Customer Information: 1260 Infinity SFC - Standard Preventive Maintenance Service Checklist
Customer Information: 1260 Infinity SFC - Standard Preventive Maintenance Service Checklist
Customer Information: 1260 Infinity SFC - Standard Preventive Maintenance Service Checklist
Service Checklist
Agilent Preventive Maintenance (PM) provides factory recommended service for your systems to
assure reliable operation and the accuracy of your results. Delivered by highly-trained and
certified service engineers using genuine Agilent parts and supplies, Agilent Preventive
Maintenance provides everything you need to reduce unplanned downtime and keep your systems
operating at their peak.
For more information about Agilent Technologies services please visit our web site using the
following URL http://www.chem.agilent.com/en-us/products/services/pages/default.aspx.
Customer Information
• Customers should provide all necessary operating supplies upon request of the engineer.
• A customer representative should be available to the engineer while performing the
preventive maintenance procedures.
• Any parts, not included in the Parts Lists section of this document, are not part of the
recommended Preventive Maintenance service, nor are they included in the price of this
service.
• If a system requires the use of additional or special procedures and/or parts for the
instrument service, then these must be ordered separately and charged as a repair, which may
incur additional costs.
System Information
Guidance:
Check box if instrument configuration report is attached instead of completing the table
below.
Preparation
Discuss any specific issues with the customer prior to starting.
Review the instrument logbook.
Save instrument control settings before starting the procedure.
Perform general inspection of system for cleanliness.
Check for proper installation of safety-related parts, assemblies, sensors etc.
Check for required firmware updates and verify with customers if they would like them
installed.
Check for Lab Advisor updates and verify with customers if they would like them installed.
Check for proper mounting and functionality of all leak sensors.
Wash deposits from each leak sensor.
Restore Instrument
Return the instrument to initial conditions.
Guidance
If the PM service is performed prior to a qualification service, then use the qualification
procedure as a guide for final instrument set up and checkout.
Service Review
Attach available reports/printouts of all tests to this documentation.
Record the PM service activity in the customer’s instrument records/logbook
Update/reset instrument maintenance counters as appropriate
Affix the PM sticker to the system or instrument logbook based on the customer’s request.
Complete the Service Engineer Comments section below if there are additional comments.
Review the service and any test results with the customer.
If the Instrument firmware was updated, record the details of the change in the Service
Engineer’s Comments box below or if necessary, in the customer’s IQ records.
If there are any specific points you wish to note as part of delivering the PM service including any
follow-up activities, specific observations made or other items of interest for the customer, please write
in this box.
Service Completion