Maintenance Processing (Shift Log Book Report) : Release V1.0
Maintenance Processing (Shift Log Book Report) : Release V1.0
Maintenance Processing (Shift Log Book Report) : Release V1.0
MAINTENANCE PROCESSING
(Shift Log Book Report)
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
Typographic Conventions
EXAMPLE TEXT Names of elements in the system. These include report names,
program names, transaction codes, table names, and individual key
words of a programming language, when surrounded by body text, for
example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths,
messages, source code, names of variables and parameters as well as
names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the
ENTER key.
Example text Exact user entry. These are words or characters that you enter in the
system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these
words and characters with appropriate entries.
Abbreviations
Contents
TCODE - ZSHIFTREP
1. You will enter the screen where you have to populate the fields as shown in the screen
Enter the planning Plant, Planner Group, Work Center, Date and Shift.
Note: We can create, change and display shift log book for Planning plant, Planner group, Work
center, date and shift unique combination.
Thro this screen you have tabs to Create notification , Change notification ,
display Notification , Delete the notification , Refresh button , direct entry of the
notification number
To create notification click on the you will go to the input screen to create notification
Create the notification and save. Populate the Shift details in the Notification tabs.
You can see the notification number in the screen.
You can also see details for the Description, Reference objects of the equipment, System status of
the equipment, Delay in minutes (Delay report Notification),
Attended By and Remarks are the free text fields.
To Change the notification select the line item of the notification and click on
You will directly enter the screen of change notification and you can save after changing
To Display the notification select the line item of the notification and click on
You will directly enter the screen of change notification and you can save after changing.
Incase if you want to delete the notification of the screen select the line and click on
If any notification is created with the parameters falling under the shift details the notifications will
be fetch in the screen. Use refresh button for that
4. You have a screen which is a free text filed where you can enter any message to the next shift.
5. You have a screen to enter the measuring point/counter reading entry from the screen
Click on to go to the standard screen of entry list where you can enter the measuring
point reading collectively and create measuring documents.
The document against entry list will be created for each measuring point.
Thro this screen you have tabs to Create maintenance Order , Change Maintenance
Order , Display Maintenance Order , Delete the Maintenance Order ,
To create Maintenance Order click on the . you will go to the input screen to create
Maintenance Order
Create the Maintenance Order and save. Populate the Shift details in the Maintenance Order tab.
You can see the Maintenance Order in the screen.
You can see the details like Description, Reference objects of the equipment, System status of the
equipment,
Attended By and Remarks are the free text fields.
To Change the Maintenance Order click on the change select the line item of the Maintenance
Order and click on
You will directly enter the screen of change Maintenance Order and you can save after changing
To Display the Maintenance Order click on the change select the line item of the Maintenance
Order and click on
You will directly enter the screen of change Maintenance Order and you can save after changing.
Incase if you want to delete the Maintenance Order of the screen select the line and click on
If any Maintenance Order is created with the parameters falling under the shift details the
Maintenance Order will be fetch in the screen. Use refresh button for that
You can see the list of documents created against the measuring point/Counter.
You can have multiple selection of entry list, date from this screen.
TCODE – ZSHIFTREP
1. Enter the parameters in the screen for which you want to change the report
Enter the planning Plant, Planner Group, Work Center, Date and Shift.
2. Click on to go to the main screen where you can change all the required fields you want to
change.
TCODE – ZSHIFTREP
1. Enter the parameters in the screen for which you want to display the report.
Enter the planning Plant, Planner Group, Work Center, Date and Shift.