Welding Procedure Specification (WPS) Pipeline: Lower Than PQR Preheat Temp
Welding Procedure Specification (WPS) Pipeline: Lower Than PQR Preheat Temp
Pipeline
Contractor Name: China petroleum pipeline bureau PRID: 1308-01 Prepared By: Shi Xiaosong
WPS No: CPP-WPS-PPL-002 Rev No: XX Date: Oct.10.2020 Supporting PQR(s) No :PQR-2020289
F No 6 4 PWHT N/A
Hot SMAW Uphill E7018-1H4 3.2 DCEP 95-120 19-27 120-150 0.72-1.62
Subsequent SMAW Uphill E7018-1H4 3.2 DCEP 100-130 19-27 110-140 0.81-1.91
Cap SMAW Uphill E7018-1H4 3.2 DCEP 100-130 19-27 100-130 0.88-2.11
Note:
1. Bridge or bullet tack weld only
the max heat input
2. Welding consumables maximum Sulphur content shall be <0.005%adjust font size
and Diffusible hydrogen shall be <5ml/100g & Nickel <1% higher than the max
3. Offset shall not exceed not exceed 10% of nominal wall thicknesses and no more than 1.6mm. If offset exceed 1.6mm, it shall heat input
tapered to theofsteeper
PQR
to 1:4.
4.No welding shall be allowed when relative humidity is more than 90%.
5.Environment wind velocity is more than 8m/s(SMAW) and 2m/s(GMAW/GTAW),welding operation shall be stopped. Wind speed Shelter shall be
provided when the weather condition does not meet with the welding requirements to protect weld area from heavy wind, rain & dust.
Contractor
Contractor Welding Inspector PMC
QA/QC Manager
Name
Signature
Date
QAF-016B
Rev-A
Welding Procedure Specification (WPS) Date: 28.09.2020
Pipeline