Welding Procedure Specification (WPS)

Pipeline

Contractor Name: China petroleum pipeline bureau PRID: 1308-01 Prepared By: Shi Xiaosong

WPS No: CPP-WPS-PPL-002 Rev No: XX Date: Oct.10.2020 Supporting PQR(s) No :PQR-2020289

Applicable Code/Standard: API-1104 Welding Process(es):GTAW+SMAW Type(s): Manual Semi-Auto Automatic


Single Vee Butt joint
30°+ 2.5° Detail
Joint Design (Processed by grinding)
1.0±0.6
Backing (Yes/No) No

Backing Material (Type) N/A T


□ Metal
□ Nonfusing Metal
□ Non-metallic 3.5+ 0.8
□ Other
Base Metal: Base Metal 1 Base Metal 2

Material Specification (Type or Grade) X52NS X52NS

Thickness Range (mm) 4.8 to 19.1

Diameter (Inch) All

Filler Metal Pre Heat & PWHT


lower than PQR preheat
AWS Classification ER70S-6 (root) E7018-1H4R ( others) Pre heat Temperature 50° C Min temp.
Group No 5 3 Interpass Temperatur ≤ 150℃

F No 6 4 PWHT N/A

SFA No A5.18 A5.5


Time lapse between
Manufacturer's completion of root & Hot Pass
≤10min
BOEHLER- EMK6 BOEHLER FOX EV50
Name
Type & Removal of Line Up Clamp Cleaning Method

Type N/A Joint preparation


Grinding disk / Powered Steel Brush.
No metal removal on base metal
Removal N/A Interpass Cleaning
Heat Input
Welding Weld Filler Metal Current Travel Speed
Weld Pass(es) Type Amp Volt Range
Process Progression Class Dia (mm/min) Kj/mm
Polarity Range
Root GTAW Uphill ER70S-6 2.4 DCEN 95-125 10-14 50-90 0.63-2.10

Hot SMAW Uphill E7018-1H4 3.2 DCEP 95-120 19-27 120-150 0.72-1.62

Subsequent SMAW Uphill E7018-1H4 3.2 DCEP 100-130 19-27 110-140 0.81-1.91

Cap SMAW Uphill E7018-1H4 3.2 DCEP 100-130 19-27 100-130 0.88-2.11
Note:
1. Bridge or bullet tack weld only
the max heat input
2. Welding consumables maximum Sulphur content shall be <0.005%adjust font size
and Diffusible hydrogen shall be <5ml/100g & Nickel <1% higher than the max
3. Offset shall not exceed not exceed 10% of nominal wall thicknesses and no more than 1.6mm. If offset exceed 1.6mm, it shall heat input
tapered to theofsteeper
PQR
to 1:4.
4.No welding shall be allowed when relative humidity is more than 90%.
5.Environment wind velocity is more than 8m/s(SMAW) and 2m/s(GMAW/GTAW),welding operation shall be stopped. Wind speed Shelter shall be
provided when the weather condition does not meet with the welding requirements to protect weld area from heavy wind, rain & dust.

Contractor
Contractor Welding Inspector PMC
QA/QC Manager
Name

Signature

Date

QAF-016B
Rev-A
Welding Procedure Specification (WPS) Date: 28.09.2020
Pipeline