Procurement Planning & Monitoring
Procurement Planning & Monitoring
Procurement Planning & Monitoring
MONITORING
1
PLANNING 101
OUTLINE
1. What is planning?
2. Nature of Planning
3. Procurement Planning
3.1 Importance of Planning
3.2 Preparing the PPMP
3.3 Preparing the APP
4. Procurement Monitoring
4.1 Importance of Monitoring
4.2 Preparing the PMR
3
PROCUREMENT PLANNING
4
PLANNING
PLANNING
Refers to
predetermined
course/s of action
to achieve a
desired end/goal.
PROCUREMENT PLANNING
9
ACTORS IN PROCUREMENT
PLANNING
APP
Annual
Procurement
Plan
PPMP
Project Procurement
Management Plan
Contracting Arrangement
Procurement
Type
Estimated
Time
Extent/size
andschedule
Objective
budget
methods
PPMP
14
PPMP SAMPLE FORMAT
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
END-USER/UNIT: _______________________
Downloadable at http://www.gppb.gov.ph/downloadables/SampleForms.html
15
IDENTIFYING THE NEED
Suggested basis for identifying needs:
1. Core functions of the end-user unit in the
organization, i.e Accounting, Legal etc.
2. Historical data/Foreseen contingencies;
3. Identified purpose/goals/MFOs;
4. Procuring Entity’s Strategic Plans;
5. Current supply inventory;
6. Other maintenance and operating needs.
16
TECHNICAL SPECIFICATIONS, SCOPE OF
WORK, AND TERMS OF REFERENCE
• Consult Stakeholders
• Engage Technical Experts
• Set clear Specifications
Generic and Flexible
Clear and unambiguous
Reminder on Reference to Brand Names (Sec. 18)
Updated, where technology is taken into
account
Fits actual requirements of the PMO/End-user
17
Technical Specifications (Sample)
Functional Description
– a pen is expected to write 1.5 km of straight,
continuous lines
Performance Description
– should do so continuously and smoothly, without
skipping, and with the color of the ink being
consistent
Environmental Interface
– on pad paper or bond paper, but not necessarily on
wood or on a white board
Design
– Ballpoint, gel-tip, sign pen, technical pen, etc.
Capacity Development Division
APPROVED BUDGET FOR THE
CONTRACT (ABC)
19
APPROVED BUDGET FOR THE
CONTRACT (ABC)
For multi-year contracts, for which a Multi-Year
Obligational Authority (MYOA) or an equivalent
document is required, the ABC shall be that
incorporated in the project cost reflected in the
MYOA or equivalent document
21
PROCUREMENT MILESTONES
22
PROCUREMENT MILESTONES
23
PROCUREMENT MILESTONES
Factors to consider in identifying procurement
timelines:
• Budget rules, i.e. CSE – 2 month-requirement;
• Nature of Procurement Projects, whether
simple or complex
• For shopping/small value procurement, give
at least two weeks
• Foreseen/Unforeseen Contingencies, i.e.
frequent change in specifications, etc.
• Availability in the market.
24
METHOD OF PROCUREMENT
As a general rule, all
procurement should be through
public bidding
26
Procurement Planning Process
APP
Annual
Procurement
Plan
PPMP
Project Procurement
Management Plan
28
ANNUAL PROCUREMENT PLAN (APP)
30
APP Format
1 2 3 4 6 8
5 7
32
Notes to Remember in Filling out APP!
Specific schedule for Ads/Post of IB/REI (similar to
RFQ), Sub/Open of Bids, NOA and/or Contract Signing
are automatically identified thru MS Excel formula.
Specific period (dates, month, quarter) for each
procurement activity should be indicated.
Total ABC column cannot be edited but is automatically
computed by filling out the MOOE or CO columns.
Ensure that amounts indicated are aligned with
budget documents.
For MYOA projects, ABC shall be the full amount
stated in the MYOA with remarks on the amount to be
disbursed on the particular FY.
33
PREPARATION OF PPMP to APP
During Budget Preparation/Budget Call
HOPE/Approving
Body
BAC &
Secretariat
Consolidate PPMP to
BAC & BAC Sec Updated/ Supplemental APP
Approve Updated/
HOPE Supplemental APP
40
ANNUAL PROCUREMENT PLAN (APP)
Early Procurement (Procurement Short of Award)
To facilitate the immediate implementation of procurement,
even pending approval of the GAA, corporate budget or
appropriations ordinance, as the case may be, the PE may
undertake the procurement activities short of award
For a contract with a period not exceeding one (1) year,
the ABC shall be based on the amount in the approved
indicative APP as included in the proposed national budget
(NEP) submitted by the President to Congress; on budget
levels as proposed to the governing board for GOCCs
No award of contract shall be made until the GAA or
corporate budget or appropriation ordinance has been
approved
41
ANNUAL PROCUREMENT PLAN (APP)
Early Procurement (Procurement Short of Award)
DBM Circular Letter No. 2018-8, July 30, 2018
(Prescribing Guidelines on the Conduct of Early Procurement for
FY 2019 NEP)
AO 25 IATF MC 2018-1 (Guidelines on the Grant of FY
2018 PBB
– Agency should ensure that at least 50% of the
volume of number of the planned procurement for
FY 2019 should undergo Early Procurement, after
strategizing those activities and projects it needs to
implement in the first semester and those
procurement activities it deems difficult or risky
– Each agency shall submit a Certification of
Compliance to the GPPB
42
APP vis-a-vis APP-CSE
APP being referred to in the IRR of RA 9184 is different
from the APP-CSE
APP-CSE serves as basis of DBM – PS in projecting its
inventory requirements, scheduling of activities, and over-all
management of the central procurement of common-use
goods (DBM Circular Letter 2011-6 & 2011-6a)
Common-use supplies – refers to those supplies and
materials and equipment included in the price list of the
PS which are necessary in the transaction of the official
business of the procuring entity and consumed in its day-to-
day operations
43
APP-CSE
44
OUTSOURCING OF
PROCUREMENT TASKS (Sec. 7.3.3)
For PE’s with NO proficiency or capability to
undertake a particular procurement:
1. Request other GoP agencies to undertake
procurement through a Memorandum of
Agreement
2. Engage private procurement agents to
directly undertake procurement
3. Recruit or engage consultants to assist
them directly and/or train staff in the
management of procurement function
45
POSSIBLE CONSEQUENCES
46
PROCUREMENT MONITORING
Preparation of PMR
47
WHAT IS MONITORING?
Defined as:
48
WHY MONITOR?
Checks compliance to R.A. 9184 and its IRR
Assesses performance as to:
Efficiency
Effectiveness
50
PROCUREMENT MONITORING REPORT
(PMR)
Contents: all procurement activities specified
in APP
ongoing and completed
from the holding of pre-procurement
conference to issuance of Notice of Award
and approval of contract
including the standard and actual time for
each major procurement activity
Downloadable at http://www.gppb.gov.ph/downloadables/SampleForms.html
52
SUBMISSION & POSTING
REQUIREMENTS
• APP
– Submitted to the GPPB on or before the
end of January of the budget year (AO
222) and posted in the procuring entity's
website of its APP (Section 1.1 of the IRR
of EO 662), following the form and format
downloadable from the GPPB website
– Changes in the APP, if any, for the budget
year shall be submitted to the GPPB in
July of the current budget year, and in
January of the following budget year
53
SUBMISSION & POSTING
REQUIREMENTS
• PMR
– Submitted to the GPPB within 14 c.d. after
the end of each semester (Section 12.2 of
IRR of RA 9184); and
email to
app@gppb.gov.ph
pmr@gppb.gov.ph
Note: For APPs and PMRs, please ensure that the electronic copies
submitted are approved and signed by the Head of Procuring Entity.