Bottling Plant Quantities Cost

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT PROPOSED BOTTLING PLANT AT NIGERIA DOCUMENT No &

REV

ABSTRACT SHEET - BOTTLING PLANT


S/NO DESCRIPTION A/U QTY RATE (₦) AMOUNT (₦)
1. SITE CLEARANCE
2. EXCAVATION FOR FOOTINGS (TOTAL DAY 267500 80000 480,000
DEPTH 1.60 MTRS.)
3 1.5 MTR – 1.6 MTR
4. PCC (1:4:8) FOR FOOTING/ FLOOR M3 195.88 12,239 2,397,300
5. M25 CONCRETE FOR FOOTING M3 107.894 63876.16 3,975,100
6. FORMWORK FOR FOOTING M2 272.20 2040 555,290
7. REINFORCEMENT STEEL Y16MM KG 8378.332 436 3,652,955
8. REINFORCEMENT STEEL Y12MM KG 5304 461.54 2,448,010
9. REINFORCEMENT STEEL Y10MM KG 15790 665.75 75,791,520
10. REINFORCEMENT STEEL Y8MM KG 1534.44 477 731,880
11. BINDING WIRE KG 500 500 250,000
12. M25 CONCRETE FOR PEDESTAL M3 20.06 39678.70 795,955
13. FORMWORK FOR COLUMN M2 274.32 2040 559,613
14. M25 CONCRETE FOR BEAM M3 59.4134 39703.20 2,358,900
15. FORMWORK FOR BEAMS M2 472 2040 962,880
16. M25 CONCRETE FOR FLOORING M3 195.745 39659.87 7,763,225
17. NAILS – 2 INCHES KG 100 480 48,000
18. NAILS – 3 INCHES KG 150 480 72,000
19. NAILS – 4 INCHES KG 150 500 75,000
20. ANCHOR BOLTS M 192 12,000 2,304,000
21 NUTS FOR ANCHOR BOLTS 384 900 345,600
WASHERS FOR ANCHOR BOLTS 384 500 192,000
230 MM (9 INCH BLK FOR 5850 300 1,755,000
FOUNDATION WALLS)
MORTAR FOR FOUNDATION - - - 804,020
BLOCK WORK
TOTAL 108,318,248

NOTES:
1) All prices stated in table above are subject to change without notice (these were prices as at last week
ending 7th November 2021).
2) Quotations above does NOT take into account cost of labor and cost of logistics to move materials to site.