Material Controller Procedure
Material Controller Procedure
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 0 of 9
Amendment Record
This procedure is reviewed to ensure its continuing relevance to the systems and process that it describes. A
record of contextual additions or omissions is given below:
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 1 of 9
1.0 OBJECTIVE:
1.1 To establish a standard procedure to monitor and check the incoming and outgoing
materials, more especially the monthly production consumption.
1.2 To provide adequate and proper inventory procedure.
2.0 SCOPE:
2.1 Consumable/Consign materials are the materials or items that commonly used at the
production process.
2.2 Incoming receiving procedure is the acceptance and determination of good and rejects
which are check by the part number and the quantity.
3.0 RESPONSIBILITIES:
3.1 The Material Controller distributes the supplies being requested by an employee.
He/she verifies that the supply/ies requested and being distributed is/are match with
that of the receiving form signed by the requesting employee.
3.2 Creates and update inventory control plan and reports of materials.
4.1. Material Issuance Log – a document that shows the release of supplies to employees.
4.2. Purchase Requisition Form (PRF) - a document filled out with data by a material
controller or any employee to notify the purchasing department of the supplies it
needs to order.
4.3. Material Inventory Log Sheet – a documentation of the stocks of supplies which is
checked by the material controller to determine the availability and inadequacy of
supplies.
4.4. Receiving Quality Control Report (RQCR) - a document filled out by the material
controller in accordance to the Purchase request form.
5.0 FORMS:
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 2 of 9
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 3 of 9
6.1.4 If the item is good upon receipt, the items should be stored in the stock room.
6.1.5 Then, if the item is not good – along with RQCR, report the item to Purchasing
Department.
6.1.6 Purchasing will assess and report to supplier.
6.2.1 The Material Controller will regularly check the inventory and record to Physical
Inventory Count Sheet to determine for the availability of Administrative,
Production, Facilities/ Maintenance supplies.
6.2.2 Once inadequacy or unavailability of supplies is noted, the Material Controller
will be requesting for purchase of supplies to the Purchasing Department.
6.2.2.1 A Purchase Requisition Form (PRF) will be filled out by the Material
Controller.
6.2.2.2 When the form has been completely filled up, the Material Controller
will submit the copies to the Director Head to have it checked and
consigned.
6.3.1 An employee in need of any of the supplies available will approach the material
controller to acquire the material/s he/she will need.
6.3.2 The material controller will confirm the item/s and quantity needed by the
requestor. Once confirmed, he/she will distribute the said item/s to the
requestor and will have the requestor to countercheck the given item/s.
6.3.3 The material controller will hand out a Material Issuance log which must be
properly filled.
6.3.4 After the distribution, the material controller will update the inventory in which
the item/s requested was/were designated.
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 4 of 9
7.1.2.1 Picklist is a written documents w/c itemized the material inside the box
& this is always paste at the top of the box.
7.1.2.2 Write the date received as your reference for the future documentation.
7.1.3 Upon checking your actual material always priority the shortages material to be
first issue to QA.
7.1.4 Do receiving report in excel file and send to Planner/ Production Director,
Impex, Production, and Engineering.
7.1.5 Check the actual quantity, part number and lot number vs documents.
7.1.6 If it has discrepancy, start filling up the DMR (Discrepant Material Report).
7.1.7 Run folder will be given to DCO for drawing verification and distribution.
7.1.8 Issue the finish kit to QA along the copy Shop Docs and DMR form these will be
your receiving form to QA.
7.1.9 Advice the Planner/Production Director for the material shortages.
7.3.1 The requestor in need of materials will approach the material controller to
request the material/s he/she will need.
7.3.2 The material controller will confirm the material/s and quantity needed by the
requestor.
7.3.3 The material controller will hand out a material issuance log sheet form which
must be properly filled.
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 5 of 9
8.1.3.1 See the Core, Vendor Name, Type of Core and Wire at Core and Wire Inventory.
8.1.3.2 Write the complete filled-up Core Part Number, Wire Part Number, Type of
Core and Core Vendor, to the Purchase Order Document – given by the Planner.
8.1.3.3 Prepare the core & cut the wire by size required.
8.1.3.4 Log all the issue kit on the core & wire log sheet.
8.1.3.5 Issue to production for core winding.
8.1.4.1 Reflect on google report the shortages core and wire and the affected P.O.
8.1.4.2 Request additional quantity for floor stock.
8.1.4.3 Advise Production Director to update the WIP plan.
9.2 Check the stock wire if it filled the required P.O quantity.
9.3 YES (with stock available) advise the Production Director with material (ok stock).
9.7 NO, reflect on your google report KW wire inventory and the affected P.O.
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 6 of 9
Material Controller
Controls and
monitor the quantity Requestor
balance of stock
if no
if yes
RQCR (Receiving
Quality Control
Not needed PRF Report
Do PRF (Purchase Out of stock?
Requisition Form
(Purchase Requisition
Form)
if no
if no
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 7 of 9
if no
Materials Dept:
Forward the lot to IQA.
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 8 of 9
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.
Department Procedure
Material Control
Doc Code: MC-QP-001 Prepared by: Wilson L. De Jesus Effective Date: February 10, 2021
Rev. No.: 01 Approved by: Pee-Jay P. Escoto Page 9 of 9
Material Controller
if yes
Advise the Director Issue the Wire to QA Log the wire part #
Wire available?
Head (ok stock) for quality assurance to KW Wire
logsheet
if no
Request additional
quantity for floor stock
Do a feedback to
Director Head (no
stock)
The printed version of this procedure is uncontrolled, except when provided with a document reference number and revision.
The electronic version of this procedure is the latest revision. Check Master List of Controlled Document for current validity.