Panel Inspection Report Format
Panel Inspection Report Format
Panel Inspection Report Format
Test Date :
Sr Points To Ensure
3 Position of busbars and spacing checked and found within acceptable limit.
9 BUSBAR IR checked.
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
SEA PROJECTS PVT LTD
PANEL INSPECTION REPORT
CLIENT : DATE : PROJECT CODE:
DESCRIPTION CLIENT PMC CONTRACTOR
Signature
Date
Test Date : Time: temperature:
Panel name:
3 Position of busbars and spacing checked and found within acceptable limit. Yes / No
4 Inter-changing of all size of Motor, Power and ACB Feeders checked. Yes / No
All meters tested and CT / PT. Ratio checked as per the ITP. And CT’s have been put Yes / No
7 in service.
8 All protection relays tested and tripping through relays checked.. Yes / No
BUSBAR IR checked. Yes / No
9
Auxiliary power supply made available. Yes / No
• DC Supply for protection & interlocks.
10 • Auxiliary supply for Space Heaters.
• Control Power supply.
11 Check all the Main & Control fuses of recommended ratings Yes / No
Yes / No
Insulation resistance test
12 Between each pole and earth
Between the poles when contacts are open
13 Feeders checking
SEA PROJECTS PVT LTD
TRANSFORMER INSPECTION REPORT
CLIENT : DATE : PROJECT CODE:
Signature
Date
Panel name:
CTOR
Remark