Basicprice: Lokasi: Kota Ambon
Basicprice: Lokasi: Kota Ambon
Basicprice: Lokasi: Kota Ambon
HARGA
GALIAN C JUMLAH
LOKASI
DASAR HARGA ONGKOS ONGKOS BERAT PEMBULATAN
No. URAIAN SAT TOTAL
QUARY TRANSPOT NAIK/TURUN JENIS (RP)
20% x (4) x BJ (4+5+6) (7+8)
1 2 3 4 5 6 7 8 9 10 11
* UPAH
1 Mandor Hari 150,000.00 - - - - - - 175,000.00 175,000.00
2 Kepala Tukang Hari 120,000.00 - - - - - - 150,000.00 150,000.00
3 Tukang Batu Hari 100,000.00 - - - - - - 120,000.00 120,000.00
4 Tukang Besi Hari 100,000.00 - - - - - - 120,000.00 120,000.00
5 Tukang Cat Hari 100,000.00 - - - - - - 120,000.00 120,000.00
6 Pekerja Hari 90,000.00 - - - - - - 90,000.00 90,000.00
7 Tukang Kayu Hari 100,000.00 120,000.00 120,000.00
HARGA PAJAK
GALIAN C
LOKASI LAINNYA
DASAR HARGA ONGKOS ONGKOS BERAT PEMBULATAN
No. URAIAN SAT TOTAL
QUARY TRANSPOT NAIK/TURUN JENIS (RP)
20% x (4) x BJ (4+5+6) 2%x(8)
1 2 3 4 5 6 7 8 9 10 11
* BAHAN PASIR
1 Tanah Urug M³ 183,933.00 14,714.64 - 1.67 61,433.62 260,081.26 5,201.63 265,282.89 265,282.00
2 Pasir Urug M³ 237,518.00 19,001.44 - 1.67 79,331.01 335,850.45 6,717.01 342,567.46 342,567.00
3 Pasir Pasangan M³ 206,946.00 16,555.68 - 1.67 69,119.96 292,621.64 5,852.43 298,474.08 298,474.00
* BAHAN BATU
1 Batu Kali M³ 240,000.00 19,200.00 - 1.80 86,400.00 345,600.00 6,912.00 352,512.00 352,512.00
2 Batu Karang M³ 249,000.00 19,920.00 - 1.80 89,640.00 358,560.00 7,171.20 365,731.20 365,731.00
3 Batu Kerikil 3/5 M³ 293,958.00 23,516.64 - 1.80 105,824.88 423,299.52 8,465.99 431,765.51 431,765.00
4 Batu Kerikil 5/7 M³ 348,752.00 27,900.16 - 1.80 125,550.72 502,202.88 10,044.06 512,246.94 512,246.00
5 Batu Kerikil 2/3 M³ 348,752.00 27,900.16 - 1.80 125,550.72 502,202.88 10,044.06 512,246.94 512,246.00
6 Batu Kerikil 1/2 M³ 348,752.00 27,900.16 - 1.80 125,550.72 502,202.88 10,044.06 512,246.94 512,246.00
7 Batu Bata Merah Kls. I Bh 1,800.00 - 1,800.00 36.00 1,836.00 1,836.00
* BAHAN KAYU