ISO 50001 Manual
ISO 50001 Manual
ISO 50001 Manual
Energy
Management
System Manual
Page 1 of 53
Table of Contents
1 Purpose.............................................................................................................................. 4
5 Leadership....................................................................................................................... 13
5.1 Leadership and Commitment 13
5.1.1 Related Documents 15
5.2 Energy Policy 17
5.2.1 Related Documents 17
5.3 Organisational Roles, Responsibilities and Authorities 17
6 Energy Planning.............................................................................................................. 20
6.1 Actions to Address Risks and Opportunities 20
6.1.1 Related Documents 23
6.2 Objectives, Energy Targets and Planning to Achieve Them 24
6.2.1 Related Documents 24
6.3 Energy Review 25
6.4 Energy Performance Indicators 26
6.5 Energy Baseline 26
6.5.1 Related Documents 26
6.6 Planning for Collection of Energy Data 27
6.6.1 Related Documents 29
7 Support ............................................................................................................................ 30
7.1 Resources 30
7.2 Competence 30
7.2.1 Related Documents 30
7.3 Awareness 31
7.3.1 Related Documents 32
Page 2 of 53
7.4 Communication 33
7.4.1 Related Documents 36
7.5 Documented Information 37
7.5.1 General 37
7.5.2 Creating and Updating 37
7.5.3 Control of Documented Information 37
8 Operation ......................................................................................................................... 40
8.1 Operational Planning and Control 40
8.1.1 Related Documents 42
8.2 Design 42
8.2.1 Related Documents 43
8.3 Procurement 43
8.3.1 Related Documents 43
10 Improvement.................................................................................................................... 50
10.1 Nonconformity and Corrective Action 50
10.2 Continual Improvement 50
10.2.1Related Documents 51
Page 3 of 53
1 Purpose
This document sets out the system to manage energy at the Cranfield campus and COTEC site
in line with the International Standard for Energy Management Systems ISO 50001:2018.
This document is applicable to employees, students, visitors and contractors at the University’s
Cranfield campus and at COTEC.
2 Common Acronyms
ACRONYM MEANING
ACI Air Conditioning Inspection
BEE Board for Energy and Environment
CDS Cranfield Defence and Security
CHP Combined Heat and Power System
CoP Code of Practice
CO2e Carbon Dioxide equivalence
CRC Carbon Reduction Commitment
DEC Display Energy Certificate
DH District Heating System
E&E / EET Energy & Environment Team
EMS Environmental Management System
EnB Energy Baseline
EnMS Energy Management System
EnPI Energy Performance Indicator
EPC Energy Performance Certificate
PSDS Public Sector Decarbonisation Scheme
PSU Professional Service Units
SATM School of Aerospace, Transport and Manufacturing
SECR Streamlined Energy and Carbon Reporting
SHE/SHEE Safety, Health, Environment & Energy
SOM School of Management
SWEE School of Water, Energy and Environment
ToR Terms of Reference
Page 4 of 53
Page 5 of 53
TERM DEFINITION
Energy Services Activities and their results related to the provision and/or use of
energy
Energy Target A detailed and quantifiable energy performance requirement,
applicable to Cranfield University, that arises from the Energy
Objective and that needs to be set and met to achieve this
objective
Energy Use Manner or kind of application of energy
Interested Party A person or group concerned with, or affected by, the Energy
Performance of Cranfield University
Internal Audit A systematic, independent and documented process for obtaining
evidence and evaluating it objectively to determine the extent to
which requirements are fulfilled
Non-conformity Non-fulfilment of a requirement
Preventive Action Action to eliminate the cause of a potential Non-conformity
Procedure A specified way to carry out an activity or a process
Record A document stating results achieved or providing evidence of
activities performed
Salix Salix Finance Ltd. provides interest-free Government funding to
the public sector to improve their energy efficiency, reduce carbon
emissions and lower energy bills. Salix is funded by the
Department for Business, Energy and Industrial Strategy, the
Department for Education, the Welsh Government and the
Scottish Government and was established in 2004 as an
independent, publicly funded company, dedicated to providing the
public sector with loans for energy efficiency projects.
Scope The extent of activities, facilities and decisions that Cranfield
University addresses through its EnMS, which can include several
Boundaries
SHE Committees Quarterly Safety, Health, Environment and Energy Committee
Meetings for each School to review performance in each of these
sectors.
Significant Energy Use Energy use accounting for substantial energy consumption and/or
offering considerable potential for energy performance
improvement
Top Management The person or group of people who direct and control Cranfield
University at the highest level
Page 6 of 53
External Issues
Issue Comment
Electricity This is banned by the local DNO. Cranfield University generates its own
Export electricity from a CHP system, a large PV Farm, and several roof top PV
installations. There are times, e.g. summer weekends, when on-site production
can exceed on-site demand. In those situations, the CHP output is
automatically modulated down, but that can only be taken as low as 50%
before risk damaging the CHP engine, after which it must be turned off.
Although it does not help with energy efficiency, to further reduce carbon
emissions it is planned to increase the amount of onsite production.
Care will continue to have to be taken to ensure appropriate controls and
operating procedures are in place to avoid any export to the grid. Failure to do
so will result in significant costs.
Carbon The National Grid has now become so clean that it creates less CO2 emissions
Savings vs than the University’s gas-powered CHP engine. From a carbon perspective,
Cost when the CHP heat output is not needed, it would be better to turn off the
Savings CHP. However, from a cost point of view it remains better to continue
maximising the use of the CHP electrical output.
This has no impact on total kWh or energy efficiency but has a potentially
negative impact on emissions and the ambition to be “net zero” carbon by
2030.
Degree Colder than average winters will create extra demand for heating and thus
Days increase energy demand to provide suitably comfortable working conditions.
As the effects of Climate Change continue to increase it is also possible that
hotter than average summers will cause increased energy demand for cooling.
Page 7 of 53
Issue Comment
Student, Both students and business/research partners increasingly want to attend or
Partner and work with organisations which can clearly demonstrate that energy efficiency
Government and the minimisation of greenhouse gas emissions are taken seriously.
Expectations Similarly, the UK Government has set CO2e emissions targets and expects
organisations it funds to support those targets.
Failure to make further progress on this risks losing business and a reduction
in student numbers.
Global Global pandemics, such as Covid-19 in 2020, may result in a much-reduced
Pandemics income affecting the University’s ability to support new energy efficiency
projects. The negative effect of that is likely to be much greater than any
temporary reduction in energy bills due to much lower usage.
Controlling virus spread within the University buildings is now a key issue and
has resulted in changes to the way that HVAC plant must be run. Air
Conditioning and Air Handling systems are a route by which air borne
infections are spread and means they are now being run 24/7 in buildings used
for lectures to avoid concentrations of the virus building up. This has also
increased the requirement for heating as the Air Handling has been set to
100% fresh air make up and people are encouraged to open windows to
maintain a flow of fresh air, even when the heating is turned on.
This is completely contrary to normal good energy efficiency practice but
cannot be avoided whilst the Covid virus is still prevalent.
Internal Issues
Issue Comment
Old The history of Cranfield University, developing from a WW2 RAF base, means
Buildings many of its buildings are now very old, were not built with energy efficiency in
mind, and are used for purposes which were never originally intended. In some
cases, the only way to make such buildings really energy efficient would be to
knock them down and rebuild but that is not always possible. In such cases
maximising insulation and upgrading old plant is the best that can be done.
New Cranfield University has a Master Plan which includes the construction of new
Buildings buildings and test facilities. Whilst new buildings are specified to much higher
energy efficiency standards than old buildings, and some older buildings are
demolished, this will still tend to increase absolute overall energy demand.
Every new building is an opportunity to make it as energy efficient as possible
with the most up to date control functionality. However, there are also issues
that when a building is planned the detail of exactly how it will be used has not
been finalised and may change after the contract is let. Budgetary constraints
will also limit which technologies can be deployed.
New The University works closely with industry and some of the contracts require
Research energy intensive equipment to be used either intermittently or 24/7, sometimes
Contracts for many weeks, months or even years at a time. Inevitably this will increase
and both absolute energy demand and the kWh/m2 for those locations when this
Experiments occurs.
Examples of such facilities include three large wind tunnels, aircraft engine test
cells and large-scale compressors. These are all detailed in the High Energy
Use Equipment Register.
Page 8 of 53
Issue Comment
Uncertain The University can take advantage of interest free loans from Salix, but all such
Financing – projects have to meet Salix’s strict requirements on payback times and the cost
Loans, per tonne of CO2 saved. These loans still include the annual Revolving Green
Credit Fund (RGF), but the Government blocked further one-off SEELS loans in 2021.
Ratings and The RGF can now have 8-year paybacks but the University prefers to achieve
Grants a 5-year payback to help maintain a good credit rating. It is now possible to
apply for very large “Public Sector Decarbonisation Scheme” grants up to £5M
but competition is fierce and such projects must include removing time expired
fossil fuel heating equipment. This both limits the scope and number of projects
whilst simultaneously removing the ability to sensibly plan for many other
energy efficiency works. There is no certainty at all how many of these Grants
will be available in the future, when they will become available, nor what the
changing criteria may be. Without other sources of Finance being identified,
creating a firm plan to achieve net Zero carbon is now much more difficult to
achieve.
Failure of The CHP engine, PV farm, biomass boiler and steam boiler are all single points
key plant of failure with no like for like replacement on site.
If the PV farm or CHP fails the lost electricity supply will be made up by
importing more electricity from the National Grid, whilst gas boilers will make up
the missing CHP heat supply (although overall gas imports may reduce as the
CHP is no longer demanding gas.)
If the biomass boiler fails gas boilers will make up the missing biomass sourced
heat supply. This was the case for most of 2020/21.
If the steam boiler fails, the only alternative at present is to provide extensive
electric heating. The steam infrastructure is also a maintenance liability due to
the corrosive nature of a steam supply.
Maximum If all the SEU equipment at the Cranfield Campus were turned on
Demand on simultaneously there is a risk that the resulting load would be greater than the
Site private wire network on site could support resulting in a site wide black out.
At present the risk of that is very, very small but a process has been proposed
with Engineering and the Technical Support Services team to ensure it cannot
happen.
This will become a greater risk if more SEU equipment is added to the Campus
facilities.
Page 9 of 53
4.2.2 Responsibilities
The Energy and Environment Team will amend as necessary any relevant University
documentation and provide information regarding changes to energy regulations and other
requirements to the relevant people.
It is the responsibility of various departments to ensure that the requirements of relevant
legislation and other requirements are implemented by appropriate staff and/or students within
their own Professional Services Unit. E.g. Campus Services are responsible for domestic EPCs;
Facilities are responsible for commercial EPCs, DECs and Air Conditioning Inspections; the
Development Team are responsible for new build EPCs.
Progress of implementation of new or revised legislation will be included in Management Reviews
of the EnMS.
It is the responsibility of all staff and students to notify the Energy and Environment Team of any
energy waste through the appropriate reporting mechanisms.
It is the responsibility of the Energy and Environment Team to bring to the attention of relevant
managers/academics/senior management (as appropriate) any instances of legislation being
breached and vice versa.
Page 11 of 53
Page 12 of 53
5 Leadership
5.1 Leadership and Commitment
The Board for Energy & Environment (BEE) is a formal sub-committee of the University
Executive. It reports to the Executive on energy and environmental issues, including:
Energy and Environmental standards,
Energy management
including ISO 50001 and ISO 14001
Energy and Environmental legislation Carbon management
Water management, including drainage Sustainable travel
Sustainable buildings and infrastructure Waste minimisation and recycling
Biodiversity including Grounds Management Pollution minimisation
Sustainable procurement, including Fairtrade Community Involvement
Authority
BEE has delegated authority from the University Executive to:
i. drive continual improvement in environmental performance in line with the University’s
strategic aims.
ii. ensure compliance with existing energy and environmental legislation.
iii. realise recurrent cost savings and reduce financial risk related to utilities.
iv. progress links between Cranfield’s academic business in energy and environment and the
performance of its Estate regarding corporate sustainability; and
v. enhance Cranfield’s reputation by demonstrating a leading capability in environmental
performance.
BEE may establish sub- or working groups as required to fulfil its duties.
BEE Responsibilities
The Board’s responsibilities are to:
formulate and recommend to the University Executive energy and environmental policies,
procedures and programmes for implementation, to achieve compliance with legislation,
permits, consents and good practice.
ensure the full implementation of the energy and environment policies, procedures and
programmes by means of monitoring and audit, and reporting to the University Executive.
take appropriate action where policies, standards or targets are not being met.
recommend to the University Executive the level of resources required to facilitate effective
energy and environmental management at the University.
integrate energy and environmental management system requirements into University
business processes.
receive progress reports from the Energy and Environment Team, and relevant Cranfield
bodies and working groups on compliance with policies and progress of programmes.
support the development and sharing of good practice.
develop and deliver an action plan, identifying priorities from within the terms of reference.
review progress against the plan at each Board meeting; and
develop, implement and monitor a University Carbon Management Plan and report to
University Executive and Council.
Page 13 of 53
Page 14 of 53
Membership
The membership of BEE will usually comprise:
Chair (appointed by Executive, normally from Senior Academic Staff)
Executive Lead for Energy and Environment.
University Finance Director.
Director of Facilities.
Director of Finance and Operations (CDS)
Energy and Environment Manager.
Environment Advisor.
Energy Advisor
an additional member of the Professional Services Executive.
a member of academic staff (normally early career academic).
a member of Campus Services; and
a member nominated by the Cranfield Student’s Association.
The Board may, as required, co-opt additional members and invite attendees. The Chair is
normally a three-year term.
BEE members represent a cross section of Cranfield University’s activities and functions at a
senior level. Membership of the Board changes over time, especially the student representative
and Chair. The current make up is recorded in the Excel spreadsheet “ISO50001 People.xlsx”.
Page 15 of 53
Council
As the governing body of the University, Council has the ultimate authority for
energy management of the University
(Monthly)
Working Groups
Cranfield University
Carbon
Board for Energy and Management
Environment (BEE)
(Quarterly) Waste
Management
Biodiversity
Departmental Management /
Team Meeting (as locally
required)
Page 16 of 53
Page 17 of 53
Energy Advisor
The Energy Advisor ensures the efficient running, management and continual improvement of
the EnMS and compliance with relevant legislation and ISO50001. Key specific responsibilities
include:
Overall responsibility for facilitating the implementation of and promoting continual
improvement of the EnMS at the Cranfield campus.
Advising and assisting senior management on the development and implementation of the
Energy Policy, Objectives and Targets.
Preparing and delivering reports covering the status of the EnMS including energy
compliance, progress against Objectives and Targets, system audits and corrective
action status for consideration during the management review process.
Developing and implementing procedures and/or work instructions to ensure that all
necessary data are collected, recorded and reported to ensure statutory compliance.
Ensuring EnMS documentation is established and maintained.
Developing and maintaining a register of energy intensive equipment
Promoting energy efficiency.
Managing EnMS surveillance audit visits by the external certifying body and arranging for
internal audits to take place.
Ensuring energy awareness of all staff and students is kept up to date including, where
appropriate, delivery and making records of general and specific energy training.
Management of non-conformity issues from audit reports and other sources in
collaboration with relevant staff.
Maintaining an up-to-date knowledge of UK and European energy legislation and
informing/advising management on compliance.
Page 18 of 53
Environment Co-ordinator
The Environment Co-ordinator supports behaviour change programmes, communications,
information system management and re-charging. Key specific responsibilities include:
Delivering a behaviour change programme covering carbon reduction, recycling, sustainable
transport and other environmental improvements.
Communicating progress on energy and environmental improvements to University staff and
students, and also externally.
Maintaining an information system covering the data required to comply with statutory
requirements and University targets for Carbon, Energy and Environment.
Supporting the recharging of electricity and water on Cranfield Campus
Page 19 of 53
6 Energy Planning
6.1 Actions to Address Risks and Opportunities
This EnMS Manual defines the energy planning process which is designed to lead to
continually improved energy performance, taking account of the external and internal
issues detailed in Section 4.1, and the expectations of interested parties detailed in Section
4.2.
The key points to note are:
1) All energy use is recorded in the Energy Manager Database from SystemsLink. The
underlying data is sourced from several different routes:-
a. Automatic Meter Readings (AMR)
b. Manual Meter Reads
c. Oil Dips
d. Invoice Data
Page 20 of 53
2) The Main meters and other records which sum together to give the total energy use on
site are detailed in the SystemsLink Energy Manager database, split by type into:
Electricity, Gas, Biomass, Aviation Fuels (AVTUR and AVGAS), Solar Water, LPG, Oil,
Petrol and Diesel. New meters are added as required to ensure adequate coverage in
sufficient detail for all buildings. Meters are closed when buildings cease to be used
but the data is retained to ensure a full history is maintained.
3) DEC results and total energy use guide the University’s planning to identify the most
inefficient buildings, considering any process loads which inherently warp the DEC
results due to the energy intensity of the processes involved. The top ten heaviest
energy usage areas are identified in “CU-SHE-PLAN-04 Energy & Carbon Plan 2020-
21.docx”. DEC results are summarised in the MS Access database
“DEC_EPC_ACI.accdb” (which also includes all EPC and Air Conditioning Inspection
reports).
Page 21 of 53
4) There is an annual Salix planning cycle to identify potential projects across the
University which can use the Revolving Green Fund to pay, or partly pay, for new
energy efficiency work. This fund has £397,900 in total, the amount available per
annum is dependent upon previous projects and the repayments made against them.
An MS Access database of potential projects is maintained in “SalixProjects.accdb”
with new possibilities added and researched throughout the year and then prioritised
for funding.
5) Salix also makes available occasional larger scale Public Sector Decarbonisation
Scheme (PSDS) Grant funding for specific projects which the University bids for as and
when the opportunity arises. The present rules require that a significant part of any bid
removes time expired fossil fuel heating systems and replaces them with a renewable
solution. This can be used for large infrastructure projects to reduce the risk of single
point of failures and enhance the robustness and security of the energy supplies e.g.
expanding PV, adding battery storage and removing steam from the District Heating
system. The timing of future PSDS Grants is unknown and competition is fierce. The
criteria required to be met may also be changed between each grant application.
6) Degree Day data is used when reviewing heating energy performance to ensure as
much of a like-for-like assessment as possible is done when comparing performance
across several years.
7) A record of intensive “Process” energy loads, as distinct from “General Office” energy
use, has been created in the “High Energy Use Equipment Register.xlsx”.
Page 22 of 53
Page 23 of 53
Page 24 of 53
Page 25 of 53
The present carbon Baseline is dynamically calculated from data held in the SystemsLink
Database and exported into the “Custom_Group_Report_Carbon&Budget.xlsx”.
The Annual kWh, Annual tonnes of CO2, Annual Conversion Factors used, and a chart
tracking progress against the key Energy Performance Indicator are all extracted from the
template and saved in “Energy Baseline Summary.xlsx”.
The energy baseline for kWh/m2 indicator is the University’s performance in
2015/2016, and the Degree Days for that year.
Page 26 of 53
For the CHP it is a requirement that the gas feed meter is calibrated by the University and this
work is undertaken by Edina.
Page 27 of 53
Page 28 of 53
e) evaluation of At the highest level this is already covered by the key Energy
actual versus Performance Indicator which looks at the combined effect of all energy
expected efficiency projects across the whole University.
energy
Where Salix projects have been implemented and the level of sub-
consumption
metering gives sufficient granularity comparisons of before and after
usage are made and reported.
Page 29 of 53
7 Support
7.1 Resources
Section 5.3 defines the key members of the Energy and Environment Team who have primary
responsibility for the establishment, implementation, maintenance and continual improvement of
the University’s energy performance and the EnMS.
The Leadership Team, to whom the Energy and Environment Team Report and who also have
primary responsibility for ensuring sufficient resources are allocated, are detailed in Section 5.1.
In addition, several key people have been identified who have a significant role in supporting
the EnMS due to the nature of their jobs in either looking after buildings, operating equipment
with Significant Energy Use and/or having primary opportunities to identify inefficient practices.
These are listed in the Excel sheet “ISO50001 People.xlsx”.
In addition, there are many other people who take care of the day to day running of the
University and who are trained on the correct Operating Procedures for specific items of
equipment, for site maintenance and providing services ranging from building surveys to meter
readings.
The operation of the main Cranfield Campus’ Heating, Ventilation and Air Conditioning (HVAC)
systems is contracted out to BAM, who are also contracted to identify cost effective
opportunities to reduce energy use by 5% each year.
7.2 Competence
All people working for or on the University’s behalf, related to significant energy uses, are
competent based on appropriate education, training, skills or experience. Training is provided
when necessary to meet the needs of the Energy Management System.
The primary significant energy uses on site relate to the Heating, Ventilation and Air
Conditioning (HVAC) systems but there are also several very high energy demand pieces of
test equipment.
HVAC systems are the responsibility of the Engineering team for overall control with day-to-
day operations and maintenance carried out by the University wide sub-contractor BAM.
Test equipment falls under the University’s own Technical Support Services. These
technicians follow Standard Operating Procedures for the equipment they are responsible for
and are aware of the need to use the kit as efficiently as possible and to avoid the 4-7pm
period as much as possible to keep costs down.
Cranfield University training records are maintained within the Agresso system. Key people also
maintain their own Continuous Professional Development records and history of training prior to
working for Cranfield University.
BAM maintain their own Training Records.
All staff and students also go through an induction process which includes compulsory
Environmental and Energy Awareness training. That training is repeated every three years.
7.3 Awareness
The following key points are addressed as described below to ensure that any people working
for or on the University’s behalf are aware of:
a) the energy policy The Energy Policy, signed by the Vice Chancellor, is
displayed on Building Noticeboards and copies are on
both the Intranet and Extranet. It is normally updated
annually.
b) their contribution to the Under the Energy Policy everyone has a responsibility
effectiveness of the EnMS, to help reduce energy wastage and identify
including achievement of opportunities for improvement, but the key people for
objectives and energy targets supporting ISO50001 are identified in “ISO50001
and the benefits of improved People.xlsx” along with their roles.
energy performance
Due to their roles and experience these people already
have a general knowledge of the requirements to
support the EnMS and to be energy efficient but further
training was provided in June 2018 to the people then
in post to highlight several key aspects for them and
their teams, especially the cost of electricity in the 4-
7pm period and the associated Triad charges.
BAM personnel are employed based on their
competence and training to operate and maintain the
HVAC facilities on site.
The Energy Advisor and Energy and Environment
Manager have received specific technical training on a
range of Energy Efficiency topics and maintain their
own Continuous Professional Development records to
satisfy the requirements of the professional bodies
and/or accreditation organisations to which they are
affiliated.
The University Intranet contains many pages relating
to Energy Performance and makes clear the financial
and environmental benefits of minimising energy use
as much as possible, including shifting the time of
operations to try to avoid the expensive periods of
electricity use and during winter to minimise the
University’s exposure to Triad charges. (Triad charges
are expected to cease after the 2021/22 winter, with
additional costs based on Maximum Demand Capacity
instead.)
Page 31 of 53
c) the impact of their activities or The Energy Code of Practice refers to comfort
behaviour with respect to heating/cooling. Notices about Triad periods are
energy performance displayed on the intranet when Triad warnings are
received; SHEE committees are briefed about the
impact of 4-7pm electricity charges, the Triad results
and the energy use in the buildings they use. There
are regular shutdown campaigns over Christmas and
Easter periods and other ad hoc campaigns, such as
Energy Champions training to remind people of their
responsibilities and how their individual actions will
affect energy use.
d) the implications of not The induction training, repeated every 3 years, and
conforming with the EnMS contractor training, repeated every year, covers the
requirements impact of not being energy efficient in terms of
monetary costs, climate change and potential loss of
ISO 50001 certification.
Page 32 of 53
7.4 Communication
Communication of the University’s energy performance and EnMS is achieved via several different routes:-
Subject Frequency Audience Method Responsibility
The most important information about As the relevant All staff and students The Energy and Energy and Environment Manager.
the EnMS and its supporting data and information is Environment web pages
Energy Advisor.
actions that is to be shared with Internal updated and on the intranet
people. deemed appropriate Environment Co-ordinator
for the intranet.
The most important information about As the relevant Everyone who looks at Cranfield University’s Energy and Environment Manager.
the EnMS and its supporting data and information is Cranfield University’s web website on the internet for
Energy Advisor.
actions that is to be shared with updated and site – especially external communications
External people. deemed appropriate prospective new students Environment Co-ordinator
for the extranet.
Switch off campaigns Ad hoc. All Staff and Students Intranet Announcements. Energy and Environment Manager.
Christmas. E-mails. Energy Advisor.
Easter Meetings Environment Co-ordinator
Actual Energy performance year to date Monthly All Staff and Students Published on the Intranet Energy and Environment Manager.
and forecast of the future performance
Environment Co-ordinator
for the rest of the Financial Year.
Review of energy and environment Monthly Facilities Managers. Meeting with reports, Energy and Environment Manager.
progress. presentations and
Engineering.
discussion.
Development Team
Page 33 of 53
Page 35 of 53
The Board for Energy and Environment decided that the University will communicate externally about its energy policy, EnMS and energy performance. This is
achieved by publishing relevant documents, including the Annual Report and the Carbon Management Plan on the internet.
The Environment Co-ordinator has principal responsibility for issuing regular information on the EnMS and for updating the Intranet pages of the E&E Team. The
Co-ordinator also liaises with the External website team and the University’ Communications Team as required. The Co-ordinator also maintains an annual
Calendar of events, reviewed regularly, which has additional planned communications listed for both energy and environment, often tying in with “National Days”
or “International Days”. All energy related communications are agreed with either the Energy Advisor or the Energy and Environment Manager to ensure the
content is accurate and consistent with the EnMS, especially data from the SystemsLink Energy Manager database and information relating to EnPIs.
Comments or suggested improvement to the EnMS can be made by emailing green@cranfield.ac.uk and this e-mail address is highlighted on the intranet. All
such suggestions are recorded in a Suggestions Database shared with ISO 14001. The database contains a history of the actions taken in response to each
suggestion. Progress responding to those suggestions are reviewed at regular Energy and Environment Team Meetings.
Page 36 of 53
The University’s Energy Advisor is responsible for reviewing, amending, issuing and controlling
EnMS related documents. Where these are shared with the EMS and/or the Health and Safety
Management System this is done in collaboration with the relevant people.
it is available and All documents are saved in the SHEE Management folder SHEE
suitable for use, when Management with the vast majority in the Energy sub-folder but
and where it is some shared documents in the Environment or Health and Safety
needed sub-folders.
it is adequately Most of the documentation is held electronically on the University’s
protected mirror server system or in the Cloud. Only manual meter readings
or older utility bills are sometimes recorded on paper. Those
records are retained in files but the data from them is transferred to
the SystemsLink Energy Manager database at the earliest
opportunity. Access to the documents requires a Username and
Password, along with either physical access to the University LAN
or advanced knowledge of the University’s computer system to
enable remote access over the internet.
it is appropriately All old documents are moved to an Archive or History folder where
retained and disposed it is useful or required that old versions are retained. Printed
of versions of controlled documents are automatically uncontrolled.
changes are All controlled documents reviewed as per their own documented
controlled review timetable and in response to any agreed suggestions to
improve them. Controlled documents contain a header on each
page and a document control panel at the end to record the version
status of each document. These are also recorded in the Excel
sheet Control of Management System Spreadsheet for Controlled
Documents.
Page 37 of 53
Manual Meter Paper copies (all details Folders stored in B44 by the Energy and
Readings entered into SystemsLink) Environment Team
EstatesShared\6.
Manual Meter Photos (all details entered into
ENERGY+ENVIRONMENT\Energy + Carbon
Readings SystemsLink)
Management\2 Meters\1 Photos
Page 38 of 53
CU-ENV-REG- \\cns.cranfield.ac.uk\FileStore\Groups\Facilitie
Corrective
07_CAPA_Register_Database. s\Facilities MS Access Databases
Actions
accdb
EstatesShared\6.
“Switch Off”
Specific electronic folders ENERGY+ENVIRONMENT\Energy + Carbon
Campaigns
Management\5 Switch Off Campaigns
Communications Specific electronic folders
to Schools and especially regular Safety, SHEE Management\Energy\7.4)
Professional Health, Environment and Communications
Service Units Energy meetings (SHEEs)
Page 39 of 53
8 Operation
8.1 Operational Planning and Control
The most significant energy uses at the University relate to:
Heating, Ventilation and Air Conditioning (HVAC) of all buildings – non-domestic and
domestic.
The 1.4 MW Combined Heat and Power (CHP) unit meeting over 60% of campus
electricity demand.
The District Heating (DH) system using the waste heat from the CHP, supplemented by
three combi-steam boiler heat exchangers, a 960kW biomass (woodchip) boiler, and two
gas boilers.
The 1 MW PV farm.
Individual items of energy intensive test equipment used for testing and research
The University plans, implements and controls the processes, related to its SEUs defined in
6.3 above, needed to meet requirements and to implement the actions determined in 6.2
above by:-
establishing criteria for The Engineering Team and the site contractor BAM are
these processes, including responsible for the correct operation and maintenance of all
the effective operation and HVAC equipment on site. The equipment is operated to
maintenance of facilities, reflect the individual usage patterns and thermal
equipment, systems and characteristics of each building based on information
energy-using processes, supplied by the Facility Managers responsible for each
where their absence can building, many years’ experience of running the site and
lead to a significant any additional relevant criteria. Regular meetings are held
deviation from intended between Engineering and BAM to ensure satisfactory
energy performance; operation of the equipment and that planned preventative
maintenance is occurring as required.
A large proportion of the site is controlled via the Johnson
Building Management System with some buildings on a
newer Trend Building Management System. Some
individual buildings work from timers or have individual Air
Conditioning controls within certain rooms. All BMS and
timer systems are the responsibility of BAM. Where local
Air Conditioning controls exist limits on the temperature
Page 40 of 53
Page 41 of 53
8.2 Design
Engineering is responsible for the Design Guide used on all new projects. Input to this guide
comes from the Engineering Team, the E&E Team, the Development Team and external
consultants employed to look at particular aspects. There is a formal process to request any
changes to the Design Guide and it is kept under regular review.
The Design Guide contains specific criteria on energy performance, including the overall aim
of the University to be as energy efficient as practical and the fact that it has an EnMS which
must be followed.
The University’s Development Team are responsible for the projects requiring the design of
new, modified and renovated facilities, equipment and systems that will have a significant
impact on energy performance. They will use the agreed Design Guide as their starting point,
and it will be issued with any Invitations to Tender. Any deviations required by a project due to
its particular constraints will be agreed between the teams.
Specific design criteria vary in detail from one project to another and are documented within
the Development Team’s own filing structure.
Page 42 of 53
8.3 Procurement
Any Project related procurement of energy services, products and equipment that have, or can
have, an impact on significant energy use, will follow the Design Standards used by the
Development Team as described in Section 8.2 above.
The BAM contract for operating and maintaining the University HVAC equipment contains key
criteria to help improve energy efficiency by 5% per annum across the site and that was a
requirement of the Invitation to Tender.
Other purchases relating to significant energy use are most likely to result from a Salix funded
project. In that case the items purchased must be on the approved list of Salix technologies
proven to be energy efficient and must pay back their capital costs from the savings achieved
within either 5 or 8 years whilst not costing more than £120 per tonne of CO2 saved (5-year
projects are preferred, 8-year projects need specific prior agreement from Salix before
proceeding). Cranfield has used both Salix SEELS and Salix Revolving Green Funding since
2010, with SEELS loans being replaced by much less certain PSDS Grants in 2021. The
history of those projects including capital expenditure, estimated – and where possible to
measure, actual – kWh savings, and estimated CO2 savings are all detailed in the Salix
projects MS Access database.
The Procurement Team uses public sector framework agreements, where possible, which
include suppliers already vetted for sustainable practices. IT equipment (including pcs and
servers) has historically been purchased to meet energy efficiency standards. Some
equipment required for research is highly bespoke with very limited supplier choice and thus
the application of energy efficiency as a key criterion is inappropriate, however such
equipment rarely constitutes a significant energy use.
All Invitation to Tender documentation makes clear that energy performance is one of the
evaluation criteria for procurement.
All of Cranfield University’s gas and electricity is procured using Kent County Council’s Laser
Public Sector Buying Group and its OJEU compliant frameworks. This is a managed service
which includes detailed supplier bill checking, with any disputed bills not being paid until the
dispute is resolved.
Page 43 of 53
9 Performance Evaluation
9.1 Monitoring, Measurement, Analysis and Evaluation of Energy Performance
and the EnMS
9.1.1 General
Key characteristics of the University’s operations which determine energy performance are
monitored, measured and analysed at planned intervals.
The fundamental tool for this work is the SystemsLink Energy Manager database into which all
automatic (AMR/Profile), manual (Direct) and invoice data is entered for all meters, oil tanks and
other energy purchases. (N.B. Within SystemsLink Energy Manager the Invoice data also
includes data generated by the E and E Team to create internal invoices to send out to tenants,
so an Invoice entry does not necessarily mean it is an external charge to the University.)
The SystemsLink database contains data going back to at least 2005, and in some cases 1994,
and can produce numerous graphs and comparisons with earlier years for each data point.
In parallel with SystemsLink the MS Access database “Meter History” has been created to make
it easier to track any ongoing issues with meters or automatic data collection and to note the
source of the data for every meter. This is used to drive Engineering work to improve the quality
of the data available. With over 1,200 meters on site it is inevitable that some will always have a
problem and as the original infrastructure ages an increased amount of work is needed to keep
the automatic data systems working (e.g. replacing time expired battery powered radio
transmitter systems).
Calibration of all incoming utility meters is the responsibility of the utility companies themselves.
Most meters on site are sub-meters used to give greater granularity of data and to enable
month-on-month and year-on-year comparisons to be made. The Meter Design Guide section of
the overall Design Guide requires that all new meters installed meet the required legal
requirements to allow billing to be done from them and that they are provided with working AMR
functionality at the time of handover. Sanity checks are done on new meter installations to
check:
a) that the AMR data received agrees with manual readings
b) that the consumption figures indicated are realistic for the equipment the meter is covering
c) that the sum of any building sub-meters matches, within meter tolerance and parasitic loss
factors, the total recorded on the master meter feeding those sub-meters
d) that any new buildings have an overall incoming meter
For the CHP it is a requirement that the gas supply meter is calibrated by the University and
this work is undertaken by Edina.
Page 44 of 53
Page 45 of 53
actual versus At the highest level this is already covered by the key Energy
expected energy Performance Indicator which looks at the combined effect of all energy
consumption efficiency projects across the whole University.
Where Salix projects have been implemented and the level of sub-
metering gives sufficient granularity comparisons of before and after
usage are made and reported.
As detailed above, checks against previous usage are also made on a
regular basis against key building and billed meters.
Degree data is used to assess the impact of cold weather. Any knowledge of changes to
operations on site, including the addition of new buildings, the removal of old buildings, the sale
of any assets, installation of more efficient plant, changes to opening hours, or significant
changes to the test equipment used on site is also considered.
An annual energy management plan is agreed and documented each year,
Where any significant deviations in energy performance are observed they are investigated to
understand the root cause and to correct any problems identified. Engineering and BAM will
record any issues with the HVAC equipment and the actions taken to resolve them.
Any other issues highlighted to the Energy and Environment Team will have the results of any
investigations recorded against the relevant buildings folder.
Any issues with metering equipment, and the solutions, are recorded in the Meter History
Database.
Document Location
SystemsLink Energy \\cns.cranfield.ac.uk\filestore\Groups\Facilities\SystemsLink
Manager Database Energy Manager
Meter History Database \\cns.cranfield.ac.uk\FileStore\Groups\Facilities\Facilities MS
Access Databases
Annual Action Plan SHEE Management\Energy\6.2) Objectives, Energy Targets and
Planning\Energy and Carbon Plan
CRC/SECR Reports EstatesShared\6. ENERGY+ENVIRONMENT\CRC & SECR
DECs SHEE Management\Energy\4.2) 9.1.2) Legal and Other
Requirements\Display Energy Certificates
Building Folders EstatesShared\6. ENERGY+ENVIRONMENT\Buildings +
Infrastructure\Buildings
High Energy Use SHEE Management\Energy\8.1) Operational Planning and
Equipment Control\8.1) High Energy Use Equipment and Photos
Register.xlsx
Page 46 of 53
The agreed audit plan allows for each clause in the standard to be reviewed at least once
every 3 years. The plan defines the scope and criteria for each audit and is updated with the
actual areas audited as required. Future audit plans are adjusted as necessary to ensure each
clause is audited within the three-year cycle. Any Non-Conformities or Opportunities for
Improvement identified are added to the CAPA database and progressed as required.
The auditors used are a mixture of internal and external auditors as resources allow and will
not be conducted by anyone directly involved with delivering the actions necessary to
achieve the ISO 50001 requirements.
Planning for each audit is the responsibility of the Energy Advisor. For each audit, relevant
people for the clauses to be checked are invited to attend the audit at specific times, as
agreed with the auditor. Each resulting audit report is saved within the EnMS folder
structure.
Results from all audits are reported to the Board for Energy and Environment, including any
trends identified. The minutes of the BEE meetings record the fact that each audit’s results
were discussed. The papers provided as inputs to those meetings are also retained.
Page 47 of 53
Page 48 of 53
In addition, any changes to the energy performance of the organisation are reflected in the
Annual Report.
Changes to the energy policy are agreed by BEE before being sent to the Vice Chancellor for
approval.
Changes to the EnB(s), EnPI(s), objectives, targets or other elements of the EnMS, or to the
allocation of resources will be recommended by the Energy and Environment Manager and
reported upwards to BEE for approval.
The agreed output from the review is minuted at the BEE meeting and the formal output
document saved within the EnMS folder structure.
Page 49 of 53
10 Improvement
10.1 Nonconformity and Corrective Action
The University regularly reviews its EnMS and conducts audits using both internal and external
resources.
b) evaluates the need for action to eliminate the cause(s) of the nonconformity, in order that it
does not recur or occur elsewhere, by:
1) reviewing the nonconformity.
2) determining the causes of the nonconformity.
3) determining if similar nonconformities exist or can potentially occur.
Page 50 of 53
Page 51 of 53
11 Document Control
Signature
Document Review
Version Amendment By Date
Draft Not Applicable – First Version Angus Murchie May 2017
1.0 Updated from the initial draft reviewed in May 17. Angus Murchie May 2018
Version 1.0 is designed to closely match all the
required clauses in the ISO50001 Standard with
links to external supporting documentation and
databases.
1.1 Organisational diagram updated, minor textual and Angus Murchie May 2018
layout changes.
1.2 Hyperlinks checked throughout and edited as Angus Murchie June 2019
required.
1.2 Updated Radio Tx numbers in Section 6.1 to Angus Murchie June 2019
reflect changes from Radio to LAN and to Supplier
Data for gas meters.
1.2 Reference to MeterWeb2 from Elcomponent in Angus Murchie June 2019
Section 6.1 removed as no longer used.
Page 52 of 53
Document Review
Version Amendment By Date
1.2 Updated details on gas meters providing half Angus Murchie June 2019
hourly AMR data in Section 6.1.
1.2 Updated SHEE reports to include District Heating Angus Murchie June 2019
too in Section 6.3
1.2 Update to potential EnPI in Section 6.4 Angus Murchie June 2019
1.2 Update to training provided in Section 7.2. Angus Murchie June 2019
1.2 Addition of monthly CHP and District Heating Angus Murchie June 2019
meetings to Section 7.4
1.2 Update to Salix details in Section 8.3 Angus Murchie June 2019
2.0 Entire Manual updated to the 2018 version of ISO Angus Murchie July 2020
50001. This required a complete renumbering of
the sections and considerable amendment to some
of the detail. (The Section Numbers detailed above
have been edited to match the new locations of
those amendments.)
2.0 More explanation provided about COTEC and its Angus Murchie July 2020
energy use.
2.1 Added in additional Interested Parties following Angus Murchie August 2020
Transition Audit Review. Also add a little more
detail on how Compliance is reviewed for DECs,
EPCs, ACIs and external billing.
2.2 All sections’ references to other document Angus Murchie May 2021
locations updated since the University’s electronic
filing system was largely moved to the Cloud and
any remaining files were moved to new University
server locations.
2.2 Reference to Forensics Labs for CDS added since Angus Murchie May 2021
they moved from Shrivenham in the last year.
2.2 SEELS Loans removed and uncertain PSDS Angus Murchie May 2021
Grants added.
2.2 Removal of reference to the Trend 963 BMS Angus Murchie May 2021
system which will be halted at the end of May 2021
2.2 Addition of MK:U Bouverie House location to the Angus Murchie May 2021
scope of the EnMS.
Page 53 of 53