Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

SAMPLE Checklist Report Aircond

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MAINTANANCE CHECKLIST REPORT ( AIR COOLED SYSTEM)

NAMA BALAI :
NO & NAMA LOKASI AIRCOND:
TARIKH PEMERIKSAAN TERDAHULU :
TARIKH PEMERIKSAAN KINI : MASA :
NAMA JURUTEKNIK SYARIKAT :
NOTA : LAPORAN INI HENDAKLAH DISOKONG GAMBAR KERJA DILAKUKAN YANG DISAHKAN JURUTEKNIK SYARIKAT DI SETIAP HELAIAN
HURAIAN KERJA PERIKSA PERLU BAIKI NAMA KOS
Q X/4
Evaporator (Cooling Unit) / YA / TIDAK KOMPONEN ANGGARAN

A
Inspect unit for any abnormalities. Trace the fault and rectify as necessary. 4
B Inspect and clean all air filters. 4
Inspect leakage or clogging at drain pan and drain line. Clean, flush, repair /
C
replace as necessary. 4
D Chemical cleaning for all coils. 1

E Inspect refrigerant leaks at joints, fittings and piping. Repair and top up
refrigerant as necessary. 4
F Inspect remote control. Replace as necessary. 4
Condenser
Inspect the suction and discharge pressures of all refrigerant compressors. If
A
abnormal, trace the faults and rectify as necessary. 4
Inspect refrigerant leaks at joints, fittings, piping and compressors. Repair or
B
replace as necessary. 4
C
Inspect all fans and motors as necessary. Repair / replace as necessary. 4
Inspect condensing coil. Repair or replace as necessary. Clean coil and comb
D
the fins as necessary. 4
E Inspect filter dryer. Replace as necessary. 4
F Inspect compressor units. Replace as necessary. 4
G Inspect rubber padding. Replace as necessary. 1
H Chemical cleaning for all coils. 1
I Refill Gas R410A /R22/ R32 according to the specifications of the unit 1
J Inspect bracket / hanger. Repair or replace as necessary. 4
Electrical Switchboard / Control Panel
Inspect the condition of the panel and its housing. Repair or replace as
A necessary. 4
Inspect and test the control wiring and circuitry. Retighten, repair or replace as
B necessary. 4
Inspect the operation of selector switches. Repair or replace as necessary.
C 4
Inspect the operation of auto-manual selector switches. Repair or replace as
D necessary. 4
Inspect the operation of stop-start buttons. Repair or replace as necessary.
E 4
F Inspect or replace indicating bulbs and covers. 4
Inspect the routine operation of all electrical starters, electrical control gears
G and ancillary electrical apparatus. Repair or replace as necessary.
4
Q : Kekerapan mengikut kontrak
x : Pemeriksaan ke berapa daripada 4
NOTA PENTING : Jika Terdapat Kerosakan dan perlu Pembaikan, Pegawai
Pemantau hendaklah Memaklumkan Pejabat Pembangunan HQ

Tandatangan & Cop Pengesahan Syarikat Disahkan Oleh Pegawai Pemantau

……………………………………………………………….. ………………………………………………………….
Nama : Nama :
No Tel : No Tel :
Tarikh : Tarikh :
LIST REPORT ( AIR COOLED SYSTEM)

You might also like