Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Checklist of Requirements (Manufacturing)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

MANUFACTURING INDUSTRIES SERVICE -

Project Evaluation and Registration Division

CHECKLIST FOR APPLICATIONS FOR REGISTRATION


UNDER BOOK 1 OF E.O. 226

Name of Applicant Enterprise : Time-In : Time-Out :


Date of First Contact Recommendation:  Accept Application
(Documents for checklisting) :  Return to Applicant for
completion of documents
Date of Second Contact Recommendation:  Accept Application
(Receipt of lacking documents) :  Return to Applicant for
completion of documents
Date Sent Applicant Deficiency Letter : Recommendation:  Accept Application
 Return to Applicant for
completion of documents
Date of Receipt of lacking Information
(Substance information/documents) :
Date of Official Acceptance of Application :

Application Form (BOI Form 501)


Proponent Information:
Name of Entity yes no n/a
Contact Details complete no n/a
Ownership - 60% Filipino yes no n/a
Background information of stockholders (local and foreign) yes no n/a
Project Profile
Activity listed in the IPP yes no n/a
Project Location (outside Metro Manila / LDA) yes no n/a
Type of Project new existing expan
sion
Status sought (if pioneer submit justification) Non- Pioneer Justifi-
Pioneer cation
Project Cost/Timetable complete Incomplete
Project Financing yes no n/a
Capacity/Assumptions Used yes no n/a
Production and Sales Projections yes no n/a
List of Equipment (imported and local) with details on cost, quantity yes no n/a
and end-use
List of Equipment (Existing and Replacement - for modernization yes no n/a
activity
List of Raw Materials (imported and local) with usage cost and yes no n/a
usage rate
Compliance to Logistics Efficiency Index (LEI)- for Motor Vehicle yes no n/a
projects
Attachments
Project site in Google Map yes no n/a
(Satellite view (must not adjacent to other existing facilities of
applicant)
Business Model Diagram yes no n/a
(Showing all sources of revenues, forward-backward linkages,
proposed market, infrastructure and equipment, sources of raw
materials and pictures of product/s)
Financial Projections yes no n/a
(Income Statement with breakdown of Cost of Goods Sold and
Operating Expenses, Cash Flow and Balance Sheet) Without

F-MIS-PERD-002/R0/01-07-2019 Page 1 of 2
MANUFACTURING INDUSTRIES SERVICE -
Project Evaluation and Registration Division

CHECKLIST FOR APPLICATIONS FOR REGISTRATION


UNDER BOOK 1 OF E.O. 226

Income Tax Holiday


Socio-Economic Impact/Benefit of the Project yes no n/a
Documentary Requirements
Board Resolution Authorizing officer/representative to transact, yes no n/a
execute and sign in behalf of the applicant enterprise
SEC Registration with Articles of Incorporation and By-Laws, yes no n/a
including amendments; Primary Purpose or application for SEC
registration indicating the purpose of business/intended activity
applied for BOI registration
GIS - latest (indicating compliance to equity requirements) yes no n/a
Audited Financial Statements and Income Tax Return (for the yes no n/a
past 3 years) for existing, modernization and expansion project
applications
Integrity Pledge yes no
Other Requirements (Pre-Acceptance of Application) yes no n/a
*DOST Endorsement (for foreign-owned expansion projects yes no n/a
requesting for Pioneer Status)
DOE Endorsement (for projects under RA9513, RA8479, Energy yes no n/a
Efficiency, eVehicles and Charging Stations
DSWD Endorsement (manufacture of technical aids & appliances yes no n/a
for the use and/or rehabilitation of PWDs)
* To be referred to DOST by MIS (pre acceptance requirement if foreign-owned)

___________________________________________ __________________________________________
Signature over Printed Name Name and Signature
(MIS-PERD Staff) (Applicant/Representative)

F-MIS-PERD-002/R0/01-07-2019 Page 2 of 2

You might also like