NHPC Performance Highlights Upto APR 2022
NHPC Performance Highlights Upto APR 2022
NHPC Performance Highlights Upto APR 2022
It was decided that the formation of Joint Venture between NHPC and JKSPDC, Govt. of J&K for execution of RatleH E Project (850 MW) shall be
fast tracked and Kirthai-II H E Project (930 MW) shall also be implemented by a Joint Venture between NHPC and JKSPDC.
Hon’ble Secretary (Power),Shri Sanjeev NandanSahai and Shri Tanmay Kumar, Joint Secretary (Hydro) visited Salal PS, Dulhasti PS, PakalDul,
Kiru and Kwar H E Projects from 28.10.2020 to 30.10.2020.
CMD along with senior officers of Subansiri Lower Project met Hon’ble Chief Minister, Assam at Guwahati on 21.10.2020. During the meeting,
Hon’ble Chief Minister was briefed about the ongoing construction activities at Subansiri Lower Project, river bank protection measures and
livelihood intervention activities in downstream areas of the project being undertaken by the Project.
Unit-1 of Chamera-II Power Station was successfully synchronized with Grid on 19.10.2020.
The first tranche of the balance outstanding dues has been received from J&K. For the first time in NHPC’s history, realization from the
beneficiaries have crossed Rs. 1000 crore for two consecutive months (September and October).
Second unit of Baira Siul Power Station after its renovation was successfully test synchronized on 27.10.2020.
Successful conduct the e-RA for 50 MW floating Solar Power Project in Kerala on 19th and 20th of October 2020.
During the month of October, total revenue collection from the beneficiaries wasRs. 1411 crore (excluding deviation) and Rs.1436.80 crore
(including deviation).
The total cumulative generation of all NHPC power stations till the month of October 2020 stands at 19500 MUs.