Cpc-Clpp-L-E-0001 CLPP Iws Datasheet
Cpc-Clpp-L-E-0001 CLPP Iws Datasheet
Cpc-Clpp-L-E-0001 CLPP Iws Datasheet
IN-WATER SURVEY DATA SHEET
FOR
CLPP
(PRD-XXXX)
This cover page is a total record of all the revisions of this document identified by number and title. Each of the pages that follow this
cover page in this document records only the latest revision for that page.
1
CONTENT TABLE OF IWS CLPP DATASHEET
I.
CLPP – ROW-1 GV AND CP INSPECTION
I.1. CPC-CLPP-L-E-0001-101
DATASHEET
CLPP – ROW-2 GV AND CP INSPECTION
I.2. CPC-CLPP-L-E-0001-102
DATASHEET
CLPP – ROWA- GV AND CP INSPECTION
I.3. CPC-CLPP-L-E-0001-103
DATASHEET
CLPP – ROW B GV AND CP INSPECTION
I.4. CPC-CLPP-L-E-0001-104
DATASHEET
I.5. CLPP – ELE (-)7M – GENERAL VISUAL
CPC-CLPP-L-E-0001-105
INSPECTION DATASHEET
I.6. CLPP – ELE (-)21M - GENERAL VISUAL
CPC-CLPP-L-E-0001-106
INSPECTION DATASHEET
I.7. CLPP – ELE (-)37 - GENERAL VISUAL
CPC-CLPP-L-E-0001-107
INSPECTION DATASHEET
I.8. CLPP – ELE (-)54.5 - GENERAL VISUAL
CPC-CLPP-L-E-0001-108
INSPECTION DATASHEET
I.9. CLPP – BARGE BUMPER - GENERAL VISUAL
CPC-CLPP-L-E-0001-109
INSPECTION DATASHEET
II.
2
V.3. CLPP – ROWA- MARINE GROWTH VISUAL
CPC-CLPP-L-E-0001-503
INSPECTION DATASHEET
V.4. CLPP – ROW B MARINE GROWTH VISUAL
CPC-CLPP-L-E-0001-504
INSPECTION DATASHEET
VI.
VIII.
IX.
CLPP NDT (FMD&CVI) MAPPING DATASHEET
IX.1. CPC-CLPP-L-E-0001-901
3
I. GENERAL VISUAL & CATHODIC PROTECTION
INSPECTION FOR STRUCTURE
4
CLPP – ROW-1 GV AND CP INSPECTION Data Sheet No.: CPC-CLPP-L-
DATASHEET E-0001-101
Date Rev Description By Check App
CP-01 CP-02
CP-03
5
CLPP – ROW-2 GV AND CP INSPECTION Data Sheet No.: CPC-CLPP-L-
DATASHEET E-0001-102
Date Rev Description By Check App
A B
CP-16 CP-17
CP-18
6
Anomaly Y/N: Anomaly Report No.:
Diver/Pilot: Inspector 3.4U:
CA: JVPC Rep.:
CP-31
CP-32
CP No. Reading
CP-34
CP Calib.
CP-31
CP-35 CP-32
CP-33
CP-34
CP-35
CP-36 CP-36
CP-37
CP-37
8
CLPP – ROW B GV AND CP INSPECTION Data Sheet No.: CPC-CLPP-L-
DATASHEET E-0001-104
Date Rev Description By Check App
2 1
CP-38
CP-39
CP No. Reading
CP
CP-41
Calib.
CP-38
CP-39
CP-42
CP-40
CP-41
CP-42
CP-43 CP-43
CP-44
CP-44
9
10
CLPP – ELE (-)7M – GENERAL VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-105
Date Rev Description By Check App
Drawing Ref: - CPC-CLPP-S-D-1005 Rev 1, Jacket - Horizontal Framing Plan at EL (-) 7.000M
A B
A B
1
KEY PLAN
11
12
13
CLPP – ELE (-)21M - GENERAL VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-106
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1006 Rev 1, Jacket - Horizontal Framing Plan at EL (-) 21.000M
A B
A B
KEY PLAN
1
2
CLPP – ELE (-)37 - GENERAL VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-107
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1007 rev 1, Jacket - Horizontal Framing Plan at EL (-) 37.000M
A B
A B
KEY PLAN
3
4
A B
Drawing Ref: CPC-CLPP-S-D-1008 Rev 1, Jacket - Horizontal at Framing Plan at EL (-) 54.490M
A B
KEY PLAN
5
CLPP – BARGE BUMPER - GENERAL VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-109
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1050 Rev 2, Jacket - Modification of Barge Bumper - 3D Perspective View
CPC-CLPP-S-D-1013 Rev 2, Jacket - Barge Bumper Details Sheet 1
BARGE BUMPER
6
CA: JVPC Rep.:
7
II. GENERAL VISUAL INSPECTION FOR RISERS
A B
8
Comment:
9
CLPP P10 RISER - GENERAL VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-202
Date Rev Description By Check App
A B
A B
Drawing Ref: CPC-CLPP-L-D-1023 Rev 6, 8" (P14) Riser Details at CLPP Platform
8” EXPORT OIL RISER P14
A B
A B
11
III. GENERAL VISUAL INSPECTION FOR CAISSON
12
CLPP PRODUCED WATER CAISSON - Data Sheet No.: CPC-CLPP-
GENERAL VISUAL INSPECTION DATASHEET L-E-0001-301
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1030 Rev 2, Jacket - Produced Water Treatment Containment Caisson
Support
CPC-CLPP-S-D-1031 Rev A, Jacket - Produced Water Treatment Disposal Caisson Sheet 2/2
A B
A B
13
14
IV. GENERAL VISUAL INSPECTION FOR CLPP TIE-IN
SPOOL
15
CLPP P8 TIE IN SPOOL PIPELINE - GENERAL Data Sheet No.: CPC-CLPP-
VISUAL INSPECTION DATASHEET L-E-0001-401
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-L-D-0052 Rev 0, CLPP P8 - 12" Export Oil Riser - Tie - in Spool details
CPC-CLPP-L-D-1028 Rev 0, CLPP Pipeline Approaches
R3
NB
E
G
ID
BR
PLAN VIEW
PIPELINE P8 - 12" TIE-IN SPOOL DETAIL AT PLATFORM CLPP
16
17
CLPP P10 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-CLPP-
GENERAL VISUAL INSPECTION DATASHEET L-E-0001-402
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-L-D-0053 Rev 0, CLPP P10 - 6" Gas Lift Riser - Tie - in Spool details
CPC-CLPP-L-D-1028 Rev 0, CLPP Pipeline Approaches
P10 6” GAS LIFT TIE-IN SPOOL
R3
NB
E
G
ID
BR
PLAN VIEW
PIPELINE P10 - 6" TIE-IN SPOOL DETAIL AT PLATFORM CLPP
18
CLPP P14 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-CLPP-
GENERAL VISUAL INSPECTION DATASHEET L-E-0001-403
Date Rev Description By Check App
SP
O
O
L
P1
4.
7
4 .1
P1
L
OO
SP
4 .2
P1
L
OO
SP SP
O
O
L
P1
4.
5
4 .3
P1
L
SP OO
O
O SP
L
P1
4.
4
NE
LI
C H
AT
M
19
P14 8” EXPORT OIL TIE-IN SPOOL – PART 2
3
BR
N
E
G
ID
BR
S
PO
O
L
P1
4 .7
1
4.
P1
L
OO
SP
2
4.
P1
L
OO
SP SP
O
O
L
P1
4 .5
3
4.
P1
L
SP OO
O
O SP
L
P1
4 .4
NE
LI
T CH
MA
20
V. GENERAL VISUAL INSPECTION FOR CLPP MARINE
GROWTH
21
CLPP – ROW-1 MARINE GROWTH VISUAL Data Sheet No.: CPC-CLPP-
INSPECTION DATASHEET L-E-0001-501
Date Rev Description By Check App
B A
M
G M
MG- - G
01 M 0 -
G 2 0
- 3
0
M4
MG-
G M
05
- G
0 -
6 M 7
G
-
8
M
MG- G M
09 - G
1 -
0 1
M 1
G
-
1
2
M
G
MG-13 - M
1 G
4 -
1
M 5
G
-
1
6
22
Hard% Soft % Hard% Soft % Hard% Soft %
MG-10 MG-11 MG-12
mm mm mm mm mm mm
Hard% Soft % Hard% Soft % Hard% Soft %
MG-13 MG-14 MG-15
mm mm mm mm mm mm
Hard% Soft %
MG-16
mm mm
Comment:
VERTICAL
A FRAMING
B ELEVATION ROW 2
M
G M
MG- - G
17 1 -
M 8 1
G 9
-
2
M 0
MG-
G M
21
- G
2 -
2 M 2
G 3
-
2
4
M
G M
MG-
- G
25
2 -
6 2
M
7
G
-
2
8
M
G 23
MG-29 - M
3 G
0 -
3
Project: Date of Insp:
For site survey record
Check: Extent species, thickness and percentage of soft & hard marine growth
Comment:
24
CLPP – ROWA- MARINE GROWTH Data Sheet No.: CPC-CLPP-L-
VISUAL INSPECTION DATASHEET E-0001-503
Date Rev Description By Check App
M
G
-
3
3
M
G
-
3
M 4
G
-
3
5
M
G
-
3
6 M
G
-
3
7
M
G
-
3
8
M
G
-
3
9
M
G
-
4
0
Project: Date of Insp:
For site survey record
Check: Extent species, thickness and percentage of soft & hard marine growth
25
mm mm mm mm
Comment:
26
CLPP – ROW B MARINE GROWTH Data Sheet No.: CPC-CLPP-L-E-
VISUAL INSPECTION DATASHEET 0001-504
Date Rev Description By Check App
2 1
M
G
-
4
1
M
G
-
4
2 M
G
-
4
3
M
G
-
4
M4
G
-
4
5
M
G
-
4
6
M
G
-
4
7
M
G
-
4
Project: 8 Date of Insp:
For site survey record
Check: Extent species, thickness and percentage of soft & hard marine growth
27
mm mm mm mm
Comment:
28
VI. SEABED VISUAL INSPECTION
29
CLPP SEABED VISUAL INSPECTION Data Sheet No.: CPC-CLPP-
DATASHEET L-E-0001-601
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1008 Rev 1, Jacket - Horizontal at Framing Plan at EL (-) 54.490M
CPC-CLPP-S-D-1011 Rev 1, Jacket - Mudmat General Arrangement
A B
30
31
VII. SCOUR INSPECTION
Drawing Ref: CPC-CLPP-S-D-1008 Rev 1, Jacket - Horizontal at Framing Plan at EL (-) 54.490M
CPC-CLPP-S-D-1011 Rev 1, Jacket - Mudmat General Arrangement
HORIZONTAL FRAMING PLAN AT ELEVATION (-) 54.490M
Comment:
33
VIII. MUDMAD INSPECTION
34
Data Sheet No.: CPC-CLPP-
CLPP MUDMAD INSPECTION DATASHEET L-E-0001-801
Date Rev Description By Check App
Drawing Ref: CPC-CLPP-S-D-1008 Rev 1, Jacket - Horizontal at Framing Plan at EL (-) 54.490M
CPC-CLPP-S-D-1011 Rev 1, Jacket - Mudmat General Arrangement
35
Anomaly Y/N: Anomaly Report No.:
Diver/Pilot: Inspector 3.4U:
CA: JVPC Rep.:
36
IX. NDT (FMD AND CVI) MAPPING DATASHEET
37
Data Sheet No.: CPC-CLPP-
CLPP NDT (FMD&CVI) MAPPING DATASHEET L-E-0001-901
Date Rev Description By Check App
Drawing Ref:
M4-2023 JF12-2023
ROW 1 ROW 2
JF12-2023 B A A B
CP-01 CP-19
JF8-2008
JF5-2008
JF14-2018
CP-03 CP-21
CP-02
CP-04 CP-20
JF7-2018
CP-07 CP-25
CP-06
CP-08 CP-24
38
ROW A JF11-2023 ROW B
JF04-2023 JF06-2023
JF03-2023
1 2 2 1
JF11-2023
JF09-2023
JF02-2023
CP-13 CP-31
JF15-2008
CP-32
CP-14
M2-2023
CP-34
CP-16
CP-35
CP-17
CP-36
CP-18
All member M will be subjects to be inspected by FMD; JFs and JSs will be closely inspected
(CVI) and if any abnormal found, NDT (ACFM/MPI) will be performed
39