In 2022, crews will be focusing on the reconstruction of the northbound lanes of I-41, W
K
AR
124TH STREET
RP
North Avenue under I-41, the I-41 North exit to Mayfair Road and the permanent railroad
VE
E RI
bridge over I-41. In addition to the continuation of long-term closures of the North Avenue
ONE
interchange ramps and Underwood Parkway at I-41, the following closures/impacts are
NOM
scheduled for 2022:
ME
RR
UP
Two 54-hour full freeway closures of
I-41 North/South from Watertown Plank BURLEIGH STREET
BURLEIGH STREET BURLEIGH STREET
Road to Burleigh Street (expected BURLEIGH STREET
UPRR
Three-week closure of I-41 North exit
ramp to Burleigh Street
Y
RKWA
IVER PA
CENTER STREET
Full closure and reconstruction of North
NEE R
Avenue, at I-41, from Spring 2022
MO
through late Summer 2022