Key Plan: Plan and Longitudinal Section of Tunnel No. T4

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

TUNNEL LEGEND
LEGEND SECTIONS DESCRIPTION ENTRY SIDE EXIT SIDE
SEC T4.1 FALSE PORTAL (CUT AND COVER) CH 156195 - 156200 M CH 160375 - 160380 M

INITIAL PORTION OF TUNNEL ENTRANCE &


L SEC T4.2 EXIT CH 156200 - 156214 M CH 160351 - 160375 M L

SEC T4.3 MAIN TUNNEL CH 156200 - 160375 M

FALSE PORTAL:2,OF TUNNEL T4 AT


FALSE PORTAL:1,OF TUNNEL T4 AT
PLAN AND LONGITUDINAL SECTION OF TUNNEL NO. T4
K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
CH:156195

CH:160380
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
T-4 LENGTH 4185 M. DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J PORTAL 1 OF TUNNEL NO.T4 AT 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CH:156200 PORTAL 2 OF TUNNEL NO.T4 AT CARRIED OUT IN CONFORMITY WITH IS:5878.
CH160375 5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
N REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.

157100
157000
156400

156500

158600
157200

157600

158000

158200

158500

158900
156600

157800

158100
157900
156900

157300

157700

159000
157500

159100
156000

159200
159 300
158400
156700

158300
156100

157400
156300
156200

156800

158800
158700

15 5950 0
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I

40
15 960 0
159
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON

97 0
GEOLOGICAL REPORTS.

00
1
0 9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
80 DESIGN.
KEY PLAN 15
9
9 90
0 10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
SOD.
AS PER
15
00 11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
00
16 12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
00
01 ON EACH SIDE.
H 16 H
00
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
02 FUNCTION SATISFACTORILY.
16

00
03

00
16

04

00
16

05
16
BH-4 CH:156950 BH-5 CH:157200 BH-8 CH:157950 BH-9 CH:158200 BH-12 CH:158950
G G

BH-11 CH:158700
BH-10 CH:158450
BH-6 CH:157450
BH-3 CH:156700

BH-7 CH:157700

BH-13 CH:159200
BH-2 CH:156450
BH-1(PORTAL-1)
BH-16 CH:159950

BH-14 CH:159450

BH-15 CH:159700
CH:156200(TUNNEL ENTRANCE)
Ø32mm, SELF DRILLING ANCHOR

BH-17 CH:160200
300 FALSE PORTAL @ 6.0m LONG FULLY GROUTED (Fe 500)
CH:156195 @ 2.0m c/c STAGGERED BOTHWAYS
290 BACK SLOPE 1:8 WITH 2 M
BH-18(PORTAL 2)
WIDE BERM AT 6M HT
TUNNEL EXIT CH:160375
280 1
F 6 MAIN TUNNEL F
FALSE PORTAL
270 CH:160380
(PORTAL-1)
260 BACK SLOPE 1:4 WITH
2 M WIDE BERM AT 6M HT
1
250 5 14 Ø32mm, SELF DRILLING ANCHOR 6
@ 6.0m LONG FULLY GROUTED (Fe 500)
@ 2.0m c/c STAGGERED BOTHWAYS
240 (PORTAL-2)

E
230 24 5 E
4137
220
4185
210
DATUM:
CH:159100

200.00 M
CH:156240

1 IN 170 (FA
LL) 1 IN 150 (FA 1 IN 183 (FA
LL) LL)
D D
PROPOSED GRADIENT ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008


-16.189

-17.626

-19.458

-19.477

-21.425

-23.455

-25.774

-28.466

-29.577

-31.130

-32.941

-31.935

-28.866

-27.145

-26.102

-26.599

-27.088

-28.192

-25.512

-24.358

-24.810

-24.215

-23.415

-22.344

-20.769

-19.822

-29.998

-42.684

-49.238

-35.322

-24.861

-22.081

-23.339

-20.096

-20.864

-26.577

-20.290

-18.672

-20.269

-23.112

-29.328

-24.132

-21.188
BANKING (+ ve)

-16.583
EAST COAST RAILWAY

-5.604
CUTTING (- ve)
east-coast-railway-squarelogo-1475151565628.png

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA

238.627
265.485

264.896

264.261

263.594

262.928

262.261

261.594

260.928

260.261

259.594

258.928

258.261

257.594

256.928

256.261

255.594

254.928

254.261

253.594

252.928

252.261

251.594

250.928

250.261

249.594

248.928

248.261

247.594

246.928

246.261

245.594

245.048

244.502

243.955

243.409

242.862

242.316

241.769

241.223

240.676

240.130

239.584

239.037

237.944
C RAIL LEVEL ROAD - BALANGIR C

NAME OF WORK

REVISED TUNNEL NO.-T4

254.468 237.885
280.931 264.742

281.780 264.154

282.977 263.519

282.329 262.852

283.610 262.185

284.974 261.519

286.626 260.852

288.651 260.185

289.096 259.519

289.982 258.852

291.126 258.185

289.454 257.519

285.718 256.852

283.330 256.185

281.621 255.519

281.451 254.852

281.273 254.185

281.711 253.519

278.364 252.852

276.543 252.185

276.329 251.519

275.067 250.852

273.600 250.185

271.863 249.519

269.621 248.852

268.007 248.185

277.517 247.519

289.536 246.852

295.423 246.185

280.841 245.519

269.713 244.852

266.387 244.306

267.098 243.759

263.309 243.213

263.530 242.666

268.697 242.120

261.863 241.573

259.699 241.027

260.749 240.480

263.046 239.934

268.715 239.387

262.973 238.841

259.483 238.295

242.806 237.202
FORMATION
LEVEL GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
GROUND LEVEL SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B
156100

156200

156300

156400

156500

156600

156700

156800

156900

157000

157100

157200

157300

157400

157500

157600

157700

157800

157900

158000

158100

158200

158300

158400

158500

158600

158700

158800

158900

159000

159100

159200

159300

159400

159500

159600

159700

159800

159900

160000

160100

160200

160300
160375

CHAINAGE 160500
DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

LONGITUDINAL SECTION
A J.E. DRAWING (C) AXEN (C)/BOUDH A
E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

NOTES:~
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
L L
METERS, UNLESS OTHERWISE SPECIFIED.
2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
3. SHOTCRETE GRADE OF M:30 AND CONCRETE GRADE OF M:30
CABLE TRAY SHALL BE USED AS PRIMARY SUPPORT & SECONDARY SUPPORT

TUNNEL AXIS
FIRE ALARM CABLE &
DETECTOR RESPECTIVELY CONFIRMING TO IS456:2000.
WATER MIST 9.
NOZZLE TYPICAL TENTATIVE ENTRANCE 4. ROCK BOLT SHALL BE INSTALLED ACCORDING TO THE LENGTHS
LUMINARES LOCATION
K K
WATER MIST
CABLE TRAY
AND ROCK BOLT PATTERNS SHOWN ON THE DRAWINGS.
BRANCH PIPE
5. MINIMUM EXCAVATION LINE SHALL INCLUDE CONSTRUCTION &
CABLE TRAY 10. FIRE ALARM CABLE &
DETECTOR DEFORMATION TOLERANCE.
FIRE ALARM CABLE & 10.
TENTATIVE ENTRANCE
DETECTOR 6. REQUIRED RING CLOSURE AT INVERT WILL BE BASED ON 3D
LUMINARES LOCATION
TENTATIVE ENTRANCE
LUMINARES LOCATION 13. HIGH PRESSURE WATER
MONITORING RESULT & GEOLOGICAL SITE CONDITIONS.
MIST RISER PIPE
7. FOR FIREFIGHTING LOCATION THE LEVEL OF THE WALKWAY SHALL

R1'=415

R1=4450
572

25kV CONVENTIONAL 11. PRIMARY SUPPORT BE 884mm HIGHER THAN THE RAIL LEVEL.
J J
REGULATED TYPE OHE (ACCORDING TO SUPPORT CLASS)

0
1 915 915
WATER PROOFING MEMBRANE

C6
5 KINEMATIC ENVLOPE (STRAIGHT
TRACK)
48 527
15 0 S.NO DESCRIPTION REMARKS
0 6 MAXIMUM MOVING DIMENSION
30
300
2 461
C5 150 mm MAINTENANCE RESERVE
1.
SPACE FOR LINEAR AT EVERY CO-ORDINATE OF CENTER
HEAT DETECTION 30m BOTH WAY
8
I
2135 2135
JET FAN FOR VENTILATION
CCTV CAMERA FOR
CENTER X Y I
2. AT EVERY 200m
TUNNEL 2292
MAXIMUM MOVING DIMENSION
3 THEORETICAL EXCAVATION LINE
C1 0

3. SPACE FOR JETFAN


AT EVERY 150m C2 -1515 1964
FINAL CONCRETE LINING Ø 900mm
C3 -571 1630
4. SPACE FOR LIGHTS AT EVERY 50m
8
6922

345 C4 1515 1964


12. FIRE HYDRANT & FIRE PLUG SPACE FOR AIR
5. AT EVERY 200m
WITH EXTINGUISHER MONITORING C5 0 4815
(AT EVERY 90m)
7 8 6. SPACE FOR
H 2360 2360 AT EVERY 150m C6 0 5470 H
CABLE TRAY
TROLLEY REFUGE 7. SPACE ALTERNATING
SIGNALLING

300
R4=57
5030
(EXCAVATED)

00 8351 8. CABLE TRAY


(FINISHED) 4
9269

WATER MIST
4420

C1 9. AT EVERY 20m
4265

NOZZLE TYPICAL
4 C2
1200 C4 1200 FIRE ALARM CABLE &
10. AT EVERY 50m
DETECTOR EXCAVATED AREA = 70.52 Sqm.
G G
(FINISHED)

(FINISHED)

3355

C3 25kV CONVENTIONAL FINISHED AREA = 46.45 Sqm.


8181

7609

WALKWAY ENVELOPE 11. AT EVERY 30m


REGULATED TYPE OHE
EXCAVATED WIDTH = 7.472m
FIRE HYDRANT &
POWER CABLE 12. AT EVERY 200m EXCAVATED HEIGHT = 9.269m
FIRE PLUG
2292

96

2100
HIGH PRESSURE WATER FINISHED WIDTH = 8.351m
13. AT EVERY 200m
CABLE SEPRATION ELEMENT MIST RISER PIPE FINISHED HEIGHT = 8.181m
1145

4000
87
R3=35

3550
14 1905 1905
1065

8 CONTROL CABLE
116

1676
305

F ±0.000 F

1100 1100
WATER PIPE FOR FIRE FIGHTING
500

500
CABLE SEPRATION ELEMENT 4
30
1739

NO FINES CONCRETE CENTRAL DRAIN 400Ø


R5=7012
R6=7208

SIDE DRAIN 150 Ø


E PERFORATED PIPE E

150
HIGH VOLTAGE CABLE

D 1747 3977 1747 3850 150 D


7472 ALT. NO. DESCRIPTIONS SIGNATURE
4000
(EXCAVATED)
11472
LOADING STANDARD : 25T LOADING - 2008
SECTION-1 east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY


SINGLE LANE MAIN TUNNEL SECTION (WITH INVERT ARCH) FOR
C (SOIL/POOR ROCK) NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA
ROAD - BALANGIR C

SCALE 1:30 NAME OF WORK

TYPICAL TUNNEL CROSS SECTION DETAILS


(POOR ROCK/SOIL)

S.M. CONSULTANTS
An ISO 9001 Company
Bhubaneswar / Balasore / Secunderabad / South Andaman
SCALE:-
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

NOTES:~
L L
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS,
UNLESS OTHERWISE SPECIFIED.
2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
3. SHOTCRETE GRADE OF M:30 AND CONCRETE GRADE OF M:30 SHALL BE
USED AS PRIMARY SUPPORT & SECONDARY SUPPORT RESPECTIVELY
CONFIRMING TO IS456:2000.
K 4. ROCK BOLT SHALL BE INSTALLED ACCORDING TO THE LENGTHS AND
K

ROCK BOLT PATTERNS SHOWN ON THE DRAWINGS.


5. MINIMUM EXCAVATION LINE SHALL INCLUDE CONSTRUCTION &
Ø25mm, 6.0m LONG @ 1.0m c/c FULLY GROUTED DEFORMATION TOLERANCE.
ROCK BOLT 310 Mpa BOTH WAYS
6. REQUIRED RING CLOSURE AT INVERT WILL BE BASED ON 3D MONITORIN
CABLE TRAY S.NO DESCRIPTION REMARKS RESULT & GEOLOGICAL SITE CONDITIONS.

TUNNEL AXIS
FIRE ALARM CABLE &
DETECTOR SPACE FOR LINEAR AT EVERY
WATER MIST 1. HEAT DETECTION 30m BOTH WAY
J 9. J
NOZZLE TYPICAL TENTATIVE ENTRANCE
LUMINARES LOCATION 2. CCTV CAMERA FOR AT EVERY 200m
WATER MIST TUNNEL
CABLE TRAY
BRANCH PIPE SPACE FOR JETFAN
3. AT EVERY 150m
CABLE TRAY 10. FIRE ALARM CABLE & Ø 900mm
DETECTOR
FIRE ALARM CABLE & 10. 4. SPACE FOR LIGHTS AT EVERY 50m
TENTATIVE ENTRANCE
DETECTOR
LUMINARES LOCATION
TENTATIVE ENTRANCE SPACE FOR AIR
5. AT EVERY 200m
LUMINARES LOCATION MONITORING
13. HIGH PRESSURE WATER
I
MIST RISER PIPE
6. SPACE FOR
AT EVERY 150m CO-ORDINATE OF CENTER I

R1-4450
R1-4150
572

CABLE TRAY
25kV CONVENTIONAL 11. PRIMARY SUPPORT
REGULATED TYPE OHE (ACCORDING TO SUPPORT CLASS) 7. SPACE ALTERNATING CENTER X Y
SIGNALLING
C1 0 2292
1 915 915
WATER PROOFING MEMBRANE
8. CABLE TRAY
C2 -1515 1964
5 KINEMATIC ENVLOPE (STRAIGHT
TRACK) 9.
WATER MIST
AT EVERY 20m C3 -571 1630
NOZZLE TYPICAL
48 527
15 0 MAXIMUM MOVING DIMENSION 10.
FIRE ALARM CABLE &
AT EVERY 50m
C4 1515 1964
0
DETECTOR
30
H
300 6 150 mm MAINTENANCE RESERVE H
2 461 11.
25kV CONVENTIONAL
REGULATED TYPE OHE AT EVERY 30m
8
JET FAN FOR VENTILATION
2135 2135 FIRE HYDRANT &
12. AT EVERY 200m
FIRE PLUG
MAXIMUM MOVING DIMENSION
3 THEORETICAL EXCAVATION LINE
HIGH PRESSURE WATER
13. AT EVERY 200m EXCAVATED AREA 65.34
= Sqm.
FINAL CONCRETE LINING MIST RISER PIPE
FINISHED AREA =
46.45 Sqm.
(FINISHED)

8 EXCAVATED WIDTH 7.472


= m
6922

345
6442

12. FIRE HYDRANT & FIRE PLUG


G
WITH EXTINGUISHER
EXCAVATED HEIGHT = 8.108
m G

(AT EVERY 90m) FINISHED WIDTH =


8.351m
8
7 2360 2360
(EXCAVATED)

FINISHED HEIGHT = m
6.442
5870
8108

R4-5700

300
5030

8351
(FINISHED) 4
4420

C1
4265

4
1200 1200
F C2 C4 F
3355

C3 WALKWAY ENVELOPE

POWER CABLE
96

2100
CABLE SEPRATION ELEMENT
87
1145

5
2682

4000
R3-3

3600
14 1905 1905
1065

E 8 CONTROL CABLE E

1676 ±0.000
305

1100 1100
WATER PIPE FOR FIRE FIGHTING
500

500
764
1186

CABLE SEPRATION ELEMENT

NO FINES CONCRETE
422

D D
ALT. NO. DESCRIPTIONS SIGNATURE
SIDE DRAIN 150 Ø
PERFORATED PIPE
485

TROLLEY REFUGE LOADING STANDARD : 25T LOADING - 2008

100
HIGH VOLTAGE CABLE
100

CENTRAL DRAIN 400Ø LEAN CONCRETE


1747 3977 1747
3850 150
east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY


7472
4000
(EXCAVATED)
11472 NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA
C ROAD - BALANGIR C

SECTION-1 NAME OF WORK

TYPICAL TUNNEL CROSS SECTION DETAILS


SINGLE LANE MAIN TUNNEL SECTION (WITHOUT INVERT ARCH) (FAIR ROCK)

(FOR FAIR ROCK) S.M. CONSULTANTS


An ISO 9001 Company
SCALE:-
SCALE1:30 Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

NOTES:~
L L
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS,
UNLESS OTHERWISE SPECIFIED.
2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
3. SHOTCRETE GRADE OF M:30 AND CONCRETE GRADE OF M:30 SHALL BE
USED AS PRIMARY SUPPORT & SECONDARY SUPPORT RESPECTIVELY
CONFIRMING TO IS456:2000.
K 4. ROCK BOLT SHALL BE INSTALLED ACCORDING TO THE LENGTHS AND
K

AREA= 35.333 Sqm. ROCK BOLT PATTERNS SHOWN ON THE DRAWINGS.


5308
5. MINIMUM EXCAVATION LINE SHALL INCLUDE CONSTRUCTION &
DEFORMATION TOLERANCE.

TUNNEL AXIS
6. REQUIRED RING CLOSURE AT INVERT WILL BE BASED ON 3D MONITORIN
RESULT & GEOLOGICAL SITE CONDITIONS.
J J

R1-4150
62

43
43

62
1 915 915
5
I I
10 527 0
00 0
10

6
2 461
MAXIMUM MOVING DIMENSION 8
2135 2135

H H

8 345

8
7 2360 2360

R4-5700
G 8351 G
4
C1

1000
4 1000
1200 1200
C2 C4

C3

96
5654

5654
2100
F
587 F
R3-3
14 1905 1905
8

1676 ±0.000

1100 1100
500

500
764

764

E E
459
1000

LEAN CONCRETE
400

CENTRAL DRAIN 400Ø

D 10370 D
ALT. NO. DESCRIPTIONS SIGNATURE

TYPICAL DETAIL OF TUNNEL PORTAL LOADING STANDARD : 25T LOADING - 2008


SECTION 1:30
east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TYPICAL CROSS SECTION AT DETAILS (PORTAL)

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:-
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
TUNNEL T4 AT CH:156195
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
FALSE PORTAL:1,OF
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
T-4 LENGTH 4185 M. 5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
100 100 100 SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
PORTAL 1 OF TUNNEL TROLLEY 7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
5 NO.T4 AT CH:156200 REFUGER REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
FOR S/S DETAILS REFER GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
7.472

I TO MAIN TUNNEL T-4 DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I


SUBSTATION DETAIL-1 WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
1.0

1.0
3.0 1.0 3.0 1.5 3.0

R.M.U (VCB PANEL)


1.0 2.0

GEOLOGICAL REPORTS.
3.0
11KV/0.433 KV
Transformer
11KV/0.433 KV
Transformer
1.7

1.5
TROLLEY 9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
REFUGER
0.6

DESIGN.
Main Lighting 0.6
Battery Bank

SPACE 1.5
Panel
10

RESERVATION FOR
GENERATOR RTU/
1.2 Main LT Panel SCADA UPS
Emergency 0.6

10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION


AS PER
Panel 0.2
Panel
1.0 5.0 0.8 0.9 0.8 0.9 0.8 2.2 1.0 1.0

VENTILATION/PLUMBING PANEL
SOD.
5 11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED

156400
156195

156200

DB-UPS

156300
H DETAIL-A ON EACH SIDE. H
DB-POWER 13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
DB-LIGHTING FUNCTION SATISFACTORILY.
200

G G

PLAN
F F

1 1

E E

10.00
3.00 4.00 3.00
TROLLEY
REFUGER

4.00
100

11.472
D D
ALT. NO. DESCRIPTIONS SIGNATURE
7.472

7.472
LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


11.472

C ROAD - BALANGIR C
4.00

TROLLEY NAME OF WORK


REFUGER
TUNNEL NO.-T4
100 GENERAL ARRANGEMENT DRAWING
3.00 4.00 3.00
10.00
S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DETAIL-A
156300

156400

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

1 1
A J.E. DRAWING (C) AXEN (C)/BOUDH A
E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
N 7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

G G

100 100 100 100


TROLLEY
REFUGER

F F

TROLLEY
REFUGER VENTILATION/PLUMBING PANEL

156700
DB-UPS
T-4 LENGTH 4185 M.
156500

156600

DB-POWER DB-UPS
DB-LIGHTING DB-POWER
DB-LIGHTING
E E
200

D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY


PLAN NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA
C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K
N
NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
T-4 LENGTH 4185 M. SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
100 100 100 12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
TROLLEY TROLLEY 13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
REFUGER REFUGER FUNCTION SATISFACTORILY.

G TROLLEY G
REFUGER
DB-UPS

156900

157000
DB-POWER
156800

DB-LIGHTING

200 200

F F

E E

PLAN

D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4 LENGTH 4185 M.


100 100 100
TROLLEY
G
REFUGER G

TROLLEY TROLLEY
REFUGER VENTILATION/PLUMBING PANEL REFUGER

157200

157300
F DB-UPS F
157100

DB-POWER
DB-LIGHTING
200

E E

PLAN
D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
N 2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4 LENGTH 4185 M.


G G

100 100 100 100


TROLLEY TROLLEY
REFUGER REFUGER

F F
TROLLEY
REFUGER VENTILATION/PLUMBING PANEL

157600
DB-UPS 157500
DB-POWER DB-UPS
157400

DB-LIGHTING DB-POWER
DB-LIGHTING

200
E E

D D

PLAN ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.
T-4 LENGTH 4185 M.
100 100 100

TROLLEY
REFUGER
G G

TROLLEY TROLLEY
ING PANEL REFUGER REFUGER
DB-UPS
157700

157800

157900
DB-POWER
F F
DB-LIGHTING

200 200

E E

D
PLAN ALT. NO. DESCRIPTIONS SIGNATURE
D

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

N
K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4 LENGTH 4185 M.


G G
100 100 100

TROLLEY TROLLEY
REFUGER REFUGER

F TROLLEY F
VENTILATION/PLUMBING PANEL REFUGER
158000

158100

158200
DB-UPS
DB-POWER
DB-LIGHTING
200
E E

D PLAN ALT. NO. DESCRIPTIONS SIGNATURE


D

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

N
K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4 LENGTH 4185 M.


100 100 100

TROLLEY
G
REFUGER G

TROLLEY
158300

REFUGER VENTILATION/PLUMBING PANEL


DB-UPS

158500
158400
F DB-POWER DB-UPS F

DB-LIGHTING DB-POWER
DB-LIGHTING
200

E E

PLAN

D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

G G

T-4 LENGTH 4185 M.


100 100 100 100

TROLLEY TROLLEY
REFUGER REFUGER

F F

TROLLEY
ING PANEL REFUGER
DB-UPS
158600

DB-POWER

158800
158700

E DB-LIGHTING E

200 200

D D
ALT. NO. DESCRIPTIONS SIGNATURE
PLAN
LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K
N NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4 LENGTH 4185 M.


100 100 100

TROLLEY
G REFUGER G

TROLLEY TROLLEY
REFUGER VENTILATION/PLUMBING PANEL REFUGER

F F
158900

159000

159100
DB-UPS
DB-POWER
DB-LIGHTING
200

E E

PLAN
D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
100 REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
100 GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I TROLLEY DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
REFUGER T-4 LE WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
NGT H 4185 GEOLOGICAL REPORTS.
M. 9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
159200

100 11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.


12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
DB-UPS 13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.
DB-POWER
TROLL
DB-LIGHTING EY
REFUG
ER

0
15930
TRO
G REF LLEY G
UGE
R
200

100

400
F F

159
VEN
T ILAT
ION
/PLU
MBI
DB- NG
UPS PAN
DB- EL
POW
DB- ER
LIGH
TING

E E

PLAN
D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

100

K N K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
VEN DIMENSIONS SHALL BE FOLLOWED.
TILA 3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
TIO
N/P DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
LUM
BIN
G PAN PREDETERMINED POSITIONS PRIOR TO CASTING.
J EL 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
TR
I
RE OLLE DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
FU Y 10 WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GE 0
R GEOLOGICAL REPORTS.
00

9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL


95

DESIGN.
15

10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION


AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.
T-
4
20
0 LE
N GT
H
41
85
G
TR
M. G

RE OL
FU LEY
GE
R
00
96
15

F F

10
0
E E

DB
-U
DB

PS
-
PO
DB

W
-L

ER
IG
HT

D D
IN
G

ALT. NO. DESCRIPTIONS SIGNATURE

PLAN LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY


TR EFU
00
R
OL GE NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA
C 97 LE R ROAD - BALANGIR C
15 Y
NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS

10
An ISO 9001 Company

0
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

10
0
N
K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN

20
PREDETERMINED POSITIONS PRIOR TO CASTING.

0
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.

TR FUG
RE
OL ER
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON

LE
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.

Y
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I

0 WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON


0
98 GEOLOGICAL REPORTS.
15 9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED

T-4
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO

LE 0
FUNCTION SATISFACTORILY.

10

NG
TH
41
85
M.
G G

F F

VE
NT
ILA
DB OWE NG
DB LIGH

-UP

TIO
00

DB
-P

TR FUG
S

N/P
99

RE BING
15

OL ER ANE
LU
E E

LE
R

M
TI

Y
P
L
PLAN
D D

10
0
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN

TR FUG
RE
METERS UNLESS NOTED OTHERWISE.

OL ER
LE
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN

Y
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
00
20

00 DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN


0

16 PREDETERMINED POSITIONS PRIOR TO CASTING.


J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE
RELEVANT CODES OF PRACTICES IN VOGUE.
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.

10
8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON

0
GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER
SOD.
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED
H
ON EACH SIDE. H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO
FUNCTION SATISFACTORILY.

T-4
LE
NG
TH
G G

4
185
M.
0 0
01
16
TR FUG
RE
OL ER
LE
Y
DB

F F
-UP
DB
-PO

S
DB
-L

WE
IGH

R
TIN

10
G

0
E E

PLAN
D D
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

east-coast-railway-squarelogo-1475151565628.png

EAST COAST RAILWAY


TR FUG
RE
OL E
LE R

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


Y

C ROAD - BALANGIR C

NAME OF WORK

00 TUNNEL NO.-T4
02
16 GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
20

E-Mail : support@smcindia.com
0

10

B B
0

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

L L

K K

NOTES:-
1. ALL DIMENSIONSARE IN MILLIMETERSAND LEVELS ARE IN
N METERS UNLESS NOTED OTHERWISE.
2. DIMENSIONSSHALL NOT BE SCALED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWINGSHALL BE READ WITH RELEVANTSERVICES
DWG. ALL INSERTS AND OPENINGS SHALL BE KEPT IN
PREDETERMINED POSITIONS PRIOR TO CASTING.
J 4. THE UNDERGROUNDEXCAVATIONFOR TUNNEL SHALL BE J
CARRIED OUT IN CONFORMITY WITH IS:5878.
5. THE CONSTRUCTIONOF TUNNELLININGSHALLBE AS PER THE

TR FU
RELEVANT CODES OF PRACTICES IN VOGUE.

RE
OL GE
6. ALL THE WORKSSHALL BE CARRIEDOUT TO THE RELEVANT

LE R
SPECIFICATIONS AS MENTIONED IN TENDER DOCUMENT.

Y
7. TUNNELSUPPORTSCHEME SHALLBE PROVIDEDAS PER THE
REQUIREMENT & METHODOLOGY AT SITE.
00 8. THE ROCK SUPPORT SYSTEM IS ARRIVED AT BASED ON
02 GEOLOGICAL AND GEO-TECHNICAL INVESTIGATION REPORT.
16
I DURINGTHE EXECUTIONOF WORK THE SUPPORT SYSTEM I
WILL BE DECIDED BY THE ENGINEER AT SITE BASED ON
GEOLOGICAL REPORTS.
9. STRUCTURALSTEELIS TENTATIVEANDSHALLBE AS PERFINAL
DESIGN.

20
10. TUNNELSECTIONIS SUITABLEFOR ELECTRIFICATION
AS PER

10
0
SOD.

T-
11. TROLLEY/MAN REFUGES SHOULD BE PROVIDED AS PER SOD.

4
12. ONEPIPEOF 100 MM.DIA FORS&TCABLESWILLBE PROVIDED

LE
ON EACH SIDE.

NG
H H
13. THE SIDE DRAINS SHOULD BE ADEQUATE IN SIZE TO

TH
FUNCTION SATISFACTORILY.

41
85
M.
G G

T
RE ROL
FU LE
GE Y
R

80
F F
80

03
CH F
AT :2,O
:16
0
30
0

T4 AL
16
PO

EL RT
R
NO TAL

NN PO
.T4 2
AT OF T

TU LSE
CH UN
16 NE

FA
03 L
E 75 E

VE
NT
ILA 5
PLAN DB TIO
N/
DB -UPS PL
U
-P MB
DB O IN
-LI WE G

72
GH R PA

7.4
D TIN NE D
G L
ALT. NO. DESCRIPTIONS SIGNATURE

LOADING STANDARD : 25T LOADING - 2008

08
03
EAST COAST RAILWAY

16
east-coast-railway-squarelogo-1475151565628.png

NAME OF PROJECT:- PROPOSED NEW B.G. LINE FROM KHURDA


C ROAD - BALANGIR C

NAME OF WORK

TUNNEL NO.-T4
GENERAL ARRANGEMENT DRAWING

S.M. CONSULTANTS
An ISO 9001 Company
SCALE:- NTS
Bhubaneswar / Balasore / Secunderabad / South Andaman
Web : www.smcindia.com ,
E-Mail : support@smcindia.com
B B

DY.C.E.(C)BOUDH CPM-I/BBS
E.Co.RAILWAY E.Co.RAILWAY
BOUDH BHUBANESWAR

A J.E. DRAWING (C) AXEN (C)/BOUDH A


E.Co. RAILWAY E.Co.RAILWAY
BHUBANESWAR BOUDH