028120-SPL-001 Shop Fabrication Bend Rev. C
028120-SPL-001 Shop Fabrication Bend Rev. C
028120-SPL-001 Shop Fabrication Bend Rev. C
PROJECT SPECIFICATION
SHOP FABRICATION AND INDUCTION PIPE BENDS
TABLE OF CONTENTS
Page
1.0 SCOPE 3
2.0 CODES, STANDARDS AND REFERENCES..............................................................................3
3.0 DEFINITIONS...............................................................................................................................3
4.0 MANUFACTURING REQUIREMENTS......................................................................................3
5.0 BENDING PROCEDURE..............................................................................................................4
6.0 BENDING PROCEDURE QUALIFICATION..............................................................................5
7.0 BEND DIMENSIONS AND TOLERANCES................................................................................6
8.0 INSPECTION AND TESTING......................................................................................................7
9.0 PAINTING AND COATING.........................................................................................................9
10.0 SHIPPING AND HANDLING.....................................................................................................10
11.0 QUALITY ASSURANCE............................................................................................................10
12.0 DOCUMENTATION...................................................................................................................11
Page 2 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
1.0 SCOPE
This Specification describes the minimum requirements for the fabrication of large radius pipe
bends, formed by the heat induction process.
COMPANY supplied individual Data Sheets and/or Drawings shall be considered an integral part
of this Specification. Any conflicts shall be brought to the immediate attention of the COMPANY.
3.0 DEFINITIONS
The definitions pertinent to this Specification are contained in document number 028120-ACG-
001.
Page 3 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
Cooling medium volume: within +10% of volume qualified (induction bend only).
R/D factor: from minimum qualified to higher values.
Postbend heat treatment; within +50°F of temperature qualified, and +0.5 hours of time
at temperature qualified, for subcritical heat treatments.
A bending procedure must be requalified when a change is made in any of the applicable
essential variables beyond the limits indicated in the above.
The pipe shall be loaded into the bending machine such that the thickest quadrant lies in the
outer radius of the bend.
The amount of springback shall be controlled to maintain the dimensional integrity of the
bend to the specified tolerance limits of the bend angle and bend radius.
The bending temperature shall be monitored by optical pyrometer. Temperature monitoring
equipment shall be calibrated daily.
For welded pipe the weld seam shall be orientated along the neutral axis of the bend.
Page 5 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
Page 7 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
Drift.
Bend angle.
Bend radius.
Plane of bend.
Tangent points.
Tangent lengths.
Bends with dimensions that are found to exceed the tolerance limits specified in Section 6.0
shall be rejected.
8.5 Wall Thickness Measurement
Wall thickness measurements shall be taken by means of an approved pulse echo caliper, D-
meter or other suitable ultrasonic device capable of providing readings to 0.001 inch
(0.025 mm).
The instrument used for wall thickness measurement shall be calibrated each day before use.
Surfaces to be measured shall be free of dirt, grease, scale and other foreign matter. All
surfaces shall be treated, if necessary, in accordance with the instrument Manufacturer's
recommendations.
Thickness measurements shall be taken at the following locations :
Beginning of bend.
Quarter bend.
Half bend.
Three quarter bend.
End of bend.
At each of the above locations, thickness measurements shall be taken at four locations
around the circumference, as follows :
At the inside radius of the bend.
At the outside radius of the the bend.
At 90 degrees from the inside radius at the top.
At 90 degrees from the inside radius at the bottom.
8.6 Ovality Measurement
Ovality measurements shall be taken by means of a suitable size caliper or C-gauge. Ovality
measurements shall be taken at the following locations :
Front tangent end.
Beginning of bend.
Quarter bend.
Half bend.
Three quarter bend.
End of bend.
Rear tangent end.
Page 8 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
The percentage reduction in ovality shall be calculated in accordance with the following
formula :
x 100
where: Di = Increased outside diameter
Dr = Reduced outside diameter
Do = Original outside diameter
8.7 Drift
The minimum internal diameter of each bend throughout any radial cross-section shall
not be less than 96% of the nominal internal diameter of the bend.
8.8 Other Dimensional Measurements
All other required dimensional measurements for every bend shall be made by the standard
shop floor layout and shall include measurement of the following dimensions :
Angle of bend.
Radius of bend.
Tangent points - front and rear.
Tangent lengths - front and rear.
Plane of bend.
The actual angle of the bend shall be calculated by measuring the radius of curvature and the
chord dimension, as follows :
Angle of bend = 2 x arcsin
8.9 Hardness Test
All finished bends shall have the hardness tested on the external surface using the Brinell
(ASTM E-10) or the Rockwell (ASTM E-18) hardness test method. The hardness shall be
measured at four (4) locations; two on the internal radius of the bend and two on the outside
radius of the bend.
8.10 Hydrostatic Pressure Test
The CONTRACTOR shall hydrostatically pressure test each finished pipe bend. The test
pressure shall be sufficient to produce a hoop stress of 90% of the specified minimum yield
strength. Test pressure shall be held for thirty (30) seconds. Leaks or deformation are cause
for rejection.
Page 9 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
Page 10 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
12.0 DOCUMENTATION
CONTRACTOR shall provide COMPANY with the following documents associated with each
pipe bend:
12.1 Bending Procedures
Bending Procedures, with supporting bending procedure qualification test reports (to be
submitted to COMPANY for review and acceptance, prior to use in production).
12.2 NDE Procedures
Nondestructive examination procedures (to be submitted to COMPANY for review and
approval prior to use in production).
12.3 Heat Treatment Records
Heat treatment reports and charts for postbend heat treatments applied to prototype bends
used in qualification of the bending procedure and all production bends.
12.4 NDE Reports
Nondestructive examination reports.
12.5 Operator Certifications
Current list of certified operators (to be submitted to COMPANY prior to start of
production).
12.6 QC Reports
Quality Control reports showing rejection rates, defect types and corrective actions taken (to
be submitted weekly during production of the pipe bends).
12.7 Marking Procedures
Marking procedures describing the traceability of materials (submitted before production).
12.8 Test Results Reports
Copies of all test results required by this Specification. Copies of test documentation shall
clearly identify the bend by mark number (submitted after production).
12.9 Bend Production List
A master bend production list, which provides the details of the bends produced, such as
bend mark number, repairs, rejects, radiography, etc. This list shall cover the entire bends
order and shall be provided to COMPANY no later than ten (10) days after completion of the
order.
Page 11 of 12
028120-SPL-001 Rev C
11-03-2003
CNOOC SOUTH EAST SUMATRA BV
SOUTH EAST SUMATRA (SES) GAS PROJECT
FRONT END ENGINEERING DESIGN
Page 12 of 12
028120-SPL-001 Rev C
11-03-2003