Zeus Ie Breathing System A1 Po 9102537 en Master
Zeus Ie Breathing System A1 Po 9102537 en Master
Zeus Ie Breathing System A1 Po 9102537 en Master
D-25240-2020
Disassembly
1 Unscrew the CLIC adapter (optional). 2 Insert cleaning disc into the adapter. Close adapter 3 Loosen and pull out the expiration port.
until it snaps.
D-25973-2020
D-25981-2020
D-7416-2014
Screw the CLIC adapter (optional). Remove cleaning disc from the adapter. Close adapter Check the grill in the expiration port*. Insert and
9 until it snaps. 8 tighten the expiration port. 7
4 Loosen and pull out the inspiration port. 5 Remove the flow sensors. 6 Turn the five screws using the hex key
counterclockwise about 90°.
D-25993-2020/D-7442-2014
D-26004-2020
D-25998-2020
7 Lift off the upper part of the breathing system. 8 Screw off the APL valve. 9 Unscrew the additional air valve.
D-26006-2020
D-26009-2020
D-26014-2020
Place the upper part of the breathing system Align the APL valve correctly and tighten it with the Screw in the additional air valve.
on the lower part. 3 knurled nut. 2 1
Assembly
Reprocessing instruction
**
Disinfection by immersion Machine cleaning and disinfection Sterilization 134 °C (273.2 °F) Visual check
D-7442-2014*
***
D-7442-2014*
D-26241-2020a
D-26240.2020a
D-26240-2020
D-7350-2011
Only use disinfectants listed in the instructions for use of the Position components so that all interior spaces and surfaces Dräger SpiroLife® flow sensors are not suitable for The following parts must be free of deposits:
Dräger SpiroLife® flow sensors. are completely flushed and water can drain off freely. plasma sterilization or radiation sterilization. – Flow grills
– Non-return valves
If required, remove deposits on the valve plates of the
non-return valves with a soft cloth.