Computation Sheet
Bill of Materials
Project: Proposed 2-Storey Residence Page: 1
Owner: Mr. and Mrs. Herson M. Cupino
Location: BLK. 30 Lot 10 Phase 1 Rio de Oro, Buenavista II, General Trias City, Cavite
Unit Cost
Item Description of Works Quantity Unit Amount
Materials
I. Earthworks
1.1. FOOTING
F1
F2
F3
Computation Sheet
Bill of Materials
Cement 11 bags ₱215.00 ₱2,365.00
F4
1.2 COLUMN
C1
C2
C3
C4
1.3 BEAMS
1FB
2FB
3FB
4FB
5FB
1RB1
2RB1
3RB1
Computation Sheet
Bill of Materials
Cement 5 bags ₱215.00 ₱1,075.00
1.4. SLABS
GS-1
GS-2
1.5. STAIRS
STEP
WAIST SLAB
IV Masonry Works
5.1 Formworks
VI Metals
6.1 Rebars
Beam and Roof Beam
Floor Slab
Computation Sheet
Bill of Materials
10mm diameter x 6.00 meters 28 pcs ₱156.00 ₱4,368.00
6.2 Fencing
6.3 Railing
8.1 Doors
8.2 Windows
IX Finishes
Floor Finishes
Wall Finishes
10.1 Framings
10.2 Roofings
Computation Sheet
Bill of Materials
10.2.1 Rib Type Roofin 65 in.m ₱230.00 ₱14,950.00
ADD:
3% Contingencies: ₱42,058.45
Computation Sheet
Bill of Materials
2% Overhead: ₱28,038.97