg/m3 323.51 Kg

216 Reinforcement Column C1 325 Kg/m3 5,646.13 Kg


217 Reinforcement Column C2 335 Kg/m3 16,176.37 Kg
218 Reinforcement Column C3 352 Kg/m3 23,674.20 Kg
219 Reinforcement Column C5 295 Kg/m3 557.81 Kg
220 Reinforcement Column C6 316 Kg/m3 733.11 Kg

221 Wiremesh M7 double layers for Slab 1st Floor 120mm thk 6,524.92 m2
Reinforcement Slab Ramp #1 1st Floor to Ground Floor 2,709.41 Kg
222
120mm thk 174 Kg/m3
Reinforcement Slab Ramp #2 1st Floor to Ground Floor 9,272.31 Kg
223
200mm thk 175 Kg/m3

224 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 3,938.16 Kg
225 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 858.30 Kg
226 Reinforcement RC Wall RW1a 200mm thk 230 Kg/m3 6,689.18 Kg

227 Reinforcement Stair #1 Public Stair, 1st Floor to 2nd Floor 1,234.08 Kg
170 Kg/m3
228 Reinforcement Stair #2 Emergency Stair, 1st Floor to 2nd 989.90 Kg
Floor 170 Kg/m3

2nd Floor Plan


229 Reinforcement Beam B1 362 Kg/m3 5,490.51 Kg
230 Reinforcement Beam B2 332 Kg/m3 14,488.98 Kg
231 Reinforcement Beam B2a 229 Kg/m3 888.45 Kg
232 Reinforcement Beam B3 308 Kg/m3 24,968.83 Kg
233 Reinforcement Beam B3a 338 Kg/m3 722.50 Kg
234 Reinforcement Beam B4 302 Kg/m3 24,052.48 Kg
235 Reinforcement Beam B4a 190 Kg/m3 2,089.90 Kg
236 Reinforcement Beam B6 334 Kg/m3 5,231.88 Kg

Str Building/Page 23
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

237 Reinforcement Beam B7 334 Kg/m3 7,184.50 Kg


238 Reinforcement Beam B8 344 Kg/m3 2,029.46 Kg
239 Reinforcement Beam B9 319 Kg/m3 17,026.26 Kg
240 Reinforcement Beam B10 343 Kg/m3 2,432.95 Kg
241 Reinforcement Beam BK1 334 Kg/m3 1,168.70 Kg
242 Reinforcement Beam BK2 344 Kg/m3 335.79 Kg
243 Reinforcement Beam BK3 341 Kg/m3 168.16 Kg

244 Reinforcement Column C3 352 Kg/m3 31,932.64 Kg


245 Reinforcement Column C5 295 Kg/m3 557.81 Kg
246 Reinforcement Column C6 316 Kg/m3 733.11 Kg

247 Wiremesh M7 double layers for Slab 1st Floor 120mm thk 5,548.88 m2
248 Wiremesh M8 double layers for Slab 1st Floor 200mm thk 2,181.06 m2
249 Reinforcement Slab Ramp #1 2nd Floor to 1st Floor 120mm 2,473.49 Kg
thk 174 Kg/m3
250 Reinforcement Slab Ramp #2 2nd Floor to 1st Floor 200mm 5,223.45 Kg
thk 175 Kg/m3

251 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 3,938.16 Kg
252 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 889.00 Kg

Reinforcement Stair #1 Public Stair, 2 nd Floor to 3rd Floor 1,121.89 Kg


253
170 Kg/m3
Reinforcement Stair #2 Emergency Stair, 2nd Floor to 3rd 899.91 Kg
254
Floor 170 Kg/m3

3rd Floor Plan


255 Reinforcement Beam B2 332 Kg/m3 1,304.51 Kg
256 Reinforcement Beam B3 308 Kg/m3 33,115.31 Kg
257 Reinforcement Beam B4 302 Kg/m3 33,806.50 Kg
258 Reinforcement Beam B5 299 Kg/m3 1,393.73 Kg
259 Reinforcement Beam B6 334 Kg/m3 6,570.19 Kg
260 Reinforcement Beam B8 344 Kg/m3 5,272.60 Kg
261 Reinforcement Beam B9 319 Kg/m3 24,405.95 Kg
262 Reinforcement Beam B10 343 Kg/m3 5,451.82 Kg
263 Reinforcement Beam BK1 334 Kg/m3 2,910.17 Kg
264 Reinforcement Beam BK2 344 Kg/m3 674.16 Kg
265 Reinforcement Beam BK3 341 Kg/m3 824.20 Kg
-
266 Reinforcement Column C3 352 Kg/m3 1,306.34 Kg
267 Reinforcement Column C4 293 Kg/m3 23,672.64 Kg
268 Reinforcement Column C7 321 Kg/m3 661.58 Kg
-
8,977.67 m2
269 Wiremesh M7 double layers for Slab 3nd Floor 120mm thk
270 Reinforcement Slab Ramp #1 3nd Floor to 2nd Floor 120mm 3,595.56 Kg
thk 174 Kg/m3
-
271 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 4,672.09 Kg
272 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 1,028.44 Kg
-
273 Reinforcement Stair #2 Emergency Stair, 3rd Floor to Roof 1,094.55 Kg
Top 170 Kg/m3 (Assumption)

Roof Plan
274 Reinforcement Beam B4 302 Kg/m3 33,205.79 Kg
275 Reinforcement Beam B5 299 Kg/m3 24,881.63 Kg
276 Reinforcement Beam B6 334 Kg/m3 1,392.32 Kg
277 Reinforcement Beam B8 344 Kg/m3 5,644.90 Kg
278 Reinforcement Beam B9 319 Kg/m3 26,980.87 Kg
279 Reinforcement Beam B10 343 Kg/m3 101.51 Kg
280 Reinforcement Beam B11 273 Kg/m3 2,707.27 Kg
281 Reinforcement Beam BK2 344 Kg/m3 1,633.62 Kg
282 Reinforcement Beam BK3 341 Kg/m3 1,408.59 Kg

283 Reinforcement Column C8 331 Kg/m3 7,433.02 Kg

284 Wiremesh M7 double layers for Plate Roof 120mm thk 8,445.95 m2

285 Reinforcement Shear Wall SW1 175mm thk 160 Kg/m3 1,221.72 Kg
286 Reinforcement Shear Wall SW2 175mm thk 162 Kg/m3 371.06 Kg

Str Building/Page 24
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Ring Beam Roof


287 Reinforcement Beam B11 273 Kg/m3 8,801.65 Kg
288 Reinforcement Beam B12 283 Kg/m3 2,906.16 Kg

289 Reinforcement Plate Roof Lift 200mm thk 175 Kg/m3 1,622.28 Kg
290 Wiremesh M7 double layers for Plate Roof 120mm thk 511.46 m2

Form Work
Concrete brick "Bataco" including cement mortar to

Basement Plan
291 Formwork Pilecap Foundation P1 (3000/3000-800)mm 92.74 m2
292 Formwork Pilecap Foundation P2 (3828/2414-750)mm 120.60 m2
293 Formwork Pilecap Foundation P3 (3000/2000-700)mm 225.41 m2
294 Formwork Pilecap Foundation P4 (2414/2414-600)mm 121.27 m2
295 Formwork Pilecap Foundation P5 (2000/2000-550)mm 148.77 m2
296 Formwork Pilecap Foundation P6 (2000/1632-500)mm 81.87 m2
297 Formwork Pilecap Foundation P7 (4350/3750-500)mm 13.04 m2
298 Formwork Pilecap Foundation P8 (4350/4000-500)mm 13.44 m2
299 Formwork Pilecap Foundation P9 (1000/1000-550)mm 10.63 m2
-
300 Formwork Tie Beam BS1 (300/600)mm 1,099.49 m2
301 Formwork Tie Beam BS2 (300/550)mm 464.67 m2
302 Formwork Tie Beam BS3 (250/450)mm 280.68 m2
303 Formwork Tie Beam BS4 (250/400)mm 21.90 m2
-
304 Formwork Slab 3rd Basement 100mm thk 24.20 m2
305 Formwork Slab 3rd Basement 150mm thk 74.78 m2
306 Formwork Slab GWT Basement 3rd 200mm thk 17.72 m2
307 Formwork Slab Roof GWT Basement 3rd 200mm thk 17.72 m2
-
308 Formwork Shear Wall SW3 233mm thk 57.12 m2
309 Formwork RC Wall RW2 180mm thk 147.73 m2
310 Formwork RC Wall RW3 250mm thk 299.00 m2

Form work work w/ plywood 9 mm, including timber


frames support to
Basement Plan
311 Formwork Foundation Genset (4050/1700-450)mm 8.33 m2

312 Formwork Beam B3 (300/650)mm 69.05 m2


313 Formwork Beam B4 (300/600)mm 33.92 m2
314 Formwork Beam B6 (300/500)mm 13.73 m2

315 Formwork Column C1 (750/750)mm 91.77 m2


316 Formwork Column C2 (500/500)mm 1,157.96 m2
317 Formwork Column C3 (450/450)mm 72.43 m2
318 Formwork Column C4 (400/400)mm 36.71 m2
319 Formwork Column C5 (350/350)mm 42.38 m2
320 Formwork Column C6 (250/600)mm 26.00 m2

321 Formwork Slab Roof GWT Basement 3rd 200mm thk 256.19 m2

322 Formwork Shear Wall SW1 175mm thk 243.22 m2


323 Formwork Shear Wall SW2 175mm thk 53.01 m2
324 Formwork Shear Wall SW3 233mm thk 57.12 m2
325 Formwork RC Wall RW1 200mm thk 287.40 m2
326 Formwork RC Wall RW2 180mm thk 147.73 m2
327 Formwork RC Wall RW3 250mm thk 816.24 m2
328 Formwork RC Wall RW4 200mm thk 166.11 m2

329 Formwork Stair #1 Public Stair, 3rd Basement to 2nd 48.88 m2


Basement
330 Formwork Stair #2 Emergency Stair, 3rd Basement to 2nd 44.06 m2
Basement

Ground Floor Plan


331 Formwork Beam B3 (300/650)mm 622.19 m2
332 Formwork Beam B4 (300/600)mm 736.59 m2
333 Formwork Beam B6 (300/500)mm 113.09 m2
334 Formwork Beam B8 (250/500)mm 81.42 m2
335 Formwork Beam B9 (250/450)mm 633.26 m2
336 Formwork Beam B10 (250/400)mm 31.24 m2
337 Formwork Beam B12 (250/350)mm 11.13 m2

Str Building/Page 25
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

338 Formwork Beam BK1 (300/500)mm 5.50 m2


339 Formwork Beam BK3 (250/450)mm 6.52 m2
340 Formwork Beam BK4 (250/400)mm 1.35 m2
-
341 Formwork Column C1 (750/750)mm 65.69 m2
342 Formwork Column C2 (500/500)mm 744.50 m2
343 Formwork Column C3 (450/450)mm 5.81 m2
344 Formwork Column C5 (350/350)mm 15.33 m2
345 Formwork Column C6 (250/600)mm 18.61 m2
-
346 Formwork Slab 2nd Basement 120mm thk 2,810.99 m2
347 Formwork Slab Roof Genset Room 120mm thk 82.26 m2
Formwork Slab Ramp #1 2nd Basement to 3rd Basement 80.62 m2
348
120mm thk
349 Formwork Slab Ramp #2 2nd Basement to 3rd Basement 162.75 m2
200mm thk
-
350 Formwork Shear Wall SW1 175mm thk 199.26 m2
351 Formwork Shear Wall SW2 175mm thk 39.84 m2
352 Formwork RC Wall RW1 200mm thk 246.34 m2
-
353 Formwork Stair #1 Public Stair, 2nd Basement to 1st 47.73 m2
Basement
354 Formwork Stair #2 Emergency Stair, 2nd Basement to 1st 43.06 m2
Basement

1st Floor Plan


355 Formwork Beam B2 (350/700)mm 64.40 m2
356 Formwork Beam B3 (300/650)mm 628.43 m2
357 Formwork Beam B4 (300/600)mm 611.85 m2
358 Formwork Beam B6 (300/500)mm 123.77 m2
359 Formwork Beam B8 (250/500)mm 89.56 m2
360 Formwork Beam B9 (250/450)mm 530.69 m2
361 Formwork Beam B10 (250/400)mm 86.34 m2
362 Formwork Beam BK1 (300/500)mm 6.05 m2
363 Formwork Beam BK2 (250/500)mm 5.42 m2
364 Formwork Beam BK3 (250/450)mm 7.17 m2

365 Formwork Column C1 (750/750)mm 85.01 m2


366 Formwork Column C2 (500/500)mm 354.22 m2
367 Formwork Column C3 (450/450)mm 548.33 m2
368 Formwork Column C5 (350/350)mm 19.84 m2
369 Formwork Column C6 (250/600)mm 24.09 m2

370 Formwork Slab 1st Basement 120mm thk 2,492.17 m2


Formwork Slab Ramp #1 1st Basement to 2nd Basement 94.04 m2
371
120mm thk
Formwork Slab Ramp #2 1st Basement to 2nd Basement 213.97 m2
372
200mm thk

373 Formwork Shear Wall SW1 175mm thk 257.87 m2


374 Formwork Shear Wall SW2 175mm thk 55.41 m2
375 Formwork RC Wall RW1a 200mm thk 266.46 m2

376 Formwork Stair #1 Public Stair, 1st Basement to 1st Floor 60.70 m2

377 Formwork Stair #2 Emergency Stair, 1st Basement to 1st 50.23 m2


Floor

2nd Floor Plan


378 Formwork Beam B1 (450/1000)mm 68.01 m2
379 Formwork Beam B2 (350/700)mm 242.60 m2
380 Formwork Beam B2a (350/1100)mm 21.53 m2
381 Formwork Beam B3 (300/650)mm 518.55 m2
382 Formwork Beam B3a (450/650)mm 9.60 m2
383 Formwork Beam B4 (300/600)mm 508.95 m2
384 Formwork Beam B4a (300/1100)mm 70.39 m2
385 Formwork Beam B6 (300/500)mm 99.94 m2
386 Formwork Beam B7 (300/500)mm 137.25 m2
387 Formwork Beam B8 (250/500)mm 44.62 m2
388 Formwork Beam B9 (250/450)mm 404.15 m2
389 Formwork Beam B10 (250/400)mm 53.60 m2
390 Formwork Beam BK1 (300/500)mm 22.33 m2
391 Formwork Beam BK2 (250/500)mm 7.38 m2
392 Formwork Beam BK3 (250/450)mm 3.73 m2

Str Building/Page 26
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

393 Formwork Column C3 (450/450)mm 739.60 m2


394 Formwork Column C5 (350/350)mm 19.84 m2
395 Formwork Column C6 (250/600)mm 24.09 m2

396 Formwork Slab 1st Floor 120mm thk 2,146.63 m2


397 Formwork Slab 1st Floor 200mm thk 822.85 m2
398 Formwork Slab Ramp #1 1st Floor to 1st Basement 120mm 83.02 m2
thk
399 Formwork Slab Ramp #2 1st Floor to 1st Basement 200mm 123.56 m2
thk

400 Formwork Shear Wall SW1 175mm thk 257.87 m2


401 Formwork Shear Wall SW2 175mm thk 57.39 m2

402 Formwork Stair #1 Public Stair, 1st Floor to 2nd Floor 55.18 m2
Formwork Stair #2 Emergency Stair, 1st Floor to 2nd Floor 45.66 m2
403

3rd Floor Plan


404 Formwork Beam B2 (350/700)mm 19.73 m2
405 Formwork Beam B3 (300/650)mm 621.33 m2
406 Formwork Beam B4 (300/600)mm 646.28 m2
407 Formwork Beam B5 (300/550)mm 26.86 m2
408 Formwork Beam B6 (300/500)mm 113.39 m2
409 Formwork Beam B8 (250/500)mm 104.72 m2
410 Formwork Beam B9 (250/450)mm 523.38 m2
411 Formwork Beam B10 (250/400)mm 108.50 m2
412 Formwork Beam BK1 (300/500)mm 50.23 m2
413 Formwork Beam BK2 (250/500)mm 13.39 m2
414 Formwork Beam BK3 (250/450)mm 16.51 m2

415 Formwork Column C3 (450/450)mm 27.34 m2


416 Formwork Column C4 (400/400)mm 668.19 m2
417 Formwork Column C7 (250/450)mm 21.26 m2

418 Formwork Slab 2nd Floor 120mm thk 3,118.85 m2


109.02
419 Formwork Slab Ramp #1 2nd Floor to 1st Floor 120mm thk
m2

420 Formwork Shear Wall SW1 175mm thk 276.39 m2


421 Formwork Shear Wall SW2 175mm thk 59.99 m2

422 Formwork Stair #2 Emergency Stair, 2nd Floor to Roof Top 45.93 m3
(Assumption)

Roof Plan
423 Formwork Beam B4 (300/600)mm 702.64 m2
424 Formwork Beam B5 (300/550)mm 530.72 m2
425 Formwork Beam B6 (300/500)mm 26.60 m2
426 Formwork Beam B8 (250/500)mm 124.10 m2
427 Formwork Beam B9 (250/450)mm 640.44 m2
428 Formwork Beam B10 (250/400)mm 2.24 m2
429 Formwork Beam B11 (200/400)mm 65.57 m2
430 Formwork Beam BK2 (250/500)mm 35.91 m2
431 Formwork Beam BK3 (250/450)mm 31.23 m2

432 Formwork Column C8 (200/400)mm 308.96 m2

433 Formwork Plate Roof 120mm thk 4,407.40 m2

434 Formwork Shear Wall SW1 175mm thk 80.00 m2


435 Formwork Shear Wall SW2 175mm thk 23.96 m2

Ring Beam Roof


436 Formwork Beam B11 (200/400)mm 329.46 m2
437 Formwork Beam B12 (200/350)mm 104.67 m2

438 Formwork Plate Roof Lift 200mm thk 57.94 m2


439 Formwork Plate Roof 120mm thk 227.29 m2

C CONCRETE WORKS carried to collection

Str Building/Page 27
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

D THERMAL & MOISTURE PROTECTION

Cement base waterproofing ex. Fosroc/SIKA c/w protective


render internally to
Basement Plan
1 Concrete Slab GWT Basement 3rd 200mm thk 304.98 m2
2 Concrete Slab Roof GWT Basement 3rd 200mm thk 304.98 m2

3 Concrete RC Wall RW3 250mm thk 971.71 m2


4 Concrete RC Wall RW4 200mm thk 197.75 m2

Cement base waterproofing ex. Fosroc/SIKA c/w protective


render externally to
Ground Floor Plan
5 Concrete Slab Ground Floor 200mm thk 1,190.06 m2

Liquid Polyurethane (PU) waterproofing ex. Sikalastic c/w


protective render externally to
1st Floor Plan
6 Concrete Slab Roof Genset Room 120mm thk 118.72 m2

2nd Floor Plan


7 Concrete Slab 2nd Floor 120mm thk 262.26 m2

3rd Floor Plan


8 Concrete Slab 3rd Floor 120mm thk 262.26 m2

Roof Plan
9 Concrete Plate Roof 120mm thk 2,152.62 m2

Ring Beam Roof


10 Concrete Plate Roof Lift 200mm thk 14.21 m2
11 Concrete Plate Roof 120mm thk 202.96 m2

D THERMAL & MOISTURE PROTECTION carried to collection

E STEEL WORKS

Structure with Metal Trusses ex. Jaindo, including anchor to


ring beam, installation, accessories, finishes and treatment as
specified to :
Roof
1 Structure Roof 4,960.23 m2

Building structure with Steel Works, including installation,

accessories, finishes and treatment as specified to :


Roof Café
2 Beam Roof WF 200x100x5.5x8 1,992.19 Kg
3 Acessories, plate (Steel Plate), Anchor, Bolt, Weld and etc 298.83 Kg

E STEEL WORKS Carried to collection

F WOOD WORKS

Roof structure with Bengkirai Timber Structure, including


installation accessories and treatment as specified to:
Roof Building
1 Timber baten sz. 20x30 mm 4,960.23 m2

Roof Café
2 Timber Beam sz. 60x120 mm 130.34 m1
2 Timber Tatab sz. 30x100 mm 168.54 m1
3 Timber baten sz. 20x30 mm 270.81 m2

Prepare and apply natural finishes or as approve architect to

4 Timber Structure Roof 90.74 m2

F WOOD WORKS Carried to collection

Str Building/Page 28
STRUCTURE WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

G ROOF WORKS

Roof covering with Genteng Kodok/Karangpilang including


installation, accessories etc as specified or as approve
architect to
1 Aluminium foil double layers 4,960.23 m2
2 Roof Covering Building 4,960.23 m2
3 Ridge Covering 362.11 m1
4 Fascia 22/235 mm Ex. Conwood Eave 2 in 1 903.59 m1
5 Murdha 18.70 no.
6 Ikuh Celedu 44.88 no.

Roof covering with Laminated Glass 12mm thk, including


installation, accessories etc as specified or as approve
architect to
7 Skylight Café 179.42 m2

G ROOF WORKS Carried to collection

Collection

A SUBSTRUCTURE

B BORPILE WORKS

C CONCRETE WORKS

D THERMAL & MOISTURE PROTECTION

E STEEL WORKS

F WOOD WORKS

G ROOF WORKS

H PROVISIONAL SUMS STEEL STAIR

I PROVISIONAL SUMS BASE MEP EQUIPMENT

2.0. STRUCTURE BUILDING Caried to Final Summary

Str Building/Page 29
BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
EXTERNAL WORKS
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy
themselves as to the accuracy of all quantities for works
requiring payment. The format provided in these Bills should
be followed in order to assist in tender evaluation.

3.0. STRUCTURE EXTERNAL WORKS

A STRUCTURE RETAINING WALL SIDEVIEW

SUBSTRUCTURE ###
Preliminary
1 Bouwplank 515.00 m1

Excavation
2 Excavation for Continous Foundation 1,073.78 m3
3 Excavation for Footplate Foundation 94.63 m3
4 Backfilling with excavated material to build up platform 350.52 m3

Compacted sand bed


5 100 mm thick compacted sand layer under foundation and 342.65 m3
slab

Stone Masonsry works


6 Stone Foundation (1 pc : 5 sand) 1,073.78 m2

CONCRETE WORKS ###


K-175 reinforced concrete to
Lean concrete
7 m3
13.14
50 mm thick concrete under pad footing and slab building

K-250 reinforced concrete to


8 Concrete Footplate Foundation P9 (1000/1000-400)mm 105.15 m3

9 Concrete Tie Beam BS4 (300/250)mm 57.65 m3


10 Concrete Tie Beam BS5 (300/300)mm 69.18 m3

11 Concrete Column K1 (300/300)mm 68.52 m3

Supply and install grade BJTD-40 (fy = 400 MPa) hot


rolled deformed bar, reinforcement and BJTP-24 (fy =
240 MPa) plain bar reinforcement in the following
12 Reinforcement Footplate Foundation P9 105 Kg/m3 11,016.48 kg

13 Reinforcement Tie Beam BS4 201 Kg/m3 11,570.47 kg


14 Reinforcement Tie Beam BS5 141 Kg/m3 9,754.48 kg

15 Reinforcement Column K1 225 Kg/m3 15,438.50 kg

Form Work
Form work work w/ plywood 9 mm, including timber
frames support to
16 Formwork Footplate Foundation P9 (1000/1000-400)mm 420.59 m2

17 Formwork Tie Beam BS4 (300/250)mm 384.34 m2


18 Formwork Tie Beam BS5 (300/300)mm 461.20 m2

19 Formwork Column K1 (300/300)mm 913.62 m2

A STRUCTURE RETAINING WALL SIDEVIEW carried to collection

Str External/Page 30
Rate Amount
Ref Description Quantity
(Rp) (Rp)

B STRUCTURE BRIDGE

SUBSTRUCTURE ###
Preliminary
1 Bouwplank 110.06 m1

Excavation
2 Excavation for Pilecap Foundation 76.54 m3
3 Excavation for Tie Beam 45.72 m3
4 Backfilling with excavated material to build up platform 40.76 m3

Compacted sand bed


5 100 mm thick compacted sand layer under foundation and m3
8.70
slab

BORPILE WORKS ###


Boring including blind boring, lining; as detailed and
specified including remove soil ex Boring
6 Ø350mm Bor Pile P5 5.00 m depth 200.60 m1
7 Ø350mm Bor Pile BS2 5.00 m depth 38.04 m1

K-300 vibrated reinforced concrete to


8 Concrete Ø350mm Bor Pile P5 5.00 m depth 19.77 m3
9 Concrete Ø350mm Bor Pile BS2 5.00 m depth 3.75 m3

Supply and install grade BJTD-40 (fy = 400 MPa) hot


rolled deformed bar, reinforcement and BJTP-24 (fy =
240 MPa) plain bar reinforcement in the following

9 Reinforcement Ø350mm Bor Pile P5 5.00 m depth 147 Kg/m3 Kg


2,914.53
10 Reinforcement Ø350mm Bor Pile BS2 5.00 m depth 147 Kg
552.68
Kg/m3

CONCRETE WORKS ###


K-175 reinforced concrete to
Lean concrete
11 m3
4.35
50 mm thick concrete under pad footing and slab building

K-300 reinforced concrete to


12 Concrete Pilecap Foundation P5 (2000/2000-550)mm 34.28 m3

13 Concrete Tie Beam BS2 (300/550)mm 14.71 m3


14 Concrete Tie Beam BS4 (250/400)mm 6.60 m3

15 Concrete Beam B13 (450/950)mm 27.11 m3


16 Concrete Beam B14 (350/600)mm 8.22 m3
17 Concrete Beam B15 (300/600)mm 9.95 m3

18 Concrete Column C7 (700/700)mm 67.22 m3

19 Concrete Slab 200mm thk with integral waterproofing 60.25 m3

Supply and install grade BJTD-40 (fy = 400 MPa) hot


rolled deformed bar, reinforcement and BJTP-24 (fy =
240 MPa) plain bar reinforcement in the following
20 Reinforcement Pilecap Foundation P5 140Kg/m3 3,504.48 kg

21 Reinforcement Tie Beam BS2 284 Kg/m3 4,172.33 kg


22 Reinforcement Tie Beam BS4 274 Kg/m3 1,806.12 kg

23 Reinforcement Beam B13 338 Kg/m3 9,150.89 kg


24 Reinforcement Beam B14 302 Kg/m3 2,478.55 kg
25 Reinforcement Beam B15 364 Kg/m3 3,621.42 kg

26 Reinforcement Column C7 332 Kg/m4 22,328.78 kg

27 Wiremesh M8 Double Layers for Slab 200mm thk 602.47 m2

Str External/Page 31
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Form Work
Concrete brick "Bataco" including cement mortar to

28 Formwork Pilecap Foundation P5 (2000/2000-550)mm 50.15 m2

29 Formwork Tie Beam BS2 (300/550)mm 98.05 m2


30 Formwork Tie Beam BS4 (250/400)mm 52.83 m2

Form work work w/ plywood 9 mm, including timber


frames support to
31 Concrete Beam B13 (450/950)mm 132.71 m2
32 Concrete Beam B14 (350/600)mm 49.84 m2
33 Concrete Beam B15 (300/600)mm 69.31 m2

34 Formwork Column C7 (700/700)mm 384.12 m2

35 Formwork Slab 200mm thk 243.09 m2

THERMAL & MOISTURE PROTECTION ###


Cement base waterproofing ex. Fosroc/SIKA c/w protective
render externally to
36 Concrete Slab 200mm thk 301.24 m2

Asphalt Expansion Joint, including installation, accessories etc

as specified or as approve architect to (Assumption)


37 Structure Bridge 51.43 m1

B STRUCTURE BRIDGE carried to collection

C STRUCTURE IPAL

SUBSTRUCTURE
Preliminary ###
1 Bouwplank 173.82 m1

Excavation
2 Excavation for IPAL 472.21 m3
3 Excavation for Tie Beam 37.74 m3
4 Backfilling with excavated material to build up platform 42.49 m3

Compacted sand bed


5 100 mm thick compacted sand layer under foundation and m3
31.48
slab

CONCRETE WORKS ###


K-175 reinforced concrete to
Lean concrete
6 m3
15.74
50 mm thick concrete under pad footing and slab building

K-300 reinforced concrete to


7 Concrete Tie Beam BS4 (250/400)mm 20.97 m3

8 Concrete Slab Ground Floor 200mm thk with integral m3


62.96
waterproofing
9 Concrete Slab Roof IPAL 150mm thk with integral m3
47.22
waterproofing

10 m3
Concrete RC Wall RW4 200mm thk with integral waterproofing 75.57
11 m3
Concrete RC Wall RW5 150mm thk with integral waterproofing 34.99

Supply and install grade BJTD-40 (fy = 400 MPa) hot


rolled deformed bar, reinforcement and BJTP-24 (fy =
240 MPa) plain bar reinforcement in the following

12 Reinforcement Tie Beam BS4 274 Kg/m3 5,734.92 kg

13 Reinforcement Slab Ground Floor 200mm thk 123 Kg/m3 7,729.11 kg


14
Wiremesh M7 double layers for Slab Roof IPAL 150mm thk 629.61 m2

15 Reinforcement RC Wall RW4 200mm thk 140 Kg/m3 9,822.09 kg

Str External/Page 32
Rate Amount
Ref Description Quantity
(Rp) (Rp)

16 Reinforcement RC Wall RW5 150mm thk 152 Kg/m3 5,302.41 kg

Str External/Page 33
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Form Work
Concrete brick "Bataco" including cement mortar to

17 Formwork Tie Beam BS4 (250/400)mm 167.75 m2

18 Formwork Slab Ground Floor 200mm thk 28.91 m2

Form work work w/ plywood 9 mm, including timber


frames support to
19 Formwork Slab Roof IPAL 150mm thk 336.49 m2

20 Formwork RC Wall RW4 200mm thk 1,032.95 m2


21 Formwork RC Wall RW5 150mm thk 466.49 m2

THERMAL & MOISTURE PROTECTION ###


Cement base waterproofing ex. Fosroc/SIKA c/w protective
render externally to
22 with integral waterproofing 314.81 m2
23 Concrete Slab Roof IPAL 150mm thk 314.81 m2

24 Concrete RC Wall RW4 200mm thk 377.84 m2


25 Concrete RC Wall RW5 150mm thk 466.49 m2

C STRUCTURE IPAL carried to collection

Collection

A STRUCTURE RETAINING WALL SIDEVIEW

B STRUCTURE BRIDGE

C STRUCTURE IPAL

D PC SUMS STRUCTURE RETAINING WALL BACKSIDE (DRIVE


WAY)

E PC SUMS STRUCTURE STATION PLN

F PC SUMS STRUCTURE SECURITY POS

G PC SUMS STRUCTURE RAMP DRIVE WAY

H PC SUMS GAS MEDIC

I PC SUMS GARBAGE

3.0. STRUCTURE EXTERNAL WORKS Caried to Final Summary

Str External/Page 34
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

1.0. ARCHITECTURE BASEMENT

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at Basement 2,620.49 m1

Water line 10mm with aluminium profile U at


2 Wall Toilet Locker Pria 66.39 m1
3 Wall Toilet Locker Wanita 63.76 m1

4 Ceiling Concrete Slab 169.82 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
Basement
1 Wall & floor Public Toilet Pria 104.85 m2
2 Wall & floor Public Toilet Wanita 90.35 m2
3 Wall & floor Toilet Locker Pria 178.02 m2
4 Wall & floor Toilet Locker Wanita 172.83 m2
5 Wall & floor Cuci Troly 97.97 m2
6 Wall & floor Cuci Alat 114.36 m2
7 Wall & floor Cuci Alat (Bahan Mentah) 82.86 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Basement 3 5,742.58 m2

Cement brick masonry ex "Bataco", laid in stretcher bond with


mortar including lintel beams and control joints.
3rd Basement Plan
2 Bataco Steping Parking to Corridor 3.56 m3
3 Bataco Steping Parking to Security Office 10.11 m3
4 Bataco Steping Parking to Genzet 39.07 m3
5 Bataco Steping Out of Stair 2 8.29 m3

C MASONRY carried to collection

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Basement 11,263.62 m2

Smooth finish to walls ex. MU


2 Wall Finishes at Basement 8,728.71 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at Basement 1,449.52 m2

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at Basement 10,178.22 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
5 Wall Finishes at Basement 1,476.78 m2

Arch Basement-CB/Page 35
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Arch Basement-CB/Page 36
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

200x200x10mm Ceramic type Topas ex. Asia Tile (1) including


mortar, adhesive and grout as specified or as approve architect to

6 Wall Main Kitchen 232.13 m2


7 Wall R. Cuci Troly 97.48 m2
8 Wall R. Cuci Alat 110.73 m2
9 Wall Ruang Distribusi 103.00 m2
10 Wall Ruang Persiapan/Saji 176.37 m2
11 Wall R. Bahan Kering 91.36 m2
12 Wall R. Bahan Mentah 115.37 m2
13 Wall Cuci Alat (Bahan Mentah) 88.88 m2
14 Wall Infeksus 85.95 m2
15 Wall B3 63.87 m2
16 Wall Non Medis 75.02 m2

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

17 Wall Public Toilet Pria 92.36 m2


18 Wall Public Toilet Wanita 79.97 m2

200x300x10mm Ceramic type Topas ex. Asia Tile including mortar,


adhesive and grout as specified or as approve architect to

19 Wall Toilet Locker Pria 135.58 m2


20 Wall Toilet Locker Wanita 129.84 m2

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
21 Railling Stair 1 (Lobby Lift) 25.21 m1
22 Railling Stair 2 (Emergency Stair) 23.26 m1
23 Railling Stair to Prefuction 83.91 m1

Mesh Fencing wall (BRC) including all fixing accessoris complete


with foundation as specified or as approve architect to
24 (Assumption)
Boundary wall 1800 mm high 1,056.09 m1

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
25 Floor Lift Hall 37.84 m2
26 Floor Corridor 680.59 m2
27 Floor Steping Entrance - Genzet 31.72 m2
28 Floor Housekeeping 78.12 m2
29 Floor Locker Wanita 73.38 m2
30 Floor Locker Pria 73.59 m2
31 Floor Kantin Pegawai 133.12 m2
32 Floor Gudang dan R.Panel 20.16 m2
33 Floor R.Cuci Trolly 20.00 m2
34 Floor R.Cuci Alat 24.37 m2
35 Floor Gudang Alat Makan 23.77 m2
36 Floor Corridor R.Cuci Alat/Trolly 40.90 m2
37 Floor R.Persiapan/Saji 59.14 m2
38 Floor R.Distribusi 21.56 m2
39 Floor R.Pengolahan 85.40 m2
40 Floor R.Bahan Mentah 25.92 m2
41 Floor R.Bahan Kering 14.89 m2
42 Floor R.Cuci 16.52 m2
43 Floor R.Gizi 21.41 m2
44 Floor Gudang Obat 157.26 m2
45 Floor Gudang Obat B3 10.00 m2
46 Floor Office 28.02 m2
47 Floor Linen Kotor 39.21 m2
48 Floor Linen Bersih 80.34 m2
49 Floor R.Workshop 61.43 m2
50 Floor R.Kontrol 43.69 m2
51 Floor Main Storage 133.28 m2
52 Floor Security Office 51.77 m2
53 Floor Purchasing 33.47 m2
54 Floor Ramp Entrance 41.06 m2
55 Floor Janitor 9.76 m2
56 Floor Security Post 9.23 m2
57 Floor Infeksius 13.58 m2
58 Floor B3 7.91 m2
59 Floor Non Medis 10.75 m2
Arch Basement-CB/Page 37
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Arch Basement-CB/Page 38
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

300mmx300mmx8mm thk Ceramic Tile Polished type Murano ex.


Asia Tile (C2) including mortar, adhesive and grout as specified or
as approve architect to
60 Floor Gudang Troly 54.20 m2
61 Floor Gudang 16.89 m2
62 Floor Grease Trap 32.22 m2

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size including mortar, adhesive and grout as
specified or as approve architect to
63 Floor Public Male Toilet 19.35 m2
64 Floor Public Female Toilet 16.65 m2

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
65 Floor Stair 1 (Lobby Lift) 53.52 m2

333x333x10mm thk Ceramic Tile Anti Slip type G 365028 Strata


Beige Ex. Roman (C5) including mortar, adhesive and grout as
specified or as approve architect to
66 Floor Stair 2 (Emergency Stair) 46.48 m2
67 Floor Steping Out of Stair 2 17.40 m2
68 Floor Steping Corridor to Security Office 10.91 m2

Anti Slip Concrete Floor Hardener (C6) including sersan gutter and
road sign as specified or as approve architect to finish to
69 Floor Ramp Down to Loading Area 105.05 m2
70 Floor Ramp Down Entrance 97.97 m2
71 Floor Ramp to Parking Area 252.50 m2
72 Floor Ramp Down Loading to Corridor 28.33 m2
73 Floor Ramp Up Basement - Ground Floor 215.81 m2
74 Floor Side Ramp Up Basement - Ground Floor 488.07 m2
75 Floor Ramp Down 75.33 m2

Concrete Floor Hardener (F1) finish to


76 Floor Loading Area 129.44 m2
77 Floor Trafo 88.47 m2
78 Floor Cubical 111.82 m2
79 Floor Genzet 175.20 m2

Paving Block (PB) including road sign, mortar, adhesive and grout
as specified or as approve architect to
80 Floor Parking Area 3,248.70 m2

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
81 Ceiling Lift Hall 37.84 m2
82 Ceiling Corridor 680.59 m2
83 Ceiling Steping Entrance - Genzet 31.72 m2
84 Ceiling Housekeeping 78.12 m2
85 Ceiling Locker Wanita 73.38 m2
86 Ceiling Locker Pria 73.59 m2
87 Ceiling Kantin Pegawai 133.12 m2
88 Ceiling Gudang dan R.Panel 20.16 m2
89 Ceiling R.Cuci Trolly 20.00 m2
90 Ceiling R.Cuci Alat 24.37 m2
91 Ceiling Gudang Alat Makan 23.77 m2
92 Ceiling Corridor R.Cuci Alat/Trolly 40.90 m2
93 Ceiling R.Persiapan/Saji 59.14 m2
94 Ceiling R.Distribusi 21.56 m2
95 Ceiling R.Pengolahan 85.40 m2
96 Ceiling R.Bahan Mentah 25.92 m2
97 Ceiling R.Bahan Kering 14.89 m2
98 Ceiling R.Cuci 16.52 m2
99 Ceiling R.Gizi 21.41 m2
100 Ceiling Gudang Obat 157.26 m2
101 Ceiling Gudang Obat B3 10.00 m2
102 Ceiling Office 28.02 m2
103 Ceiling Linen Kotor 39.21 m2
104 Ceiling Linen Bersih 80.34 m2
105 Ceiling R.Workshop 61.43 m2
106 Ceiling R.Kontrol 43.69 m2
107 Ceiling Main Storage 133.28 m2
108 Ceiling Security Office 51.77 m2
109 Ceiling Purchasing 33.47 m2
Arch Basement-CB/Page 39
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

110 Ceiling Ramp Entrance 41.06 m2


111 Ceiling Janitor 9.76 m2
112 Ceiling Security Post 9.23 m2

Arch Basement-CB/Page 40
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

113 Ceiling Infeksius 13.58 m2


114 Ceiling B3 7.91 m2
115 Ceiling Non Medis 10.75 m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
116 Ceiling Public Toilet Female 9.24 m2
117 Ceiling Public Toilet Male 10.01 m2
118 Ceiling Janitor 5.58 m2

Exposed Concrete Ceiling (CR) Finish to


119 Ceiling Parking Area 3,003.25 m2
120 Ceiling Stair 1 45.07 m2
121 Ceiling Stair 2 39.28 m2
122 Ceiling Grease Trap 31.80 m2
123 Ceiling Cubical 88.02 m2
124 Ceiling Trafo 78.82 m2
125 Ceiling Ramp Up Basement 3 - Basement 2 179.21 m2
126 Ceiling Genzet 173.40 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
127 Gypsumboard Ceilling 2,519.69 m2
128 Calsiboard Ceilling 42.22 m2
129 Exposed Concrete Ceiling 3,299.88 m2

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
130 Above the Window sz. 1200x400x80 mm 4.00 unit
131 Above the Window sz. 3100x400x80 mm 18.00 unit
132 Above the Window sz. 2050x400x80 mm 2.00 unit

D FINISHES

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Basement
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male & Female Public Toilet"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 42.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Male & Female Locker, Side Entrance,
Security Office, Purchasing, R. IT, Genset, Stairs, Grease Trap,
Gudang, R. Distribusi, R. Saji, R. Gizi, R. Cuci, R. Bahan Mentah,
Janitor, Infeksius, B3 & Non Medis"
3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 4.00 unit
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel & Gudang Alat Makan"

5 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 26.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "Corridor, House Keeping, Gudang Troly,
Main Storage, Gudang Obat, Linen Bersih, Trafo, Cubical, Ruang
UPS, R. Kontrol, Work Shop & Linen Kotor "
6 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 10.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Entrance, Corridor & Kantin Pegawai"

7 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R.Cuci"
8 Multiple folding 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
3680x2250mm type D12, "Genset"
9 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
& single swing 5mm thk clear glass window and 'IMPRA WS- 162B
Dark Mahony' frame finished door, sz. 1750x2250mm type DW02,
"Security Office"
Arch Basement-CB/Page 41
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

10 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet" (Assumption & Included
Ironmongery)
11 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

12 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 12.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Basement
13 Single swing window with 5mm thk clear glass and 'Dark brown' 4.00 unit
frame finished sz. 900x1450mm type W01, "Corridor & Security
Office" (Include hardware)
14 Double swing window with 5mm thk clear glass and 'Dark brown' 18.00 unit
frame finished sz. 2800x1450mm type W02, "Security Office,
Office, Gudang Obat & R. Distribusi, R. Cuci, R. IT & Corridor"
(Include hardware)
15 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1750x2200 type W04, "Ramp to Corridor"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
Basement
16 Single swing cubicle door, sz. 700x2100mm "Male & Female Locker 16.00 unit
Toilet" Include Ironmengery by supplier
17 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 6.00 unit
Toilet" Include Ironmengery by supplier
18 Partition Cubicle "Female Locker Toilet" 44.87 m2
19 Partition Cubicle "Male Locker Toilet" 49.77 m2
20 Partition Cubicle "Female Public Toilet" 16.03 m2
21 Partition Cubicle "Male Public Toilet" 13.54 m2

E DOORS AND WINDOW carried to collection

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Basement
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male & Female Public Toilet"
Handle KEND HRE 75.01 US32D 6.00 set
Lockace SWING KEND K87735-40 US32D 6.00 pcs
WC Cylinder KEND K3116-61 US14 6.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 9.00 set
Door Stop KEND 75-016 US32D 6.00 pcs
-
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 42.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Male & Female Locker, Side Entrance,
Security Office, Purchasing, R. IT, Genset, Stairs, Grease Trap,
Gudang, R. Distribusi, R. Saji, R. Gizi, R. Cuci, R. Bahan Mentah,
Janitor, Infeksius, B3 & Non Medis"
Handle KEND HRE 75.01 US32D 42.00 set
Lockace SWING KEND K87735-40 US32D 42.00 pcs
Double Cylinder KEND 08610-10 US14 42.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 63.00 set
Door Stop KEND 75-014 US32D 42.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 42.00 pcs
-
3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set
Door Stop KEND 75-014 US32D 2.00 pcs

Arch Basement-CB/Page 42
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

Arch Basement-CB/Page 43
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

-
4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 4.00 unit
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel & Gudang Alat Makan"

Handle KEND HRE 75.01 US32D 4.00 set


Lockace SWING KEND K87735-40 US32D 4.00 pcs
Double Cylinder KEND 08610-10 US14 4.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 12.00 set
Door Stop KEND 75-014 US32D 8.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 4.00 set
Dust proos Strike KEND 95/12NUS26 4.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 4.00 pcs
-
5 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 26.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "Corridor, House Keeping, Gudang Troly,
Main Storage, Gudang Obat, Linen Bersih, Trafo, Cubical, Ruang
UPS, R. Kontrol, Work Shop & Linen Kotor "
Pull handle KEND PR.73.01 US32D 52.00 set
Escutcheon KEND E.73.01 US32D 26.00 set
Lockcase pelor kayu KEND K87738-60 US32D 26.00 pcs
Double Cylinder KEND 08610-10 US14 26.00 pcs
Center Pivot KEND CPH.20-500 US32D 26.00 set
Door stop KEND 75-014 US14D 52.00 pcs
-
6 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 10.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Entrance, Corridor & Kantin Pegawai"

Floor hinge KEND FH08323 20.00 set


Pull handle KEND PR 73.01 US32D 20.00 set
Escutcehon KEND E 73.01 US32D 10.00 set
Lockace Pelor KEND K87738-60 US32D 10.00 pcs
Double Cylinder KEND 08610-10 US14 10.00 pcs
-
7 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R.Cuci"
Sliding set KEND P85-2M 2.00 set
Flush handle KEND FPP 75.07 US432D 2.00 set
Lockace sliding KEND K87720-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Escutcehon KEND E 73.01 US32D 2.00 pcs
-
8 Multiple folding 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
3680x2250mm type D12, "Genset"
Rell atas Hillaldam coburn 2-16-3M Alumunium 2.00 pcs
Rell bawah Alumunium Hillaldam Coburn 33-2-3M 4.00 pcs
Roda atas Hillaldam Coburn 2-207 Galvanis 4.00 pcs
Stopan rell Hillaldam Coburn 44-719 Galvanis 4.00 set
Roda bawah Hillaldam Coburn 44-340 Galvanis 4.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Flush Ring handle FRP 75.01 US432D 4.00 set
Escutcehon KEND E 73.01 US32D 2.00 set
Lockace Pelor KEND K87735-60 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Grendel 306 6 “ US26 2.00 pcs
-
9 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
& single swing 5mm thk clear glass window and 'IMPRA WS- 162B
Dark Mahony' frame finished door, sz. 1750x2250mm type DW02,
"Security Office"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set
Door Stop KEND 75-014 US32D 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

F IRONMONGERY carried to collection

Arch Basement-CB/Page 44
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

G ACCESSORIES
MIRROR (ASSUMPTION)
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Basement
1510mm wide x 1000mm high mirror to Male & Female Public 4.00 unit
1
Toilet
2 1600mm wide x 1000mm high mirror to Male Locker Toilet 2.00 unit
3 3825mm wide x 1000mm high mirror to Female Locker Toilet 2.00 unit

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Basement
4 1510 x 500mm Lavatory Counter Male & Female Public Toilet 4.00 unit
5 1850 x 500mm Lavatory Counter Male Locker Toilet 2.00 unit
6 3825 x 500mm Lavatory Counter Female Locker Toilet 2.00 unit
7 2220 x 500mm Lavatory Counter Kantin Pegawai 2.00 unit

G ACCESSORIES carried to collection

H SANITARY
Basement
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
2 Jet washer ex Toto THX 20 MCRB 2.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 4.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 4.00 no
5 Urinoir ex. Toto UW 930 JM 4.00 no
6 Paper Holder ex. Toto 703 AE 2.00 no
7 Robe Hook ex. Toto TX 704 AE 2.00 no
8 Floor Drain ex. Toto TX 1 BN 2.00 no
-
Female Public Toilet -
9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 4.00 no
10 Jet washer ex Toto THX 20 MCRB 4.00 no
11 Lavatory ex. Toto Le Muse LW 818 J 4.00 no
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 4.00 no
13 Paper Holder ex. Toto 703 AE 4.00 no
14 Robe Hook ex. Toto TX 704 AE 4.00 no
15 Floor Drain ex. Toto TX 1 BN 4.00 no
-
Male Locker Toilet -
16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 4.00 no
17 Jet washer ex Toto THX 20 MCRB 4.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 4.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 4.00 no
20 Fixed Shower Head ex. Toto TX 45 SMN 4.00 no
21 Shower Mixer TX 433 SDV1 4.00 no
22 Urinoir ex. Toto UW 930 JM 6.00 no
23 Paper Holder ex. Toto 703 AE 4.00 no
24 Robe Hook ex. Toto TX 704 AE 8.00 no
25 Floor Drain ex. Toto TX 1 BN 8.00 no

Female Locker Toilet


26 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 4.00 no
27 Jet washer ex Toto THX 20 MCRB 4.00 no
28 Lavatory ex. Toto Le Muse LW 818 J 8.00 no
29 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 8.00 no
30 Fixed Shower Head ex. Toto TX 45 SMN 4.00 no
31 Shower Mixer TX 433 SDV1 4.00 no
32 Paper Holder ex. Toto 703 AE 4.00 no
33 Robe Hook ex. Toto TX 704 AE 8.00 no
34 Floor Drain ex. Toto TX 1 BN 8.00 no

Kantin Pegawai
35 Lavatory ex. Toto Le Muse LW 818 J 6.00 no
36 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 6.00 no

H SANITARY carried to collection

Arch Basement-CB/Page 45
BASEMENT
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

1.0. ARCHITECTURE BASEMENT Caried to Final Summary

Arch Basement-CB/Page 46
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

2.0. ARCHITECTURE GROUND FLOOR

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at Ground Floor 3,290.60 m1

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 304.69 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
Ground Floor
1 Wall & floor Public Toilet Pria 61.04 m2
2 Wall & floor Public Toilet Wanita 52.59 m2
3 Wall & floor Toilet Direktur Rumah Sakit 41.93 m2
4 Wall & floor Toilet Sekretaris 41.93 m2
5 Wall & floor Toilet Room VIP A (2 unit) 97.01 m2
6 Wall & floor Toilet Room VIP B (2 unit) 78.75 m2
7 Wall & floor Toilet Room VIP C (12 unit) 472.48 m2
8 Wall & floor Toilet Room Kelas 1 (4 unit) 123.60 m2
9 Wall & floor Toilet Room Kelas 2 (4 unit) 123.60 m2
10 Wall & floor Toilet Room Kelas 3 (4 unit) 165.77 m2
11 Wall & floor Toilet Prefuction 1 28.07 m2
12 Wall & floor Toilet Prefuction 2 28.14 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Ground Floor 6,086.62 m2

C MASONRY carried to collection

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Ground Floor 12,173.24 m2

Smooth finish to walls ex. MU


2 Wall Finishes at Ground Floor 9,970.06 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at Ground Floor 601.04 m2

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at Ground Floor 8,674.75 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
5 Wall Finishes at Ground Floor 1,896.33 m2

Ply wall with Glasswool & Gypsump Acustic finish with paint (4) to

6 Wall Meeting Room 754.78 m2

Arch GF-CB/Page 48
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 70.97 m2


8 Wall Public Toilet Wanita 61.45 m2
9 Wall Toilet Room VIP A (2 unit) 110.29 m2
10 Wall Toilet Room VIP B (2 unit) 91.81 m2
11 Wall Toilet Room VIP C (12 unit) 550.85 m2
12 Wall Toilet Room Kelas 1 (4 unit) 139.07 m2
13 Wall Toilet Room Kelas 2 (4 unit) 139.07 m2
14 Wall Toilet Room Kelas 3 (4 unit) 183.12 m2

300x600x10mm Ceramic type Polished ex. China (5) including


mortar, adhesive and grout as specified or as approve architect to

15 Wall Toilet Direktur Rumah Sakit 50.90 m2


16 Wall Toilet Sekretaris 50.90 m2
17 Wall Prefunction Toilet 1 32.25 m2
18 Wall Prefunction Toilet 2 32.25 m2

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
19 Railling Stair 1 (Lobby Lift) 17.84 m1
20 Railling Stair 2 (Emergency Stair) 14.89 m1
21 Railling Stair to Ruang Pengembangan 12.68 m1
22 Railling Prefuction area 40.12 m1

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
23 Floor R. Audio/Alat 29.50 m2
24 Floor Gudang 25.78 m2
25 Floor Pantry 25.78 m2

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
26 Floor Toilet R. Direktur RS 8.93 m2
27 Floor Toilet R. Sekretaris 8.93 m2

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size including mortar, adhesive and grout as
specified or as approve architect to
28 Floor Public Male Toilet 13.52 m2
29 Floor Public Female Toilet 11.63 m2
30 Floor Toilet R. Inap Kelas 1 (4 unit) 19.55 m2
31 Floor Toilet R. Inap Kelas 2 (2 unit) 19.82 m2
32 Floor Toilet R. Inap Kelas 3 (4 unit) 28.16 m2

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
33 Floor Stair 1 (Lobby Lift) 37.39 m2

333x333x10mm thk Ceramic Tile Anti Slip type G 365028 Strata


Beige Ex. Roman (C5) including mortar, adhesive and grout as
specified or as approve architect to
34 Floor Stair 2 (Emergency Stair) 32.47 m2

Anti Slip Concrete Floor Hardener (C6) including sersan gutter and
road sign as specified or as approve architect to finish to
35 Floor Ramp Up Basement 2 - Basement 1 (Grid G-H,4-6) 125.62 m2

600x600x10mm thk Granite Tile Polished Ex. China (C7) (material


Price Rp. 300.000/m2)including mortar, adhesive and grout as
specified or as approve architect to
36 Floor Prefunction Room 342.14 m2
37 Floor Corridor 674.30 m2
38 Floor R. Direktur RS 75.21 m2
39 Floor R. Sekretaris 46.95 m2
40 Floor Office Management 353.89 m2
41 Floor R. Keuangan 55.84 m2
42 Floor R. SIMRS 68.41 m2
43 Floor Gudang Arsip 76.02 m2
44 Floor R. Panel 15.04 m2
45 Floor R. Inap VIP A (2 unit) 179.70 m2
46 Floor R. Inap VIP B (2 unit) 113.00 m2

Arch GF-CB/Page 49
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

47 Floor R. Inap VIP C (12 unit) 485.58 m2


48 Floor Toilet R. Inap VIP A (2 unit) 19.71 m2
49 Floor Toilet R. Inap VIP B (2 unit) 14.65 m2
50 Floor Toilet R. Inap VIP C (12 unit) 87.91 m2
51 Floor R. Inap Kelas 1 (4 unit) 174.58 m2
52 Floor R. Inap Kelas 2 (2 unit) 151.70 m2
53 Floor R. Inap Kelas 3 (2 unit) 412.68 m2
54 Floor Counter Perawat 26.76 m2
55 Floor Gudang & R. Persiapan 17.05 m2
56 Floor Depo 13.07 m2
57 Floor R. Diskusi 110.39 m2
58 Floor Prefunction Toilet 1 4.10 m2
59 Floor Prefunction Toilet 2 4.16 m2
60 Floor Skirting h= 100mm, to Floor R. Inap Kelas 1 (4 unit) 144.82 m2
61 Floor Skirting h= 100mm, to Floor R. Inap Kelas 2 (2 unit) 94.69 m2
62 Floor Skirting h= 100mm, to Floor R. Inap Kelas 3 (2 unit) 234.15 m2

Syntetic Carpet Ex. Noble (SC) including all fixing accessoris


complete as specified or as approve architect to
63 Floor Meeting Room 438.49 m2

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
64 Ceiling R. Audio/Alat 26.82 m2
65 Ceiling R. Direktur 68.11 m2
66 Ceiling R. Sekretaris 42.42 m2
67 Ceiling R. Office Management 320.66 m2
68 Ceiling R. Keuangan 50.47 m2
69 Ceiling R. Arsip 68.82 m2
70 Ceiling R. SIMRS 61.51 m2
71 Ceiling R. Prefuction 220.99 m2
72 Ceiling Gudang 23.44 m2
73 Ceiling Pantry 23.44 m2
74 Ceiling R. Diskusi 110.39 m2
75 Ceiling R. Panel 13.67 m2
76 Ceiling R. Inap VIP A (2 unit) 162.84 m2
77 Ceiling R. Inap VIP B (2 unit) 102.21 m2
78 Ceiling R. Inap VIP C (12 unit) 438.35 m2
79 Ceiling Counter Perawat 23.81 m2
80 Ceiling Gudang & R. Persiapan 17.05 m2
81 Ceiling Depo 13.07 m2
82 Ceiling R. Inap Kelas 1 (4 unit) 158.71 m2
83 Ceiling R. Inap Kelas 2 (2 unit) 136.88 m2
84 Ceiling R. Inap Kelas 3 (2 unit) 386.68 m2
85 Ceiling Corridor 601.44 m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
86 Ceiling Public Toilet Female 10.97 m2
87 Ceiling Public Toilet Male 11.89 m2
88 Ceiling Toilet R. Inap VIP A (2 unit) 17.92 m2
89 Ceiling Toilet R. Inap VIP B (2 unit) 13.32 m2
90 Ceiling Toilet R. Inap VIP C (12 unit) 79.92 m2
91 Ceiling Toilet R. Inap Kelas 1 (4 unit) 19.55 m2
92 Ceiling Toilet R. Inap Kelas 2 (2 unit) 19.82 m2
93 Ceiling Toilet R. InapKelas 3 (2 unit) 28.16 m2
94 Ceiling Toilet R. Direktur RS 8.12 m2
95 Ceiling Toilet Sekretaris 8.12 m2
96 Ceiling Janitor 6.63 m2
97 Ceiling Prefunction Toilet 1 4.10 m2
98 Ceiling Prefunction Toilet 2 4.16 m2

Exposed Concrete Ceiling (CR) Finish to


99 Ceiling Stair 1 (Lift) 31.48 m2
100 Ceiling Stair 2 27.44 m2
101 Ceiling Ramp Up Basement 2 - Basement 1 125.19 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
102 Gypsumboard Ceilling 3,071.81 m2
103 Calsiboard Ceilling 224.42 m2
104 Exposed Concrete Ceiling 184.11 m2

Arch GF-CB/Page 50
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
105 Above the Window sz. 1200x400x80 mm 14.00 unit
106 Above the Window sz. 3100x400x80 mm 50.00 unit
107 Above the Window sz. 3750x400x80 mm 10.00 unit
108 Above the Window sz. 2050x400x80 mm 2.00 unit

D FINISHES carried to collection

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Basement 2
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 36.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "Kelas 1, Kelas 2, Kelas
3, VIP A, VIP B & VIP C"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 51.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Toilet Direktur, Toilet Sekretaris,
Male&Female Toilet, Toilet Kelas 1, Toilet Kelas 2, Toilet Kelas 3,
Toilet VIP A, Toilet VIP B, Toilet VIP C & Toilet Prefungtion"
3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 16.50 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "R. Radio/Alat, R. Direktur R.Sakit, R.
Sekretaris, Pantry, Gudang, SIMRS, Keuangan, Gudang Arsip, Depo
& Janitor"
4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 1.50 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 1.50 unit
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel"
6 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "R. Diskusi & Office Management"

7 Double swing 12mm thk Multiplex with 3mm thk plywood two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D07, "Meeting Room"
8 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
500x800mm, "Shaft" (Assumption & Included Ironmongery)
9 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 1.50 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet" (Assumption & Included
Ironmongery)
10 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

11 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 18.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Basement 2
12 Single swing window with 5mm thk clear glass and 'Dark brown' 10.50 unit
frame finished sz. 900x1450mm type W01, "Kelas 1, VIP B &
Emergency Stairs" (Include hardware)
13 Double swing window with 5mm thk clear glass and 'Dark brown' 37.50 unit
frame finished sz. 2800x1450mm type W02, "Pantry, Kelas 3,
Corridor, VIP A, VIP B, VIP C, R. Keuangan & Office Management"
(Include Hardware)
14 Mutiple swing window with 5mm thk clear glass and 'Dark brown' 7.50 unit
frame finished sz. 3450x1450mm type W03, "R. Direktur R.Sakit,
Prefunction, R.Diskusi, Office Management & Corridor" (Include
Hardware)
15 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 1.50 unit
sz. 1750x2200 type W04, "Ramp to Corridor"

Arch GF-CB/Page 51
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
16 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 4.50 unit
Toilet" Include Ironmengery by supplier
17 Partition Cubicle "Female Public Toilet" 9.43 m2
18 Partition Cubicle "Male Public Toilet" 7.96 m2

E DOORS AND WINDOW carried to collection

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Basement 2
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 36.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "Kelas 1, Kelas 2, Kelas
3, VIP A, VIP B & VIP C"
Handle KEND HRE 75.01 US32D 36.00 set
Lockace SWING KEND K87735-40 US32D 36.00 pcs
Double Cylinder KEND 08610-10 US14 36.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 108.00 set
Door Stop KEND 75-014 US32D 72.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 36.00 set
Dust proos Strike KEND 95/12NUS26 36.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 36.00 pcs

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 51.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Toilet Direktur, Toilet Sekretaris,
Male&Female Toilet, Toilet Kelas 1, Toilet Kelas 2, Toilet Kelas 3,
Toilet VIP A, Toilet VIP B, Toilet VIP C & Toilet Prefungtion"
Handle KEND HRE 75.01 US32D 51.00 set
Lockace SWING KEND K87735-40 US32D 51.00 pcs
WC Cylinder KEND K3116-61 US14 51.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 76.50 set
Door Stop KEND 75-016 US32D 51.00 pcs

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 16.50 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "R. Radio/Alat, R. Direktur R.Sakit, R.
Sekretaris, Pantry, Gudang, SIMRS, Keuangan, Gudang Arsip, Depo
& Janitor"
Handle KEND HRE 75.01 US32D 16.50 set
Lockace SWING KEND K87735-40 US32D 16.50 pcs
Double Cylinder KEND 08610-10 US14 16.50 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 24.75 set
Door Stop KEND 75-014 US32D 16.50 pcs
Door Closer KEND DCL 83210.2-4 RA S 16.50 pcs

4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 1.50 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 1.50 set
Lockace SWING KEND K87735-40 US32D 1.50 pcs
Double Cylinder KEND 08610-10 US14 1.50 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 2.25 set
Door Stop KEND 75-014 US32D 1.50 pcs
Door Closer KEND DCL 83210.2-4 RA S 1.50 pcs

5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 1.50 unit
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel"
Handle KEND HRE 75.01 US32D 1.50 set
Lockace SWING KEND K87735-40 US32D 1.50 pcs
Double Cylinder KEND 08610-10 US14 1.50 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 4.50 set
Door Stop KEND 75-014 US32D 3.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 1.50 set
Dust proos Strike KEND 95/12NUS26 1.50 pcs
Door Closer KEND DCL 83210.2-4 RA S 1.50 pcs

Arch GF-CB/Page 52
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

6 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "R. Diskusi & Office Management"

Pull handle KEND PR.73.01 US32D 6.00 set


Escutcheon KEND E.73.01 US32D 3.00 set
Lockcase pelor kayu KEND K87738-60 US32D 3.00 set
Double Cylinder KEND 08610-10 US14 3.00 pcs
Center Pivot KEND CPH.20-500 US32D 3.00 set
Door stop KEND 75-014 US14D 6.00 pcs

7 Double swing 12mm thk Multiplex with 3mm thk plywood two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D07, "Meeting Room"
Floor hinge KEND FH08323 12.00 set
Pull handle KEND PR 73.01 US32D 12.00 set
Escutcehon KEND E 73.01 US32D 6.00 set
Lockace Pelor KEND K87738-60 US32D 6.00 pcs
Double Cylinder KEND 08610-10 US14 6.00 pcs

F IRONMONGERY carried to collection

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Basement 2
1050mm wide x 1000mm high mirror to Lavatory Direktur RS & 4.00 unit
1
Sekretaris Toilet
1510mm wide x 1000mm high mirror to Male & Female Public 4.00 unit
2
Toilet
600mm wide x 1000mm high mirror to Lavatory Kelas 1,2,3, VIP 60.00 unit
3
A,B&C & Prefunction Toilet

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Basement 2
4 1050 x 600mm Lavatory Counter Direktur RS & Sekretaris 4.00 unit
5 1510 x 500mm Lavatory Counter Male & Female Public Toilet 4.00 unit
6 650 x 500mm Lavatory Counter Kelas 1,2,3, VIP B&C & Prefunction 56.00 unit
Toilet
7 1150 x 400mm Lavatory Counter Kelas VIP A 4.00 unit
8 1775 x 500mm Lavatory Counter Prefungtion 2.00 unit
9 600 x 600mm Lavatory Counter Counter Perawat 4.00 unit

G ACCESSORIES carried to collection

H SANITARY
Basement 2
Direktur & Sekretaris Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
2 Jet washer ex Toto THX 20 MCRB 3.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
5 Paper Holder ex. Toto 703 AE 3.00 no
6 Robe Hook ex. Toto TX 704 AE 3.00 no
7 Floor Drain ex. Toto TX 1 BN 3.00 no

Male Public Toilet


8 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
9 Jet washer ex Toto THX 20 MCRB 2.00 no
10 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
11 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
12 Urinoir ex. Toto UW 930 JM 3.00 no
13 Paper Holder ex. Toto 703 AE 2.00 no
14 Robe Hook ex. Toto TX 704 AE 2.00 no
15 Floor Drain ex. Toto TX 1 BN 2.00 no

Female Public Toilet


16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
17 Jet washer ex Toto THX 20 MCRB 3.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
20 Paper Holder ex. Toto 703 AE 3.00 no
21 Robe Hook ex. Toto TX 704 AE 3.00 no
22 Floor Drain ex. Toto TX 1 BN 3.00 no

Arch GF-CB/Page 53
GROUND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Kelas 1,2,3 Toilet


23 Closet Monoblock ex. Toto CW 421 /SW 420 JP 18.00 no
24 Jet washer ex Toto THX 20 MCRB 18.00 no
25 Lavatory ex. Toto Le Muse LW 818 J 18.00 no
26 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 18.00 no
27 Fixed Shower Head ex. Toto TX 465 SE 18.00 no
28 Shower Mixer TX 433 SDV1 18.00 no
29 Paper Holder ex. Toto 703 AE 18.00 no
30 Robe Hook ex. Toto TX 704 AE 18.00 no
31 Floor Drain ex. Toto TX 1 BN 36.00 no

VIP A,B & C Toilet


32 Closet Monoblock ex. Toto CW 436 NJ 24.00 no
33 Jet washer ex Toto THX 20 MCRB 24.00 no
34 Lavatory ex. Toto Le Muse LW 818 J 24.00 no
35 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 24.00 no
36 Fixed Shower Head ex. Toto TX 465 SE 24.00 no
37 Shower Mixer TX 433 SDV1 24.00 no
38 Paper Holder ex. Toto 703 AE 24.00 no
39 Robe Hook ex. Toto TX 704 AE 24.00 no
40 Floor Drain ex. Toto TX 1 BN 48.00 no

Prefunction Toilet 1&2


41 Closet Monoblock ex. Toto CW 421 /SW 420 JP 3.00 no
42 Jet washer ex Toto THX 20 MCRB 3.00 no
43 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
44 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
45 Paper Holder ex. Toto 703 AE 3.00 no
46 Robe Hook ex. Toto TX 704 AE 3.00 no
47 Floor Drain ex. Toto TX 1 BN 3.00 no

Prefunction
48 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
49 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no

Counter Perawat
50 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
51 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no

H SANITARY carried to collection

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

2.0. ARCHITECTURE GROUND FLOOR Caried to Final Summary

Arch GF-CB/Page 54
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

3.0. ARCHITECTURE FIRST FLOOR

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at First Floor 3,966.35 m1

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 134.10 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
First Floor
1 Wall & floor Public Toilet Pria 77.02 m2
2 Wall & floor Public Toilet Wanita 66.37 m2
3 Wall & floor Toilet Persalinan VIP 01 38.51 m2
4 Wall & floor Toilet Persalinan VIP 02 38.51 m2
5 Wall & floor Toilet Persalinan VIP 03 38.51 m2
6 Wall & floor Toilet Persalinan VIP 04 38.51 m2
7 Wall & floor Toilet Lounge R. Dokter (R. VK) 32.78 m2
8 Wall & floor Toilet Ruang Ganti Perawat 51.17 m2
9 Wall & floor Toilet Ruang Persiapan 35.03 m2
10 Wall & floor Toilet Ruang Pemulihan 37.55 m2
11 Wall & floor Toilet Ruang Dokter 35.56 m2
12 Wall & floor Toilet Ruang Isolasi 34.80 m2
13 Wall & floor Toilet Triage 34.01 m2
14 Wall & floor Spoel Hock 54.53 m2
15 Wall & floor Toilet One Day Care 47.09 m2
16 Wall & floor Toilet Lab Klinik 38.40 m2
17 Wall & floor Toilet X-Ray 41.42 m2
18 Wall & floor Toilet Perawat ICU 38.28 m2
19 Wall & floor Toilet Ruang Isolasi 56.49 m2
20 Wall & floor Toilet Ruang Konsultasi ICU 37.43 m2
21 Wall & floor Ruang Dekontaminasi 79.59 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at First Floor 9,284.92 m2

1st Floor Plan


2 Bataco Steping Drop off to Lobby 24.12 m3

C MASONRY

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at First Floor 18,422.63 m2

Smooth finish to walls ex. MU


2 Wall Finishes at First Floor 15,316.48 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at First Floor 718.55 m2

Arch First-CB/Page 55
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at First Floor 6,883.65 m2

Prepare and apply Internal wall finishes "Epoxy MX-98 Light ex.
Propan" (7) paint to
5 Wall Finishes at First Floor 3,486.91 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
6 Wall Finishes at First Floor 2,501.46 m2

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 89.55 m2


8 Wall Public Toilet Wanita 77.54 m2
9 Wall Toilet One Day Care 82.51 m2
10 Wall Toilet Lab Klinik & X Ray 54.10 m2

300x600x10mm Ceramic type Polished ex. China (5) including


mortar, adhesive and grout as specified or as approve architect to

11 Wall Toilet Persalinan VIP 01 49.95 m2


12 Wall Toilet Persalinan VIP 02 49.95 m2
13 Wall Toilet Persalinan VIP 03 49.95 m2
14 Wall Toilet Persalinan VIP 04 49.95 m2
15 Wall Toilet Counter Perawat 42.82 m2
16 Wall Toilet Ruang Ganti Perawat 62.44 m2
17 Wall Toilet Ruang Persiapan 45.49 m2
18 Wall Toilet Ruang Pemulihan 48.17 m2
19 Wall Janitor & Spoel Hock Area Persalinan 121.54 m2
20 Wall Toilet Ruang Dokter 45.94 m2
21 Wall Toilet Ruang Isolasi Triage 45.08 m2
22 Wall Toilet Ruang Dokter/Perawat ICU 69.54 m2
23 Wall Toilet Ruang ICU 49.06 m2
24 Wall Toilet Ruang Konsultasi ICU 92.43 m2
25 Wall Ruang Dekontaminasi 92.55 m2

200x300x10mm Ceramic type Topas ex. Asia Tile including mortar,


adhesive and grout as specified or as approve architect to

26 Wall Toilet Triage 32.11 m2


27 Wall Spoel Hock 42.82 m2

Ply wall with Timbal & Gypsump 10mm finish with Epoxy MX-98
Light ex. Propan (8) paint to
28 Wall X Ray 163.02 m2

Tempered glass wall 12mm thk including all fixing accessoris


complete with finish as specified or as approve architect to
29 Wall NICU, PICU & Konsultasi 108.65 m2

Wooden Cladding including all fixing accessoris complete with finish


as specified or as approve architect to
30 Wall Lobby Reception 106.57 m2
31 Cover Column Drop Off 38.25 m2

600x600mm Andesit Stone including mortar, adhesive and grout as


specified or as approve architect to
32 Cover Column Drop Off 127.27 m2

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
33 Railling Stair 1 (Lobby Lift) 22.51 m1
34 Railling Stair 2 (Emergency Stair) 23.23 m1

Vertical Louver with Aluminium sz. 20x40mm including all fixing


accessoris complete with finish powder coating as specified or as
approve architect to (Assumption)
34 Wall Ambulance 54.54 m2

Arch First-CB/Page 56
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
35 Floor Security Post 6.81 m2
36 Floor Linen UGD 6.71 m2
37 Floor Spoel Hock UGD 9.60 m2
38 Floor Toilet Perawat (ICU) 8.35 m2
39 Floor Spoel Hock / Alat ICU 8.40 m2
40 Floor Gudang R. VK 12.52 m2
41 Floor Janitor/Spoel Hock R. VK 37.50 m2
42 Floor R. Alat/Linen Steril R. VK 23.34 m2
43 Floor R. Tunggu UGD 40.82 m2

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
44 Floor Toilet R. Dokter 1 4.86 m2
45 Floor Toilet R. Isolasi 11.67 m2
46 Floor Toilet UGD (Triage) 4.37 m2
47 Floor One Day Care Toilet 7.17 m2

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size ex.China including mortar, adhesive and
grout as specified or as approve architect to

48 Floor Public Male Toilet 15.01 m2


49 Floor Public Female Toilet 12.92 m2
50 Floor Toilet Lounge R. Dokter (R. VK) 8.58 m2
51 Floor Toilet R. Persalinan VIP 01-04 20.48 m2
52 Floor Toilet Perawat (R. VK) 4.34 m2
53 Floor Toilet R. Persiapan/Pemulihan 9.42 m2
54 Floor Depo (Lab. Klinik) 20.78 m2

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
55 Floor Stair 1 (Lobby Lift) 41.52 m2

600x600x10mm thk Granite Tile Polished Ex. China (C7) (Material


Price Rp. 300.000/m2) including mortar, adhesive and grout as
specified or as approve architect to
56 Floor Depo UGD 4.14 m2
57 Floor R. Alat UGD 4.37 m2
58 Floor Corridor 345.18 m2
59 Floor R. UGD (Triage) 188.58 m2
60 Floor R. Panel 15.18 m2
61 Floor Bank Darah 19.27 m2
62 Floor R. Istirahat Dokter UGD 21.37 m2
63 Floor Lounge UGD 22.39 m2
64 Floor R. Isolasi UGD 27.51 m2
65 Floor R. Observasi 186.45 m2
66 Floor X-Ray 53.47 m2
67 Floor Foyer X-Rray 24.39 m2
68 Floor R. Kontrol 27.96 m2
69 Floor Lab. Klinik 48.49 m2
70 Floor R. Dokter (R. VK) 29.76 m2
71 Floor Lounge (R. VK) 84.65 m2
72 Floor R. Ganti (R. VK) 17.81 m2
73 Floor R. Konsultasi Dokter (R. VK) 19.13 m2
74 Floor Spoel Hock/Alat 8.40 m2
75 Floor Janitor 7.58 m2
76 Floor Lab. Sample 16.91 m2
77 Floor Toilet Lab. Klinik 11.28 m2
78 Floor One Daycare 165.86 m2
79 Floor GRO 13.74 m2
80 Floor Lift Hall 59.60 m2

600x600x10mm thk 600X600X10 mmthk Granite Tile Polished type


Wenge GMA61 White EX.Niro Granite (C8) including mortar,
adhesive and grout as specified or as approve architect to

81 Floor Lobby Terace 30.60 m2


82 Floor Lobby 114.88 m2
83 Floor FO 13.74 m2

Arch First-CB/Page 57
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Medistep Ninyl ex. LG (V1) including all fixing accessoris complete


with natural finish as specified or as approve architect to

84 Floor Foyer ICU 28.63 m2


85 Floor R. PICU 44.13 m2
86 Floor NICU/RISTI/INT 59.51 m2
87 Floor R. ICU/Perawat 286.56 m2
88 Floor R. Linen ICU 49.60 m2
89 Floor Isolasi ICU 26.10 m2
90 Floor Ruang Bayi 41.39 m2
91 Floor R. Persalinan VIP 01 - 04 132.19 m2
92 Floor Corridor R. VK 94.59 m2
93 Floor R. Laktasi 9.10 m2
94 Floor Counter Perawat R. VK 38.91 m2
95 Floor R. Transisi 43.14 m2
96 Floor R. Ginekologi 39.79 m2
97 Floor R. Scrub 1 10.34 m2
98 Floor R. Scrub 2 11.03 m2
99 Floor R. Persiapan/Pemulihan 202.03 m2
100 Floor R. Resusitasi Bayi 143.50 m2
101 Floor R. OK 1 81.19 m2
102 Floor R. OK 2 80.66 m2
103 Floor R. OK 3 76.61 m2
104 Floor Skirting h= 100mm, to Floor VK & OK 698.17 m1

Koral Sikat Motif (CS) including mortar, adhesive and grout as


specified or as approve architect to
105 Floor Drop Off 50.85 m2

Paving Block (PB) including road sign, mortar, adhesive and grout
as specified or as approve architect to
106 Floor Entrance Road 908.38 m2
107 Floor Ramp Up to Drop Off UGD 45.64 m2
108 Floor Drop Off UGD 179.61 m2
109 Floor Parking Ambulans 43.44 m2

Batu Candi (BC) including mortar, adhesive and grout as specified


or as approve architect to
110 Floor Tempat Suci 31.68 m2

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
111 Ceiling R. Dokter UGD 21.37 m2
112 Ceiling Lounge UGD 21.74 m2
113 Ceiling R. Isolasi UGD 27.04 m2
114 Ceiling R. Observasi UGD 374.78 m2
115 Ceiling Spoel Hock UGD 9.31 m2
116 Ceiling Linen UGD 6.71 m2
117 Ceiling Depo UGD 3.85 m2
118 Ceiling R. UGD 188.58 m2
119 Ceiling R. Panel 15.18 m2
120 Ceiling Bank Darah 19.48 m2
121 Ceiling Drop Off 50.85 m2
122 Ceiling Lobby Terace 36.26 m2
123 Ceiling Lobby 55.36 m2
124 Ceiling R. GRO 13.74 m2
125 Ceiling FO 13.74 m2
126 Ceiling One Day Care 165.86 m2
127 Ceiling R. X-Ray 53.47 m2
128 Ceiling Foyer X-Ray 17.97 m2
129 Ceiling R. Kontrol 27.96 m2
130 Ceiling Lab. Klinik 48.49 m2
131 Ceiling Depo 20.78 m2
132 Ceiling R. ICU/Perawat 286.56 m2
133 Ceiling R. Linen ICU 49.60 m2
134 Ceiling R. Isolasi ICU 26.10 m2
135 Ceiling R. Spoel Hock ICU 9.49 m2
136 Ceiling NICU/RISTI/INT 59.51 m2
137 Ceiling R. PICU 44.13 m2
138 Ceiling Foyer ICU 28.63 m2
139 Ceiling Corridor R. Bayi - R. Persalinan 90.88 m2
140 Ceiling R. Bayi 41.39 m2
141 Ceiling R. Persalinan VIP 01 - 04 131.05 m2
142 Ceiling R. Laktasi 9.10 m2
143 Ceiling Counter Perawat VK 36.18 m2
144 Ceiling Gudang VK 6.26 m2

Arch First-CB/Page 58
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

145 Ceiling R. Transisi 42.55 m2


146 Ceiling R. Ginekologi 39.79 m2
147 Ceiling Janitor/Spoel Hock VK 18.75 m2
148 Ceiling R. Dokter VK 29.44 m2
149 Ceiling Lounge VK 84.33 m2
150 Ceiling R. Ganti VK 17.16 m2
151 Ceiling R. Resusitasi Bayi 139.45 m2
152 Ceiling R. Scrub 1 10.34 m2
153 Ceiling R. Scrub 2 11.03 m2
154 Ceiling R. OK 1 81.19 m2
155 Ceiling R. OK 2 - OK 3 157.04 m2
156 Ceiling R. Alat/Linen Steril 23.34 m2
157 Ceiling R. Persiapan - R. Pemulihan 201.14 m2
158 Ceiling R. Konsultasi Dokter 19.13 m2
159 Ceiling Corridor 325.41 m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
160 Ceiling Drop Off 250.49 m2
161 Ceiling Side Ramp 223.32 m2
162 Ceiling R. Tunggu UGD 40.82 m2
163 Ceiling Gudang Bed./Kursi Roda UGD 15.69 m2
164 Ceiling Corridor Connecting Lobby-UGD 53.52 m2
165 Ceiling Toilet UGD 3.85 m2
166 Ceiling Toilet R. Dokter UGD 4.86 m2
167 Ceiling Toilet R. Isolasi UGD 4.74 m2
168 Ceiling Public Toilet Female 12.18 m2
169 Ceiling Public Toilet Male 13.20 m2
170 Ceiling Janitor 7.36 m2
171 Ceiling Toilet One Day Care 11.28 m2
172 Ceiling Toilet Lab. Klinik 8.18 m2
173 Ceiling Spoel Hock/Alat/Toilet ICU 15.71 m2
174 Ceiling Toilet R. ICU 9.31 m2
175 Ceiling Toilet R. Isolasi ICU 6.53 m2
176 Ceiling Toilet R. Persalinan VIP 01-04 20.48 m2
177 Ceiling Toilet Perawat R. VK 4.34 m2
178 Ceiling Toilet R. Dokter VK 8.58 m2
179 Ceiling Toilet R. Persiapan/R. Pemulihan 9.42 m2

Exposed Concrete Ceiling (CR) Finish to


180 Ceiling Stair 1 34.96 m2
181 Ceiling Stair 2 30.47 m2
182 Ceiling Ramp Up First Floor - Second Floor 139.01 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
183 Gypsumboard Ceilling 3,211.48 m2
184 Calsiboard Ceilling 723.86 m2
185 Exposed Concrete Ceiling 204.44 m2

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
186 Above the Window sz. 1200x400x80 mm 11.00 unit
187 Above the Window sz. 3100x400x80 mm 12.00 unit
188 Above the Window sz. 2050x400x80 mm 2.00 unit
189 Above the Window sz. 800x400x80 mm 3.00 unit

Planter Box & Boundary Wall finishes


Smooth finish to concrete wall & column ex. MU
190 Wall Planter Box 320.93 m2
191 Boundary wall (grid 9, C-H & grid 3-6) 391.00 m2
192 Wall Pura 98.13 m2

Camprot Motif finish to


193 Wall Planter Box 320.93 m2
194 Boundary wall (grid 9, C-H & grid 3-6) 391.00 m2
195 Wall Pura 98.13 m2

Pond Drop Off finishes


Smooth finish to concrete wall & column ex. MU
196 Wall & Floor Pond Drop Off 26.21 m2

Camprot Motif finish to


197 External Wall Pond Drop Off 10.83 m2

Arch First-CB/Page 59
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

300x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
198 Topping Pond Drop Off 22.68 m1

199 Artwork/ Sclupture Water Feature 1.00 no

200 Concrete Structure Pond (Assumption) 1.54 Unit

Entrance Water Feature finishes


Smooth finish to concrete wall & column ex. MU
201 Internal Wall & Floor Water Feature 37.93 m2

Camprot Motif finish to


202 External Wall Water Feature 35.98 m2

150x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
203 Wall Water Feature 28.43 m2

204 Puri Bunda Signage 1.00 no

Entrance Gate finishes


150x300mm Candi Stone including mortar, adhesive and grout as
specified or as approve architect to
205 Wall Entrance Gate 83.91 m2

206 Artwork/ Sclupture Entrance 3.08 no - By Specialist

D FINISHES carried to collection

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
First Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"
10 Fixed 5mm thk clear glass window with timber grill sz. 1250x1250 2.00 unit
"Security" (Assumption)
11 Fixed 5mm thk clear glass window sz. 1250x1250 "Security" 3.00 unit
(Assumption)

Arch First-CB/Page 60
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

12 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet & OK" (Assumption & Included
Ironmongery)
13 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

14 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 9.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)
-
Supply and install Aluminium Alexindo with 5mm thk clear glass -
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
First Floor -
15 Double swing 10mm thk tempered glass dark brown frame finished 2.00 unit
door with fixed glass sz. 1600x2810mm type D17, "Triage"
(Include Hardware)
16 Double sliding 10mm thk tempered glass dark brown frame finished 2.00 unit
door sz. 1900x2810mm type D18, "Lobby" (Include Hardware)

17 Single swing window with 5mm thk clear glass and 'Dark brown' 11.00 unit
frame finished sz. 900x1450mm type W01, "FO, Emergency Stairs,
INT, PICU, NICU, R.Dokter 1 & Lounge 1" (Include Hardware)

18 Double swing window with 5mm thk clear glass and 'Dark brown' 12.00 unit
frame finished sz. 2800x1450mm type W02, "Corridor Persalinan,
ICU, Lab.Klinik, One Day Care, Lounge & R.Tunggu UGD" (Include
Hardware)
19 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1750x2200 type W04, "Ramp to Corridor"
20 Single swing window with 5mm thk clear glass and 'Dark brown' 3.00 unit
frame finished sz. 500x900mm type W05, "Toilet One Day Care &
Toilet Isolasi" (Include Hardware)
21 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 3600x2800 type W10, "R.Perawat"
22 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 3200x2800 type W13, "Lobby"
23 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 1500x2800 type W14, "Lobby"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
24 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 5.00 unit
Toilet" Include Ironmengery by supplier
25 Partition Cubicle "Female Public Toilet" 7.07 m2
26 Partition Cubicle "Male Public Toilet" 5.97 m2

E DOORS AND WINDOW carried to collection

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
First Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
Handle KEND HRE 75.01 US32D 14.00 set
Lockace SWING KEND K87735-40 US32D 14.00 pcs
Double Cylinder KEND 08610-10 US14 14.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 41.00 set
Door Stop KEND 75-014 US32D 27.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 14.00 set
Dust proos Strike KEND 95/12NUS26 14.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 14.00 pcs

Arch First-CB/Page 61
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

Handle KEND HRE 75.01 US32D 32.00 set


Lockace SWING KEND K87735-40 US32D 32.00 pcs
WC Cylinder KEND K3116-61 US14 32.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 47.00 set
Door Stop KEND 75-016 US32D 32.00 pcs

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
Handle KEND HRE 75.01 US32D 44.00 set
Lockace SWING KEND K87735-40 US32D 44.00 pcs
Double Cylinder KEND 08610-10 US14 44.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 65.00 set
Door Stop KEND 75-014 US32D 44.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 44.00 pcs

4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 2.00 set
Door Stop KEND 75-014 US32D 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
Handle KEND HRE 75.01 US32D 6.00 set
Lockace SWING KEND K87735-40 US32D 6.00 pcs
Double Cylinder KEND 08610-10 US14 6.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Door Stop KEND 75-014 US32D 12.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 6.00 set
Dust proos Strike KEND 95/12NUS26 6.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 6.00 pcs

6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
Pull handle KEND PR.73.01 US32D 48.00 set
Escutcheon KEND E.73.01 US32D 24.00 set
Lockcase pelor kayu KEND K87738-60 US32D 24.00 set
Double Cylinder KEND 08610-10 US14 24.00 pcs
Center Pivot KEND CPH.20-500 US32D 24.00 set
Door stop KEND 75-014 US14D 48.00 pcs

7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
Pull handle KEND PR.73.01 US32D 9.00 set
Escutcheon KEND E.73.01 US32D 5.00 set
Lockcase pelor kayu KEND K87738-60 US32D 5.00 set
Double Cylinder KEND 08610-10 US14 5.00 pcs
Center Pivot KEND CPH.20-500 US32D 5.00 set
Door stop KEND 75-014 US14D 9.00 pcs

Arch First-CB/Page 62
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

Handle KEND HRE 75.01 US32D 2.00 set


Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 5.00 set
Door Stop KEND 75-014 US32D 3.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 2.00 set
Dust proos Strike KEND 95/12NUS26 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"
Sliding set KEND P85-2M 2.00 set
Flush handle KEND FPP 75.07 US432D 2.00 set
Lockace sliding KEND K87720-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Escutcehon KEND E 73.01 US32D 2.00 pcs

F IRONMONGERY carried to collection

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
First Floor
1 1510mm wide x 1000mm high mirror to Male & Female Public 3.00 unit
Toilet
2 500mm wide x 1000mm high mirror to Lavatory Triage Toilet, 15.00 unit
R.Dokter, Persalinan VIP 1-4, Toilet Perawat, R.Persiapan &
R.Pemulihan
3 900mm wide x 1000mm high mirror to Lavatory Isolasi Toilet, ICU 5.00 unit
Toilet & Pantry
4 1350mm wide x 1000mm high mirror to Lavatory Lab. Klinik Toilet 3.00 unit
& Oneday Care Toilet
5 850mm wide x 1000mm high mirror to Lavatory R. X Ray Toilet 2.00 unit

6 600mm wide x 1000mm high mirror to Lavatory R. Dokter Perawat 2.00 unit

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Basement 1
7 1510 x 500mm Lavatory Counter Male & Female Public Toilet 3.00 unit
500 x 416mm Lavatory Counter Triage, R.Dokter, Persalinan VIP 1- 15.00 unit
8
4, Toilet Perawat, R.Persiapan & R.Pemulihan
9 1000 x 500mm Lavatory Counter Isolasi Toilet 2.00 unit
10 900 x 550mm Lavatory Counter Pantry 2.00 unit
11 1350 x 500mm Lavatory Counter Lab.Klinik toilet & Oneday Care 3.00 unit
Toilet
12 850 x 550mm Lavatory Counter R. Dokter Perawat 2.00 unit
13 1750 x 500mm Lavatory Counter ICU Toilet 2.00 unit
14 800 x 500mm Lavatory R. Dekontaminasi 2.00 unit
15 1050 x 417mm Lavatory R. X Ray Toilet 2.00 unit

G ACCESSORIES carried to collection

H SANITARY
First Floor
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
2 Jet washer ex Toto THX 20 MCRB 2.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
5 Urinoir ex. Toto UW 930 JM 3.00 no
6 Paper Holder ex. Toto 703 AE 2.00 no
7 Robe Hook ex. Toto TX 704 AE 2.00 no
8 Floor Drain ex. Toto TX 1 BN 2.00 no

Arch First-CB/Page 63
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Female Public Toilet


9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
10 Jet washer ex Toto THX 20 MCRB 3.00 no
11 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
13 Paper Holder ex. Toto 703 AE 3.00 no
14 Robe Hook ex. Toto TX 704 AE 3.00 no
15 Floor Drain ex. Toto TX 1 BN 3.00 no

Triage, R.Dokter, Isolasi, Perawat, R.Persiapan & Pemulihan


Toilet, Lab. Klinik & Oneday Care Toilet, R. Dokter Perawat &
X Ray Toilet
16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 15.00 no
17 Jet washer ex Toto THX 20 MCRB 15.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 15.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 15.00 no
20 Paper Holder ex. Toto 703 AE 15.00 no
21 Robe Hook ex. Toto TX 704 AE 15.00 no
22 Floor Drain ex. Toto TX 1 BN 15.00 no

Persalinan VIP 1-4 Toilet


23 Closet Monoblock ex. Toto CW 436 NJ 6.00 no
24 Jet washer ex Toto THX 20 MCRB 6.00 no
25 Lavatory ex. Toto Le Muse LW 818 J 6.00 no
26 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 6.00 no
27 Fixed Shower Head ex. Toto TX 465 SE 6.00 no
28 Shower Mixer TX 433 SDV1 6.00 no
29 Paper Holder ex. Toto 703 AE 6.00 no
30 Robe Hook ex. Toto TX 704 AE 6.00 no
31 Floor Drain ex. Toto TX 1 BN 12.00 no
-
Pantry Toilet -
32 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
33 Jet washer ex Toto THX 20 MCRB 2.00 no
34 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
35 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
36 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
37 Shower Mixer TX 433 SDV1 2.00 no
38 Paper Holder ex. Toto 703 AE 2.00 no
39 Robe Hook ex. Toto TX 704 AE 2.00 no
40 Floor Drain ex. Toto TX 1 BN 3.00 no

ICU & Isolasi Toilet


41 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
42 Jet washer ex Toto THX 20 MCRB 3.00 no
43 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
44 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
45 Fixed Shower Head ex. Toto TX 465 SE 3.00 no
46 Shower Mixer TX 433 SDV1 3.00 no
47 Paper Holder ex. Toto 703 AE 3.00 no
48 Robe Hook ex. Toto TX 704 AE 3.00 no
49 Floor Drain ex. Toto TX 1 BN 6.00 no

Ruang Dekontaminasi
50 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
51 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
52 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
53 Shower Mixer TX 433 SDV1 2.00 no
54 Floor Drain ex. Toto TX 1 BN 2.00 no

H SANITARY carried to collection

Arch First-CB/Page 64
FIRST FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

3.0. ARCHITECTURE FIRST FLOOR Caried to Final Summary

Arch First-CB/Page 65
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

4.0. ARCHITECTURE SECOND FLOOR

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at First Floor 3,909.28 m1

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 132.18 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
SECOND FLOOR
1 Wall & floor Public Toilet Pria 75.91 m2
2 Wall & floor Public Toilet Wanita 65.41 m2
3 Wall & floor Toilet Persalinan VIP 01 37.96 m2
4 Wall & floor Toilet Persalinan VIP 02 37.96 m2
5 Wall & floor Toilet Persalinan VIP 03 37.96 m2
6 Wall & floor Toilet Persalinan VIP 04 37.96 m2
7 Wall & floor Toilet Lounge R. Dokter (R. VK) 32.30 m2
8 Wall & floor Toilet Ruang Ganti Perawat 50.43 m2
9 Wall & floor Toilet Ruang Persiapan 34.52 m2
10 Wall & floor Toilet Ruang Pemulihan 37.01 m2
11 Wall & floor Toilet Ruang Dokter 35.05 m2
12 Wall & floor Toilet Ruang Isolasi 34.29 m2
13 Wall & floor Toilet Triage 33.52 m2
14 Wall & floor Spoel Hock 53.74 m2
15 Wall & floor Toilet One Day Care 46.42 m2
16 Wall & floor Toilet Lab Klinik 37.84 m2
17 Wall & floor Toilet X-Ray 40.83 m2
18 Wall & floor Toilet Perawat ICU 37.73 m2
19 Wall & floor Toilet Ruang Isolasi 55.68 m2
20 Wall & floor Toilet Ruang Konsultasi ICU 36.89 m2
21 Wall & floor Ruang Dekontaminasi 78.45 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at First Floor 9,151.31 m2

2nd Floor Plan


2 Bataco Steping Drop off to Lobby 23.78 m3

C MASONRY

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at First Floor 18,811.41 m2

Smooth finish to walls ex. MU


2 Wall Finishes at First Floor 16,605.68 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at First Floor 779.03 m2

Arch Second-CB/Page 66
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at First Floor 6,784.59 m2

Prepare and apply Internal wall finishes "Epoxy MX-98 Light ex.
Propan" (7) paint to
5 Wall Finishes at First Floor 3,436.74 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
6 Wall Finishes at First Floor 2,465.47 m2

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 88.26 m2


8 Wall Public Toilet Wanita 76.42 m2
9 Wall Toilet One Day Care 81.33 m2
10 Wall Toilet Lab Klinik & X Ray 53.32 m2

300x600x10mm Ceramic type Polished ex. China (5) including


mortar, adhesive and grout as specified or as approve architect to

11 Wall Toilet Persalinan VIP 01 49.24 m2


12 Wall Toilet Persalinan VIP 02 49.24 m2
13 Wall Toilet Persalinan VIP 03 49.24 m2
14 Wall Toilet Persalinan VIP 04 49.24 m2
15 Wall Toilet Counter Perawat 42.20 m2
16 Wall Toilet Ruang Ganti Perawat 61.54 m2
17 Wall Toilet Ruang Persiapan 44.84 m2
18 Wall Toilet Ruang Pemulihan 47.48 m2
19 Wall Janitor & Spoel Hock Area Persalinan 119.79 m2
20 Wall Toilet Ruang Dokter 45.28 m2
21 Wall Toilet Ruang Isolasi Triage 44.44 m2
22 Wall Toilet Ruang Dokter/Perawat ICU 68.53 m2
23 Wall Toilet Ruang ICU 48.36 m2
24 Wall Toilet Ruang Konsultasi ICU 91.10 m2
25 Wall Ruang Dekontaminasi 91.22 m2

200x300x10mm Ceramic type Topas ex. Asia Tile including mortar,


adhesive and grout as specified or as approve architect to

26 Wall Toilet Triage 31.65 m2


27 Wall Spoel Hock 42.20 m2

Ply wall with Timbal & Gypsump 10mm finish with Epoxy MX-98
Light ex. Propan (8) paint to
28 Wall X Ray 160.68 m2

Tempered glass wall 12mm thk including all fixing accessoris


complete with finish as specified or as approve architect to
29 Wall NICU, PICU & Konsultasi 107.09 m2

Wooden Cladding including all fixing accessoris complete with finish


as specified or as approve architect to
30 Wall Lobby Reception 105.04 m2
31 Cover Column Drop Off 37.70 m2

600x600mm Andesit Stone including mortar, adhesive and grout as


specified or as approve architect to
32 Cover Column Drop Off 125.43 m2

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
33 Railling Stair 1 (Lobby Lift) 22.19 m1
34 Railling Stair 2 (Emergency Stair) 22.89 m1

Vertical Louver with Aluminium sz. 20x40mm including all fixing


accessoris complete with finish powder coating as specified or as
approve architect to (Assumption)
34 Wall Ambulance 53.76 m2

Arch Second-CB/Page 67
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
35 Floor Security Post 6.71 m2
36 Floor Linen UGD 6.61 m2
37 Floor Spoel Hock UGD 9.46 m2
38 Floor Toilet Perawat (ICU) 8.23 m2
39 Floor Spoel Hock / Alat ICU 8.28 m2
40 Floor Gudang R. VK 12.34 m2
41 Floor Janitor/Spoel Hock R. VK 36.96 m2
42 Floor R. Alat/Linen Steril R. VK 23.00 m2
43 Floor R. Tunggu UGD 40.24 m2

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
44 Floor Toilet R. Dokter 1 4.79 m2
45 Floor Toilet R. Isolasi 11.50 m2
46 Floor Toilet UGD (Triage) 4.31 m2
47 Floor One Day Care Toilet 7.07 m2

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size ex.China including mortar, adhesive and
grout as specified or as approve architect to

48 Floor Public Male Toilet 14.80 m2


49 Floor Public Female Toilet 12.73 m2
50 Floor Toilet Lounge R. Dokter (R. VK) 8.46 m2
51 Floor Toilet R. Persalinan VIP 01-04 20.19 m2
52 Floor Toilet Perawat (R. VK) 4.27 m2
53 Floor Toilet R. Persiapan/Pemulihan 9.28 m2
54 Floor Depo (Lab. Klinik) 20.49 m2

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
55 Floor Stair 1 (Lobby Lift) 40.92 m2

600x600x10mm thk Granite Tile Polished Ex. China (C7) (Material


Price Rp. 300.000/m2) including mortar, adhesive and grout as
specified or as approve architect to
56 Floor Depo UGD 4.08 m2
57 Floor R. Alat UGD 4.31 m2
58 Floor Corridor 340.21 m2
59 Floor R. UGD (Triage) 185.87 m2
60 Floor R. Panel 14.96 m2
61 Floor Bank Darah 18.99 m2
62 Floor R. Istirahat Dokter UGD 21.06 m2
63 Floor Lounge UGD 22.06 m2
64 Floor R. Isolasi UGD 27.11 m2
65 Floor R. Observasi 183.77 m2
66 Floor X-Ray 52.70 m2
67 Floor Foyer X-Rray 24.04 m2
68 Floor R. Kontrol 27.56 m2
69 Floor Lab. Klinik 47.79 m2
70 Floor R. Dokter (R. VK) 29.33 m2
71 Floor Lounge (R. VK) 83.43 m2
72 Floor R. Ganti (R. VK) 17.55 m2
73 Floor R. Konsultasi Dokter (R. VK) 18.85 m2
74 Floor Spoel Hock/Alat 8.28 m2
75 Floor Janitor 7.47 m2
76 Floor Lab. Sample 16.67 m2
77 Floor Toilet Lab. Klinik 11.12 m2
78 Floor One Daycare 163.47 m2
79 Floor GRO 13.54 m2
80 Floor Lift Hall 58.75 m2

600x600x10mm thk 600X600X10 mmthk Granite Tile Polished type


Wenge GMA61 White EX.Niro Granite (C8) including mortar,
adhesive and grout as specified or as approve architect to

81 Floor Lobby Terace 30.16 m2


82 Floor Lobby 113.22 m2
83 Floor FO 13.54 m2

Arch Second-CB/Page 68
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Medistep Ninyl ex. LG (V1) including all fixing accessoris complete


with natural finish as specified or as approve architect to

84 Floor Foyer ICU 28.22 m2


85 Floor R. PICU 43.50 m2
86 Floor NICU/RISTI/INT 58.65 m2
87 Floor R. ICU/Perawat 282.44 m2
88 Floor R. Linen ICU 48.88 m2
89 Floor Isolasi ICU 25.73 m2
90 Floor Ruang Bayi 40.80 m2
91 Floor R. Persalinan VIP 01 - 04 130.29 m2
92 Floor Corridor R. VK 93.23 m2
93 Floor R. Laktasi 8.97 m2
94 Floor Counter Perawat R. VK 38.35 m2
95 Floor R. Transisi 42.52 m2
96 Floor R. Ginekologi 39.21 m2
97 Floor R. Scrub 1 10.19 m2
98 Floor R. Scrub 2 10.87 m2
99 Floor R. Persiapan/Pemulihan 199.13 m2
100 Floor R. Resusitasi Bayi 141.44 m2
101 Floor R. OK 1 80.03 m2
102 Floor R. OK 2 79.50 m2
103 Floor R. OK 3 75.50 m2
104 Floor Skirting h= 100mm, to Floor VK & OK 688.12 m1

Koral Sikat Motif (CS) including mortar, adhesive and grout as


specified or as approve architect to
105 Floor Drop Off 50.12 m2

Paving Block (PB) including road sign, mortar, adhesive and grout
as specified or as approve architect to
106 Floor Entrance Road 644.10 m2
107 Floor Ramp Up to Drop Off UGD 32.36 m2
108 Floor Drop Off UGD 127.36 m2
109 Floor Parking Ambulans 30.80 m2

Batu Candi (BC) including mortar, adhesive and grout as specified


or as approve architect to
110 Floor Tempat Suci 30.77 m2

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
111 Ceiling R. Dokter UGD 21.06 m2
112 Ceiling Lounge UGD 21.43 m2
113 Ceiling R. Isolasi UGD 26.65 m2
114 Ceiling R. Observasi UGD 369.38 m2
115 Ceiling Spoel Hock UGD 9.18 m2
116 Ceiling Linen UGD 6.61 m2
117 Ceiling Depo UGD 3.80 m2
118 Ceiling R. UGD 185.87 m2
119 Ceiling R. Panel 14.96 m2
120 Ceiling Bank Darah 19.20 m2
121 Ceiling Drop Off 50.11 m2
122 Ceiling Lobby Terace 35.73 m2
123 Ceiling Lobby 54.56 m2
124 Ceiling R. GRO 13.54 m2
125 Ceiling FO 13.54 m2
126 Ceiling One Day Care 163.47 m2
127 Ceiling R. X-Ray 52.70 m2
128 Ceiling Foyer X-Ray 17.71 m2
129 Ceiling R. Kontrol 27.56 m2
130 Ceiling Lab. Klinik 47.79 m2
131 Ceiling Depo 20.49 m2
132 Ceiling R. ICU/Perawat 282.44 m2
133 Ceiling R. Linen ICU 48.88 m2
134 Ceiling R. Isolasi ICU 25.73 m2
135 Ceiling R. Spoel Hock ICU 9.35 m2
136 Ceiling NICU/RISTI/INT 58.65 m2
137 Ceiling R. PICU 43.50 m2
138 Ceiling Foyer ICU 28.22 m2
139 Ceiling Corridor R. Bayi - R. Persalinan 89.57 m2
140 Ceiling R. Bayi 40.80 m2
141 Ceiling R. Persalinan VIP 01 - 04 129.16 m2
142 Ceiling R. Laktasi 8.97 m2
143 Ceiling Counter Perawat VK 35.66 m2
144 Ceiling Gudang VK 6.17 m2

Arch Second-CB/Page 69
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

145 Ceiling R. Transisi 41.94 m2


146 Ceiling R. Ginekologi 39.21 m2
147 Ceiling Janitor/Spoel Hock VK 18.48 m2
148 Ceiling R. Dokter VK 29.01 m2
149 Ceiling Lounge VK 83.12 m2
150 Ceiling R. Ganti VK 16.92 m2
151 Ceiling R. Resusitasi Bayi 137.44 m2
152 Ceiling R. Scrub 1 10.19 m2
153 Ceiling R. Scrub 2 10.87 m2
154 Ceiling R. OK 1 80.03 m2
155 Ceiling R. OK 2 - OK 3 154.78 m2
156 Ceiling R. Alat/Linen Steril 23.00 m2
157 Ceiling R. Persiapan - R. Pemulihan 198.25 m2
158 Ceiling R. Konsultasi Dokter 18.85 m2
159 Ceiling Corridor 320.73 m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
160 Ceiling Drop Off 246.88 m2
161 Ceiling Side Ramp 220.10 m2
162 Ceiling R. Tunggu UGD 40.24 m2
163 Ceiling Gudang Bed./Kursi Roda UGD 15.47 m2
164 Ceiling Corridor Connecting Lobby-UGD 52.75 m2
165 Ceiling Toilet UGD 3.80 m2
166 Ceiling Toilet R. Dokter UGD 4.79 m2
167 Ceiling Toilet R. Isolasi UGD 4.67 m2
168 Ceiling Public Toilet Female 12.01 m2
169 Ceiling Public Toilet Male 13.01 m2
170 Ceiling Janitor 7.25 m2
171 Ceiling Toilet One Day Care 11.12 m2
172 Ceiling Toilet Lab. Klinik 8.06 m2
173 Ceiling Spoel Hock/Alat/Toilet ICU 15.49 m2
174 Ceiling Toilet R. ICU 9.18 m2
175 Ceiling Toilet R. Isolasi ICU 6.44 m2
176 Ceiling Toilet R. Persalinan VIP 01-04 20.19 m2
177 Ceiling Toilet Perawat R. VK 4.27 m2
178 Ceiling Toilet R. Dokter VK 8.46 m2
179 Ceiling Toilet R. Persiapan/R. Pemulihan 9.28 m2

Exposed Concrete Ceiling (CR) Finish to


180 Ceiling Stair 1 34.46 m2
181 Ceiling Stair 2 30.03 m2
182 Ceiling Ramp Up First Floor - Second Floor 137.01 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
183 Gypsumboard Ceilling 3,165.26 m2
184 Calsiboard Ceilling 713.44 m2
185 Exposed Concrete Ceiling 201.49 m2

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
186 Above the Window sz. 1200x400x80 mm 12.00 unit
187 Above the Window sz. 3100x400x80 mm 13.00 unit
188 Above the Window sz. 2050x400x80 mm 2.00 unit
189 Above the Window sz. 800x400x80 mm 3.00 unit

Planter Box & Boundary Wall finishes


Smooth finish to concrete wall & column ex. MU
190 Wall Planter Box 316.31 m2
191 Boundary wall (grid 9, C-H & grid 3-6) 385.38 m2
192 Wall Pura 96.72 m2

Camprot Motif finish to


193 Wall Planter Box 316.31 m2
194 Boundary wall (grid 9, C-H & grid 3-6) 385.38 m2
195 Wall Pura 96.72 m2

Pond Drop Off finishes


Smooth finish to concrete wall & column ex. MU
196 Wall & Floor Pond Drop Off 28.42 m2

Camprot Motif finish to


197 External Wall Pond Drop Off 11.74 m2

Arch Second-CB/Page 70
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

300x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
198 Topping Pond Drop Off 33.69 m1

199 Artwork/ Sclupture Water Feature 1.00 no - By Landscape

200 Concrete Structure Pond (Assumption) 2.00 Unit

Entrance Water Feature finishes


Smooth finish to concrete wall & column ex. MU
201 Internal Wall & Floor Water Feature 41.12 m2

Camprot Motif finish to


202 External Wall Water Feature 39.01 m2

150x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
203 Wall Water Feature 30.82 m2

204 Puri Bunda Signage 1.00 no - By Specialist

Entrance Gate finishes


150x300mm Candi Stone including mortar, adhesive and grout as
specified or as approve architect to
205 Wall Entrance Gate 90.97 m2

206 Artwork/ Sclupture Entrance 3.00 no - By Specialist

D FINISHES carried to collection

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Second Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"
10 Fixed 5mm thk clear glass window with timber grill sz. 1250x1250 2.00 unit
"Security" (Assumption)

Arch Second-CB/Page 71
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

11 Fixed 5mm thk clear glass window sz. 1250x1250 "Security" 3.00 unit
(Assumption)
12 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet & OK" (Assumption & Included
Ironmongery)
13 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

14 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 9.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
First Floor
15 Double swing 10mm thk tempered glass dark brown frame finished 2.00 unit
door with fixed glass sz. 1600x2810mm type D17, "Triage"
(Include Hardware)
16 Double sliding 10mm thk tempered glass dark brown frame finished 2.00 unit
door sz. 1900x2810mm type D18, "Lobby" (Include Hardware)

17 Single swing window with 5mm thk clear glass and 'Dark brown' 11.00 unit
frame finished sz. 900x1450mm type W01, "FO, Emergency Stairs,
INT, PICU, NICU, R.Dokter 1 & Lounge 1" (Include Hardware)

18 Double swing window with 5mm thk clear glass and 'Dark brown' 12.00 unit
frame finished sz. 2800x1450mm type W02, "Corridor Persalinan,
ICU, Lab.Klinik, One Day Care, Lounge & R.Tunggu UGD" (Include
Hardware)
19 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1750x2200 type W04, "Ramp to Corridor"
20 Single swing window with 5mm thk clear glass and 'Dark brown' 3.00 unit
frame finished sz. 500x900mm type W05, "Toilet One Day Care &
Toilet Isolasi" (Include Hardware)
21 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 3600x2800 type W10, "R.Perawat"
22 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 3200x2800 type W13, "Lobby"
23 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 1500x2800 type W14, "Lobby"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
24 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 5.00 unit
Toilet" Include Ironmengery by supplier
25 Partition Cubicle "Female Public Toilet" 7.07 m2
26 Partition Cubicle "Male Public Toilet" 5.97 m2

E DOORS AND WINDOW carried to collection

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Second Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
Handle KEND HRE 75.01 US32D 14.00 set
Lockace SWING KEND K87735-40 US32D 14.00 pcs
Double Cylinder KEND 08610-10 US14 14.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 41.00 set
Door Stop KEND 75-014 US32D 27.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 14.00 set
Dust proos Strike KEND 95/12NUS26 14.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 14.00 pcs

Arch Second-CB/Page 72
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

Handle KEND HRE 75.01 US32D 32.00 set


Lockace SWING KEND K87735-40 US32D 32.00 pcs
WC Cylinder KEND K3116-61 US14 32.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 47.00 set
Door Stop KEND 75-016 US32D 32.00 pcs

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
Handle KEND HRE 75.01 US32D 44.00 set
Lockace SWING KEND K87735-40 US32D 44.00 pcs
Double Cylinder KEND 08610-10 US14 44.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 65.00 set
Door Stop KEND 75-014 US32D 44.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 44.00 pcs

4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 2.00 set
Door Stop KEND 75-014 US32D 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
Handle KEND HRE 75.01 US32D 6.00 set
Lockace SWING KEND K87735-40 US32D 6.00 pcs
Double Cylinder KEND 08610-10 US14 6.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Door Stop KEND 75-014 US32D 12.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 6.00 set
Dust proos Strike KEND 95/12NUS26 6.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 6.00 pcs

6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
Pull handle KEND PR.73.01 US32D 48.00 set
Escutcheon KEND E.73.01 US32D 24.00 set
Lockcase pelor kayu KEND K87738-60 US32D 24.00 set
Double Cylinder KEND 08610-10 US14 24.00 pcs
Center Pivot KEND CPH.20-500 US32D 24.00 set
Door stop KEND 75-014 US14D 48.00 pcs

7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
Pull handle KEND PR.73.01 US32D 9.00 set
Escutcheon KEND E.73.01 US32D 5.00 set
Lockcase pelor kayu KEND K87738-60 US32D 5.00 set
Double Cylinder KEND 08610-10 US14 5.00 pcs
Center Pivot KEND CPH.20-500 US32D 5.00 set
Door stop KEND 75-014 US14D 9.00 pcs

Arch Second-CB/Page 73
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

Handle KEND HRE 75.01 US32D 2.00 set


Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 5.00 set
Door Stop KEND 75-014 US32D 3.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 2.00 set
Dust proos Strike KEND 95/12NUS26 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"
Sliding set KEND P85-2M 2.00 set
Flush handle KEND FPP 75.07 US432D 2.00 set
Lockace sliding KEND K87720-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Escutcehon KEND E 73.01 US32D 2.00 pcs

F IRONMONGERY carried to collection

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Second Floor
1 1510mm wide x 1000mm high mirror to Male & Female Public 3.00 unit
Toilet
2 500mm wide x 1000mm high mirror to Lavatory Triage Toilet, 15.00 unit
R.Dokter, Persalinan VIP 1-4, Toilet Perawat, R.Persiapan &
R.Pemulihan
3 900mm wide x 1000mm high mirror to Lavatory Isolasi Toilet, ICU 5.00 unit
Toilet & Pantry
4 1350mm wide x 1000mm high mirror to Lavatory Lab. Klinik Toilet 3.00 unit
& Oneday Care Toilet
5 850mm wide x 1000mm high mirror to Lavatory R. X Ray Toilet 2.00 unit

6 600mm wide x 1000mm high mirror to Lavatory R. Dokter Perawat 2.00 unit

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Second Floor
7 1510 x 500mm Lavatory Counter Male & Female Public Toilet 3.00 unit
500 x 416mm Lavatory Counter Triage, R.Dokter, Persalinan VIP 1- 15.00 unit
8
4, Toilet Perawat, R.Persiapan & R.Pemulihan
9 1000 x 500mm Lavatory Counter Isolasi Toilet 2.00 unit
10 900 x 550mm Lavatory Counter Pantry 2.00 unit
11 1350 x 500mm Lavatory Counter Lab.Klinik toilet & Oneday Care 3.00 unit
Toilet
12 850 x 550mm Lavatory Counter R. Dokter Perawat 2.00 unit
13 1750 x 500mm Lavatory Counter ICU Toilet 2.00 unit
14 800 x 500mm Lavatory R. Dekontaminasi 2.00 unit
15 1050 x 417mm Lavatory R. X Ray Toilet 2.00 unit

G ACCESSORIES carried to collection

H SANITARY
Second Floor
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
2 Jet washer ex Toto THX 20 MCRB 2.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
5 Urinoir ex. Toto UW 930 JM 3.00 no
6 Paper Holder ex. Toto 703 AE 2.00 no
7 Robe Hook ex. Toto TX 704 AE 2.00 no
8 Floor Drain ex. Toto TX 1 BN 2.00 no

Arch Second-CB/Page 74
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Female Public Toilet


9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
10 Jet washer ex Toto THX 20 MCRB 3.00 no
11 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
13 Paper Holder ex. Toto 703 AE 3.00 no
14 Robe Hook ex. Toto TX 704 AE 3.00 no
15 Floor Drain ex. Toto TX 1 BN 3.00 no

Triage, R.Dokter, Isolasi, Perawat, R.Persiapan & Pemulihan


Toilet, Lab. Klinik & Oneday Care Toilet, R. Dokter Perawat &
X Ray Toilet
16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 15.00 no
17 Jet washer ex Toto THX 20 MCRB 15.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 15.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 15.00 no
20 Paper Holder ex. Toto 703 AE 15.00 no
21 Robe Hook ex. Toto TX 704 AE 15.00 no
22 Floor Drain ex. Toto TX 1 BN 15.00 no

Persalinan VIP 1-4 Toilet


23 Closet Monoblock ex. Toto CW 436 NJ 6.00 no
24 Jet washer ex Toto THX 20 MCRB 6.00 no
25 Lavatory ex. Toto Le Muse LW 818 J 6.00 no
26 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 6.00 no
27 Fixed Shower Head ex. Toto TX 465 SE 6.00 no
28 Shower Mixer TX 433 SDV1 6.00 no
29 Paper Holder ex. Toto 703 AE 6.00 no
30 Robe Hook ex. Toto TX 704 AE 6.00 no
31 Floor Drain ex. Toto TX 1 BN 12.00 no
-
Pantry Toilet -
32 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
33 Jet washer ex Toto THX 20 MCRB 2.00 no
34 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
35 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
36 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
37 Shower Mixer TX 433 SDV1 2.00 no
38 Paper Holder ex. Toto 703 AE 2.00 no
39 Robe Hook ex. Toto TX 704 AE 2.00 no
40 Floor Drain ex. Toto TX 1 BN 3.00 no
-
ICU & Isolasi Toilet -
41 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
42 Jet washer ex Toto THX 20 MCRB 3.00 no
43 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
44 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
45 Fixed Shower Head ex. Toto TX 465 SE 3.00 no
46 Shower Mixer TX 433 SDV1 3.00 no
47 Paper Holder ex. Toto 703 AE 3.00 no
48 Robe Hook ex. Toto TX 704 AE 3.00 no
49 Floor Drain ex. Toto TX 1 BN 6.00 no

Ruang Dekontaminasi
50 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
51 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
52 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
53 Shower Mixer TX 433 SDV1 2.00 no
54 Floor Drain ex. Toto TX 1 BN 2.00 no

H SANITARY carried to collection

Arch Second-CB/Page 75
SECOND FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

4.0. ARCHITECTURE SECOND FLOOR Caried to Final Summary

Arch Second-CB/Page 76
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

4.0. ARCHITECTURE THIRD FLOOR

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at First Floor 3,796.78 m1

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 128.37 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
SECOND FLOOR
1 Wall & floor Public Toilet Pria 73.72 m2
2 Wall & floor Public Toilet Wanita 63.53 m2
3 Wall & floor Toilet Persalinan VIP 01 36.87 m2
4 Wall & floor Toilet Persalinan VIP 02 36.87 m2
5 Wall & floor Toilet Persalinan VIP 03 36.87 m2
6 Wall & floor Toilet Persalinan VIP 04 36.87 m2
7 Wall & floor Toilet Lounge R. Dokter (R. VK) 31.37 m2
8 Wall & floor Toilet Ruang Ganti Perawat 48.98 m2
9 Wall & floor Toilet Ruang Persiapan 33.53 m2
10 Wall & floor Toilet Ruang Pemulihan 35.94 m2
11 Wall & floor Toilet Ruang Dokter 34.04 m2
12 Wall & floor Toilet Ruang Isolasi 33.31 m2
13 Wall & floor Toilet Triage 32.56 m2
14 Wall & floor Spoel Hock 52.20 m2
15 Wall & floor Toilet One Day Care 45.08 m2
16 Wall & floor Toilet Lab Klinik 36.75 m2
17 Wall & floor Toilet X-Ray 39.65 m2
18 Wall & floor Toilet Perawat ICU 36.65 m2
19 Wall & floor Toilet Ruang Isolasi 54.07 m2
20 Wall & floor Toilet Ruang Konsultasi ICU 35.83 m2
21 Wall & floor Ruang Dekontaminasi 76.19 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at First Floor 8,887.97 m2

3rd Floor Plan


2 Bataco Steping Drop off to Lobby 23.09 m3

C MASONRY

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at First Floor 19,188.72 m2

Smooth finish to walls ex. MU


2 Wall Finishes at First Floor 16,127.82 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at First Floor 756.61 m2

Arch Third-CB/Page 77
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at First Floor 7,248.29 m2

Prepare and apply Internal wall finishes "Epoxy MX-98 Light ex.
Propan" (7) paint to
5 Wall Finishes at First Floor 3,671.62 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
6 Wall Finishes at First Floor 2,633.97 m2

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 85.72 m2


8 Wall Public Toilet Wanita 74.22 m2
9 Wall Toilet One Day Care 78.99 m2
10 Wall Toilet Lab Klinik & X Ray 51.79 m2
-
300x600x10mm Ceramic type Polished ex. China (5) including
mortar, adhesive and grout as specified or as approve architect to

11 Wall Toilet Persalinan VIP 01 47.82 m2


12 Wall Toilet Persalinan VIP 02 47.82 m2
13 Wall Toilet Persalinan VIP 03 47.82 m2
14 Wall Toilet Persalinan VIP 04 47.82 m2
15 Wall Toilet Counter Perawat 40.99 m2
16 Wall Toilet Ruang Ganti Perawat 59.77 m2
17 Wall Toilet Ruang Persiapan 43.55 m2
18 Wall Toilet Ruang Pemulihan 46.11 m2
19 Wall Janitor & Spoel Hock Area Persalinan 116.35 m2
20 Wall Toilet Ruang Dokter 43.98 m2
21 Wall Toilet Ruang Isolasi Triage 43.16 m2
22 Wall Toilet Ruang Dokter/Perawat ICU 66.56 m2
23 Wall Toilet Ruang ICU 46.97 m2
24 Wall Toilet Ruang Konsultasi ICU 88.48 m2
25 Wall Ruang Dekontaminasi 88.59 m2

200x300x10mm Ceramic type Topas ex. Asia Tile including mortar,


adhesive and grout as specified or as approve architect to

26 Wall Toilet Triage 30.74 m2


27 Wall Spoel Hock 40.99 m2

Ply wall with Timbal & Gypsump 10mm finish with Epoxy MX-98
Light ex. Propan (8) paint to
28 Wall X Ray 115.59 m2

Tempered glass wall 12mm thk including all fixing accessoris


complete with finish as specified or as approve architect to
29 Wall NICU, PICU & Konsultasi 104.01 m2

Wooden Cladding including all fixing accessoris complete with finish


as specified or as approve architect to
30 Wall Lobby Reception 102.01 m2
31 Cover Column Drop Off 36.62 m2

600x600mm Andesit Stone including mortar, adhesive and grout as


specified or as approve architect to
32 Cover Column Drop Off 121.82 m2

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
33 Railling Stair 1 (Lobby Lift) 21.55 m1
34 Railling Stair 2 (Emergency Stair) 22.24 m1

Vertical Louver with Aluminium sz. 20x40mm including all fixing


accessoris complete with finish powder coating as specified or as
approve architect to (Assumption)
34 Wall Ambulance 41.77 m2

Arch Third-CB/Page 78
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
35 Floor Security Post 6.52 m2
36 Floor Linen UGD 6.42 m2
37 Floor Spoel Hock UGD 9.19 m2
38 Floor Toilet Perawat (ICU) 8.00 m2
39 Floor Spoel Hock / Alat ICU 8.04 m2
40 Floor Gudang R. VK 11.99 m2
41 Floor Janitor/Spoel Hock R. VK 35.90 m2
42 Floor R. Alat/Linen Steril R. VK 22.34 m2
43 Floor R. Tunggu UGD 39.08 m2

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
44 Floor Toilet R. Dokter 1 4.65 m2
45 Floor Toilet R. Isolasi 11.17 m2
46 Floor Toilet UGD (Triage) 4.18 m2
47 Floor One Day Care Toilet 6.87 m2

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size ex.China including mortar, adhesive and
grout as specified or as approve architect to

48 Floor Public Male Toilet 14.37 m2


49 Floor Public Female Toilet 12.36 m2
50 Floor Toilet Lounge R. Dokter (R. VK) 8.21 m2
51 Floor Toilet R. Persalinan VIP 01-04 19.61 m2
52 Floor Toilet Perawat (R. VK) 4.15 m2
53 Floor Toilet R. Persiapan/Pemulihan 9.02 m2
54 Floor Depo (Lab. Klinik) 19.90 m2

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
55 Floor Stair 1 (Lobby Lift) 39.74 m2

600x600x10mm thk Granite Tile Polished Ex. China (C7) (Material


Price Rp. 300.000/m2) including mortar, adhesive and grout as
specified or as approve architect to
56 Floor Depo UGD 3.96 m2
57 Floor R. Alat UGD 4.18 m2
58 Floor Corridor 330.42 m2
59 Floor R. UGD (Triage) 180.52 m2
60 Floor R. Panel 14.53 m2
61 Floor Bank Darah 18.44 m2
62 Floor R. Istirahat Dokter UGD 20.46 m2
63 Floor Lounge UGD 21.43 m2
64 Floor R. Isolasi UGD 26.33 m2
65 Floor R. Observasi 178.48 m2
66 Floor X-Ray 51.19 m2
67 Floor Foyer X-Rray 23.34 m2
68 Floor R. Kontrol 26.76 m2
69 Floor Lab. Klinik 46.41 m2
70 Floor R. Dokter (R. VK) 28.49 m2
71 Floor Lounge (R. VK) 81.03 m2
72 Floor R. Ganti (R. VK) 17.04 m2
73 Floor R. Konsultasi Dokter (R. VK) 18.31 m2
74 Floor Spoel Hock/Alat 8.04 m2
75 Floor Janitor 7.26 m2
76 Floor Lab. Sample 16.19 m2
77 Floor Toilet Lab. Klinik 10.80 m2
78 Floor One Daycare 158.77 m2
79 Floor GRO 13.15 m2
80 Floor Lift Hall 57.06 m2

600x600x10mm thk 600X600X10 mmthk Granite Tile Polished type


Wenge GMA61 White EX.Niro Granite (C8) including mortar,
adhesive and grout as specified or as approve architect to

81 Floor Lobby Terace 29.29 m2


82 Floor Lobby 109.96 m2
83 Floor FO 13.15 m2

Arch Third-CB/Page 79
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Medistep Ninyl ex. LG (V1) including all fixing accessoris complete


with natural finish as specified or as approve architect to

84 Floor Foyer ICU 27.41 m2


85 Floor R. PICU 42.24 m2
86 Floor NICU/RISTI/INT 56.96 m2
87 Floor R. ICU/Perawat 274.31 m2
88 Floor R. Linen ICU 47.48 m2
89 Floor Isolasi ICU 24.99 m2
90 Floor Ruang Bayi 39.62 m2
91 Floor R. Persalinan VIP 01 - 04 126.54 m2
92 Floor Corridor R. VK 90.55 m2
93 Floor R. Laktasi 8.71 m2
94 Floor Counter Perawat R. VK 37.25 m2
95 Floor R. Transisi 41.30 m2
96 Floor R. Ginekologi 38.08 m2
97 Floor R. Scrub 1 9.90 m2
98 Floor R. Scrub 2 10.56 m2
99 Floor R. Persiapan/Pemulihan 193.40 m2
100 Floor R. Resusitasi Bayi 137.37 m2
101 Floor R. OK 1 77.72 m2
102 Floor R. OK 2 77.21 m2
103 Floor R. OK 3 73.33 m2
104 Floor Skirting h= 100mm, to Floor VK & OK 668.32 m1

Koral Sikat Motif (CS) including mortar, adhesive and grout as


specified or as approve architect to
105 Floor Drop Off 48.67 m2

Paving Block (PB) including road sign, mortar, adhesive and grout
as specified or as approve architect to
106 Floor Entrance Road 869.54 m2
107 Floor Ramp Up to Drop Off UGD 43.68 m2
108 Floor Drop Off UGD 171.93 m2
109 Floor Parking Ambulans 41.58 m2

Batu Candi (BC) including mortar, adhesive and grout as specified


or as approve architect to
110 Floor Tempat Suci 41.54 m2

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
111 Ceiling R. Dokter UGD 20.46 m2
112 Ceiling Lounge UGD 20.82 m2
113 Ceiling R. Isolasi UGD 25.89 m2
114 Ceiling R. Observasi UGD 358.75 m2
115 Ceiling Spoel Hock UGD 8.91 m2
116 Ceiling Linen UGD 6.42 m2
117 Ceiling Depo UGD 3.69 m2
118 Ceiling R. UGD 180.52 m2
119 Ceiling R. Panel 14.53 m2
120 Ceiling Bank Darah 18.65 m2
121 Ceiling Drop Off 48.67 m2
122 Ceiling Lobby Terace 34.71 m2
123 Ceiling Lobby 52.99 m2
124 Ceiling R. GRO 13.15 m2
125 Ceiling FO 13.15 m2
126 Ceiling One Day Care 158.77 m2
127 Ceiling R. X-Ray 51.19 m2
128 Ceiling Foyer X-Ray 17.20 m2
129 Ceiling R. Kontrol 26.76 m2
130 Ceiling Lab. Klinik 46.41 m2
131 Ceiling Depo 19.90 m2
132 Ceiling R. ICU/Perawat 274.31 m2
133 Ceiling R. Linen ICU 47.48 m2
134 Ceiling R. Isolasi ICU 24.99 m2
135 Ceiling R. Spoel Hock ICU 9.08 m2
136 Ceiling NICU/RISTI/INT 56.96 m2
137 Ceiling R. PICU 42.24 m2
138 Ceiling Foyer ICU 27.41 m2
139 Ceiling Corridor R. Bayi - R. Persalinan 87.00 m2
140 Ceiling R. Bayi 39.62 m2
141 Ceiling R. Persalinan VIP 01 - 04 125.45 m2
142 Ceiling R. Laktasi 8.71 m2
143 Ceiling Counter Perawat VK 34.63 m2
144 Ceiling Gudang VK 5.99 m2

Arch Third-CB/Page 80
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

145 Ceiling R. Transisi 40.73 m2


146 Ceiling R. Ginekologi 38.08 m2
147 Ceiling Janitor/Spoel Hock VK 17.95 m2
148 Ceiling R. Dokter VK 28.18 m2
149 Ceiling Lounge VK 80.72 m2
150 Ceiling R. Ganti VK 16.43 m2
151 Ceiling R. Resusitasi Bayi 133.48 m2
152 Ceiling R. Scrub 1 9.90 m2
153 Ceiling R. Scrub 2 10.56 m2
154 Ceiling R. OK 1 77.72 m2
155 Ceiling R. OK 2 - OK 3 150.33 m2
156 Ceiling R. Alat/Linen Steril 22.34 m2
157 Ceiling R. Persiapan - R. Pemulihan 192.54 m2
158 Ceiling R. Konsultasi Dokter 18.31 m2
159 Ceiling Corridor 311.50 m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
160 Ceiling Drop Off 239.78 m2
161 Ceiling Side Ramp 213.77 m2
162 Ceiling R. Tunggu UGD 39.08 m2
163 Ceiling Gudang Bed./Kursi Roda UGD 15.02 m2
164 Ceiling Corridor Connecting Lobby-UGD 51.23 m2
165 Ceiling Toilet UGD 3.69 m2
166 Ceiling Toilet R. Dokter UGD 4.65 m2
167 Ceiling Toilet R. Isolasi UGD 4.53 m2
168 Ceiling Public Toilet Female 11.66 m2
169 Ceiling Public Toilet Male 12.64 m2
170 Ceiling Janitor 7.05 m2
171 Ceiling Toilet One Day Care 10.80 m2
172 Ceiling Toilet Lab. Klinik 7.83 m2
173 Ceiling Spoel Hock/Alat/Toilet ICU 15.04 m2
174 Ceiling Toilet R. ICU 8.91 m2
175 Ceiling Toilet R. Isolasi ICU 6.25 m2
176 Ceiling Toilet R. Persalinan VIP 01-04 19.61 m2
177 Ceiling Toilet Perawat R. VK 4.15 m2
178 Ceiling Toilet R. Dokter VK 8.21 m2
179 Ceiling Toilet R. Persiapan/R. Pemulihan 9.02 m2

Exposed Concrete Ceiling (CR) Finish to


180 Ceiling Stair 1 33.47 m2
181 Ceiling Stair 2 29.16 m2
182 Ceiling Ramp Up First Floor - Second Floor 133.07 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
183 Gypsumboard Ceilling 3,074.18 m2
184 Calsiboard Ceilling 692.91 m2
185 Exposed Concrete Ceiling 195.70 m2

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
186 Above the Window sz. 1200x400x80 mm 11.52 unit
187 Above the Window sz. 3100x400x80 mm 13.16 unit
188 Above the Window sz. 2050x400x80 mm 1.65 unit
189 Above the Window sz. 800x400x80 mm 3.29 unit

Planter Box & Boundary Wall finishes


Smooth finish to concrete wall & column ex. MU
190 Wall Planter Box 307.21 m2
191 Boundary wall (grid 9, C-H & grid 3-6) 374.29 m2
192 Wall Pura 93.94 m2

Camprot Motif finish to


193 Wall Planter Box 307.21 m2
194 Boundary wall (grid 9, C-H & grid 3-6) 374.29 m2
195 Wall Pura 93.94 m2

Pond Drop Off finishes


Smooth finish to concrete wall & column ex. MU
196 Wall & Floor Pond Drop Off 27.60 m2

Camprot Motif finish to


197 External Wall Pond Drop Off 11.40 m2

Arch Third-CB/Page 81
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

300x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
198 Topping Pond Drop Off 32.72 m1

199 Artwork/ Sclupture Water Feature 1.00 no - By Landscape

200 Concrete Structure Pond (Assumption) 2.00 Unit

Entrance Water Feature finishes


Smooth finish to concrete wall & column ex. MU
201 Internal Wall & Floor Water Feature 36.31 m2

Camprot Motif finish to


202 External Wall Water Feature 34.45 m2

150x300mm Candi Stone including mortar, adhesive and grout as


specified or as approve architect to
203 Wall Water Feature 27.21 m2

204 Puri Bunda Signage 1.00 no - By Specialist

Entrance Gate finishes


150x300mm Candi Stone including mortar, adhesive and grout as
specified or as approve architect to
205 Wall Entrance Gate 88.35 m2

206 Artwork/ Sclupture Entrance 3.00 no - By Specialist

D FINISHES carried to collection

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Third Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"

Arch Third-CB/Page 82
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

10 Fixed 5mm thk clear glass window with timber grill sz. 1250x1250 2.00 unit
"Security" (Assumption)
11 Fixed 5mm thk clear glass window sz. 1250x1250 "Security" 3.00 unit
(Assumption)
12 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet & OK" (Assumption & Included
Ironmongery)
13 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

14 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 9.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Third Floor
15 Double swing 10mm thk tempered glass dark brown frame finished 2.00 unit
door with fixed glass sz. 1600x2810mm type D17, "Triage"
(Include Hardware)
16 Double sliding 10mm thk tempered glass dark brown frame finished 2.00 unit
door sz. 1900x2810mm type D18, "Lobby" (Include Hardware)

17 Single swing window with 5mm thk clear glass and 'Dark brown' 11.00 unit
frame finished sz. 900x1450mm type W01, "FO, Emergency Stairs,
INT, PICU, NICU, R.Dokter 1 & Lounge 1" (Include Hardware)

18 Double swing window with 5mm thk clear glass and 'Dark brown' 12.00 unit
frame finished sz. 2800x1450mm type W02, "Corridor Persalinan,
ICU, Lab.Klinik, One Day Care, Lounge & R.Tunggu UGD" (Include
Hardware)
19 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1750x2200 type W04, "Ramp to Corridor"
20 Single swing window with 5mm thk clear glass and 'Dark brown' 3.00 unit
frame finished sz. 500x900mm type W05, "Toilet One Day Care &
Toilet Isolasi" (Include Hardware)
21 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 3600x2800 type W10, "R.Perawat"
22 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 3200x2800 type W13, "Lobby"
23 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 3.00 unit
sz. 1500x2800 type W14, "Lobby"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
24 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 5.00 unit
Toilet" Include Ironmengery by supplier
25 Partition Cubicle "Female Public Toilet" 7.07 m2
26 Partition Cubicle "Male Public Toilet" 5.97 m2

E DOORS AND WINDOW carried to collection

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Third Floor
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 14.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "R. Persalinan VIP 1-4,
R. Bayi, Isolasi, Picu & Risti"
Handle KEND HRE 75.01 US32D 14.00 set
Lockace SWING KEND K87735-40 US32D 14.00 pcs
Double Cylinder KEND 08610-10 US14 14.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 41.00 set
Door Stop KEND 75-014 US32D 27.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 14.00 set
Dust proos Strike KEND 95/12NUS26 14.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 14.00 pcs

Arch Third-CB/Page 83
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 32.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet, Toilet R. Persalinan
1-4, Toilet Perawat, Corridor R. Persalinan, Toilet Lounge/Pantry,
Toilet R.Persiapan, Toilet R.Pemulihan, One Day Care Toilet, Toilet
R.Isolasi, Toilet R.Dokter & Security, R. Konsultasi, Toilet X-Ray,
Toilet Lab.Klinik, Toilet Triage & Toilet R.Dokter"

Handle KEND HRE 75.01 US32D 32.00 set


Lockace SWING KEND K87735-40 US32D 32.00 pcs
WC Cylinder KEND K3116-61 US14 32.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 47.00 set
Door Stop KEND 75-016 US32D 32.00 pcs

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 44.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "GRO, FO, Perawat, R.Dokter, Lounge,
R.Alat, Bank Darah, Laktasi, Spoel Hock, Gudang, Scrub, R.Ganti,
R.Dokter, R. Konsultasi Dokter, R. Dokter Perawat, R. Konsultasi,
Depo & Janitor"
Handle KEND HRE 75.01 US32D 44.00 set
Lockace SWING KEND K87735-40 US32D 44.00 pcs
Double Cylinder KEND 08610-10 US14 44.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 65.00 set
Door Stop KEND 75-014 US32D 44.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 44.00 pcs

4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 2.00 set
Door Stop KEND 75-014 US32D 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs

5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 6.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel, Alat/Line Steril, Line Gudang
Alat Troly & R. Dekontaminasi"
Handle KEND HRE 75.01 US32D 6.00 set
Lockace SWING KEND K87735-40 US32D 6.00 pcs
Double Cylinder KEND 08610-10 US14 6.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Door Stop KEND 75-014 US32D 12.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 6.00 set
Dust proos Strike KEND 95/12NUS26 6.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 6.00 pcs

6 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 24.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Corridor, R.Transisi, Ginekologi,
R.Persiapan, R.Pemulihan, R.Oneday Care, R.Observasi, R.X-Ray &
Lab. Klinik"
Pull handle KEND PR.73.01 US32D 48.00 set
Escutcheon KEND E.73.01 US32D 24.00 set
Lockcase pelor kayu KEND K87738-60 US32D 24.00 set
Double Cylinder KEND 08610-10 US14 24.00 pcs
Center Pivot KEND CPH.20-500 US32D 24.00 set
Door stop KEND 75-014 US14D 48.00 pcs

7 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1500x2250mm type D09, "R. OK 1-3"
Pull handle KEND PR.73.01 US32D 9.00 set
Escutcheon KEND E.73.01 US32D 5.00 set
Lockcase pelor kayu KEND K87738-60 US32D 5.00 set
Double Cylinder KEND 08610-10 US14 5.00 pcs
Center Pivot KEND CPH.20-500 US32D 5.00 set
Door stop KEND 75-014 US14D 9.00 pcs

Arch Third-CB/Page 84
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

-
8 Double swing 12mm thk Multiplex and timbal & gypsum inside with 2.00 unit
HPL Silk Brown finished and 'IMPRA WS- 162B Dark Mahony' frame
finished door sz. 1500x2250mm type D10, "X-Ray"

Handle KEND HRE 75.01 US32D 2.00 set


Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 5.00 set
Door Stop KEND 75-014 US32D 3.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 2.00 set
Dust proos Strike KEND 95/12NUS26 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs
-
9 Single sliding 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D11, "R. Kontrol"
Sliding set KEND P85-2M 2.00 set
Flush handle KEND FPP 75.07 US432D 2.00 set
Lockace sliding KEND K87720-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Escutcehon KEND E 73.01 US32D 2.00 pcs

F IRONMONGERY carried to collection

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Third Floor
1 1510mm wide x 1000mm high mirror to Male & Female Public 3.00 unit
Toilet
2 500mm wide x 1000mm high mirror to Lavatory Triage Toilet, 15.00 unit
R.Dokter, Persalinan VIP 1-4, Toilet Perawat, R.Persiapan &
R.Pemulihan
3 900mm wide x 1000mm high mirror to Lavatory Isolasi Toilet, ICU 5.00 unit
Toilet & Pantry
4 1350mm wide x 1000mm high mirror to Lavatory Lab. Klinik Toilet 3.00 unit
& Oneday Care Toilet
5 850mm wide x 1000mm high mirror to Lavatory R. X Ray Toilet 2.00 unit

6 600mm wide x 1000mm high mirror to Lavatory R. Dokter Perawat 2.00 unit

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Third Floor
7 1510 x 500mm Lavatory Counter Male & Female Public Toilet 3.00 unit
500 x 416mm Lavatory Counter Triage, R.Dokter, Persalinan VIP 1- 15.00 unit
8
4, Toilet Perawat, R.Persiapan & R.Pemulihan
9 1000 x 500mm Lavatory Counter Isolasi Toilet 2.00 unit
10 900 x 550mm Lavatory Counter Pantry 2.00 unit
11 1350 x 500mm Lavatory Counter Lab.Klinik toilet & Oneday Care 3.00 unit
Toilet
12 850 x 550mm Lavatory Counter R. Dokter Perawat 2.00 unit
13 1750 x 500mm Lavatory Counter ICU Toilet 2.00 unit
14 800 x 500mm Lavatory R. Dekontaminasi 2.00 unit
15 1050 x 417mm Lavatory R. X Ray Toilet 2.00 unit

G ACCESSORIES carried to collection

H SANITARY
Third Floor
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
2 Jet washer ex Toto THX 20 MCRB 2.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
5 Urinoir ex. Toto UW 930 JM 3.00 no
6 Paper Holder ex. Toto 703 AE 2.00 no
7 Robe Hook ex. Toto TX 704 AE 2.00 no
8 Floor Drain ex. Toto TX 1 BN 2.00 no

Arch Third-CB/Page 85
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Female Public Toilet


9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
10 Jet washer ex Toto THX 20 MCRB 3.00 no
11 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
13 Paper Holder ex. Toto 703 AE 3.00 no
14 Robe Hook ex. Toto TX 704 AE 3.00 no
15 Floor Drain ex. Toto TX 1 BN 3.00 no

Triage, R.Dokter, Isolasi, Perawat, R.Persiapan & Pemulihan


Toilet, Lab. Klinik & Oneday Care Toilet, R. Dokter Perawat &
X Ray Toilet
16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 15.00 no
17 Jet washer ex Toto THX 20 MCRB 15.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 15.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 15.00 no
20 Paper Holder ex. Toto 703 AE 15.00 no
21 Robe Hook ex. Toto TX 704 AE 15.00 no
22 Floor Drain ex. Toto TX 1 BN 15.00 no

Persalinan VIP 1-4 Toilet


23 Closet Monoblock ex. Toto CW 436 NJ 6.00 no
24 Jet washer ex Toto THX 20 MCRB 6.00 no
25 Lavatory ex. Toto Le Muse LW 818 J 6.00 no
26 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 6.00 no
27 Fixed Shower Head ex. Toto TX 465 SE 6.00 no
28 Shower Mixer TX 433 SDV1 6.00 no
29 Paper Holder ex. Toto 703 AE 6.00 no
30 Robe Hook ex. Toto TX 704 AE 6.00 no
31 Floor Drain ex. Toto TX 1 BN 12.00 no
-
Pantry Toilet -
32 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
33 Jet washer ex Toto THX 20 MCRB 2.00 no
34 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
35 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
36 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
37 Shower Mixer TX 433 SDV1 2.00 no
38 Paper Holder ex. Toto 703 AE 2.00 no
39 Robe Hook ex. Toto TX 704 AE 2.00 no
40 Floor Drain ex. Toto TX 1 BN 3.00 no

ICU & Isolasi Toilet


41 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 3.00 no
42 Jet washer ex Toto THX 20 MCRB 3.00 no
43 Lavatory ex. Toto Le Muse LW 818 J 3.00 no
44 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 3.00 no
45 Fixed Shower Head ex. Toto TX 465 SE 3.00 no
46 Shower Mixer TX 433 SDV1 3.00 no
47 Paper Holder ex. Toto 703 AE 3.00 no
48 Robe Hook ex. Toto TX 704 AE 3.00 no
49 Floor Drain ex. Toto TX 1 BN 6.00 no

Ruang Dekontaminasi
50 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
51 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no
52 Fixed Shower Head ex. Toto TX 45 SMN 2.00 no
53 Shower Mixer TX 433 SDV1 2.00 no
54 Floor Drain ex. Toto TX 1 BN 2.00 no

H SANITARY carried to collection

Arch Third-CB/Page 86
THIRD FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

5.0. ARCHITECTURE THIRD FLOOR Caried to Final Summary

Arch Third-CB/Page 87
BILL OF QUANTITIES ARCHITHECTURE
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

5.0. ARCHITECTURE ROOF TOP FLOOR

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at Second Floor 1,813.65 m1

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Plate Roof 525.88 m1
3 Ceiling Concrete Slab Canopy 206.87 m1

A METAL WORKS carried to collection

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
Roof Top Floor
1 Wall & floor Public Toilet Pria 60.30 m2
2 Wall & floor Public Toilet Wanita 51.96 m2
3 Wall & floor Toilet Polyklinik 91.76 m2
4 Floor Balkon Café 89.46 m2

B THERMAL & MOISTURE PROTECTION carried to collection

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Second Floor 3,443.85 m2

C MASONRY carried to collection

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Second Floor 6,450.26 m2

Smooth finish to walls ex. MU


2 Wall Finishes at Second Floor 5,352.68 m2

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at Second Floor 423.42 m2

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at Second Floor 3,912.85 m2

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
5 Wall Finishes at Second Floor 1,863.25 m2

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

6 Wall Public Toilet Pria 63.74 m2


7 Wall Public Toilet Wanita 55.20 m2
8 Wall Toilet Polyklinik 95.09 m2

Arch Roof Top-CB/Page 88


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

200x200x10mm Ceramic type Topas ex. Asia Tile (1) including


mortar, adhesive and grout as specified or as approve architect to

9 Wall Dapur 89.03 m2

600mmx600mm Travertine Marble including mortar, adhesive and


grout as specified or as approve architect to
10 Wall External 222.80 m2

Gympsum Partition Wall (1 side) with paint finish, including all


fixing accessoris complete as specified or as approve architect to

11 Wall Corridor 38.86 m2

Gympsum Partition Wall (2 side) with paint finish, including all


fixing accessoris complete as specified or as approve architect to

12 Wall Laktasi 20.69 m2

Frameless tempered glass railling with steel structure and Timber


50/150mm Hand Railling including all fixing accessoris complete
with finish as specified or as approve architect to

13 Railling Void Café 42.76 m1

Timber 50/150mm & 60/60mm Hand Railling with Timber


60/60mm railling including all fixing accessoris complete with finish
as specified or as approve architect to
14 Railling Balkon Café 45.61 m1

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
15 Railling Stair 2 (Emergency Stair) 16.54 m1

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
16 Floor Dapur 30.97 m2
17 Floor Gudang 12.83 m2

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
18 Floor Toilet Poliklinik 6.70 m2
19 Floor Public Male Toilet 13.36 m2
20 Floor Public Female Toilet 11.49 m2

333x333x10mm thk Ceramic Tile Anti Slip type G 365028 Strata


Beige Ex. Roman (C5) including mortar, adhesive and grout as
specified or as approve architect to
21 Floor Stair 2 (Emergency Stair) 32.08 m2
22 Floor Balcony Café 76.74 m2

600x600x10mm thk Granite Tile Polished Ex. China (C7) (material


Price Rp. 300.000/m2) including mortar, adhesive and grout as
specified or as approve architect to
23 Floor Counter Perawat m2
24 Floor Gudang & R. Persiapan 16.85 m2
25 Floor Depo 12.91 m2
26 Floor Corridor 285.24 m2
27 Floor R. Panel 13.50 m2
28 Floor Poliklinik 1 m2
29 Floor Poliklinik 2 m2
30 Floor Poliklinik 3 m2
31 Floor Poliklinik 4 m2
32 Floor Poliklinik 5 m2
33 Floor Poliklinik 6 m2
34 Floor R. Admin 28.78 m2
35 Floor R. Café-1 561.44 m2
36 Floor Apotik m2
37 Floor Poliklinik 8 m2
38 Floor Poliklinik 9 m2
39 Floor Poliklinik 10 m2
40 Floor Poliklinik 11 m2
41 Floor Poliklinik 12 m2
42 Floor Janitor m2
43 Floor Wastafel Area Toilet Poliklinik m2

Arch Roof Top-CB/Page 89


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

44 Floor R. Racik m2
45 Floor Café-2 635.27 m2
46 Floor Skirting h= 100mm, to Floor Area Polyklinik 614.81 m1
-
Ceiling finishes -
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to : -
47 Ceiling Counter Perawat 23.53 m2
48 Ceiling Gudang & R. Persiapan 16.85 m2
49 Ceiling Depo 12.91 m2
50 Ceiling Corridor 285.24 m2
51 Ceiling R. Panel 13.50 m2
52 Ceiling Poliklinik 1 m2
53 Ceiling Poliklinik 2 m2
54 Ceiling Poliklinik 3 m2
55 Ceiling Poliklinik 4 m2
56 Ceiling Poliklinik 5 m2
57 Ceiling Poliklinik 6 m2
58 Floor R. Admin 28.78 m2
59 Floor R. Café-1 556.61 m2
60 Ceiling Apotik m2
61 Ceiling Poliklinik 7 m2
62 Ceiling Poliklinik 8 m2
63 Ceiling Poliklinik 9 m2
64 Ceiling Poliklinik 10 m2
65 Ceiling Poliklinik 11 m2
66 Ceiling Café-2 625.99 m2
67 Ceiling Dapur 30.68 m2
68 Ceiling Gudang 12.57 m2
69 Ceiling R. Racik m2

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
70 Ceiling Public Toilet Female 10.84 m2
71 Ceiling Public Toilet Male 11.75 m2
72 Ceiling Janitor 6.55 m2
73 Ceiling Cafe Balcony 75.86 m2
74 Ceiling Toilet Poliklinik 28.05 m2

Exposed Concrete Ceiling (CR) Finish to


75 Ceiling Stair 1 31.11 m2
76 Ceiling Stair 2 27.11 m2
77 Ceiling Ramp Up Roof Top 123.69 m2

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
78 Gypsumboard Ceilling 2,041.71 m2
79 Calsiboard Ceilling 133.04 m2
80 Exposed Concrete Ceiling 181.90 m2

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
81 Above the Window sz. 1200x400x80 mm 18.00 unit
82 Above the Window sz. 3100x400x80 mm 34.00 unit
83 Above the Window sz. 3750x400x80 mm 2.00 unit

D FINISHES carried to collection

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Roof Top Floor
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet & Toilet R.Tunggu"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 12.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Dapur, R.Perawat, Apotik, Janitor &
Gudang"
3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel"

Arch Roof Top-CB/Page 90


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

5 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 4.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Mini Market & R.Tunggu"

6 Double swing 12mm thk Multiplex with 3mm thk plywood two 20.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D13, "Polyklinik"

7 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk dark glass 50% and 'IMPRA WS- 162B Dark
Mahony' finished door sz. 5430x2800mm type D14, "Cafe"

8 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 3390x2800mm type D15, "Cafe"
9 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 4160x2800mm type D16, "Cafe"
10 Double swing 12mm thk Multiplex with 3mm thk plywood two 4.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1700x2250mm type DW01 "Suite"
11 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
500x800mm, "Shaft" (Assumption & Included Ironmongery)
12 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet" (Assumption & Included
Ironmongery)
13 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

14 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 24.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Roof Top Floor
15 Single swing window with 5mm thk clear glass and 'Dark brown' 18.00 unit
frame finished sz. 900x1450mm type W01, "Polyklinik, Emergency
Stairs & VIP B" (Include Hardware)
16 Double swing window with 5mm thk clear glass and 'Dark brown' 34.00 unit
frame finished sz. 2800x1450mm type W02, "VIPB, VIP C, Corridor
& Dapur" (Include Hardware)
17 Mutiple swing window with 5mm thk clear glass and 'Dark brown' 2.00 unit
frame finished sz. 3450x1450mm type W03, "Ruang Tunggu"
(Include hardware)
18 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1750x2200 type W04, "Ramp to Corridor"
19 Fixed 5mm thk clear glass window with 'Dark brown' frame & 2.00 unit
screen finished sz. 3400x2800 type W06, "Cafe"
20 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 4.00 unit
sz. 2200x2800 type W07, "Cafe"
21 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 4.00 unit
sz. 3950x2800 type W08, "Cafe"
22 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 4350x2800 type W09, "Cafe"
23 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 1800x2800 type W10, "Cafe"
24 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 6500x2800 type W11, "Cafe"
25 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 2.00 unit
sz. 5500x2800 type W12, "Cafe"
26 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 8.00 unit
sz. 4800x300, "Roof Cafe"
27 Fixed 5mm thk clear glass window with 'Dark brown' frame finished 8.00 unit
sz. 3250x500, "Roof Cafe"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
28 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 6.00 unit
Toilet" Include Ironmengery by supplier
29 Partition Cubicle "Female Public Toilet" 9.43 m2
30 Partition Cubicle "Male Public Toilet" 7.96 m2

E DOORS AND WINDOW carried to collection

Arch Roof Top-CB/Page 91


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Roof Top Floor
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet & Toilet R.Tunggu"
Handle KEND HRE 75.01 US32D 8.00 set
Lockace SWING KEND K87735-40 US32D 8.00 pcs
WC Cylinder KEND K3116-61 US14 8.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 12.00 set
Door Stop KEND 75-016 US32D 8.00 pcs
-
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 12.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Dapur, R.Perawat, Apotik, Janitor &
Gudang"
Handle KEND HRE 75.01 US32D 12.00 set
Lockace SWING KEND K87735-40 US32D 12.00 pcs
Double Cylinder KEND 08610-10 US14 12.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Door Stop KEND 75-014 US32D 12.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 12.00 pcs
-
3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set
Door Stop KEND 75-014 US32D 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs
-
4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel"
Handle KEND HRE 75.01 US32D 2.00 set
Lockace SWING KEND K87735-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 6.00 set
Door Stop KEND 75-014 US32D 4.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 2.00 set
Dust proos Strike KEND 95/12NUS26 2.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs
-
5 Double pivot 12mm thk Multiplex with HPL Silk Brown two sides 4.00 unit
with 'White Duco' frame finished and 5mm thk clear glass door sz.
1500x2250mm type D08, "Mini Market & R.Tunggu"

Pull handle KEND PR.73.01 US32D 8.00 set


Escutcheon KEND E.73.01 US32D 4.00 set
Lockcase pelor kayu KEND K87738-60 US32D 4.00 set
Double Cylinder KEND 08610-10 US14 4.00 pcs
Center Pivot KEND CPH.20-500 US32D 4.00 set
Door stop KEND 75-014 US14D 8.00 pcs
-
6 Double swing 12mm thk Multiplex with 3mm thk plywood two 20.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D13, "Polyklinik"

Handle KEND HRE 75.01 US32D 20.00 set


Lockace SWING KEND K87735-40 US32D 20.00 pcs
Double Cylinder KEND 08610-10 US14 20.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 60.00 set
Door Stop KEND 75-014 US32D 40.00 pcs
Grendel tanam KEND 314 6+12”X19MM US26 20.00 set
Dust proos Strike KEND 95/12NUS26 20.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 20.00 pcs
-
7 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk dark glass 50% and 'IMPRA WS- 162B Dark
Mahony' finished door sz. 5430x2800mm type D14, "Cafe"

Rell atas Hillaldam coburn 3-20-3M Alumunium 4.00 pcs


Rell bawah Alumunium Hillaldam Coburn 33-2-3M 4.00 pcs
Roda atas Hillaldam Coburn 3-240 Galvanis 8.00 pcs
Roda atas Hillaldam Coburn 3-241 Galvanis 4.00 set
Stopan rell Hillaldam Coburn 44-719 Galvanis 8.00 pcs

Arch Roof Top-CB/Page 92


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

Roda bawah Hillaldam Coburn 44-340 Galvanis 12.00 pcs


Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 18.00 set
Flush Ring handle FRP 75.01 US432D 4.00 set
Escutcehon KEND E 73.01 US32D 2.00 set
Lockace Sliding KEND K87720-40 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Grendel 306 6 “ US26 8.00 pcs
-
8 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 3390x2800mm type D15, "Cafe"
Rell atas Hillaldam coburn 2-16-3M Alumunium 2.00 pcs
Rell bawah Alumunium Hillaldam Coburn 33-2-3M 4.00 pcs
Roda atas Hillaldam Coburn 2-207 Galvanis 4.00 pcs
Stopan rell Hillaldam Coburn 44-719 Galvanis 4.00 set
Roda bawah Hillaldam Coburn 44-340 Galvanis 4.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 15.00 set
Flush Ring handle FRP 75.01 US432D 4.00 set
Escutcehon KEND E 73.01 US32D 2.00 set
Lockace Pelor KEND K87735-60 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Grendel 306 6 “ US26 2.00 pcs
-
9 Multiple swing 12mm thk Multiplex with 3mm thk plywood two 2.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 4160x2800mm type D16, "Cafe"
Rell atas Hillaldam coburn 3-20-3M Alumunium 2.00 pcs
Rell bawah Alumunium Hillaldam Coburn 33-2-3M 2.00 pcs
Roda atas Hillaldam Coburn 3-240 Galvanis 4.00 pcs
Roda atas Hillaldam Coburn 3-241 Galvanis 4.00 pcs
Stopan rell Hillaldam Coburn 44-719 Galvanis 8.00 pcs
Roda bawah Hillaldam Coburn 44-340 Galvanis 8.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 12.00 set
Flush Ring handle FRP 75.01 US432D 4.00 set
Escutcehon KEND E 73.01 US32D 2.00 set
Lockace Pelor KEND K87735-60 US32D 2.00 pcs
Double Cylinder KEND 08610-10 US14 2.00 pcs
Grendel 306 6 “ US26 8.00 pcs
-
10 Double swing 12mm thk Multiplex with 3mm thk plywood two 4.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1700x2250mm type DW01 "Suite"
Handle KEND HRE 75.01 US32D 4.00 set
Lockace SWING KEND K87735-40 US32D 4.00 pcs
Double Cylinder KEND 08610-10 US14 4.00 pcs
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 6.00 set
Door Stop KEND 75-014 US32D 4.00 pcs
Door Closer KEND DCL 83210.2-4 RA S 4.00 pcs

F IRONMONGERY carried to collection

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Roof Top Floor
1 1510mm wide x 1000mm high mirror to Male & Female Public 4.00 unit
Toilet
3250mm wide x 100mm high mirror to Lavatory Polyklinik Toilet 2.00
2
unit
3 900mm wide x 1000mm high mirror to Lavatory R. Racik 2.00 unit

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Second Floor
4 1510 x 500mm Lavatory Counter Male & Female Public Toilet 4.00 unit
5 3250 x 600mm Lavatory Counter Polyklinik Toilet 2.00 unit
6 900 x 500mm Lavatory Counter R. Racik 2.00 unit

G ACCESSORIES carried to collection

Arch Roof Top-CB/Page 93


ROOF TOP FLOOR
Rate Amount
Ref Description Quantity
(Rp) (Rp)

H SANITARY
Roof Top Floor
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no
2 Jet washer ex Toto THX 20 MCRB 2.00 no
3 Lavatory ex. Toto Le Muse LW 818 J 4.00 no
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 4.00 no
5 Urinoir ex. Toto UW 930 JM 4.00 no
6 Paper Holder ex. Toto 703 AE 2.00 no
7 Robe Hook ex. Toto TX 704 AE 2.00 no
8 Floor Drain ex. Toto TX 1 BN 2.00 no

Female Public Toilet


9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 4.00 no
10 Jet washer ex Toto THX 20 MCRB 4.00 no
11 Lavatory ex. Toto Le Muse LW 818 J 4.00 no
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 4.00 no
13 Paper Holder ex. Toto 703 AE 4.00 no
14 Robe Hook ex. Toto TX 704 AE 4.00 no
15 Floor Drain ex. Toto TX 1 BN 4.00 no
-
Polyklinik Toilet -
16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 4.00 no
17 Jet washer ex Toto THX 20 MCRB 4.00 no
18 Lavatory ex. Toto Le Muse LW 818 J 6.00 no
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 6.00 no
20 Paper Holder ex. Toto 703 AE 4.00 no
21 Robe Hook ex. Toto TX 704 AE 4.00 no
22 Floor Drain ex. Toto TX 1 BN 4.00 no
-
R. Racik -
23 Lavatory ex. Toto Le Muse LW 818 J 2.00 no
24 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no

H SANITARY carried to collection

Collection

A METAL WORKS

B THERMAL & MOISTURE PROTECTION

C MASONRY

D FINISHES

E DOORS AND WINDOW

F IRONMONGERY

G ACCESSORIES

H SANITARY

6.0. ARCHITECTURE THIRD FLOOR Caried to Final Summary

Arch Roof Top-CB/Page 94


BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI

BIDDER NAME : PT. -


DATE OF TENDER : MARET 2020
MEP WORKS
Unit Rate Total Rate
No. Description QTY
(Rp) (Rp)

FINAL SUMMARY

A PRELIMINARIES MEP 1.00 LS 983,980,000 983,980,000.00

B PEKERJAAN MEP 19,044 M2 2,500,000 47,610,000,000.00

REAL COST RP. : 48,593,980,000.00


ADDITIONAL PPN 10% :
TOTAL RP. : 48,593,980,000.00
ROUNDED RP. : 48,593,980,000.00

Belum Termasuk
1 Biaya perijinan dan pajak2 yang berlaku PT. ------------------------------
2 Penyambungan dan pengadaan daya PLN
3 Penyambungan dan pengadaan jaringan
telephone/telkom
4 Sistem Management Rumah Sakit
5 Equipment Rumah Sakit
6 Interior Rumah Sakit

Biaya Budgeting bersifat sementara yang akan dihitung ( NAMA PENANGGUNG JAWAB)
secara detail per item kerja menunggu perhtungan DIRECTOR
volume dan spesifikasi hasil gambar DED perencanaan
final lengkap dan detail.

Sum-MEP/Page 95
BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

2.0. ARCHITECTURE BASEMENT 2

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at Basement 2 1,431.32 m1 - -

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 132.53 m1 - -

A METAL WORKS carried to collection -

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
Basement 2
1 Wall & floor Public Toilet Pria 26.55 m2 - -
2 Wall & floor Public Toilet Wanita 22.88 m2 - -
3 Wall & floor Toilet Direktur Rumah Sakit 18.24 m2 - -
4 Wall & floor Toilet Sekretaris 18.24 m2 - -
5 Wall & floor Toilet Room VIP A (2 unit) 42.19 m2 - -
6 Wall & floor Toilet Room VIP B (2 unit) 34.25 m2 - -
7 Wall & floor Toilet Room VIP C (12 unit) 205.52 m2 - -
8 Wall & floor Toilet Room Kelas 1 (4 unit) 53.76 m2 - -
9 Wall & floor Toilet Room Kelas 2 (4 unit) 53.76 m2 - -
10 Wall & floor Toilet Room Kelas 3 (4 unit) 72.10 m2 - -
11 Wall & floor Toilet Prefuction 1 12.21 m2 - -
12 Wall & floor Toilet Prefuction 2 12.24 m2 - -

B THERMAL & MOISTURE PROTECTION carried to collection -

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Basement 2 2,647.51 m2 - -

C MASONRY carried to collection -

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Basement 2 5,295.01 m2 - -

Smooth finish to walls ex. MU


2 Wall Finishes at Basement 2 4,336.69 m2 - -

Smooth finish to concrete wall & column ex. MU


3 Wall Finishes at Basement 2 261.44 m2 - -

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
4 Wall Finishes at Basement 2 3,773.28 m2 - -

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
5 Wall Finishes at Basement 2 824.85 m2 - -

Ply wall with Glasswool & Gypsump Acustic finish with paint (4) to

6 Wall Meeting Room 328.31 m2 - By Design Interior

QS by Ratio Construction Arch Basment2/Page 96


Rate Amount
Ref Description Quantity
(Rp) (Rp)

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 30.87 m2 - -


8 Wall Public Toilet Wanita 26.73 m2 - -
9 Wall Toilet Room VIP A (2 unit) 47.97 m2 - -
10 Wall Toilet Room VIP B (2 unit) 39.93 m2 - -
11 Wall Toilet Room VIP C (12 unit) 239.60 m2 - -
12 Wall Toilet Room Kelas 1 (4 unit) 60.49 m2 - -
13 Wall Toilet Room Kelas 2 (4 unit) 60.49 m2 - -
14 Wall Toilet Room Kelas 3 (4 unit) 79.65 m2 - -

300x600x10mm Ceramic type Polished ex. China (5) including


mortar, adhesive and grout as specified or as approve architect to

15 Wall Toilet Direktur Rumah Sakit 22.14 m2 406,500.81 8,999,927.91


16 Wall Toilet Sekretaris 22.14 m2 406,500.81 8,999,927.91
17 Wall Prefunction Toilet 1 14.03 m2 406,500.81 5,702,454.33
18 Wall Prefunction Toilet 2 14.03 m2 406,500.81 5,702,454.33

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
19 Railling Stair 1 (Lobby Lift) 7.76 m1 - -
20 Railling Stair 2 (Emergency Stair) 6.48 m1 - -
21 Railling Stair to Ruang Pengembangan 5.52 m1 - -
22 Railling Prefuction area 17.45 m1 - -

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
23 Floor R. Audio/Alat 12.83 m2 - -
24 Floor Gudang 11.22 m2 - -
25 Floor Pantry 11.22 m2 - -

300mmx300mmx8mm thk Granite Tile Unpolished ex. China (C3)


including mortar, adhesive and grout as specified or as approve
architect to
26 Floor Toilet R. Direktur RS 3.89 m2 376,644.10 1,464,133.31
27 Floor Toilet R. Sekretaris 3.89 m2 376,644.10 1,464,133.38

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size including mortar, adhesive and grout as
specified or as approve architect to
28 Floor Public Male Toilet 6.47 m2 - -
29 Floor Public Female Toilet 5.57 m2 - -
30 Floor Toilet R. Inap Kelas 1 (4 unit) 9.36 m2 - -
31 Floor Toilet R. Inap Kelas 2 (2 unit) 9.48 m2 - -
32 Floor Toilet R. Inap Kelas 3 (4 unit) 13.47 m2 - -

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
33 Floor Stair 1 (Lobby Lift) 17.89 m2 - -

333x333x10mm thk Ceramic Tile Anti Slip type G 365028 Strata


Beige Ex. Roman (C5) including mortar, adhesive and grout as
specified or as approve architect to
34 Floor Stair 2 (Emergency Stair) 15.53 m2 - -

Anti Slip Concrete Floor Hardener (C6) including sersan gutter and
road sign as specified or as approve architect to finish to
35 Floor Ramp Up Basement 2 - Basement 1 (Grid G-H,4-6) 60.11 m2 - -

600x600x10mm thk Granite Tile Polished Ex. China (C7) (material


Price Rp. 300.000/m2)including mortar, adhesive and grout as
specified or as approve architect to
36 Floor Prefunction Room 148.82 m2 569,564.39 84,765,169.61
37 Floor Corridor 293.30 m2 569,564.39 167,053,409.06
38 Floor R. Direktur RS 32.71 m2 569,564.39 18,632,141.67
39 Floor R. Sekretaris 20.42 m2 569,564.39 11,630,825.07
40 Floor Office Management 153.93 m2 569,564.39 87,675,752.05
41 Floor R. Keuangan 24.29 m2 569,564.39 13,832,684.15
42 Floor R. SIMRS 29.76 m2 569,564.39 16,947,564.26
43 Floor Gudang Arsip 33.07 m2 569,564.39 18,833,224.96
44 Floor R. Panel 6.54 m2 569,564.39 3,724,666.31
45 Floor R. Inap VIP A (2 unit) 78.16 m2 569,564.39 44,517,967.81
46 Floor R. Inap VIP B (2 unit) 49.15 m2 569,564.39 27,995,534.13

QS by Ratio Construction Arch Basment2/Page 97


Rate Amount
Ref Description Quantity
(Rp) (Rp)

47 Floor R. Inap VIP C (12 unit) 211.21 m2 569,564.39 120,299,956.45


48 Floor Toilet R. Inap VIP A (2 unit) 8.57 m2 569,564.39 4,883,513.99
49 Floor Toilet R. Inap VIP B (2 unit) 6.37 m2 569,564.39 3,629,798.29
50 Floor Toilet R. Inap VIP C (12 unit) 38.24 m2 569,564.39 21,778,786.53
51 Floor R. Inap Kelas 1 (4 unit) 75.94 m2 569,564.39 43,252,545.40
52 Floor R. Inap Kelas 2 (2 unit) 65.98 m2 569,564.39 37,582,184.32
53 Floor R. Inap Kelas 3 (2 unit) 179.50 m2 569,564.39 102,237,150.63
54 Floor Counter Perawat 11.64 m2 569,564.39 6,629,091.10
55 Floor Gudang & R. Persiapan 8.16 m2 569,564.39 4,647,076.15
56 Floor Depo 6.25 m2 569,564.39 3,561,201.29
57 Floor R. Diskusi 52.82 m2 569,564.39 30,084,433.58
58 Floor Prefunction Toilet 1 1.96 m2 569,564.39 1,116,189.25
59 Floor Prefunction Toilet 2 1.99 m2 569,564.39 1,134,038.29
60 Floor Skirting h= 100mm, to Floor R. Inap Kelas 1 (4 unit) 69.29 m2 74,043.37 5,130,465.12
61 Floor Skirting h= 100mm, to Floor R. Inap Kelas 2 (2 unit) 45.31 m2 74,043.37 3,354,534.89
62 Floor Skirting h= 100mm, to Floor R. Inap Kelas 3 (2 unit) 112.03 m2 74,043.37 8,295,263.88

Syntetic Carpet Ex. Noble (SC) including all fixing accessoris


complete as specified or as approve architect to
63 Floor Meeting Room 209.80 m2 - By Interior Design

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
64 Ceiling R. Audio/Alat 12.83 m2 - -
65 Ceiling R. Direktur 32.59 m2 - -
66 Ceiling R. Sekretaris 20.30 m2 - -
67 Ceiling R. Office Management 153.43 m2 - -
68 Ceiling R. Keuangan 24.15 m2 - -
69 Ceiling R. Arsip 32.93 m2 - -
70 Ceiling R. SIMRS 29.43 m2 - -
71 Ceiling R. Prefuction 105.74 m2 - -
72 Ceiling Gudang 11.22 m2 - -
73 Ceiling Pantry 11.22 m2 - -
74 Ceiling R. Diskusi 52.82 m2 - -
75 Ceiling R. Panel 6.54 m2 - -
76 Ceiling R. Inap VIP A (2 unit) 77.92 m2 - -
77 Ceiling R. Inap VIP B (2 unit) 48.91 m2 - -
78 Ceiling R. Inap VIP C (12 unit) 209.74 m2 - -
79 Ceiling Counter Perawat 11.39 m2 - -
80 Ceiling Gudang & R. Persiapan 8.16 m2 - -
81 Ceiling Depo 6.25 m2 - -
82 Ceiling R. Inap Kelas 1 (4 unit) 75.94 m2 - -
83 Ceiling R. Inap Kelas 2 (2 unit) 65.49 m2 - -
84 Ceiling R. Inap Kelas 3 (2 unit) 185.02 m2 - -
85 Ceiling Corridor 287.77 m2 - -

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
86 Ceiling Public Toilet Female 5.25 m2 - -
87 Ceiling Public Toilet Male 5.69 m2 - -
88 Ceiling Toilet R. Inap VIP A (2 unit) 8.57 m2 - -
89 Ceiling Toilet R. Inap VIP B (2 unit) 6.37 m2 - -
90 Ceiling Toilet R. Inap VIP C (12 unit) 38.24 m2 - -
91 Ceiling Toilet R. Inap Kelas 1 (4 unit) 9.36 m2 - -
92 Ceiling Toilet R. Inap Kelas 2 (2 unit) 9.48 m2 - -
93 Ceiling Toilet R. InapKelas 3 (2 unit) 13.47 m2 - -
94 Ceiling Toilet R. Direktur RS 3.89 m2 - -
95 Ceiling Toilet Sekretaris 3.89 m2 - -
96 Ceiling Janitor 3.17 m2 - -
97 Ceiling Prefunction Toilet 1 1.96 m2 - -
98 Ceiling Prefunction Toilet 2 1.99 m2 - -

Exposed Concrete Ceiling (CR) Finish to


99 Ceiling Stair 1 (Lift) 15.06 m2 - -
100 Ceiling Stair 2 13.13 m2 - -
101 Ceiling Ramp Up Basement 2 - Basement 1 59.90 m2 - -

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
102 Gypsumboard Ceilling 1,469.77 m2 - -
103 Calsiboard Ceilling 107.38 m2 - -
104 Exposed Concrete Ceiling 88.09 m2 - -

QS by Ratio Construction Arch Basment2/Page 98


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
105 Above the Window sz. 1200x400x80 mm 7.00 unit - -
106 Above the Window sz. 3100x400x80 mm 25.00 unit - -
107 Above the Window sz. 3750x400x80 mm 5.00 unit 1,158,924.31 5,794,621.54
108 Above the Window sz. 2050x400x80 mm 1.00 unit - -

D FINISHES carried to collection 931,352,820.94

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Basement 2
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 24.00 unit 4,241,991.66 101,807,799.77
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "Kelas 1, Kelas 2, Kelas
3, VIP A, VIP B & VIP C"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 34.00 unit 3,265,549.73 111,028,690.91
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Toilet Direktur, Toilet Sekretaris,
Male&Female Toilet, Toilet Kelas 1, Toilet Kelas 2, Toilet Kelas 3,
Toilet VIP A, Toilet VIP B, Toilet VIP C & Toilet Prefungtion"
3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 11.00 unit 3,459,102.97 38,050,132.70
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "R. Radio/Alat, R. Direktur R.Sakit, R.
Sekretaris, Pantry, Gudang, SIMRS, Keuangan, Gudang Arsip, Depo
& Janitor"
4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 1.00 unit 3,211,187.73 3,211,187.73
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 1.00 unit 4,933,646.60 4,933,646.60
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel"
6 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit 4,920,077.85 9,840,155.71
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "R. Diskusi & Office Management"

7 Double swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit 4,920,077.85 19,680,311.41
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D07, "Meeting Room"
8 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit 1,926,750.00 7,707,000.00
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
500x800mm, "Shaft" (Assumption & Included Ironmongery)
9 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 1.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet" (Assumption & Included
Ironmongery)
10 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

11 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 12.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Basement 2
12 Single swing window with 5mm thk clear glass and 'Dark brown' 7.00 unit 4,273,770.52 29,916,393.61
frame finished sz. 900x1450mm type W01, "Kelas 1, VIP B &
Emergency Stairs" (Include hardware)
13 Double swing window with 5mm thk clear glass and 'Dark brown' 25.00 unit 9,093,694.23 227,342,355.75
frame finished sz. 2800x1450mm type W02, "Pantry, Kelas 3,
Corridor, VIP A, VIP B, VIP C, R. Keuangan & Office Management"
(Include Hardware)
14 Mutiple swing window with 5mm thk clear glass and 'Dark brown' 5.00 unit 15,566,933.97 77,834,669.87
frame finished sz. 3450x1450mm type W03, "R. Direktur R.Sakit,
Prefunction, R.Diskusi, Office Management & Corridor" (Include
Hardware)
15 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 1.00 unit 5,115,413.28 5,115,413.28
sz. 1750x2200 type W04, "Ramp to Corridor"

QS by Ratio Construction Arch Basment2/Page 99


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
16 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 3.00 unit - -
Toilet" Include Ironmengery by supplier
17 Partition Cubicle "Female Public Toilet" 4.71 m2 - -
18 Partition Cubicle "Male Public Toilet" 3.98 m2 - -

E DOORS AND WINDOW carried to collection 636,467,757.35

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Basement 2
1 Double swing 12mm thk Multiplex with 3mm thk plywood two 24.00 unit
sides, 5mm thk clear glass and 'IMPRA WS- 162B Dark Mahony'
finished door sz. 1300x2250mm type D01, "Kelas 1, Kelas 2, Kelas
3, VIP A, VIP B & VIP C"
Handle KEND HRE 75.01 US32D 24.00 set 532,350.00 12,776,400.00
Lockace SWING KEND K87735-40 US32D 24.00 pcs 532,350.00 12,776,400.00
Double Cylinder KEND 08610-10 US14 24.00 pcs 300,300.00 7,207,200.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 72.00 set 382,200.00 27,518,400.00
Door Stop KEND 75-014 US32D 48.00 pcs 116,025.00 5,569,200.00
Grendel tanam KEND 314 6+12”X19MM US26 24.00 set 313,950.00 7,534,800.00
Dust proos Strike KEND 95/12NUS26 24.00 pcs 129,675.00 3,112,200.00
Door Closer KEND DCL 83210.2-4 RA S 24.00 pcs 887,250.00 21,294,000.00

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 34.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Toilet Direktur, Toilet Sekretaris,
Male&Female Toilet, Toilet Kelas 1, Toilet Kelas 2, Toilet Kelas 3,
Toilet VIP A, Toilet VIP B, Toilet VIP C & Toilet Prefungtion"
Handle KEND HRE 75.01 US32D 34.00 set 532,350.00 18,099,900.00
Lockace SWING KEND K87735-40 US32D 34.00 pcs 532,350.00 18,099,900.00
WC Cylinder KEND K3116-61 US14 34.00 pcs 245,700.00 8,353,800.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 51.00 set 382,200.00 19,492,200.00
Door Stop KEND 75-016 US32D 34.00 pcs 116,025.00 3,944,850.00

3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 11.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "R. Radio/Alat, R. Direktur R.Sakit, R.
Sekretaris, Pantry, Gudang, SIMRS, Keuangan, Gudang Arsip, Depo
& Janitor"
Handle KEND HRE 75.01 US32D 11.00 set 532,350.00 5,855,850.00
Lockace SWING KEND K87735-40 US32D 11.00 pcs 532,350.00 5,855,850.00
Double Cylinder KEND 08610-10 US14 11.00 pcs 300,300.00 3,303,300.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 16.50 set 382,200.00 6,306,300.00
Door Stop KEND 75-014 US32D 11.00 pcs 116,025.00 1,276,275.00
Door Closer KEND DCL 83210.2-4 RA S 11.00 pcs 887,250.00 9,759,750.00

4 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 1.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 1.00 set 532,350.00 532,350.00
Lockace SWING KEND K87735-40 US32D 1.00 pcs 532,350.00 532,350.00
Double Cylinder KEND 08610-10 US14 1.00 pcs 300,300.00 300,300.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 1.50 set 382,200.00 573,300.00
Door Stop KEND 75-014 US32D 1.00 pcs 116,025.00 116,025.00
Door Closer KEND DCL 83210.2-4 RA S 1.00 pcs 887,250.00 887,250.00

5 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 1.00 unit
with 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1300x2250mm type D05, "R. Panel"
Handle KEND HRE 75.01 US32D 1.00 set 532,350.00 532,350.00
Lockace SWING KEND K87735-40 US32D 1.00 pcs 532,350.00 532,350.00
Double Cylinder KEND 08610-10 US14 1.00 pcs 300,300.00 300,300.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set 382,200.00 1,146,600.00
Door Stop KEND 75-014 US32D 2.00 pcs 116,025.00 232,050.00
Grendel tanam KEND 314 6+12”X19MM US26 1.00 set 313,950.00 313,950.00
Dust proos Strike KEND 95/12NUS26 1.00 pcs 129,675.00 129,675.00
Door Closer KEND DCL 83210.2-4 RA S 1.00 pcs 887,250.00 887,250.00

QS by Ratio Construction Arch Basment2/Page 100


Rate Amount
Ref Description Quantity
(Rp) (Rp)

6 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "R. Diskusi & Office Management"

Pull handle KEND PR.73.01 US32D 4.00 set 450,450.00 1,801,800.00


Escutcheon KEND E.73.01 US32D 2.00 set 88,725.00 177,450.00
Lockcase pelor kayu KEND K87738-60 US32D 2.00 set 532,350.00 1,064,700.00
Double Cylinder KEND 08610-10 US14 2.00 pcs 300,300.00 600,600.00
Center Pivot KEND CPH.20-500 US32D 2.00 set 1,747,200.00 3,494,400.00
Door stop KEND 75-014 US14D 4.00 pcs 116,025.00 464,100.00

7 Double swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D07, "Meeting Room"
Floor hinge KEND FH08323 8.00 set 2,852,850.00 22,822,800.00
Pull handle KEND PR 73.01 US32D 8.00 set 450,450.00 3,603,600.00
Escutcehon KEND E 73.01 US32D 4.00 set 88,725.00 354,900.00
Lockace Pelor KEND K87738-60 US32D 4.00 pcs 532,350.00 2,129,400.00
Double Cylinder KEND 08610-10 US14 4.00 pcs 300,300.00 1,201,200.00

F IRONMONGERY carried to collection 242,867,625.00

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Basement 2
1050mm wide x 1000mm high mirror to Lavatory Direktur RS & 2.00 unit 2,226,439.31 4,452,878.62
1
Sekretaris Toilet
1510mm wide x 1000mm high mirror to Male & Female Public 2.00 unit - -
2
Toilet
600mm wide x 1000mm high mirror to Lavatory Kelas 1,2,3, VIP 30.00 unit 1,397,885.89 41,936,576.73
3
A,B&C & Prefunction Toilet

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Basement 2
4 1050 x 600mm Lavatory Counter Direktur RS & Sekretaris 2.00 unit 1,633,773.61 3,267,547.22
5 1510 x 500mm Lavatory Counter Male & Female Public Toilet 2.00 unit - -
6 650 x 500mm Lavatory Counter Kelas 1,2,3, VIP B&C & Prefunction 28.00 unit 1,633,773.61 45,745,661.11
Toilet
7 1150 x 400mm Lavatory Counter Kelas VIP A 2.00 unit 1,938,680.08 3,877,360.17
8 1775 x 500mm Lavatory Counter Prefungtion 1.00 unit 3,497,821.99 3,497,821.99
9 600 x 600mm Lavatory Counter Counter Perawat 2.00 unit 1,524,600.18 3,049,200.37

G ACCESSORIES carried to collection 105,827,046.20

H SANITARY
Basement 2
Direktur & Sekretaris Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no 4,450,770.00 8,901,540.00
2 Jet washer ex Toto THX 20 MCRB 2.00 no 677,982.78 1,355,965.56
3 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
5 Paper Holder ex. Toto 703 AE 2.00 no 1,094,081.58 2,188,163.16
6 Robe Hook ex. Toto TX 704 AE 2.00 no 763,470.00 1,526,940.00
7 Floor Drain ex. Toto TX 1 BN 2.00 no 736,857.18 1,473,714.36

Male Public Toilet


8 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 1.00 no 4,450,770.00 4,450,770.00
9 Jet washer ex Toto THX 20 MCRB 1.00 no 677,982.78 677,982.78
10 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
11 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
12 Urinoir ex. Toto UW 930 JM 2.00 no 8,799,101.40 17,598,202.80
13 Paper Holder ex. Toto 703 AE 1.00 no 1,094,081.58 1,094,081.58
14 Robe Hook ex. Toto TX 704 AE 1.00 no 763,470.00 763,470.00
15 Floor Drain ex. Toto TX 1 BN 1.00 no 736,857.18 736,857.18

Female Public Toilet


16 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no 4,450,770.00 8,901,540.00
17 Jet washer ex Toto THX 20 MCRB 2.00 no 677,982.78 1,355,965.56
18 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
19 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
20 Paper Holder ex. Toto 703 AE 2.00 no 1,094,081.58 2,188,163.16
21 Robe Hook ex. Toto TX 704 AE 2.00 no 763,470.00 1,526,940.00
22 Floor Drain ex. Toto TX 1 BN 2.00 no 736,857.18 1,473,714.36

QS by Ratio Construction Arch Basment2/Page 101


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Kelas 1,2,3 Toilet


23 Closet Monoblock ex. Toto CW 421 /SW 420 JP 12.00 no 4,450,770.00 53,409,240.00
24 Jet washer ex Toto THX 20 MCRB 12.00 no 677,982.78 8,135,793.36
25 Lavatory ex. Toto Le Muse LW 818 J 12.00 no 2,572,557.30 30,870,687.60
26 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 12.00 no 4,757,779.80 57,093,357.60
27 Fixed Shower Head ex. Toto TX 465 SE 12.00 no 1,818,527.40 21,822,328.80
28 Shower Mixer TX 433 SDV1 12.00 no 1,752,094.80 21,025,137.60
29 Paper Holder ex. Toto 703 AE 12.00 no 1,094,081.58 13,128,978.96
30 Robe Hook ex. Toto TX 704 AE 12.00 no 763,470.00 9,161,640.00
31 Floor Drain ex. Toto TX 1 BN 24.00 no 736,857.18 17,684,572.32

VIP A,B & C Toilet


32 Closet Monoblock ex. Toto CW 436 NJ 16.00 no 3,621,118.32 57,937,893.12
33 Jet washer ex Toto THX 20 MCRB 16.00 no 677,982.78 10,847,724.48
34 Lavatory ex. Toto Le Muse LW 818 J 16.00 no 2,572,557.30 41,160,916.80
35 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 16.00 no 4,757,779.80 76,124,476.80
36 Fixed Shower Head ex. Toto TX 465 SE 16.00 no 1,818,527.40 29,096,438.40
37 Shower Mixer TX 433 SDV1 16.00 no 1,752,094.80 28,033,516.80
38 Paper Holder ex. Toto 703 AE 16.00 no 1,094,081.58 17,505,305.28
39 Robe Hook ex. Toto TX 704 AE 16.00 no 763,470.00 12,215,520.00
40 Floor Drain ex. Toto TX 1 BN 32.00 no 736,857.18 23,579,429.76

Prefunction Toilet 1&2


41 Closet Monoblock ex. Toto CW 421 /SW 420 JP 2.00 no 4,450,770.00 8,901,540.00
42 Jet washer ex Toto THX 20 MCRB 2.00 no 677,982.78 1,355,965.56
43 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
44 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
45 Paper Holder ex. Toto 703 AE 2.00 no 1,094,081.58 2,188,163.16
46 Robe Hook ex. Toto TX 704 AE 2.00 no 763,470.00 1,526,940.00
47 Floor Drain ex. Toto TX 1 BN 2.00 no 736,857.18 1,473,714.36

Prefunction
48 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
49 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60

Counter Perawat
50 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
51 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60

H SANITARY carried to collection 688,457,336.46

Collection

A METAL WORKS -

B THERMAL & MOISTURE PROTECTION -

C MASONRY -

D FINISHES 931,352,820.94

E DOORS AND WINDOW 636,467,757.35

F IRONMONGERY 242,867,625.00

G ACCESSORIES 105,827,046.20

H SANITARY 688,457,336.46

6.0. ARCHITECTURE BASEMENT 2 Caried to Final Summary 2,604,972,585.94

QS by Ratio Construction Arch Basment2/Page 102


BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JLN. BY PASS DARMAGIRI, GG. KEN AROK, GIANYAR-BALI
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

6.0. ARCHITECTURE ROOF TOP

A METAL WORKS
Water line 10mm with aluminium profile U at
1 Ceiling Concrete Plate Roof 36.68 m1 - -
2 Ceiling Concrete Slab Canopy 76.92 m1 - -

A METAL WORKS carried to collection -

B MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Roof Top 1,266.39 m2 - -

B MASONRY carried to collection -

C FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Roof Top 1,264.46 m2 - -

Smooth finish to walls ex. MU


2 Wall Finishes at Roof Top 1,264.46 m2 - -

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
3 Wall Finishes at Roof Top 76.84 m2 - -

Prepare and apply External wall finishes "Dulux Pentalite Weather


shield" (6) paint to
4 Wall Finishes at Roof Top 1,187.62 m2 - -

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
5 Above the Window sz. 1200x400x80 mm 34.00 unit - -
6 Above the Window sz. 3100x400x80 mm 2.00 unit - -

C FINISHES carried to collection -

D DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Rooftop Floor
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit 3,459,102.97 6,918,205.95
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "janitor"
2 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit 3,211,187.73 6,422,375.47
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
3 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 8.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft Janitor & Shaft Stair" (Assumption & Included
Ironmongery)

QS by Ratio Construction Arch Roof Top/Page 103


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Rooftop Floor
4 Single swing window with 5mm thk clear glass and 'Dark brown' 34.00 unit 4,273,770.52 145,308,197.53
frame finished sz. 900x1450mm type W01, "Main Stairs" (Include
Hardware)
5 Double swing window with 5mm thk clear glass and 'Dark brown' 2.00 unit 9,093,694.23 18,187,388.46
frame finished sz. 2800x1450mm type W02, "Main Stairs" (Include
Hardware)

D DOORS AND WINDOW carried to collection 176,836,167.40

E IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Rooftop Floor
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "janitor"
Handle KEND HRE 75.01 US32D 2.00 set 532,350.00 1,064,700.00
Lockace SWING KEND K87735-40 US32D 2.00 pcs 532,350.00 1,064,700.00
Double Cylinder KEND 08610-10 US14 2.00 pcs 300,300.00 600,600.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set 382,200.00 1,146,600.00
Door Stop KEND 75-014 US32D 2.00 pcs 116,025.00 232,050.00
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs 887,250.00 1,774,500.00

2 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs"
Handle KEND HRE 75.01 US32D 2.00 set 532,350.00 1,064,700.00
Lockace SWING KEND K87735-40 US32D 2.00 pcs 532,350.00 1,064,700.00
Double Cylinder KEND 08610-10 US14 2.00 pcs 300,300.00 600,600.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set 382,200.00 1,146,600.00
Door Stop KEND 75-014 US32D 2.00 pcs 116,025.00 232,050.00
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs 887,250.00 1,774,500.00

E IRONMONGERY carried to collection 11,766,300.00

Collection

A METAL WORKS -

B MASONRY -

C FINISHES -

D DOORS AND WINDOW 176,836,167.40

E IRONMONGERY 11,766,300.00

6.0. ARCHITECTURE ROOF TOP Caried to Final Summary 188,602,467.40

QS by Ratio Construction Arch Roof Top/Page 104


BILL OF QUANTITIES
RUMAH SAKIT CENTRA BALI
JL. BY PASS KEDIRI, TABANAN - BALI
Rate Amount
Ref Description Quantity
(Rp) (Rp)

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to measure and satisfy themselves as
to the accuracy of all quantities for works requiring payment. The
format provided in these Bills should be followed in order to assist
in tender evaluation.

3.0. ARCHITECTURE BASEMENT 1

A METAL WORKS
Shadow line 10 mm with aluminium profile U at
Gypsum ceiling
1 Ceilling at Basement 1 308.45 m1 - -

Water line 10mm with aluminium profile U at


2 Ceiling Concrete Slab Canopy 117.72 m1 - -

A METAL WORKS carried to collection -

B THERMAL & MOISTURE PROTECTION


Cement base waterproofing ex. Fosroc/SIKA c/w protective render
internally to
Basement 1
1 Wall & floor Public Toilet Pria 26.55 m2 - -
2 Wall & floor Public Toilet Wanita 22.88 m2 - -
3 Wall & floor Pencucian 33.37 m2 - -
4 Floor Loading 27.84 m2 - -

B THERMAL & MOISTURE PROTECTION carried to collection -

C MASONRY
Light brick masonry ex "Hebel", laid in stretcher bond with mortar
including lintel beams and control joints.
Masonry with Hebel 100 mm thick finish wall
1 Wall at Basement 1 1,901.86 m2 - -

C MASONRY carried to collection -

D FINISHES
Wall finishes
Cement mortar to
25 mm thick rendered plaster ex. MU
1 Wall Finishes at Basement 1 2,001.95 m2 - -

Smooth finish to walls ex. MU


2 Wall Finishes at Basement 1 1,785.39 m2 - -

Prepare and apply Internal wall finishes "E-7000 ex. Mowilex" (2)
paint to
3 Wall Finishes at Basement 1 774.87 m2 - -

Prepare and apply External wall finishes "Dulux Weather shield" (6)
paint to
4 Wall Finishes at Basement 1 938.18 m2 - -

Prepare and apply Internal wall finishes "Epoxy MX-98 Light ex.
Propan" (7) paint to
5 Wall Finishes at Basement 1 72.34 m2 49,087.50 3,550,959.07

200x200x10mm Ceramic type Topas ex. Asia Tile (1) including


mortar, adhesive and grout as specified or as approve architect to

6 Wall Pencucian 33.83 m2 - -

300x600x10mm Ceramic type Topas ex. Indogress (3) including


mortar, adhesive and grout as specified or as approve architect to

7 Wall Public Toilet Pria 30.87 m2 - -


8 Wall Public Toilet Wanita 26.73 m2 - -

QS by Ratio Construction Arch Basement 1/Page 105


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Railling Hollow metal 20x40mm including all fixing accessoris


complete with Black Paint finish as specified or as approve architect
to
9 Railling Stair 1 (Lobby Lift) 7.76 m1 - -
10 Railling Stair 2 (Emergency Stair) 8.01 m1 - -
11 Railling Ruang Pengembangan 18.96 m1 - -

Floor finishes
400mmx400mmx8mm thk Ceramic Tile Polished type Murano ex.
Asia Tile (C1) including mortar, adhesive and grout as specified or
as approve architect to
12 Floor Tempat Ibadah 22.89 m2 - -
13 Floor R. Rekam Medik 70.57 m2 - -
14 Floor Security 4.24 m2 - -
15 Floor Corridor 27.73 m2 - -
16 Floor Loading 27.84 m2 - -
17 Floor Corridor Kotor 28.69 m2 - -
18 Floor Gudang Kotor 7.30 m2 - -
19 Floor Pencucian 9.98 m2 - -
20 Floor Pengeringan 9.13 m2 - -
21 Floor Pengemasan 10.87 m2 - -
22 Floor Penyimpanan 8.79 m2 - -
23 Floor Steril 11.96 m2 - -

600X600X8 mm thk Granite Tile Unpolished Tipe Fortuna/Cardea


ex. Indogress/Cutting Size including mortar, adhesive and grout as
specified or as approve architect to
24 Floor Public Male Toilet 6.47 m2 - -
25 Floor Public Female Toilet 5.57 m2 - -

300mmx300mmx8mm thk Granite Tile Unpolished type Fortuna ex.


Indogress (C4) including mortar, adhesive and grout as specified or
as approve architect to
26 Floor Stair 1 (Lobby Lift) 17.89 m2 - -

333x333x10mm thk Ceramic Tile Anti Slip type G 365028 Strata


Beige Ex. Roman (C5) including mortar, adhesive and grout as
specified or as approve architect to
27 Floor Stair 2 (Emergency Stair) 15.53 m2 - -

Anti Slip Concrete Floor Hardener (C6) including sersan gutter and
road sign as specified or as approve architect to finish to
28 Floor Ramp Up Basement 1 - 1st Floor (Grid G-H,4-6) 60.11 m2 - -
29 Floor Side Ramp Up Basement 1 - 1st Floor 76.62 m2 - -

600x600x10mm thk Granite Tile Polished Ex. China (C7) (Material


Price Rp. 300.000/m2) including mortar, adhesive and grout as
specified or as approve architect to
30 Floor Corridor 29.72 m2 - -
31 Floor R. Panel 6.54 m2 - -
32 Floor Counter Perawat 11.64 m2 - -
33 Floor Gudang & R. Persiapan 8.16 m2 - -
34 Floor Depo 6.25 m2 - -
35 Floor Janitor 3.27 m2 - -

Concrete Floor Hardener (F1) finish to


36 Floor Loading Area 76.00 m2 - -
37 Floor Pemulasaran Jenazah 30.24 m2 - -
38 Floor Gudang 17.83 m2 - -

Concrete Screed finish to (Assumption)


39 Floor Corridor 163.04 m2 78,391.41 12,780,814.66

Ceiling finishes
9mm thick Gypsumboard Ceilling (GY) taped and sanded including
Metal Furing support, installation to :
40 Ceiling Meeting Room 222.64 m2 - -
41 Ceiling R. Rekam Medik 70.57 m2 - -
42 Ceiling Tempat Ibadah 22.89 m2 - -
43 Ceiling R. Panel 6.54 m2 - -
44 Ceiling Counter Perawat 11.39 m2 - -
45 Ceiling Gudang & R. Persiapan 8.16 m2 - -
46 Ceiling Depo 6.25 m2 - -
47 Ceiling Security Post 4.24 m2 - -
48 Ceiling Loading 27.84 m2 - -
49 Ceiling R. Pemulasaran Jenazah 30.24 m2 - -
50 Ceiling Corridor 29.72 m2 - -

QS by Ratio Construction Arch Basement 1/Page 106


Rate Amount
Ref Description Quantity
(Rp) (Rp)

51 Ceiling Corridor Kotor 27.84 m2 - -


52 Ceiling Gudang Kotor 28.69 m2 - -
53 Ceiling Pencucian 7.30 m2 - -
54 Ceiling Pengeringan 9.98 m2 - -
55 Ceiling Pengemasan 9.13 m2 - -
56 Ceiling Penyimpanan 10.87 m2 - -
57 Ceiling Steril 8.79 m2 - -

Calsiboard 6mm Ceilling taped and sanded including Metal Furing


support, installation to :
58 Ceiling Public Toilet Female 5.25 m2 - -
59 Ceiling Public Toilet Male 5.69 m2 - -
60 Ceiling Janitor 3.17 m2 - -

Exposed Concrete Ceiling (CR) Finish to


61 Ceiling Stair 1 15.06 m2 - -
62 Ceiling Stair 2 13.13 m2 - -
63 Ceiling Ramp Up Basement 1 - First Floor 59.90 m2 - -

Prepare and apply two finishing coats Dulux Pentalite paint as


specified to
64 Gypsumboard Ceilling 217.85 m2 - -
65 Calsiboard Ceilling 14.11 m2 - -
66 Exposed Concrete Ceiling 88.09 m2 - -

Concrete Slab Canopy, including with Dulux Weather shield finish


as specified or as approve architect to (Assumption)
67 Above the Window sz. 1200x400x80 mm 4.00 unit - -
68 Above the Window sz. 3100x400x80 mm 22.00 unit - -
69 Above the Window sz. 3750x400x80 mm 4.00 unit - -
70 Above the Window sz. 2050x400x80 mm 1.00 unit - -

D FINISHES carried to collection 16,331,773.73

E DOORS AND WINDOW


Kiln dry Kamper Timber Panel & 6mm thk Plywood, 12mm thk
Multiplex, HPL and Kiln dry Kamper Timber Frame Door Window
with 5mm thk Clear Glass, finished with 3 coats of Ultran Politur,
Paint and fixing hardware / accessories, all as specified and shown
drawing
Basement 1
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit 3,265,549.73 6,531,099.47
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet"
2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit 3,459,102.97 10,377,308.92
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Security, Tempat Ibadah & Janitor"
3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 9.00 unit 3,211,187.73 28,900,689.60
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs, Gudang Kotor, Korridor Kotor,
Pencucian, Pengeringan, Pengemasan, Steril & Penyimpanan"

4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit 4,933,646.60 9,867,293.20
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel & Pemulasaran Jenazah"
5 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 5.00 unit 4,920,077.85 24,600,389.27
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "Corridor, Rekam Medic & Gudang"

6 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 4.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
500x800mm, "Shaft" (Assumption & Included Ironmongery)
7 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 1.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
600x800mm, "Shaft male toilet" (Assumption & Included
Ironmongery)
8 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
700x800mm, "Shaft lift" (Assumption & Included Ironmongery)

9 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 12.00 unit - -
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x800mm, "Shaft lift, Shaft Janitor & Shaft Stair" (Assumption &
Included Ironmongery)

QS by Ratio Construction Arch Basement 1/Page 107


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Supply and install Aluminium Alexindo with 5mm thk clear glass
and all necessary fixing accessories; as detailed and specified in the
drawings described to:
Basement 1
10 Single swing window with 5mm thk clear glass and 'Dark brown' 4.00 unit 4,273,770.52 17,095,082.06
frame finished sz. 900x1450mm type W01, "VIP & Air Purifer Filter"
(Include Hardware)
11 Double swing window with 5mm thk clear glass and 'Dark brown' 22.00 unit 9,093,694.23 200,061,273.06
frame finished sz. 2800x1450mm type W02, "R.Pengembangan,
Corridor & Security" (Include Hardware)
12 Mutiple swing window with 5mm thk clear glass and 'Dark brown' 4.00 unit 15,566,933.97 62,267,735.90
frame finished sz. 3450x1450mm type W03, "Ruang
Pengembangan & Corridor" (Include Hardware)
13 Fixed 8mm thk clear glass window with 'Dark brown' frame finished 1.00 unit 5,115,413.28 5,115,413.28
sz. 1750x2200 type W04, "Ramp to Corridor"

Cubicle with PVC Panel 'Light Green and Alumunium Dark brown
frame' and all necessary fixing accessories; as detailed and
specified in the drawings described to:
14 Single swing cubicle door, sz. 600x2100mm "Male & Female Public 3.00 unit - -
Toilet" Include Ironmengery by supplier
15 Partition Cubicle "Female Public Toilet" 4.71 m2 - -
16 Partition Cubicle "Male Public Toilet" 3.98 m2 - -

E DOORS AND WINDOW carried to collection 364,816,284.76

F IRONMONGERY
Supply and install the following ironmongery including all
accessories; Ex Kend to
Basement 1
1 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
800x2250mm type D02, "Male&Female Toilet"
Handle KEND HRE 75.01 US32D 2.00 set 532,350.00 1,064,700.00
Lockace SWING KEND K87735-40 US32D 2.00 pcs 532,350.00 1,064,700.00
WC Cylinder KEND K3116-61 US14 2.00 pcs 245,700.00 491,400.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 3.00 set 382,200.00 1,146,600.00
Door Stop KEND 75-016 US32D 2.00 pcs 116,025.00 232,050.00

2 Single swing 12mm thk Multiplex with 3mm thk plywood two sides 3.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D03, "Security, Tempat Ibadah & Janitor"
Handle KEND HRE 75.01 US32D 3.00 set 532,350.00 1,597,050.00
Lockace SWING KEND K87735-40 US32D 3.00 pcs 532,350.00 1,597,050.00
Double Cylinder KEND 08610-10 US14 3.00 pcs 300,300.00 900,900.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 4.50 set 382,200.00 1,719,900.00
Door Stop KEND 75-014 US32D 3.00 pcs 116,025.00 348,075.00
Door Closer KEND DCL 83210.2-4 RA S 3.00 pcs 887,250.00 2,661,750.00

3 Single swing 12mm thk Multiplex with HPL Silk Brown two sides 9.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
900x2250mm type D04, "Stairs, Gudang Kotor, Korridor Kotor,
Pencucian, Pengeringan, Pengemasan, Steril & Penyimpanan"

Handle KEND HRE 75.01 US32D 9.00 set 532,350.00 4,791,150.00


Lockace SWING KEND K87735-40 US32D 9.00 pcs 532,350.00 4,791,150.00
Double Cylinder KEND 08610-10 US14 9.00 pcs 300,300.00 2,702,700.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 13.50 set 382,200.00 5,159,700.00
Door Stop KEND 75-014 US32D 9.00 pcs 116,025.00 1,044,225.00
Door Closer KEND DCL 83210.2-4 RA S 9.00 pcs 887,250.00 7,985,250.00

4 Double swing 12mm thk Multiplex with HPL Silk Brown two sides 2.00 unit
and 'IMPRA WS- 162B Dark Mahony' finished door, sz.
1300x2250mm type D05, "R. Panel & Pemulasaran Jenazah"
Handle KEND HRE 75.01 US32D 2.00 set 532,350.00 1,064,700.00
Lockace SWING KEND K87735-40 US32D 2.00 pcs 532,350.00 1,064,700.00
Double Cylinder KEND 08610-10 US14 2.00 pcs 300,300.00 600,600.00
Engsel KEND SEL 0010 4X4X3 2BBNRP US32D 6.00 set 382,200.00 2,293,200.00
Door Stop KEND 75-014 US32D 4.00 pcs 116,025.00 464,100.00
Grendel tanam KEND 314 6+12”X19MM US26 2.00 set 313,950.00 627,900.00
Dust proos Strike KEND 95/12NUS26 2.00 pcs 129,675.00 259,350.00
Door Closer KEND DCL 83210.2-4 RA S 2.00 pcs 887,250.00 1,774,500.00

QS by Ratio Construction Arch Basement 1/Page 108


Rate Amount
Ref Description Quantity
(Rp) (Rp)

5 Double pivot 12mm thk Multiplex with 3mm thk plywood two sides 5.00 unit
and 'IMPRA WS- 162B Dark Mahony' frame finished door, sz.
1500x2250mm type D06, "Corridor, Rekam Medic & Gudang"

Pull handle KEND PR.73.01 US32D 10.00 set 450,450.00 4,504,500.00


Escutcheon KEND E.73.01 US32D 5.00 set 88,725.00 443,625.00
Lockcase pelor kayu KEND K87738-60 US32D 5.00 set 532,350.00 2,661,750.00
Double Cylinder KEND 08610-10 US14 5.00 pcs 300,300.00 1,501,500.00
Center Pivot KEND CPH.20-500 US32D 5.00 set 1,747,200.00 8,736,000.00
Door stop KEND 75-014 US14D 10.00 pcs 116,025.00 1,160,250.00

F IRONMONGERY carried to collection 66,455,025.00

G ACCESSORIES
MIRROR
6mm thick mirror, including 9mm thick plywood backing, wood
frame, mastic adhesive, sealant, accessories etc.; as specifed and
shown drawing
Basement 1
1 1510mm wide x 1000mm high mirror to Male & Female Public 2.00 unit - -
Toilet
1200mm wide x 1000mm high mirror to Corridor Pemulasaran
2
Jenazah 1.00 unit 2,502,623.78 2,502,623.78

LAVATORY COUNTER
Granite tile Nero-Marquena ex. Indogress (S.I) to counter top as
specified included concrete base and shown on dwg
Basement 1
3 1510 x 500mm Lavatory Counter Male & Female Public Toilet 2.00 unit - -
1200 x 500mm Lavatory Counter Corridor Pemulasaran Jenazah 1.00 unit 2,425,352.22
4
2,425,352.22

G ACCESSORIES carried to collection 4,927,976.00

H SANITARY
Basement 1
Male Public Toilet
1 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 1.00 no 4,450,770.00 4,450,770.00
2 Jet washer ex Toto THX 20 MCRB 1.00 no 677,982.78 677,982.78
3 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
4 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
5 Urinoir ex. Toto UW 930 JM 2.00 no 8,799,101.40 17,598,202.80
6 Paper Holder ex. Toto 703 AE 1.00 no 1,094,081.58 1,094,081.58
7 Robe Hook ex. Toto TX 704 AE 1.00 no 763,470.00 763,470.00
8 Floor Drain ex. Toto TX 1 BN 1.00 no 736,857.18 736,857.18

Female Public Toilet


9 Closet Monoblock ex. Toto CW 421 J / SW 420 JP 2.00 no 4,450,770.00 8,901,540.00
10 Jet washer ex Toto THX 20 MCRB 2.00 no 677,982.78 1,355,965.56
11 Lavatory ex. Toto Le Muse LW 818 J 2.00 no 2,572,557.30 5,145,114.60
12 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 2.00 no 4,757,779.80 9,515,559.60
13 Paper Holder ex. Toto 703 AE 2.00 no 1,094,081.58 2,188,163.16
14 Robe Hook ex. Toto TX 704 AE 2.00 no 763,470.00 1,526,940.00
15 Floor Drain ex. Toto TX 1 BN 2.00 no 736,857.18 1,473,714.36

Corridor Pemulasaran Jenazah


16 Lavatory ex. Toto Le Muse LW 818 J 1.00 no 2,572,557.30 2,572,557.30
17 Lavatory Faucet ex. Toto TX 119 LGNCV 1 BR 1.00 no 4,757,779.80 4,757,779.80

H SANITARY carried to collection 77,419,372.92

QS by Ratio Construction Arch Basement 1/Page 109


Rate Amount
Ref Description Quantity
(Rp) (Rp)

Collection

A METAL WORKS -

B THERMAL & MOISTURE PROTECTION -

C MASONRY -

D FINISHES 16,331,773.73

E DOORS AND WINDOW 364,816,284.76

F IRONMONGERY 66,455,025.00

G ACCESSORIES 4,927,976.00

H SANITARY 77,419,372.92

3.0. ARCHITECTURE BASEMENT 1 Caried to Final Summary 529,950,432.40

QS by Ratio Construction Arch Basement 1/Page 110