Tboli West I District
Purok Sentro, Kematu, Tboli, South Cotabato
ENHANCED
SCHOOL IMPROVEMENT
PLAN
Madam:
Greetings!
Attached is a copy of the Enhanced-School Improvement Plan (E-SIP) of Tboli
Elementary School Kematu, Tboli, South Cotabato which we are hereby endorsing
for your approval. We wish to inform your office that this E-SIP is a product of the
collaborative effort of parents, community leaders, teachers, alumni and pupils
Recommending Approval:
I. Message
III. Assess
IV. Plan
LIST OF ACRONYMS
NOTE: This chapter presents the documentation of matters that transpired THE
DEPED VISION
3. Barangay/LGU Representative
-Shares valuable information on the interest of the community in the
school improvement and participate in setting goals, strategies and
priorities of the school, and commit available resources in the
implementation of the plan.
4. Teacher Representative
-Provides needed information relative to teaching-learning process
5. Parent Representative
-Shares insights about what their children need to learn and the
difficulties they face in the school, their aspirations for the school and their
children, present other areas of concerns.
6. Student Representative
-Shares insights about their needs and difficulties in the school.
The school has a total area of more or less 2.5 hectares donated by
the Barangay Local Government Unit of Kematu and 2.5 kilometers away
from Barangay Poblacion where the District Office (Tboli West I) is
situated. The place can be reached through a motorized vehicles and large
truck with a concrete road from Poblacion to Barangay Proper. Primarily,
the household source of income is farming, mining and others are
employed in the Multi-National Company. With this opportunities, there
are still families living in the far flung areas suffered poverty due to lack of
education in which becomes a hindrance in finding a good job for a living.
b. Learning Environment
c. Number of Teachers
Pupils Taken
BODY MASS INDEX (BMI) HEIGHT-FOR-AGE (HFA) Height
Pupils Weighed
Grade Severely Severely
Enrolment Wasted Normal Overweight Obese
Levels Wasted Stunted Stunted Normal Tall
No No No No No
No. % . % . % No. % . % . % No. % No. % No. % . % No. %
DRR
BRIGADA ESKWELA
The above table revealed that based on the School Physical Facilities
Status, three (3) buildings needs major repair, although it is still functional
considering that it is one of the oldest school in the municipality. These
buildings were used by Grades 1,2,4 learners. During the assessment
conducted by the Division School Facilities Coordinator, they suggested and
recommended that there is a need for the building to be condemned but it
depends upon the availability of funds. In the next five years the school is
really in need of classrooms and other facilities especially when its
application for conversion to Integrated School will be approved and if it will
18
School Improvement Plan
start to offer Junior High School (JHS). Furthermore, the Local Government
is very positive as to the provision of makeshift classroom if necessary or
until such time that there will be budget for classroom construction from the
Central Office.
19
School Improvement Plan
to implements its programs and projects for the realization of the vision-
mission of the Department of Education as well as the mission of the school.
The school has the following school- community partnership activities:
Parent – Teachers Association Meeting, Homeroom PTA Meeting, Parents
Cook helping the Feeding Program of the School, and Parents supporting
their children in different school activities such as Brigada Eskwela,
Scouting, Athletics and Academic Contest at school and district level. Every
year the Local Government Unit distribute school supplies to our students.
The school receives scholarship programs for our indigent but deserving
pupils from the Local Government Unit, Private Companies and the province.
Here in school parents are welcome to share their time and support
(monetary and non-monetary contributions) to advance public education of
their children, from pre-school to grade six, to improve the quality of
teaching, increase student achievement and make schools safer and better
places to learn.
g. Fund Sources
With the demand of giving quality education to all children and
to realize the vision-mission of the Department of Education as well as of the
school itself, share governance has been established between the
government and the school. The Republic Act 7160 otherwise known as
Philippine Local Government Code is the response to these challenges for the
attainment of the national goals through the creation of self-reliant
communities. Likewise, the Department of Education creates the
decentralization of governance in basic education (Republic Act 9155). Such
law was realized through the implementation of the School-Based
Management Program (SBM) and give accountability to school heads,
teachers, learners, parents, local government units (LGU’s) and the
community to properly manage its school.
School-Based Management (SBM) is a program of the Department of
Education (DepEd) that assists school in managing and using its own
resources efficiently to address all the programs, projects and problems for
the benefit of the learners. It advocates the development of school-community
partnerships among parents-teachers’ associations, local government unit,
alumni and other stakeholder for improvement of learners’ learning
20
School Improvement Plan
outcomes. The School Governing Council (SGC) is the school organization
which is responsible for the development and implementation of the School
Improvement Plan (SIP) as well as the generation and management of school
funds. Managing school funds and generation of resources is vital element for
Tboli Elementary School. Its school operating budget are coming from
different sources: DepEd MOOE, Barangay Social Development Fund and,
PTA donations, donations from private sectors and individuals and school-
income generating projects. Because funds and resources are scarce to
sustain the needs of the school good practices are being strengthened and
sustained.
One of the practices is the partnership between parents and teachers,
the Parent-Teachers Association (PTA). The parents through the PTA provide
help in the school by giving monetary donations to provide better learning
facilities for their children. This action motivates parents to share and be a
part in the education of their children.
The table below summarizes fund management and resource
generation of Tboli Elementary School:
Resources Process Source of Funds Feedback
Needed Mechanism
21
School Improvement Plan
SOURCE OF SCHOOL FUNDING SY 2019-
30,000.00 ; 3%
30,000.00 ; 3%
224,000.00 ; 24%
As shown in this pie graph, the school has the following allocation of
funds from the different sources to sustain its services and operations.
MOOE is 639,000.00 is given annually, and were divided equally per
learners’ ratio with our extension school, Traan Leteng. From this the
school gets its monthly expenses to fund trainings, travels, teachers’
instructional materials, repairs and maintenance, utilities and other
expenditures. Aside from this, the school has an allocation from the
Provincial Government amounting to 30,000.00 and Municipal Government
amounting to 224,000.00. These financial aids to augment the needs of the
learners’ development services. School is making initiative to source out
other funds aside from the aid it receives from the LGU and National
Appropriation.
22
School Improvement Plan
teachers attended the K to 12 Seminar in Grade IV specifically on the Least
Learned Competences in English, MAPEH, Filipino and Araling Panlipunan,
three (3) teachers also attended Kindergarten Seminar and other seminars
and training called by the Division Office where our school where identified
to participate.
23
School Improvement Plan
through timely connection with other agencies, capacity building in the
part of the school personnel, and high level of commitment and dedication
in the course of duty. The Provincial Government had funded the
honorarium of our School Watchman. Furthermore, regular assessment
and review and updating of the school Priority Improvement Areas (PIAs)
has given premium for timely monitoring on the status of the school in
relation to attaining its goal in serving the children at its best.
The stakeholders play a vital role in the successful implementation of
projects, activities and programs (PAPs) of the school. They are the
backbone of the school in the continuous improvement. Due to limited
resources and with the implementation of “No Collection Policy” set by the
Provincial Government the school were not able to collect PTA Donations
from parents to sustain other projects in improving the school facilities.
24
School Improvement Plan
improvement projects like Learning Partnership Program, Concrete
Perimeter Fencing, Construction of genderized toilets, School Material
Recovery Facility (MRF) are also one of the top priority projects
implemented and supported by the stakeholders. Strong implementation of
the Solid Waste Management was being implemented in the school through
the effort of our Student Pupil Government. Among the priority projects
started DepEd Computerization Program has great impact to the teaching-
learning process. It makes teaching- learning processes easy and
interesting. Our school needs a strong internet connection in order to
facilitate the teaching-learning process with the aid of this tool to ensure
that learners have enough learning resources to cope with the latest trends
in education as well as provide an avenue for the teachers to improve their
learning strategies through ICT-Based Instruction.
In more year time the school is projecting more improvement projects
which when attained will contribute in making the teaching-learning
processes more effective and improve pupils’ performance. Stakeholders
had shown notable participation in the numerous undertaking of the
school. Their attendance is very high. They are very participative in all
activities of the school. With their highest participation the school’s
participation to all activities is not a problem. During the Brigada Eskwela
stakeholders do their great part which has the greatest number of
volunteer to participate in the cleaning, repair of the classrooms and
furniture’s to make the school ready for the opening of classes for which
the school had received an award being one of the implementer in the
Division of South Cotabato.
25
School Improvement Plan
Ko
Be an Early Bird 5 5 5 5 5 1
School Ko, Love Ko, 5 5 5 5 5 1
Pagandahin Ko Ito
Tayo’y Magkaisa, 5 5 5 5 5 1
Halina’t Mag- Brigada
Eskwela
Tubig at Kuryente 5 5 5 5 5 1
Ayusin at Panatilihin
Internet Connection 5 5 5 5 5 1
at Printer Ko Para sa
Pag-aaral Mo
School Ko. Ipa- 5 5 5 5 5 1
Survey Ko
Kagamitan Ko Para 5 5 5 5 5 1
sa Pagkatoto Mo
SBM Level of 5 5 5 5 5 1
Practice Iangat Natin
Health is Wealth 5 5 5 5 5 1
Sakuna Iwasan, 5 5 5 5 5 1
Safety Tips
Pakinggan
Batang MATHalas 5 5 4 5 4.75 2
Teachers Induction
Program
Kaibigan Ko, Basa 5 5 4 5 4.75 2
Mo, Gabay Ko
Equal Rights, Equal 5 5 4 5 4.75 2
Life
Hindi lang Pang- 5 4 5 5 4.75 2
Akademiks Pang
Sports Din
My Teacher, My Hero 5 4 5 5 4.75 2
RPMS Alamin at 5 4 5 5 4.75 2
Suriin
Peace Be With You 5 4 4 4 4.25 3
May Pera Sa Basura 5 4 4 4 4.25 3
Gulay ay Buhay 5 4 4 4 4.25 3
Tribu, Ipagmalaki at 5 4 4 4 4.25 3
Mahalin
Bata Iskawt, Sikat! 4 4 4 4 4 4
Girls Power 4 4 4 4 4 4
26
School Improvement Plan
CHAPTER 3
C
Plan
H
A. Project Work Plan & Budget Matrix A
SCHOOL IMPROVEMENT PLANNING WORKSHEET P
PLANNING WORKSHEET for ACCESS and QUALITY T
LEARNING DEPED PRIORITY GENERAL ROOT CAUSE/S TIME FRAME E
STAGE INTERMEDIATE IMPROVEMENT OBJECTIVE/S
OUTCOMES AREA SY SY SY R
2020- 2021- 2022-
2021 2022 2013
101: Learners are in Low Enrolment Increase Transfer of residence √ √ √ 3
school and learning Rate Enrolment Rate due to livelihood
centers atleast 2% every /economic status
School Year
27
School Improvement Plan
learning environment and technological projector and No donors
facilities printer of atleast 1 Lack of parental
Implement set per year support/financial
learning To increase constraints
partnership academic/non
program[LPP] academic
participation of
pupils in all
learning areas
105: Learners attain Low learners To deacrease the Poor study habit √ √ √
learning standards reading level numbers of Non Lack of interest/no
especially in Readers especially focus
English in English atleast Lack of Parents
Low Literacy 20% per Quarter support/no follow-
Rate (English Increase Literacy up at home
and Filipino Rate of Learners Poor reading habit
Low atleast 20% per Short span of
performance of Quarter. interest
pupils in To increase the Lack of localized
English,Filipin Performance Level books.
o, Science and of Learners in Lack of focus
Mathematics English, Filipino,
Science and
Mathematics
atleast 20% per
Quarter.
28
School Improvement Plan
101: Learners are in Low enrolment To increase Transfer of √ √ √
school and learning rate Enrolment Rate residence due to
centers atleast 2% every livelihood/economi
School Year c status
105: Learners attain Low learning level To decrease the Poor study habit √ √ √
learning standards especially in number of Non Lack of
29
School Improvement Plan
English Readers especially in interest/no focus
English atleast 20% Lack of Parents
Low Literacy rate every Quarter. support/no follow-
(English and To increase Literacy up at home
Filipino) Rate of learners Poor health status
atleast 20% every Distance from
Low performance Quarter. home to school
of Learners in To increase the Lack of daily
English, Filipino, performance level of subsistence
Science and Learners in English, Peer influence
Mathematics. Filipino, Science and
Mathematics atleast
20% every Quarter.
106: Learners are well High % of severely To decrease number Low economic √ √ √
rounded, happy and wasted learners . of wasted and status
smart severely wasted Improper food
pupils of at least 10 intake
pupils per year Lack of daily
subsistence
Non observance of
nutritional value
of foods
30
School Improvement Plan
Education Leaders Low % of To increase % of Low economic
and managers stakeholders stakeholders status
practice participative participation in participation in all Less priority
and inclusive activities activities to 90% Poor parental
management Sustainability of To level up the support
processes SBM Level of SBM Assessment Undocumented
practice Level of practice . activities
(SRC 11) To increase Un-updated files
K-6
Lack of Gender and awareness of Limited
Sensitivity parents and pupils ideas/background
Awareness on gender
Lack of
sensitivity by 30%
training/seminar
31
School Improvement Plan
Learners actively Low textbook To improve, repair, Lack of supply
participate in their supply, enhance and Lack of funds
learning environment learning facilities acquire 80% Obsolete facilities
and equipment sufficient and Low economic
satisfactory status
facilities, materials Lack of parents
Low pupil and equipment to support
participation in improve learning Lack of dedicated
BSP/GSP activities outcomes coaches
To increase pupils
participation in
scouting by 5%
Low participation in every year
Lack of sports
sports activities
equipment
To increase pupils
participation in
sports activities
yearly
32
School Improvement Plan
Learners enjoy Unsafe and To increase Lack of funds
learner-friendly hazardous construction of
environment learning concrete perimeter
environment fence, repair
classroom and
learning facilities
(desks, chairs, attitude
tables,
Poor blackboards)
implementation Improve SWM Location of school
of SWM implementation of
70 to 90%
Prone to To avoid accident
accident and by 100%
other disaster
related risks .
33
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
Project Title: “HALINA’T MAGPALISTA”
Project Objective Statement: To ensure that school age children will be enrolled in school and to increase school enrolment.
Problem Statement: Conduct of school mapping and enrolment advocacy in compliance to DepEd mandate that school age
children must be in school and in compliance of the “Education For All (EFA) of the national government.
Root Cause: Education For All (EFA)
Activities Output for the Year Date of Persons Responsible Budget Budget
Implementation Per Source
Activity
House to house visitation List of school age April-May 2020 School Head 5,000.00 PTA
children in every Teachers MOOE
purok or sitio of the Barangay leaders
barangay PTA Officers
Conduct meeting with School Head PTA
parents Teachers MOOE
Barangay leaders
PTA Officers
Conduct FGD with the School Head PTA
barangay/community Teachers MOOE
leaders Barangay leaders
PTA Officers
Identify school age School Head PTA
children for enrolment Teachers MOOE
Barangay leaders
PTA Officers
PREPARED BY: NOTED:
34
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
35
School Improvement Plan
PREPARED BY: NOTED:
36
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
Activities Output of the Date of Person’s Responsible Budget Per Budget Source
Year Implementation Activity
Regular Increased Whole Year School Head
checking of attendance/SF2 Round Teachers
attendance. Learners
37
School Improvement Plan
feeding
38
School Improvement Plan
Project Title: “SCHOOL KO, LOVE KO, PAGANDAHIN KO ITO”
Problem Statement: Absence and insufficient learning facilities and equipment
Project Objective Statement: To improve repair, enhance and acquire 30% sufficient and satisfactory facilities and equipment
Root Cause: Worn-out facilities and equipment and lack of funds
Project Work Plan and Budget Matrix
Activity Output Date of Person’s Budget Budget
Implementat Responsible Source
ion
39
School Improvement Plan
Conduct of DRRM Activities Room. Teen BE
Pruning of trees, cleaning of classrooms Coordinator
Center and 90,000
and surroundings Teachers
Repair of worn out Facilities acquired Stakeholders
Roofs, Ceiling, Walls, electronics, May 2020
Windows and doors
Physical
Chairs, tables and
chalkboards Education MOOE/PTA/
Comfort rooms DST/other
Equipment
Leaking pipes and lines funds
and other
Landscaping & school
signage related
Drainage and canals facilities
Electrical connections
Repainting including School head
Physical
Science
Year round repair and maintenance of school Facilities
facilities and equipment Apparatus, Year round coor. 110,000
40
School Improvement Plan
Repair of genderized CR June to July Kabugwason
2020 MOOE/DST/
Construction of Teen Center 20,000
July to School head Kabugwason
Construction of Reading Center September Physical 50,000 MOOE/DST/
2020 Facilities Kabugwason
Construction of Concrete Pavement 50,000
July to coor. MOOE/DST/
September 50,000 Kabugwason
Construction of Makeshift classroom for the
2020 MOOE/DST/
proposed Integrated School. 100,000
May-August School head Kabugwason
Provision of PPEs and Sanitary/COVID prevention 2021 Physical 200,000 MOOE/DST/
Supplies Year round Facilities Kabugwason
coor. MOOE/DST/
School head 100,000 Kabugwason
Clinic In- MOOE
Charge
PREPARED BY: NOTED:
41
School Improvement Plan
Project Title: “TAYO’Y MAGKAISA, HALINA’T MAG-BRIGADA ESKWELA”
Project Objective Statement: To Maintain Child friendly School through Brigada Eskwela.
Project Statement: Institutionalization of Brigada Eskwela
Root Cause: Under Repaired Buildings, Underdeveloped School Environment and lack of partners to support school operation.
Activity Output of the Year Date of Person Budget Budget
Implementation Responsible Source
Implement minor repairs of Implemented minor repairs of School Physical May, 2020-March School Head, 100,000.000
School Physical Plant Plant 2021 Teachers,
stakeholders, MOOE
School Physical LGU
Facilities OTHERS
Coordinator, Pupils
Repainting of walls, mini- Repainted of walls, mini-fences, flower boxes, May, 2020-March School Head, 50,000.00
fences, flower boxes, roofs, roofs, chairs, tables and school gate 2021 Teachers,
chairs, tables and school stakeholders,
gate School Physical
Facilities
Coordinator
Intensify partnership and Memorandum of Agreement, Deed of Whole Year Round School Head, 1, 000.00
networking among Donations Teachers,
stakeholders stakeholders,
School Physical
Facilities
Coordinator
Project Work Plan and Budget Matrix
42
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
43
School Improvement Plan
Project Statement: Rehabilitate & maintain safe water and electrical services.
Project Objective Statement: To rehabilitate & maintain the good water and electrical services.
Root Cause: Unsafe Water and Electrical lines
Activity Output of the Year Date of Person Budget Budget
Implementation Responsible Source
- Rehabilitation of water system Replaced and May, 2020 School Head, 100,000.00 MOOE,
and Electrical wirings & Installed Safe water School LGU,OTHERS
lighting. sources and Facilities
electrical lines in Coordinator,
every classroom Electrician
-Maintain the good water and Updated payment of Whole year round School Head 80,000.00
electrical services Electric bill MOOE,LGU,OTH
ERS
44
School Improvement Plan
Project Title: “INTERNET CONNECTION AT PRINTER KO PARA SA PAG-AARAL MO”
Problem Statement: Only one (1) printer per grade level is available for the preparation of teaching and testing materials and
unavailability of internet connection.
Project Objective Statement: To avail one (1) printer per teacher and at least 21 mbps internet speed.
Root Cause: Insufficient number of printers and unavailability of internet connection.
45
School Improvement Plan
Project Title: “SCHOOL KO, IPA- SURVEY KO!”
Project Objective Statement: To provide established and lawful school site documents.
Problem Statement: This project aims to prioritize improvement areas of the school; however, implementation pending due to limited
resources and conflict of boundaries that needs to be settled.
Root Causes: 1. School site was not yet segregated from the barangay site
2. Encroachment problem
Activities Output for the Year Date of Persons Budget Per Budget
Implementatio Responsible Activity Source
n
Conduct Focused Group Agreement made June 2020 School Head 30, 000.00 MOOE
Discussion and meeting with during the Teachers, PTA PTA, SGC
the concerned stakeholders/ discussion and Officials & LGU
offices meeting
46
School Improvement Plan
of the school site Surveyor
PREPARED BY: NOTED:
47
School Improvement Plan
Project Objective Statement: To procure School and Office Supply to teachers and learners
Root Cause: Insufficient School & Office Supply to teachers and learners.
48
School Improvement Plan
Project Objective Statement: To Level up SBM PASBE level of Practice
Root Cause: Delayed updating of SBM documents
Activities Output for the Year Date of Persons Responsible Budget Budget
Implementation Per Source
Activity
-Enhancing knowledge of Enhanced knowledge of School Head, SBM
teachers & stakeholders on teachers & stakeholders on June- July, 2020 Coordinator 5, 000.00 MOOE
SBM implementation through SBM implementation through Teachers, Stakeholders LGU
seminar/training/orientation. seminar/training/orientation. OTHERS
-Benchmarking of SBM Benchmarked of SBM August, 2020 School Head, SBM
practice from other school. practice from other school Coordinator 5, 000.00
Teachers, Stakeholders,
SGC
-Updating data of each SBM Updated data of each SBM Whole Year School Head, SBM
principles. principles. Round Coordinator 5, 000.00
Teachers, Stakeholders,
SGC
-Updating SBM Showroom. -Updated SBM Showroom. Whole Year School Head, SBM
Round Coordinator 50, 000.00
Teachers, Stakeholders,
SGC
-Evaluation of SBM level of Evaluated SBM level of December, 2020 School Head, SBM 10, 000.00
practice. practice Coordinator
Teachers, Stakeholders,
SGC
49
School Improvement Plan
School SBM Coordinator School Principal-I
Project Team leader
50
School Improvement Plan
Project Work Plan and Budget Matrix
51
School Improvement Plan
Root Cause: Lack of knowledge
Project Work Plan and Budget Matrix
52
School Improvement Plan
Activities Output of the Year Date of Persons Responsible Budget Budget Source
Implementation per
Activity
1. Conduct numeracy pre- Numeracy test result (pre- June,2020and Teachers, SH, Pupils 3,000 MOOE,LGU.OTHERS
test and post- test and post) March,2021
identify non-computers
2. Conduct Conducted Whole Year Round Teachers, SH, Math 3,000 MOOE,LGU,OTHERS
remediation/intervention remediation/intervention Coordinator,
3. Conduct school based Conducted school based August ,2020 SH,Math 5,000 MOOE,
Math Olympics Mathematics Olympics Coordinator,Pupils LGU,OTHERS
4. Conduct SLAC/LPP Conducted SLAC/LPP Whole year round Teachers , SH, 7,000 MOOE,LGU,OTHERS
5. Reproduce and utilize IMs IMs reproduced and utilized Whole Year Round SH, Teachers, 9,000 MOOE,
and Test Papers in Math Test paper every grading LGU,OTHERS
every grading period
6. Reproduce Math & Math and Science Kto12 June-July,2020 Math Teacher, 3,000 MOOE,
Science Kto12,TG and LM CG,TG and LM School Head LGU,OTHERS
7. Sustain MATH Park Improved/Sustained Math Whole Year Round Math Coordinator, 5,000 MOOE,
Park Teacher, School Head LGU,OTHERS
Project Work Plan and Budget Matrix
PREPARED BY: NOTED:
CYRON S. SALVALOSA JEMAR B. PELAEZ
School Guidance Coordinator School Principal-I
Project Team Leader
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
53
School Improvement Plan
Root Cause: Teachers need to be oriented on different DepEd Policies
54
School Improvement Plan
Activity Output of the Year Date of Person Responsible Budget Budget Source
Implementation
Implementation of -Provided reading clinic June, 2020 School Head, 15, 000 MOOE,
Care for non-readers -Assigned reading clinic June, 2020 Reading Clinic DST,Kabugwason,
Teacher Whole year round Teacher Others
-Acquired different CNR Coordinator,
reading materials June, 2020 & Teachers, Learners
-Conducted Phil- IRI (Pre March, 2021
and Post) October, 2020
- Conducted School Based
training in teaching
strategy in developing Whole Year Round
reading comprehension
skills.
-implemented reading
enrichment period.
55
School Improvement Plan
Project Work Plan and Budget Matrix
Re- structuring of GAD Restructured GAD Focal School Head, School GAD MOOE
Focal Point Point June- August, 2020 Coordinator, Teachers 5,000.00 LGU
OTHERS
Construction of genderized Constructed 3 School Head, School GAD MOOE
Comfort Rooms Genderized Comfort Whole Year Round Coordinator, Teachers 50,000.00 LGU
Rooms OTHERS
Advocate and promote Posting of Signages Whole Year Round School Head, School GAD 5,000.00 MOOE
Gender Development and /Poster related to GAD Coordinator, Teachers LGU
Sensitivity OTHERS
57
School Improvement Plan
Activity Output of the
Project Year Plan and Budget
Work Date of Person Budget Budget
Implementation Responsible Source
Matrix
Increase by 75% in IPCRF rating Increased by 75% in IPCRF rating Whole Year 3,000.00
by capacity building seminars by capacity building seminars Round
Master the PPST standard Mastered the PPST standard Whole Year School Head MOOE
Round Teachers LGU
Attend seminars/trainings Attended seminars/trainings Whole Year OTHERS
conducted by school (LAC-TIP) conducted by school ( LAC-TIP) Round 50000.OO
district, division, region and district, division, region and
national national
Enroll teachers and School Enrolled teachers and School Whole Year 25,000.00
Heads to SEAMEO INNOTECH Heads to SEAMEO INNOTECH Round
Scholars Scholars
Encourage teachers to enroll in Encourage teachers to enroll in Whole Year
Graduate Studies Graduate Studies Round
58
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
Project Title: “RPMS ALAMIN AT SURIIN”
Project Objective Statement: 1. Orient teachers on the preparation of the RPMS tool
2. Come up with a precise and accurate RPMS output after the conduct of the training
3. Improve teachers work perspective through insights gained in the RPMS training
59
School Improvement Plan
Problem Statement: the need to conduct a School-based training on the preparation of the RPMS is identified one of the emerging
priorities of the school to adapt to the prescribed RPMS tool prescribed for the current school year.
Root Cause: Adaption of the RPMS tool prescribed for the current school year.
Activities Output for the Year Date of Persons Responsible Budget Per Budget
Implementation Activity Source
Preparation of training Design RPMS Training July 2020 School head 3,000.00 MOOE
conducted Teachers
District Head
Seek approval from the higher RPMS Outputs School head MOOE
office to conduct training Submitted by the Teachers
participants/teachers District Head
Send communication to School head MOOE
proposed speakers Teachers
District Head
Preparation of the materials School head MOOE
and other resources or facilities Teachers
need for the training District Head
PREPARED BY: NOTED:
JONELYN C. MERCADO JEMAR B. PELAEZ
School Personnel Officer-Designate School Principal-I
Project Team Leader
60
School Improvement Plan
Project Work Plan and Budget Matrix
63
School Improvement Plan
Project Work Plan and Budget Matrix
Activity Output of the Year Date of Person Responsible Budget Budget
Implementatio Source
n
Implementation of Implemented the
different program on IP different programs on IP Whole year 60 000.00
Education Education round MOOE
School Head, Teachers, IP LGU
Procurement of different Procured different IP Whole year Coordinator, IP Learners OTHERS
IP materials/instruments materials/instruments round
64
School Improvement Plan
Project Work Plan and Budget
Activities Output of the Year Date of
Matrix Persons Responsible Budget Per Budget Source
Implementation Activity
Register boys to the Registered Boys (Kid, August- School Head, Parents, Teachers, 30,000.00
Council Kab, Boys, KL) September, 2020 BSP Coordinator
Conduct Investiture Conducted September, Boys, Parents, Teachers ,BSP 5,000.00
PARENTS,
Ceremony Investiture Ceremony 2020 Coordinator, School Head
MOOE
Conduct Conducted School September, 2020 Boys, Parents, Teachers, BSP 30,000.00
LGU
School Based Camporal Based Camporal Coordinator, School Head
OTHERS
Participate District Participated in September 2020 Parents, Teachers, BSP 30,000.00
Camporal District Wide Coordinator, School Head, Boys,
Camporal
Participate Council Wide Participated Council October- Boys, Parents, Teachers, BSP 30,000.00 MOOE,LGU,Do
Jamboree/National Wide Jamboree November 2020 Coordinator, School Head nations
Jamboree
Attend BTC/Wood Badge Certificate of September 2020 Teachers, Boys, School Head 10,000.00
Training Participation/Recogni
tion
65
School Improvement Plan
TBOLI ELEMENTARY SCHOOL
PROJECT WORK PLAN AND BUDGET MATRIX
SY 2020-2023
66
School Improvement Plan
Register girls to the Council Registered Girls ( Star August-September, School Head, Parents, 30, 000.00 PARENTS, MOOE
Scout, Girl, TL) 2020 Teachers, GSP LGU
Coordinator
Conduct Conducted School September, 2020 Parents, Teachers 30,000.00 OTHERS
School Based Based Encampment GSP Coordinator
Encampment School Head
Participate District Participated District September, 2020 Parents, Teachers 30,000.00
Encampment Wide Encampment GSP Coordinator
School Head
Participate Council Wide Participated Council October-November, Parents, Teachers, GSP 30,000.00
Encampment/Encampment Wide Encampment 2020 Coordinator, School
Head
Attend GSP Attended GSP Whole year round Girls, Teachers, School 10,000.00
Trainings/Seminars Trainings/Seminars Head
67
School Improvement Plan
ANNUAL IMPLEMENTATION PLAN
SY 2020-2021
School Project Output for the Activities Person(s) Venue Budget per Budget
Improvement Objectives Year Responsible Activity Source
Project Title
68
School Improvement Plan
To increase List of families Family Mappings SH, School/ 5,000.00 MOOE
Halina’t Magpalista enrolment rate mapped Early registration Teachers Barangay LGU
of atleast 2% List of pupils Sponsorship grants SGC / PTA OTHERS
every year enrolled in Conduct advocacy Guidance
early campaign/information Coordinator,
registration drive Learners
List of pupils
belong to
scholarship
grant
To convert the Issuance of On-site Division and SH, School 20, 000.00 MOOE
School Ko, I- school from new School ID Virtual Regional Teachers LGU
Convert Ko Elementary to from Central Validation PTA / SGC OTHERS
Integrated Office Learners
Approved Sangguniang
school Approved
Bayan Resolution
Sangguniang
Supporting the
Bayan
Conversion of the school
Resolution
Supporting the
Conversion of
the school
69
School Improvement Plan
Be an Early Bird To increase Increased Regular checking of School Head, School MOOE
percentage of percentage of attendance Teachers, LGU
attendance attendance as Conduct orientation on Guidance 15,000.00 OTHERS
atleast 2% every reflected in the school rules and Coordinator,
Quarter SF2 regulation Guidance
Home Conduct Home visitation Coordinator,
Visitation and Parents,
Record Guidance Services Stakeholder,
Recognize/Give awards Learners
Sustain zero drop-out rate
through school feeding
program
School Ko, Love To improve the Improved/ Acquired school learning School Head School 500,000.00 MOOE
Ko, Pagandahin Ko physical aspect enhanced facilities Teachers LGU
Ito of the school school learning Deed of Donations SGC OTHERS
through facilities Request Letter PTA
provision of Acceptance and BE
different Inspection Report Coordinator
learning School
facilities Physical
Facilities
Coordinator
Internet To allocate Availed and Request internet provider School Head School MOOE
Connection at funds for procured 24 to conduct survey for the Teachers LGU
Printer Ko Para sa internet units of printer school to avail their 432,000.00 OTHERS
Pag-aaral Mo connection and and availed services
1:1 printer to atleast 21 Schedule teacher to
teachers mbps internet receive printer every
speed with release of MOOE
cable.
70
School Improvement Plan
To provide Approved ●Conduct Focused Group School Head, School 30,000.00 MOOE,
School Ko. Ipa- established and Survey Plan Discussion and meeting with Teachers, LGU
Survey Ko lawful school School Site the concerned stakeholders/ PTA, OTHERS
document Documents offices SGC
(Title) ●Resolved some issues
involving occupants in some
area of the school site
●Come up with an agreement
concerning some issues and
concerns pertaining to
surveying and titling of the
school
●Set schedule for the
conduct of Survey and titling
of the school site
Batang MATHalas To increase the -Increased in Conduct numeracy pre- School head School
performance Mathematics test and post-test to Teachers MOOE
level of learners Performance by identify non-computers Mathematics LGU
in Mathematics 2% Conduct School-Based Coordinator OTHERS
by 2% Mathematics Olympics 35,000.00
Conduct
intervention/remediation
Improved/Enhance
School Math Park
71
School Improvement Plan
School Project Output for the Activities Person(s) Schedule Budget Budget
Improvement Objectives Year Responsibl / Venue per Source
Project Title e Activity
To decrease -Phil-IRI, - Care for Non-Reader SH, School 65,000.00
Kaibigan Ko, number of EGRA and (CNR) Implementation Teachers
Basa Mo, Gabay non-readers other Reading Intensify School Reading Learners MOOE
Ko and Assessment Program CNR and LGU
frustration Result Establish School Reading Phil-IRI OTHERS
level -School Park Coordinator
Reading Park
Equal Rights, To increase - Increased -Conduct Gender Sensitivity School Head School
Equal Life awareness of awareness of Training and Responsible Teachers 65,000.00 MOOE
parents and parents and Parenthood GAD LGU
learners on learners on Construction of Genderized Coordinator OTHERS
Gender Gender Comfort Room
Development Development Restructuring of GAD
and sensitivity and sensitivity Corners
by 30% by 30%
Health is Wealth To decrease Decreased Conduct Annual Check-up School School 87,900.00
number of number of Intensify School-Based Head,
Severely Severely Deworming and School MOOE
Wasted and Wasted and Immunization Clinic LGU
Wasted Wasted Procurement of School Clinic Teacher, OTHERS
Learners Learners - Supplies and Medicines. SBFP
Conduct School-Based Coordinator
Feeding Program (SBFP)
72
School Improvement Plan
To increase Increased Constructed School Peace SH, School 65,000.00
Peace Be With awareness awareness and Park/Hub Teachers
You through intensified Integrate PEACE Education PEACE MOOE
implementation implementatio in every lesson Coordinator LGU
of PEACE n of PEACE Updated PEACE Corner in OTHERS
Education and Education every classroom
strengthen
advocacy
73
School Improvement Plan
SBM Level of School SBM Rating/Validation Training on SBM SBM School
Practice Iangat Level of Result Documents Coordinator 75,000.00 MOOE
Natin Practice -Improved SBM Organization PTA/SGC LGU
Showroom Enhancing SBM OTHERS
Showroom
Kagamitan Ko To Procure Procured sufficient Procurement of sufficient School Head
Para sa sufficient school and office school and office Teachers School MOOE
Pagkatoto Mo school and supplies for the supplies for the teaching- School 300,000.00 LGU
teaching-learning
office learning process Property OTHERS
process
supplies for Costudian
the teaching-
learning
process
To Strengthened Construction of MRF School Head School
May Pera Sa strengthen SWM Program Implement proper Teachers
Basura SWM implementation to waste disposal SWM
Program 90% Coordinator 50,000.00 MOOE
implementati Implement the 3R’s SPGO LGU
on from 70- program PTA OTHERS
90% SGC
Enhanced SWM Learners
corner
Enhanced SWM
policies
SWM inside and
outside of the school
Participate in SWM
evaluation/activities
74
School Improvement Plan
Sakuna To orine -Conducted DRR Conduct DRR Parents, School 20,000.00
Iwasan, Safety teachers and Orientation orientation to Teachers, DRR
Tips Pakinggan learners on -Conducted parents, pupils, Coordinator
DRR to regular DRR drills teachers Learners,
minimize quarterly Conduct regular DRR BDRRM
accidents by -Procured Radio drills quarterly School Head
100% Communication Procure Radio
Sets for emergency Communication Sets
Purposes and for for emergency
Monitoring Purposes and for
Monitoring
Bata Iskawt, To increase Increased number Register boys to the Teachers School 135,000.00
Sikat! number of of boys BSP Council School Head,
boys participating in Conduct Investiture BSP
participating scouting activities Ceremony Coordinator
in scouting Attend different Parents,
activities encampment Boys
Attend BTC and Wood
Badge Training
75
School Improvement Plan
To increase Increased number of Register girls inthe Teachers School 130,000.00 OTHERS
Girls Power number of girls girls participating in GSP ouncil School Head, BSP
participating in scouting activities Coordinator
scouting Conduct school- Parents, MOOE
LGU
activities based encampment Girls
OTHERS
Attend District
Camporals and
Provincial Jamboree
Attend GSP
Trainings/Seminars
76
School Improvement Plan
Eskwela physical plant
Repainted of walls, mini
fences, chairs, tables,
roofs and school gate
-Memorandum of
Agreement/Deed of
Donations
My Teacher, To attain 90% -Increased by 75% in -Increased by 75% in IPCRF School Head School MOOE
My Hero of 24 IPCRF rating by rating by capacity building Teachers 75,000.00 LGU
teachers in K- capacity building seminars OTHERS
6 rated in seminars
their IPCRF -Mastered the PPST -Master the PPST standard
as Proficient standard
to Highly -Attended -Attend seminars/trainings
Proficient seminars/trainings conducted by school district,
conducted by school division, region and national
(SLAC-TIP), district,
division, region and
national -Enrolled teachers and School
-Enrolled teachers Head to SEAMEO INNOTECH
and School Head to Course
SEAMEO INNOTECH
Scholars -Encouraged teachers to enroll in
77
School Improvement Plan
-Encouraged Graduate Studies
teachers to enroll in
Graduate Studies
RPMS Alamin Orient - Oriented teachers Preparation of Training School Head School 5,000.00 MOOE
at Suriin teachers on on the preparation of Designs Teachers LGU
the RPMS Seeking an approval from OTHERS
preparation higher office
of RPMS Send Communication to
proposed speakers
78
School Improvement Plan
Agri-Crop production
materials and instruments
Conduct GPP Evaluation
per grade level/
Tribu, To Strengthened IP Implement different School Head, School 60,000.00 MOOE
Ipagmalaki at strengthen IP Education in School programs on IP Education Teachers, LGU
Mahalin Education in by providing Procured different IP School IP Others
School by different IP Materials to enhanced Coordinator
providing Materials /enhance teaching and learning.
different IP to enhance
Materials teaching.
/enhance to
enhance
teaching.
Teachers To conduct Acquired different Acquiring different modules for School Head,
Induction TIP to the modules for TIP. TIP. Teachers, Whole MOOE
Program newly hired Conducted the TIP Conducting TIP to the newly Guidance Year 20,000.00 LGU
teachers to the newly hired hired teachers through SLAC Coordinator Round OTHERS
through teachers through Session. and Newly
SLAC SLAC Session. hired teachers
Session
79
School Improvement Plan
CHAPTER 4 C
H
MONITORING AND EVALUATION
A
P
The School-Community Planning team have agreed to organized and
T
report the progress of SIP and AIP implementation at the middle of the year,
E
October 2020 and at the end, March 2021. For projects that require longer time
R
and big amount to accomplish, the SPT will monitor it quarterly and annually
starting June 2020. The SPT have also agreed to guide and help the Project
4
Teams in resolving problems especially during the early stage of project
implementation.
The project Teams will submit a progress report using the template on
the other page. Both the SPT and the Project Team will discuss the
Recommendations/Actions Points based on the results on the monitoring done
by the SPT.
The progress report shall be consolidated and serve as inputs to the SRC,
which shall be presented to the stakeholders during mid-year and year- end.
80
School Improvement Plan
TBOLI ELEMENTARY SCHOOL MONITORING & EVALUATION
TEAM
JEMAR B. PELAEZ
School Principal -I
School M & E Team Chairman
81
School Improvement Plan
PROJECT MONITORING REPORT FORM
83
School Improvement Plan
Institutionalize May 2020
Tayo’y Magkaisa, Brigada Eskwela March 2021
Halina’t Mag- Brigada
Eskwela
84
School Improvement Plan
To provide
School Ko. Ipa- established and October 2020
Survey Ko lawful school March 2021
documents
85
School Improvement Plan
Sakuna Iwasan, To orient teachers October 2020
Safety Tips and learners on March 2021
Pakinggan DRR to minimize
accidents by 100%
To increase the
performance level of October 2020
Batang MATHalas
learners in March 2021
Mathematics by 2%
Teachers Induction To conduct TIP to
Program the newly hired
teachers through
SLAC Session
86
School Improvement Plan
To increase number October 2020
Hindi lang Pang- of athletes to March 2021
Akademiks Pang qualified in the
Sports Din Palarong Pambansa
87
School Improvement Plan
Gulay ay Buhay To strengthen October 2020
Gulayan sa March 2021
Paaralan Program.
88
School Improvement Plan
PREPARED BY:
89
School Improvement Plan
Region XII
Schools Division of South Cotabato
Tboli West I District
TBOLI ELEMENTARY SCHOOL
Purok Sentro, Kematu, Tboli South Cotabato
Madam:
Greetings!
Attached is a copy of the Enhanced-School Improvement Plan (E-SIP) of Tboli
Elementary School Kematu, Tboli, South Cotabato which we are hereby
endorsing for your approval.
We wish to inform your office that this E-SIP is a product of the collaborative
effort of parents, community leaders, teachers, alumni and pupils.
Sincerely yours,
JEMAR B. PELAEZ
School Principal-I
90
School Improvement Plan