380910-Eia-0010-01 (2), Temp PDB-02 & 03
380910-Eia-0010-01 (2), Temp PDB-02 & 03
380910-Eia-0010-01 (2), Temp PDB-02 & 03
P1
P1 D-601A Air Dyer for 6bar CA(Phase1) 3 5.5
-
- 32
-
-
-
-
-
-
250/5
30/5
1
1 5 Yes
-
-
-
-
1
1 4 2.5
Al.
Cu.
PDB-04/-*-/K-601B/P1
PDB-04/-*-/D-601A/P1
-
-
-
-
-
-
-
-
-
-
CP
CP
-
-
18.The kW rating indicated in 1st column of Table-1 are connected load, while the Mehsana
kW rating indicated in 2nd column of Table-1 are maximum running load with load factor and
10 P1 D-601B Air Dyer for 6bar CA(Phase1 : Future) 3 5.5 - 32 - - - 30/5 1 5 Yes - - 1 4 2.5 Cu. PDB-04/-*-/D-601A/P1 - - - - - CP 1 - diversity factor without standby & spare load. Near Ahmedabad
19. Power cable sizing will be designed considering total voltage drop of 5% up to motor equipment
11 M1 CT-303A Process Cooling Tower (Phase-1) 3 1.5 - - 4 - - - - - - - Y 1 3 2.5 Cu. PDB-04/-*-/CT-303A/P1 1 4 2.5 Cu. PDB-04/-*-/CT-303A/P1 MO - during steady state and starting voltage dip of 15%. Gujarat
20. Electrical contractor shall provide the cable tag as per circuit number indicated in
12 M1 CT-303B Process Cooling Tower (Phase-1 : Standby) 3 1.5 - - 4 - - - - - - - Y 1 3 2.5 Cu. PDB-04/-*-/CT-303B/P1 1 4 2.5 Cu. PDB-04/-*-/CT-303B/C1 MO -
the drawing and also make the actual feeder number of switchboard in the cable tag in place of -*-.
13 M1 CT-303C Process Cooling Tower (Phase-1 : Future) 3 1.5 - - 4 - - - - - - - Y 1 3 2.5 Cu. PDB-04/-*-/CT-303C/P1 1 4 2.5 Cu. PDB-04/-*-/CT-303C/C1 MO - 21. The Load Manager of PDB shall be with Ethernet IP communication port .
22. Internal wiring of reactor & other modules will be in PDB vendor scope.
Process Cooling Water Circulation Pump for Title
23. Maximum 50 feeders to be considered in each nod at PDB-3 Panel, Nods switch to be provided in
14 M1 P-303A
Cold Well (Phase-1)
3 5.5 - - 12.5 - - - - - - - Y 1 3 4 Cu. PDB-04/-*-/P-303A/P1 1 4 2.5 Cu. PDB-04/-*-/P-303A/C1 MO
incomer section of Panel. Panel vendor to provide Repeater after every 25 feeders. Greenfield Automotive Glass Plant
Process Cooling Water Circulation Pump for 24. Panel shall have Ingress Protection IP-54 for Starter feeders, IP-42 for VFD feeders with proper
15 M1 P-303B
Cold Well (Phase-1 : Standby)
3 5.5 - - 12.5 - - - - - - - Y 1 3 4 Cu. PDB-04/-*-/P-303B/P1 1 4 2.5 Cu. PDB-04/-*-/P-303B/C1 MO heat dissipation arrangement. Power Distribution Baord - 02, 03 & 04
25. Required kVA rating UPS shall be provided by Panel vendor in the control compartment of panel to
16 M1 P-303C
Process Cooling Water Circulation Pump for
Cold Well (Phase-1 : Future) 3 5.5 - - 12.5 - - - - - - - Y 1 3 4 Cu. PDB-04/-*-/P-303C/P1 1 4 2.5 Cu. PDB-04/-*-/P-303C/C1 MO feed auxiliary supply to PDB-3 relay of all starter feeders and control bus for the same shall be
formed in the panel by panel vendor.
(PDB-02, 03 & 04) for TEMP Plant
17 P1 GIM-01 MAW Injection Mould Machine-PH-1 3 100 - 250 - - - 250/5 1 5 Yes - - 1 3.5 120 Cu. PDB-03/-*-/GIM-01/P1 - - - - - CP - 26. All CTs terminals shall be Short link type.
27. All switchgear ampere rating shall be in panel rating as per site operating condition.
Electrical Single Line Diagram
18 M1 - Spare 3 1.5 - - 4 - - - - - - - - - - - - - - - - - - MO - 28. Panel Incomer feeder rating is designed based on running load with 25% de-ration and outgoing
19 M1 - Spare 3 5.5 - - 12.5 - - - - - - - - - - - - - - - - - - MO - feeder rating are designed based on the connected load of the respective equipment.
29.Panel Incomer cable size is designed based on running load of the panel and outgoing feeder cable
20 P1 - Spare 3 - - 32 - - - 30/5 1 5 Yes - - - - - - - - - - - - CP are designed based on the connected load of the respective equipment. Designed N Hingorani Eng check G C Beldar
30.All the load managers/MFM's/kWH meter communication cable shall be looped at brought at at
21 P1 - Spare 3 - - 63 - - - 60/5 1 5 Yes - - - - - - - - - - - - CP
terminal block for energy monitoring. Drawn M Apastamb Coordination S Mardwar
22 P1 - Spare 3 - - 63 - - - 120/5 1 5 Yes - - - - - - - - - - - - CP 31.ACB/ MCCB s' ON/OFF feedback (potential free contacts) shall be available up to control Box,
Dwg check J Melath Approved S Bartakke
through which remote/SCADA status can be seen.
23 P1 - Spare 3 - - 250 - - - 250/5 1 5 Yes - - - - - - - - - - - - CP 32.Each microprocessor base relesse of ACB/ MCCB should be communicable to SCADA through Status Rev Security
Scale at A1
Modbus or TCP IP.
33.Arc protection relays shall be provided along with require number of arc sensing sensors duly wired NTS EXE 1 STD
up to arc protection relay in LT panels for bus bar arc protection
© Mott MacDonald Drawing Number
34.All panel shall be powder coated with RAL7032 colour shed.
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
35.VFD shall be of Mitsubishi make shall be supplyed by panel vendor.
380910-EIA-0010-01
C:\pwlocal\pims03\apa42076\d0246935\380910-EIA-0010-01 (1).dwg Sep 3, 2018 - 11:11AM APA42076