SEA PROJECTS INDIA PVT LTD

PANEL INSPECTION REPORT


CLIENT : DATE : JOB
PROJECT
NO : 6261
NO:
DESCRIPTION CLIENT PMC SUBCONTRACTOR
Signature
Date
INSPECTION TYPE CHECKLIST FOR LT. PANELS.
(PCC, PMCC, MCC, PDB and MLDB)

Test Date :
Sr Points To Ensure

1 Check for any physical breakage / damage

3 Position of busbars and spacing checked and found within acceptable limit.

4 All the insulators are in good condition.

4 Inter-changing of all size of Motor, Power and ACB Feeders checked.

5 Operation of shutter mechanism checked and satisfied.

6 Panel wiring checked and found as per scheme.


• Motor Feeders.
• Motor feeder interlock with Control Room Panels
• Incomer interlocks scheme.
7 All meters tested and CT / PT. Ratio checked as per the ITP. And CT’s have been put in service.

8 All protection relays tested and tripping through relays checked..

9 BUSBAR IR checked.

10 Auxiliary power supply made available.


• DC Supply for protection & interlocks.
11 •Check all the supply
Auxiliary Main &for
Control
Space fuses of recommended ratings
Heaters.
• Control Power supply.
12 Check Feeder
Confirmation

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No
SEA PROJECTS PVT LTD
PANEL INSPECTION REPORT
CLIENT : DATE : PROJECT CODE:
DESCRIPTION CLIENT PMC CONTRACTOR
Signature
Date
Test Date : Time: temperature:
Panel name:

S.No Points To Ensure Confirmation Remark

1 Panel as per GA approved drwing Yes / No

2 Check for any physical breakage / damage Yes / No

3 Position of busbars and spacing checked and found within acceptable limit. Yes / No

4 All the insulators are in good condition. Yes / No

4 Inter-changing of all size of Motor, Power and ACB Feeders checked. Yes / No

5 Operation of shutter mechanism checked and satisfied. Yes / No

Panel wiring checked and found as per scheme. Yes / No


• Motor Feeders.
6 • Motor feeder interlock with Control Room Panels
• Incomer interlocks scheme.

All meters tested and CT / PT. Ratio checked as per the ITP. And CT’s have been put Yes / No
7 in service.

8 All protection relays tested and tripping through relays checked.. Yes / No
BUSBAR IR checked. Yes / No
9
Auxiliary power supply made available. Yes / No
• DC Supply for protection & interlocks.
10 • Auxiliary supply for Space Heaters.
• Control Power supply.

11 Check all the Main & Control fuses of recommended ratings Yes / No
Yes / No
Insulation resistance test
12 Between each pole and earth
Between the poles when contacts are open
13 Feeders checking
SEA PROJECTS PVT LTD
TRANSFORMER INSPECTION REPORT
CLIENT : DATE : PROJECT CODE:

DESCRIPTION CLIENT PMC CONTRACTOR

Signature

Date

Test Date : Time: temperature:

Panel name:

Points To Ensure Confirmation