The Constitution of Kenya 2010 established two tier governance systems with a national government and 47 county governments. The
County Government Act 2012 stipulates the need for all counties to prepare five-year County Integrated Development Plans (CIDPs)
which replaces District Development Plans (DDPs) that used to guide development under former constitutional dispensation. These
plans are expected to integrate county governments’ functions as specified in the Fourth Schedule of the Constitution and on relevant
national policies.
In view of the constitutional requirements and the need to promote the welfare of our residents, I am proud to present the West Pokot
Second County Integrated Development Plan that will cover the period 2018-2022. This is a blueprint that will guide future development
agenda of our county. The Plan will form a basis for appropriating county public funds and integrates economic, physical, social,
environmental and spatial aspects of our county. The Plan preparation has been guided by the Constitution, aspirations of Kenya Vision
2030 and its Third Medium Term Plan (MTP 2018-2022).
The County Government under my leadership recognises the existence of socio-economic challenges affecting our residents that includes
poverty, rampant insecurity, poor infrastructure and effects of climate change and will over the Plan period work tirelessly to promote
the welfare of all residents. West Pokot CIDP 2018-2022 outlines programmes and projects aimed at address these challenges and in
overall spur economic growth and development of our county.
By implementing the programs and policies under the County Economic Transformation Agenda, we are laying a solid foundation for
County’s industrialization as envisaged in the Vision 2030. Building on the progress made this far, we aim to address the remaining
bottlenecks that continue to hold our economy from achieving its full potential by focusing on “The 3E’s” Plan over the next five years.
The plan targets to;
i. Increase access, retention and completion levels in pre-primary education, primary, secondary and post-secondary education by
at least 100 percent by 2022;
2
ii. Support value addition and contribute the manufacturing sector’s share to GDP to 15 percent by 2022. This will accelerate
economic growth, create jobs and reduce poverty;
iii. Focus on initiatives that guarantee food security and nutrition to all residents by 2022 through expansion of food production and
supply, provision of incentives and subsidies to attract investments and support value addition in the food processing value chain;
iv. Ensuring equity in all socio-economic opportunities and protection of marginalized groups;
v. Support provision of Universal Health Coverage thereby guaranteeing quality and affordable healthcare to all County residents.
Under this Plan, the county government will put in place strategies to make West Pokot a destination of choice for all investors and will
seek to accelerate investment in the areas of trade, industry, farming and tourism.
The objective of this Plan will be to create a platform for informed decision making; create an environment for robust economic
development; building social cohesion and further ensuring that within the county we realise our vision of working together in
development and growth. The Plan contains programmes and projects designed with great consideration to promoting equitable
distribution of resources within our county. Over the medium term period, the county government will implement programmes and
projects aimed at improving our infrastructure, health-care services, education, environmental conservation, agricultural value addition
and disaster risk management. Employment creation and promotion of entrepreneurial culture especially for the youth and women will
also be a priority of my county government. These aspirations will be achieved through a public sector led, private sector driven and
community based development approach.
The county government under my able County Executive, County Assembly and County Staff will strive to build strong and efficient
institutions to drive our development course. The County Assembly is a legislative organ and will play an oversight role on all County
public institutions including the urban areas. In order to successfully implement this Plan, the county will pursue prudent financial
management practises as outlined in the Public Finance Management Act 2012. The county will promote revenue collection to
3
supplement allocations from the national government and ensure resources are prudently utilized during implementation of this Plan.
My government will ensure efficient public service delivery with high level of integrity to enable our people reap the fruits of devolution
Recognizing the importance of all stakeholders in development of our county, the Plan was prepared through wide consultative process
as required by Article 10 of the Constitution. Public consultations were undertaken in all sub-counties to collect views that informed the
formulation of policies, programmes and projects outlined in this Plan. Going forward, successful implementation of our development
priorities will require collaborative approach and a sense of responsibility by all stakeholders. Our county government will also work
closely with the national government, neighbouring, and all other county governments in fostering our development agenda through
building synergies and benefiting from varying comparative advantages.
I therefore call upon all county residents, development partners, private sector players and all other stakeholders to commit themselves
to play an important role in the implementation of this plan, so that our county moves forward to a prosperous future. The County
government under my leadership on its part is committed to coordinating successful implementation of this plan. I strongly believe
working together for this common course will take our county to greater heights of development and contribute to our Kenya Vision of
being a rapidly industrializing, middle-income country by 2030, offering all its citizens a high quality of life
ACKNOWLEDGEMENTS
The West Pokot second County Integrated Development Plan has been prepared through a consultative process involving varied
stakeholders within the county. I am indebted to H.E the Governor Prof .John Krop Lonyangapuo, His Deputy Dr.Nicholas Atudonyang
and the County Executive Members, Senator Samuel Poghisho, the Hon. Members of parliament and County Assembly for their support,
guidance and their continued collaboration throughout the entire preparatory process.
4
The Ministry of Devolution and Planning played a key role by preparing the guidelines that have informed the preparation of this Plan.
The county shall continue working closely with the Ministry during implementation of this Plan especially in building capacity of our
county staff.
The County Planning Unit provided leadership, guidance and coordination of the various stakeholders and especially in designing
programmes and projects contained herein. I am grateful to the leadership and support of the CIDP steering committee and secretariatThe
County Planning Unit also benefitted immensely from the technical heads of departments who provided guidance and inputs as well as
leadership in their relevant areas of operations. I also wish to appreciate the immense role played by the members of the public who are
the direct beneficiaries of this Plan. Their contribution during the Sub- County Consultative Forums made this Plan legimate and
responsive to their needs.
Finally, I wish to appreciate the individual persons and organizations that provided their inputs through memoranda and written
submissions.These organizations include FAO… among others. To all, I thank you and look forward to continuous engagement in
improving the lives of our county residents. Let us all arise to this righteous course of moving our county to prosperity.
God bless you all.
5
Table of Contents
FOREWORD................................................................................................................................................................................................................ 2
ACKNOWLEDGEMENTS ........................................................................................................................................................................................ 4
LIST OF TABLES ..................................................................................................................................................................................................... 10
LIST OF FIGURES ................................................................................................................................................................................................... 10
LIST OF ABBREVIATIONS AND ACRONYMS ................................................................................................................................................. 11
EXECUTIVE SUMMARY ....................................................................................................................................................................................... 15
CHAPER ONE: COUNTY GENERAL INFORMATION .................................................................................................................................... 16
1.0: County Overview .............................................................................................................................................................................................. 16
1.1: Position and Size ............................................................................................................................................................................................... 16
1.2: Physiographic and Natural Conditions ............................................................................................................................................................. 17
1.3: Administrative and Political Units .................................................................................................................................................................... 18
1.4: Demographic Features ...................................................................................................................................................................................... 20
1.5: Human Development Approach ....................................................................................................................................................................... 28
1.6: Infrastructure Development .............................................................................................................................................................................. 29
1.7: Land and Land use ............................................................................................................................................................................................ 30
1.8: Employment ...................................................................................................................................................................................................... 31
1.9: Irrigation infrastructure and schemes................................................................................................................................................................ 32
1.10: Crop, Livestock, Fish production and Value addition .................................................................................................................................... 32
1.11: Oil and Other Mineral Resources ................................................................................................................................................................... 35
1.12: Tourism and Wildlife ...................................................................................................................................................................................... 36
6
1.13: Industry and Trade .......................................................................................................................................................................................... 37
1.14: Financial services ............................................................................................................................................................................................ 37
1.15: Forestry, Agroforestry and Value Addition .................................................................................................................................................... 37
1.16: Environment and Climate Change .................................................................................................................................................................. 40
1.18: Health and Sanitation ...................................................................................................................................................................................... 42
1.19: Education, Skills, Literacy and Infrastructure ................................................................................................................................................ 44
1.20: Sports, Culture and Creative Arts ................................................................................................................................................................... 47
1.21: Community Organizations/Non-State Actors ................................................................................................................................................. 47
1.22: Security, Law and Order ................................................................................................................................................................................. 49
1.23: The Blue Economy ......................................................................................................................................................................................... 49
CHAPTER TWO: LINKAGES WITH VISION 2030 AND OTHER PLANS .................................................................................................... 51
2.1 Overview ............................................................................................................................................................................................................ 51
2.2 Implementation of Kenya Vision 2030 and Medium Term Plan III (2018-2022) ............................................................................................. 51
2.2.1 Foundations for National Transformation ............................................................................................................................................ 51
2.2.2 Economic Pillar .................................................................................................................................................................................... 53
2.2.3 Social Pillar .......................................................................................................................................................................................... 55
4.2.4 Political Pillar....................................................................................................................................................................................... 58
2.3 Linkage between CIDP, Sector Plans and Budget ........................................................................................................................................... 59
2.4 Legal Framework for County Planning ........................................................................................................................................................... 60
2.4.1 Kenya Constitution (2010) ................................................................................................................................................................... 61
2.4.2 The County Government Act 2012 ...................................................................................................................................................... 61
2.4.3 Public Finance Management Act (PFMA), 2012 ................................................................................................................................. 62
2.4.4 Urban Areas and Cities Act, 2011........................................................................................................................................................ 62
7
2.5 Implementation of the Sustainable Development Goals (SDGs) at the County Level ................................................................................ 62
2.6 Implementation of the Agenda 2063 at the County Level ........................................................................................................................... 66
CHAPTER THREE: REVIEW OF IMPLEMENTATION OF THE PREVIOUS CIDP .................................................................................. 68
3.1 Introduction ........................................................................................................................................................................................................ 68
3.2 Implementation Status of the CIDP (2013-2017) .............................................................................................................................................. 68
CHAPTER FOUR: COUNTY DEVELOPMENT PRIORITIES AND STRATEGIES ..................................................................................... 74
4.1 Introduction .................................................................................................................................................................................................. 74
4.2 Spatial Development Framework................................................................................................................................................................. 74
4.3 Natural Resource Assessment ...................................................................................................................................................................... 77
4.4 Flagship /County Transformative Projects .................................................................................................................................................. 80
4.5 DEVELOPMENT PRIORITIES AND STRATEGIES .......................................................................................................................... 85
4.5.1 EDUCATION SECTOR .......................................................................................................................................................................... 85
4.5.2 ENVIRONMENTAL PROTECTION, WATER & NATURAL RESOURCES SECTOR..................................................................... 89
4.5.3 GENERAL ECONOMIC & COMMERCIAL AFFAIRS SECTOR ....................................................................................................... 96
4.5.4 AGRICULTURE, RURAL & URBAN DEVELOPMENT SECTOR .................................................................................................. 100
4.5.5 HEALTH SECTOR ............................................................................................................................................................................... 114
4.5.6 PUBLIC ADMINISTRATION AND INTERGOVERNMENTAL RELATIONS SECTOR ............................................................... 122
4.5.7 ENERGY, INFRASTRUCTURE & ICT SECTOR .............................................................................................................................. 133
4.5.8 SOCIAL PROTECTION, CULTURE & RECREATION SECTOR .................................................................................................... 136
5.0 CHAPTER FIVE: IMPLEMENTATION FRAMEWORK ........................................................................................................................... 142
5.1 Introduction .................................................................................................................................................................................................... 142
5.2 Institutional Framework ................................................................................................................................................................................. 142
5.3 Amendment of the Plan ................................................................................................................................................................................. 149
8
5.4 The Resource Mobilization Framework .................................................................................................................................................... 149
5.4.1 Sources of Revenue for the County ......................................................................................................................................................... 149
5.4.2 Revenue and Expenditure Forecasts...................................................................................................................................................... 154
5.4.3 Estimated Resource Gap and Measures of Addressing It ....................................................................................................................... 155
CHAPTER SIX: MONITORING AND EVALUATION FRAMEWORK .................................................................................................... 156
6.1 Introduction ................................................................................................................................................................................................ 156
6.2 County Monitoring and Evaluation System ............................................................................................................................................... 156
6.3 Data collection, Analysis, and Reporting................................................................................................................................................... 158
6.4 M&E Outcome Indicators .......................................................................................................................................................................... 159
ANNEX I: SECTOR PROJECTS DERIVED FROM PROGRAMMES ........................................................................................................... 167
9
LIST OF TABLES
TABLE 1: AREA BY SUB COUNTY AND WARDS ................................................................................................................................................................................................ 19
TABLE 2: COUNTY ELECTORAL WARDS BY CONSTITUENCIES................................................................................................................................................................................ 20
TABLE 3: POPULATION PROJECTION BY AGE COHORT ....................................................................................................................................................................................... 20
TABLE 4: POPULATION PROJECTIONS BY URBAN CENTRES.................................................................................................................................................................................. 21
TABLE 5: POPULATION DISTRIBUTION AND DENSITY BY SUB COUNTY ................................................................................................................................................................... 22
TABLE 6: POPULATION PROJECTION BY SPECIAL AGE GROUPS............................................................................................................................................................................. 23
TABLE 7: PEOPLE LIVING WITH DISABILITIES BY TYPE AND SEX............................................................................................................................................................................. 26
TABLE 8: WEST POKOT COUNTY DEMOGRAPHIC DIVIDEND POTENTIAL ................................................................................................................................................................ 27
TABLE 9: COUNTY SPATIAL DEVELOPMENT STRATEGIES..................................................................................................................................................................................... 74
TABLE 10: NATURAL RESOURCE ASSESSMENT ................................................................................................................................................................................................. 77
TABLE 11: FLAGSHIP/TRANSFORMATIVE PROJECTS .......................................................................................................................................................................................... 80
TABLE 12:SECTOR PROGRAMMES ................................................................................................................................................................................................................ 87
TABLE 13: CROSS SECTORAL IMPACTS ......................................................................................................................................................................................................... 140
TABLE 14: SUMMARY OF PROPOSED BUDGET BY SECTOR ................................................................................................................................................................................ 153
TABLE 15: REVENUE PROJECTIONS ............................................................................................................................................................................................................. 154
TABLE 16: SUMMARY OF M&E OUTCOME INDICATORS .................................................................................................................................................................................. 159
TABLE 17: NEW PROJECT PROPOSALS ......................................................................................................................................................................................................... 167
LIST OF FIGURES
FIGURE 1: LOCATION OF THE COUNTY IN KENYA ............................................................................................................................................................................................ 16
FIGURE 2: COUNTY’S ADMINISTRATIVE & POLITICAL UNITS ............................................................................................................................................................................. 18
FIGURE 3: CIDP LINKAGE WITH OTHER PLANS .............................................................................................................................................................................................. 60
FIGURE 4: COUNTY ORGANOGRAM ........................................................................................................................................................................................................... 142
10
LIST OF ABBREVIATIONS AND ACRONYMS
CIDP County Integrated Development Plan
MTP Medium Term Plan
FAO Food & Agriculture organization of the United Nation
SDG Sustainable Development Goals
HIV Human Imuno Virus
AIDS Acquired Imunodeficiency Virus
ECDE Early Childhood Education
U5MR Under 5 Mortality Rate
TIVET Technical Institutional Vocational Training
TBA Traditional Birth Attendance
GDP Gross Domestic Product
HDI Human Development Index
PPP Purchasing Power Perity
HDR Human Development Report
ICT Information And Communication Technology
FM Frequency Modulation
KVDA Kerio Valley Development Authority
MSME Micro, Small And Medium Enterprise
KCB Kenya Comercial Bank
SACCO Saving And Credit Cooperative
GOK Government Of Kenya
ACF Action Against Hunger
KDHS Kenya Demographic And Health Survey
TTC Teachers Training College
VCT Voluntay Councelling And Testing
NGO Non Governmental Organizations
CBO Community Based Organization
PWD People With Disability
11
SHG Self Help Group
WEF Women Enterprise Fund
YEF Young Enterprise Fund
INGO International Non -Govermental Organization
FBO Faith Based Organization
PBO Projected Benefit Obligation
ACTED Agency For Technical Coorperation And Development
UNICEF United Nations Children Fund
USAID United States Agency For International Development
UN United Nations
MTEF Medium Term Expenditure Framework
NUTRIP National Urban Transport Improvement Project
LAPSSET Lamu Port-South Sudan-Ethiopia-Transport
CCP County Connectivity Project
ASAL Arid And Semi-Arid Lands
DRR Disaster Risk Reduction
CCA Consumer Credit Account
HSNP Hunger Safety Net Programme
DRM Digital Rights Management
ITES Information Technology Enabled Services
SFRTF Street Families Rehabilitation Trust Fund
THVC Travelelers Health And Vaccination Clinic
FGM Femal Genital Mutilation
KCPE Kenya Certificate Of Primary Education
DLP Digital Light Processing
AGPO Acess Government -Procurement Opportunities
M&E Monitering And Evaluation
PFMA Public Financial Management Act
KCSE Kenya Certificate Of Secondary Education
FY Financial Year
12
KFS Kenya Forest Service
NEMA National Environment Management Authorithy
KWS Kenya Wildlife Service
CFA Community Forest Association
WRUA Water Resource Users Association
MOU Memorandum Of Understanding
KENHA Kenya National Hifhway Authority
KURA Kenya Urban Roads Authority
KERRA Kenya Rural Roads Authorithy
HQ Head Quarters
TSE Traffic Safety Beducation
NITA National Industrial Training Authority
VTC Voctional Training College
BQ Bills Of Quantities
CJ Chief Justice
CCF Catholic Community Foundation
CDF Community Development Fund
RANET Response And Assistance Network
KMD Kenya Meterological Department
WRMA Water Resource Management Authority
CCM Certified Construction Manager
SME Small Medium Enterprise
KNCCI Kenya National Chamber Of Comerce And Industry
FOSA Front Office Services And Accounts
KPI Key Perfomance Indicators
AI Artificial Insemination
CBHIS Community Based Health Information System
CHS Community Health Strategy
CHV Community Health Colunteers
NHIF National Insurance Fund
13
VITA Volunteer Income Tax Assistant
KNCHR Kenya National Commission On Human Rights
CU Community Unit
HR Human Resource
GIS Geographical Information System
MCA Member Of County Assembly
NACC National Aids Control Council
MFI Micro-Finance Institutions
NIMES National intergrated monitoring and evaluation system
COMEC County Monitoring And Evaluation Committee
TOC Technical Oversight Committee
MMEC Ministerial Monitoring And Evaluation Committee
SMEC Sub-County Monitoring And Evaluation Committee
WMEC Ward Monitoring And Evaluation Committee
VMES Vulnerable Marine Eco-Systems
DHIS District Health Information System
SMART Specific, Measurable, Achievable, Realistic and Time bound
LIC Livestock Improvement Centre
14
EXECUTIVE SUMMARY
This County Integrated Development Plan is the second publication produced by the county government of West Pokot and its
stakeholders. It is the new medium term county development blueprint and is motivated by a collective aspiration for a better society by
end of the planned period. The plan has been carefully prepared and informed by the Kenyan vision 2030 that aims to transform Kenya
into a newly industrializing; middle income country providing a high quality of life to all its citizens in a clean and secure
environment.Simultaneously, the plan aims to accelerate the realization of the SDGs for county residents by 2030. Its implementation
will be through annual rolling work plan starting from the period 2018/2019.
The plan is devided into six chapters. The first chapter provides an overview of the county in terms of its locsation,area,administrative
and political units,demographic and settlement patterns and natural conditions.It also provides information on the current state of
infrastructure; land and land use;community organizations/non-state actors;crop, livestock and fish production;forestry amd agro-
forestry;environment and climate change;mining;tourism;industry;employment and other sources of income;water and sanitation;health
and nutrition;education and literacy;and private sectors competitiveness.
The Second Chapter discusses the linkages with Vision 2030, International Commitments and Other Plans.These plans include the
SDGs, Agenda 2063, Ending Drought Emergencies, Constitution of Kenya 2010 and the Medium Term Plan III.Chapter Three provides
the review of implementation of the previous CIDP (2013-2017)
The County Spatial Framework is provided in Chapter Four which identifies development projects and programmes and locates them
on specific geographic areas in the county.Chapter five outlines the county institutional framework and organizational flow chart that
will be followed in implementing the plan.It outlines the stakeholders in the county, and the roles that they play and how their functions
are intergrated to avoid duplication of efforts.
Chapter Six provides the monitoring and evaluation mechanism that facilitates the realization of the identified goals, objectives and
targets. It specifically identifies verifiable M&E indicators that will be used to monitor programmes and projects, and sets medium term
milestones for impact assessment.
In summary, this Plan will provide basis for strong linkage between policy, planning and budgeting and the spring board for realizing
socioeconomic transformation under the new devolved structures.
15
CHAPER ONE: COUNTY GENERAL INFORMATION
West Pokot County is one of the 14 Counties in the Rift Valley region. It is situated in the North Rift along Kenya’s Western boundary
with Uganda border. It borders Turkana County to the North and North East, Trans Nzoia County to the South, Elgeyo Marakwet County
and Baringo County to the South East and east respectively. The County lies within Longitudes 34° 47’and 35° 49’East and Latitude 1°
and 2° North and covers an area of approximately 9,169.4 km2
16
1.2: Physiographic and Natural Conditions
1.2.1: Physical and Topographic features
The county is characterized by a variety of topographic features. On the northern and north eastern parts are the dry plains, with an
altitude of less than 900 m above sea level. On the southeastern part are Cherangani Hills with an altitude of 3,370 m above sea level.
Landscapes associated with this range of altitude include spectacular escarpments of more than700 m. The high altitude areas have high
agricultural potential while medium altitude areas lie between 1,500 m and 2,100 m above sea level and receive low rainfall in addition
to being predominantly pastoral land. The low altitude areas include Alale, Kacheliba, Kongelai, Masol and parts of Sigor. These areas
are prone to soil erosion due to flash floods.
The main forests in the county are found in Cherangani Hills. The gazetted forest, which forms part of the Cherangani Hills in Lelan,
covers an area of 20,857 ha. The un-gazetted forest covers 15,719 ha and consists of rain forests blocks scattered all over the county.
These are natural forests dominated by tree species like cedar (Juniperous procera) and bamboo (Aredinaria alpina). Plantation forests
cover an area of 662 ha of which approximately 34 ha are indigenous and the rest exotic.
The main rivers in the county are Suam, Kerio, Weiwei and Muruny. Cherangani Hills are the main source of Muruny and Weiwei
rivers, while Mt Elgon is the main source of river Suam. River Muruny, Kerio and Weiwei drain northwards into Lake Turkana, while
other small rivers join and drain into River Nzoia which in turn drains into Lake Victoria. River Suam drains into Turkwel dam that
generates hydro-electric power.
The county has a bimodal type of rainfall. The long rains fall between April and August while the short rains fall between October and
February. There is, however, great variation in the total amount and distribution of the rainfall received in the county. The lowlands
receive 600 mm per annum while the highlands receive 1,600 mm per annum.
17
The county also experience great variations in temperature with the lowlands experiencing temperatures of up to 300 C and the highlands
experiencing moderate temperatures of 150 C. These high temperatures in the lowlands cause high evapo-transpiration which is un-
favourable for crop production. The high altitude areas with moderate temperatures experience high rainfall and low evapo-transpiration
hence suitable for crop production.
West Pokot County has four constituencies, 20 wards, 16 divisions, 65 locations and 224 sub locations. The table below presents the
existing administrative units in terms of Sub-Counties, Divisions, Locations and Sub locations
18
Table 1: Area by Sub County and Wards
The population of the county in the 2009 census was 512,690.This population comprised of 255,136 males and 257,554 females giving
a sex ratio of 100:101.The county population is estimated at 777,180 persons in 2018 and is projected to grow to 987,989 and 1,338,990
in 2022 and 2030 respectively.
20
Age 2009 (Census) 2018 (Projected) 2022(Projected) 2030(Projected)
Cohort Male Female Total Male Female Total Male Female Total Male Female Total
0-4 49,362 48,160 97,522 74,827 73,005 147,832 95,124 92,808 187,932 128,919 125,779 254,698
5-9 46,548 44,974 91,522 70,561 68,175 138,737 89,701 86,668 176,369 121,569 117,458 239,028
10-14 40,465 38,466 78,931 61,340 58,310 119,650 77,979 74,127 152,105 105,682 100,462 206,144
15-19 28,746 27,198 55,944 43,576 41,229 84,805 55,396 52,412 107,808 75,076 71,033 146,109
20-24 19,937 23,499 43,436 30,222 35,622 65,844 38,420 45,284 83,704 52,069 61,372 113,442
25-29 15,835 18,494 34,329 24,004 28,035 52,039 30,515 35,639 66,154 41,356 48,301 89,657
30-34 12,597 13,561 26,158 19,096 20,557 39,653 24,275 26,133 50,408 32,900 35,417 68,317
35-39 10,223 10,943 21,166 15,497 16,588 32,085 19,700 21,088 40,788 26,699 28,580 55,279
40-44 7,577 7,486 15,063 11,486 11,348 22,834 14,601 14,426 29,027 19,789 19,551 39,340
45-49 6,099 6,100 12,199 9,245 9,247 18,492 11,753 11,755 23,508 15,929 15,931 31,860
50-54 4,685 4,929 9,614 7,102 7,472 14,574 9,028 9,499 18,527 12,236 12,873 25,109
55-59 3,585 3,458 7,043 5,434 5,242 10,676 6,909 6,664 13,572 9,363 9,031 18,394
60-64 2,904 3,164 6,068 4,402 4,796 9,198 5,596 6,097 11,693 7,584 8,263 15,848
65-69 1,896 2,072 3,968 2,874 3,141 6,015 3,654 3,993 7,647 4,952 5,411 10,363
70-74 1,448 1,661 3,109 2,195 2,518 4,713 2,790 3,201 5,991 3,782 4,338 8,120
75-79 950 1,019 1,969 1,440 1,545 2,985 1,831 1,964 3,794 2,481 2,661 5,142
80+ 2,211 2,320 4,531 3,352 3,517 6,868 4,261 4,471 8,732 5,774 6,059 11,834
TOTAL 255,136 257,554 512,690 386,757 390,422 777,180 491,665 496,324 987,989 666,338 672,653 1,338,991
Source: West Pokot County Statistics Office (2018), Kapenguria
Chepareria
12,589 12,918 25,507 19,083 19,582 38,666 24,808 25,457 50,265 38,452 39,458 77,910
Total
47,447 47,917 95,364 71,924 72,637 144,561 93,501 94,427 187,928 144,927 146,362 291,288
Source: County Statistics Office (2018), Kapenguria
West Pokot County has two major urban areas namely; Kapenguria and Cheperaria as per the provisions of Section 9 and 10 of the
Urban Areas and Cities Act, 2012. Currently, 18.6 percent of county residents live in urban areas as per the 2009 census. This urban
population is projected to grow by 30 percent and 55 percent by 2022 and 2030 respectively. Majority of this urban population comprises
of people aged between 15 to 64 years who are economically active.The main economic activities in the county urban areas include:
retail and wholesale trading, fresh produce and cereals businesses, entertainment and hospitality businesses, service industries including
motor garages, cyber cafes, law firms, livestock auctions, private education businesses, honey processing, banking and financial services,
real estate enterprises and road transport services.
County urban areas in West Pokot face a myriad of development challenges. The urban areas lack county policy on urban planning and
development control, County Urban Integrated Development Plans and local physical development plans. Most roads are not all weather
with poor drainage system and consequently pose major transport challenge during rainy seasons. There is also no designated solid
waste dumpsite. The existing temporary dumpsite is poorly located since it is on a riparian area. The county also lacks liquid sewerage
system. Poverty and unemployment levels are also high.
1.4.2: Population Density and Distribution
Population distribution in the county is influenced by climatic conditions and socio-economic development. Urban areas and high
potential agricultural areas have high population distribution and density. The population density for the county is expected to increase
from 85 in 2018 to 108 and 147 persons per square km in 2022 and 2030 due to the high population growth.
22
Constituency Total Total Total Total Total
Pokot
104,75 135,85 164,61
Central/Sigo 2,109.7 85,079 40 50 64 78 223,091 106
0 4 0
r
132,10 162,64 210,93 255,58
Pokot South 1,284 103 127 164 199 346,389 270
0 3 7 6
Table 5 shows that population density is high in Pokot south estimated at 164 persons per km2 while Kacheliba is lowest with a density
of 63 persons per km2 as per 2018 projections. The high population density in Pokot South is due to high agricultural potential of the
area.
Under 1 year 10,669 10,461 21,130 16,173 15,858 32,031 20,560 20,159 40,719 27,864 27,322 55,186
Under 5years 49,362 48,160 97,522 74,827 73,005 147,832 95,124 92,808 187,931 128,918 125,779 254,697
Pre-School
29,899 28,731 58,630 45,323 43,553 88,876 57,617 55,367 112,984 78,086 75,037 153,123
(3-5 yr)
23
Primary (6-
69,885 67,758 137,643 105,938 102,713 208,651 134,674 130,574 265,247 182,519 176,963 359,482
13yr)
Secondary
25998 23,438 49,436 39,410 35,529 74,939 50,100 45,166 95,266 67,899 61,212 129,111
(14-17yr)
Labour force
112,108 118,907 231,015 169,943 180,249 350,192 216,040 229,141 445,181 292,792 310,548 603,340
(15-64yrs)
Youth
77,115 82,752 159,869 116,898 125,443 242,340 148,606 159,469 308,076 201,402 216,124 417,526
(15-34yrs)
Reproductive
female - 107,365 107,365 - 162,753 162,753 0 206,900 206,900 280,405 280,405 560,809
Aged (65+) 6,409 7,422 13,831 9,715 11,251 20,966 12,350 14,303 26,653 16,738 19,384 36,122
Under five years (0-5yrs): In 2018, the under- five year age group in the county is estimated at 268,739 children. This is nearly 20.2
per cent of the total population. The population of this age cohort is projected to be 341,634 in 2022 and 463,006 in 2030.
This age group forms the base for the future human resource for the county. It is therefore an important group when planning especially
on health and education. Early Childhood Programmes (ECDE) provides a foundation for this group for meeting cognitive,
psychological, moral and emotional needs. Health on the other hand ensures a healthy child population. This age group is highly
vulnerable to morbidity and mortality. For instance, the under-five Mortality Rate (U5MR) for the county remains high, estimated at
127 deaths per 1,000 live births (127/1,000) compared to the national estimate of 54/1,000. This is double the country’s U5MR and
efforts to address this are very crucial. The major challenges in reduction of child mortality include: inequity in access to health care
service, high cost of accessing health care due to the high poverty levels, inadequate medical personnel and drugs in government
facilities. There is need therefore to focus on access to healthcare services through construction of new health facilities and ensuring
availability of essential medical drugs.
Primary school age group (6-13yrs): The population of this age group is estimated to grow from 208,651 in 2018 to 265,247 in 2022
and 359,482 in 2030. This age group accounts for 26.8 per cent of the total population. Free Primary Education has had a positive impact
on enrolment and completion rates in the county. Despite this improved performance, primary education continues to experience a
number of challenges such as overstretched facilities, overcrowding in schools, low teacher- pupil ratio, retrogressive cultures, nomadic
lifestyle and inaccessibility of education facilities. Some of the requisite interventions to improve access to education to this group
24
include; construction of new schools, expansion of existing school infrastructure, deploying teachers to schools and establishing
boarding facilities for nomadic families.
Secondary School Age group (14-17 yrs): The population of this age group is estimated to increase from 74,939 in 2018 to 95,266 in
2022 and 129,111 in 2030. The increasing enrollment rates due to free primary education and subsidized secondary school education
have exerted pressure on the existing secondary school facilities. Thiscalls for continued investment in secondary school infrastructures,
staffing and additional training institutions to ensure increased opportunities for secondary education are available. There is also need
for an increase in allocation of school bursaries and improved transparency to enhance completion rates and for the benefit of the
disadvantaged poor.
Youth (15-34 yrs.): This is the most productive age group and accounts for 31 per cent of the total population in the county. It is
expected to increase to 242,340, 308,076 and 417,526 in 2018, 2022 and 2030 respectively. The county will require more training
institutions and employment opportunities to make them productive citizens.
Currently, the county has few institutions of higher learning. As a result, only a small proportion of eligible school leavers are absorbed.
Every year less than one half of those graduating from primary schools either join the youth polytechnics for artisan training or enroll
directly for apprenticeship training within the “Jua kali” sector. There is therefore need to implement quality skills development
programmes through TIVET institutions that target this group to enable them to engage in productive employment in both the formal
and informal sectors. Promotion of small and medium enterprises is also very important.
Labour force (15-64yrs): This population is expected to grow to 350,192, 445,181 and 603,340 in 2018, 2022 and 2030 respectively.
This population is projected to grow from 49.34 percent in 2018 to 51.02 per cent in 2022.This age cohort forms the pillar for economic
development in the county as the county depends on it to provide both skilled and unskilled labours to enable the county achieve its
vision. Promotion of small and medium enterprises is also very important for this group. The county must invest heavily on the labour
force existing in the county by improving their work culture, creativity, ethics, and education, entrepreneurial and other skills necessary
for economic take off.
Female Reproductive Age Group (15-49 yrs): The projected population of this age group as at 2018 is 162,753 and is projected to
increase to 206,900 and 560,903 in 2022 and 2030 respectively.
25
This age group faces a number of challenges in the county that include; shortage and inaccessible health facilities, understaffing of
health facilities, high illiteracy levels and poor quality of health services. More than half of public health facilities are poorly equipped
to handle pregnancy related complications, while only a small percentage of pregnant women have births attended to by skilled
personnel. This means that most deliveries take place at home assisted by poorly skilled Traditional Birth Attendants (TBAs).
Contraceptive acceptance for this age group is only 9 per cent meaning that women in the reproductive age group are either not accessing
or utilizing family planning services. This has led to the high population growth rate in the county. Most adolescents and youths lack
appropriate sexual information and services to respond to their reproductive health needs and engage in unprotected sex. The result is
the high levels of STIs, unwanted pregnancy, abortion and abortion-related mortality. The poor performance of maternal indicators is
due to weaknesses in the health systems such human resources, infrastructure, and referral systems. Negative socio-cultural practices
which are rampant such as female genital mutilation and early marriages continue to impact negatively on maternal health.
For the county to achieve SDG 5 on improvement of maternal health; more programmes need to be implemented to address the
reproductive health issues. High Maternal Mortality Rate will be reduced by ensuring the availability of adequate maternity services in
rural health facilities and rapid response to complications caused by unsafe/induced abortion, malaria and HIV and AIDS among others.
This will also be achieved by ensuring that health facilities have adequate staff and by providing more facilities to increase accessibility.
26
The percentage of people living with disability in West Pokot County is estimated at 3.0 per cent. This population is expected to reduce
due to improved health indicators throughout the county.
The demographic dividend refers to the accelerated economic development that a country can attain by slowing down the pace of
population growth while at the same time making strategic investments in the health, education, economic, and governance sectors.
With fewer dependents to support, those in the working ages will have more savings that can be invested for the economic growth of
the county thereby improving the wellbeing of the county’s residents.The aim of these investments is to ensure that as the county’s
children and youth get older, they remain healthy, are able to access education and training opportunities.As they enter the labour force
they get income and employment opportunities, they invest for their life in old age, and they participate fully in governance matters
affecting the county.
West Pokot County has the potential to achieve demographic dividend by 2035 if the appropriate investments are made in health,
education, governance and economy and implemented over the plan period.
27
1.5: Human Development Approach
The Human Development Approach examines broader human development issues and is concerned with both building up human
capabilities and with using those human capabilities fully. This approach emerged in response to the growing criticism of the use of
economic development as a measure in the standard of living. It underlines the expansion of opportunities so that the disadvantaged
can do more for themselves through economic, social and political empowerment.
Human development approach recognizes that there is no automatic link between economic growth and human development. The link
has to be made through deliberate policies at all levels. Economic growth that provides resources to support health care, education, and
advancement in other Millennium Development Goals (MDGs) is necessary to enlarge human choices but not sufficient. It in turn,
achievements in human development makes critical contribution in assuring quality human capital to spur economic growth via
productivity gains.
The Human Development Index (HDI) measures human development based on the basic factors of a long and healthy life, the acquisition
of knowledge, and a reasonable standard of living. These factors are measured using the following indicators: life expectancy at birth;
adult literacy rate and the combined enrolment ratio at primary, secondary and tertiary levels; and GDP per capita measured in
purchasing power parity (PPP) US dollars
The use of Human Development Index (HDI), normally in the Human Development Reports (HDR) measure a country’s development
which is a composite index measuring average achievement in three basic dimensions of human development to reflect a country’s
achievements in health and longevity (as measured by life expectancy at birth), education (measured by adult literacy and combined
primary, secondary, and tertiary enrolments), and living standard (measured by GDP per capita in purchasing power parity terms).
Achievement in each area is measured by how far a country has gone in attaining the following goal: life expectancy of 85 years, adult
literacy and enrolments of 100 percent, and real GDP per capita of $40,000 in purchasing power parity terms.
The HDI is not designed to assess progress in human development over the short term because two of its component indicators - adult
literacy and life expectancy at birth - are not responsive to short-term policy changes.
According to the report Kenyan's life expectancy at birth has increased to 62.2 years, According to the report, Kenya has improved
from 0.473 points in 1990 to 0.555 last year, an increase of 17.3 percent. The HDI value for 2015 was 0.555 — which put the country
in the medium human development category whereas West Pokot County life expectancy is at .45 per cent
28
1.6: Infrastructure Development
1.6.1: Road, Rail Network, Ports and Airports, Airstrips and Jetts
The road network in the County is predominantly earth and gravel surface which makes up 87 percent of the road network. The gravel
surface roads cover a distance of 349 km while the earth surface roads cover 697 km. The total length of bitumen surface (tarmac) road
is only 151 km. This means that for every 60.7 km2, there is 1 Km of a tarmac roadand for every 1 Km of the same tarmac road, we
have 4,180 persons. The general status of the road network in the county is poor. The tarmacked road is poorly maintained while the
earth and graveled roads becomes impassable during the rainy seasons. A rugged and hilly terrain within the county poses another
challenge in road connectivity. The county has no rail network, ports and airports. The airstrips are completely inactive.
The county has 5 Post Offices and 3 courier services. In terms of mobile handset communication, the coverage of the mobile network
is still low despite the presence of all major mobile operators (Safaricom, Zain, Yu and Orange) in the county. The low coverage has
therefore limited access to mobile phone services in most parts of the county. There is need to encourage these network providers to
extend their network services to all parts of the county to facilitate easy communication and also to eliminate marginalization of some
parts of the county. This can have a multiplier effect of opening up these areas for other development activities to support the realization
of Kenya vision 2030. Television access is limited to some areas in the county. In addition, the county has one local FM radio station.
External FMs radio stations also play a big role in the dissemination of information. They also offer platforms for people to air their
views and for authorities to disseminate policies and issues affecting the people.
1.6.3: Energy Access
The main source of energy in the county is fuel wood which accounts 90 per cent of the energy needs of the county population.
Petroleum energy is another source accounting for 5 per cent energy needs. Despite the presence of Turkwel Dam, which generates
electricity, connection is still low with only 2 per cent of the population accessing electricity and only 10 trading centres connected
with power. Electricity power outages are also prevalent in the county. Paraffin, which is another source of energy, is used by 8 per
cent of population. Other sources of energy in the county include charcoal and solar. The county has a high potential for solar energy
which remains untapped.
29
Energy is one of the infrastructural enablers of the three pillars of Vision 2030 and the level and intensity of commercial energy use is
a key indicator of the degree of economic growth and development
Electricity connections for domestic use, small commercial, industrial use and street lighting and the average annual pump prices and
monthly pump prices in the County are relatively lower. Electricity for domestic use are Low voltage level (240 /415kV) users while
Small commercial are medium commercial and industrial customers user are medium at Voltage level (11&33 kV)
The main housing types in the county are grass thatched houses, semi-permanent and permanent houses. In overall, there are 88,026
grass thatched houses, 5,129 permanent and semi-permanent houses mainly found in the urban/town centres. Traditional manyattas are
found in some parts of Pokot North and Pokot Central Sub-Counties. The county housing sector is characterized by inadequacy of
affordable and decent housing, low investment, extensive and inappropriate dwelling units.
Land ownership in the county is under public, private and community. Public land consist of schools, hospitals, forests, cattle dips,
holding grounds for livestock among others. Private land category is classified into registered land to individuals (absolute ownership),
land leased to individuals and companies by county and national governments while community land category consist of all the
unregistered land which is held in trust by the county government.They are in form of group ranches and community shrines.
The average farm sizes in the county stands at 20 acres. The population is predominantly rural depending on pastoralism as their main
source of livelihood. Subsistence crop production is also undertaken in the arable areas.
30
An estimated 80 and 90 per cent of land in West Pokot and Pokot South sub counties have title deeds. Land Adjudication is currently
ongoing in Pokot Central while nearly all land in North Pokot does not have title deeds as it is communally owned. In total, less than 40
percent of the farmers in the county have title deeds.
Land in the county is largely communally owned. As a result, cases of landlessness are minimal. The county government will work
towards land reforms that address the needs of specific groups including women, widows, orphans, and persons with disabilities. Land
reforms are geared towards holistic management and participatory governance of this critical resource so as to create a foundation for
the implementation of projects identified in the integrated plan.
1.8: Employment
1.8.1: Wages Earners
Wage earners constitute only five percent of the county population. This is due to low education levels among the county residents, lack
of technical skills and limited job opportunities. Informal sector employs a good proportion of the County population through farming
and pastoralism.
An agriculture and livestock sector contributes 84 per cent of household income in the county and is the biggest source of employment.
The pastoralist keep cattle, sheep, goats and camels while those practicing agriculture mainly grow maize, potatoes, pyrethrum, coffee
and beans. Other sources of self-employment in the county include trading, transport sector and Jua kali business activities
The labour force (15-64 years) in the county comprises 45 per cent of the county population. Therefore, there is an urgent need to put
in place strategies that facilitate generation of employment opportunities to enable the labour force to be employed.
The county total irrigation potential is estimated at 10,000 ha of which 1,800 ha is currently under irrigation.The importance of irrigation
in the county cannot be over emphasized. The people living in the lowlands virtually survive on it. It is therefore a crucial
activity.Irrigation is mainly carried out by groups of farmers using irrigation canals and furrows abstracting water from rivers and
streams. There are a total of 120 canals/ furrows concentrated mainly in Pokot Central and the lower parts of Pokot South sub- counties.
There are several irrigation schemes which are complete while others are still under construction. The completed irrigation schemes
are Ngorkal in West Pokot sub-county (20 ha), Kariamangole (60ha) and Mokuwo (90 ha) in Pokot South sub-county. The irrigation
schemes under construction include the following Mrel (200ha) and Orwa (150ha) in Pokot central, Tamough (20 ha), Tombul (40ha)
and Kochar (30ha) in West Pokot sub-county and Kolotubei ( ) in Pokot South.
The main food crops produced include maize, beans, sorghum, fingermillet, green grams, Irish potatoes, sweet potatoes and bananas.
The farmers also grow horticultural crops which include fruits (mangoes, pawpaw, oranges, tree tomato and passion fruit) and vegetables
both exotic and local (onions, cabbages, kales, pumpkins, sucha, cowpeas, saga, peas and carrots among others). The fruits and
vegetables contribute immensely to food security as farmers use it for food as well as generate income to the households.
Cash crops grown in the County include coffee, pyrethrum, sunflower and tea which still has small acreage. There is high potential to
expand area under cash crops when market is streamlined.
32
Maize is the staple food in the County and is mainly grown in the high rainfall areas of the county especially in West Pokot sub-county.
Coffee is grown in West Pokot and Pokot South sub- counties while pyrethrum is grown in Pokot South sub-county. The food crops
grown do not food requirements for the county. The farmers get low yields for food crops as they grown them on subsistence basis and
some farmers do not use fertilizer and certified seed. The County government has subsidized the farmers through ploughing and
provision of farm inputs to needy farmers.
Pyrethrum farms had been neglected by farmers due to non payment of delivery of their flowers and problem of brokers. With
establishment of cash crop directorate and liberalization of the market pyrethrum will come back to its glory and be able to improve the
lives of farmers. The strategies which have been put in place will increase the acreage under the crop immensely.
The total acreage for crops in the County is 44.102ha. This consists of approximately 40,797 Ha of food crops, 2,785 ha of horticultural
crops and 520 ha under cash crops.There has been an increase in land under food crops due to development of irrigation schemes. Most
of them are under construction while some are complete.The main challenges facing agriculture in the the county include high illiteracy
levels among farmers,effects of climate change, low certified seeds and fertilizer usage,pest and diseases and low extension coverage.
Despite progress made, there exist huge potential for commercialized agriculture in the county.
The average farm size is 5 hectares and 25 hectares for small farmers and large scale farmers respectively. Land ownership in West
Pokot Sub-county and parts of Pokot South has been adjudicated therefore farmers can access to credit. Pokot North, Pokot Central,
parts of West Pokot and Pokot South are communally owned hence is difficult for farmers in these areas to access any credit.
National Cerals and produce Board provide the major storage facilities for cereals with a capacity of 150, 000 bags of cereals (90kg
bags). These storage facilities are situated in Makutano, Sigor and Kacheliba. There are also two private storage facilities within the
environs of Makutano while the others within farmers are small granaries which are prone to high post-harvest losses.
In terms of estimated population, there are 789,300 indigenous cattle, 74,500 dairy cattle, 200 sahiwal cattle, 634,355 indigenous goats,
6,000 galla goats, 400 dairy goats, 529,376 indigenous sheep 95,550 wool sheep, 4,000 dorper sheep, 533,000 indigenous poultry,
55,980 exotic poultry, 35,271 camels and 41,943 donkeys.These livestock types and breeds are distributed in all the four sub-counties
in varied numbers depending on the climatic conditions and rate of adoption of introduced breeds.
The estimated annual milk production for West Pokot County is 6,000,000 litres valued at KSh.200, 000,000. Most of this milk is sold
through cooperatives’ which collect the milk in their milk coolers. Currently, there are fourteen (14) milk coolers most of them in Lelan
and Tapach wards. Apart from milk, meat is another important product whose production is estimated at 4,140,000 kg valued at KSh.
750,950,000 per year. This is meat from animals slaughtered in butcheries within the county. Most of the livestock are sold as live
animals to places outside West Pokot County. Such destinations include Western Kenya, Trans-Nzoia, Uasin-Gishu, Nakuru, Maimahiu,
Nairobi and Mombasa. From the local butcheries, about 5,000 hides and 50,000 sheep and goat skins are produced per year.
Livestock facilities in the county include office blocks, livestock improvement centres, Livestock holding grounds, hay sheds, cattle
dips, metallic crushes and veterinary laboratories.
There are seven livestock holding grounds in the county namely: Kacheliba, Pkopoch, Keringet, Kabichbich, Nasukuta, Runo and
Lotongot. Other lands meant for livestock breeding camps, livestock water pans and grazing demonstrations were Kitelakapel, Kongelai,
Kanyikeny and Murpus. Most of these are dormant and therefore need to be revived or rehabilitataed for better livestock productivity.
For example Kanyikeny has been earmarked for Beekeeping Research Centre and Kitelakapel for Pasture production, livestock breeding
and Nasukuta should be upgraded to into a Pastoral Training Centre.Among the holding grounds under use are Nasukuta, Keringet and
Pkopoch. Nasukuta hosts a livestock improvement centre and an export slaughter house, while Keringet hosts an agricultural training
centre currently proposed to be university. Pkopoch hosts a pasture plot and hay store together with a county hotel under construction.
Apart from the hay shed at Pkopoch another hay shed also constructed through DRSLP project is at Masol. The county government has
constructed a hay shed at Nasukuta, There is need to construct more of these as they help store hay for dry seasons.Ninety-nine (99)
34
cattle dips and thirty-four (34) metallic crushes have been constructed and more need be done as the are important in livestock disease
control. Dips are more appropriate in the highlands while hand spray pumps and metallic crushes are more useful in the lowland.
There is one satellite veterinary laboratory in the county which requires equipping. Six office blocks are in existence some of which are
not complete and require completion and equipping. Some more need be constructed at sub-county and ward levels.There are five
constructed saleyards and there is need to construct more for better livestock marketing.
1.10.6: Ranching
There are no commercial ranches in the county. Group ranches have become dormant and are some are currently undergoing sub-
division into individual parcels. There is need to encourage pastoralists to emrace ranching as a sustainable form of livelihood as
opposed to currently practiced pastoralism.
1.10.7: Apiculture
Bee-keeping is an old practice among the West Pokot residents. Livestock department has continued to promote apiculture with
emphasis on use of modern hives and equipment. There are about 149,478 bee hives producing approximately 1,196,000 kg of honey
and 119,600 kg of wax annually.Most beekeepers sell their honey in crude form to traders within and outside the county. The main
honey buyers within the county are CABESI in Kapenguria, Kodich Beekeepers’ Co-operative Society , Kitelakapel Cooperative
Society and Kerio Valley Development Authority.These buyers process or semi-refine the honey before marketing.
The county mineral potentials remain untapped. The following minerals are unexploited: limestone, gold, and ruby. Massive limestone
deposits are found in Sebit, Ortum, Muino, and Alale. A proposed cement industry is to be established in Sebit to fully exploit the
limestone deposits. In addition to these potentials, the County has prospect of oil reserve in parts of Pokot North and Central Pokot. All
these minerals in the county have the potential of generating additional revenue to the county government. There is need for the county
government to enter into partnership (PPP) with investors to be able to explore and tap these natural resources
35
1.11.2: Ongoing Mining and Extraction (Quarry, sand harvesting, cement etc.)
The County has limited gold deposits along river Muruny, Seker and parts of Alale, limestone deposits in Sebit, Ortum, Muino and parts
of Alale. However, the deposits have not been commercially exploited. Sand harvesting is carried out in most parts of the county but is
mainly in Kongelai Division.
Tourism sites in the county have largely remained unexploited. For instance tourist attraction sites in the county include (Nasolot Game
reserve), scenic sites, escarpments (Marich escarpment, Kaisagat viewpoint, Mtelo and Koh hills), ecotourism and Turkwel Dam remain
untapped. Others tourism attractions include the rich Pokot Culture and artefacts in Kapenguria museum, curio shops and wildlife. Apart
from these, the County is a proud home of the infamous “Kapenguria Six” Cells that is found in Kapenguria Museum
There is lack of classified hotels and the low bed occupancy in the county due to unexploited and poor marketing of tourism potential.
This is a setback in the development of tourism sector. Given the tourism potential, despite the tourism potential, there are no
classified hotels and restaurants in the county. The places where tourist can reside include Mtelo view campsite, Lamut cultural site
(Sigor), KVDA guest house (Sigor) and Chesta guest house (on the foot of Koh hills). However, the county government has initiated
the need to promote hotel industry by constructing Kopoch Tourism Hotel which will trigger requisite infrastructural support for
aggressive marketing a tourist circuit within the county.
Nasolot Game Reserve which has variety of wild animals is the only game reserve in the area. The animals include Elephant, Buffalo,
Hyena, Impalas, Leopard and Lions. Currently, there are more than 160 elephants and more than 20 leopards in the County. The
elephants found in Nasolot game reserve are among the largest Elephants found in the world. Human-wildlife conflict due to drought
and encroachment of the wildlife habitat which has led to crop destructions and human deaths is the main challenge.
36
1.12.1: Wildlife Conservation areas (Game parks, Reserves, Conservancies, Game ranches)
The county has 3 commercial banks (KCB, Equity and Barclays), 4 Micro Finance Institutions and 6 SACCOs. Most of these financial
institutions have their services concentrated in Makutano Town. Pokot Central and Pokot North Sub-Counties do not have banks or
micro finance institutions thus limiting access to financial services.The percentage of citizens owning bank accounts remains low in
the county. Loan uptake and repayment is also low and more effort is needed to reverse this trend. Agency banking is expected to play
a key role in enhancing financial services penetration into rural areas and in mobilising savings for investment
37
The gazetted forest covers an area of 22938 ha. Natural forests are mainly found on the highland side of Pokot South and Pokot Central
which forms Cherangani Hills. Forest cover is continuously being depleted due to human activities and deforestation is largely in areas
of Kamatira, Sondany, Solion, Kawuk, Kuper, Seker, parts of Alale, and most parts of Pokot South. There are also exotic forests in West
Pokot and Pokot South. Farmers also practice tree planting on their farms.
The current forest cover in the county is approximately 8.39% including indigenous forests, open woodlands and a few plantations.
However, the county is losing a lot of forests primarily through conversion of forests to agriculture or for development projects.
More than 80% of West Pokot land area is semi-arid lands (SALs). These areas have low population densities and livelihoods are
primarily based on livestock k. Woody vegetation in these areas is sparse consisting mainly of dry bush and open wooded grassland.
The majority of the rural population lives in the remaining 20%, that experience higher rainfall. Much of the current forest areas are
protected as forest reserves and trust lands forests. There is great potential for the expansion of forestry development into SALs areas.
They provide the potential for the production of fuel wood, charcoal, building poles and pasture for dry season grazing.
The main forest products include firewood, timber, herbs, fruits, grazing fields and honey production. The quantities of these products
and their value have not so far been determined.
The majority of West Pokot residents rely on wood and wood products as their primary source of energy. It is estimated that over 80%
of Kenya rely on forest for their domestic energy needs either as charcoal or firewood, with a continually increasing population in West
Pokot, there is continuous great pressure on the county forests.
1.15.1: Agro-forestry
There are few farm forests in the county with woodlots for commercial purposes. The Kerio Valley Development Authority have set up
fruit seedling demonstration plots at Kongelai to encourage farmers to engage in farm forestry as a source of income. There exists a
huge market for forests products such as poles, timber and wood fuel which can be tapped. Several community based organizations are
also engaged in woodlot establishment as an income generating activity
38
Forest Income Generating Activities
• The county needs to prioritise increase of tree cover in water catchment areas. It is worth noting that Cherangany water catchment
area has been under illegal encroachment and therefore, there is need to strengthen protection of this catchment area so that the
county can continue benefiting from this catchment area as most rivers emanates from it.
• Protection of water catchment areas by planting more trees and improved farming practices like intercropping and agro-forestry
need to be promoted in the county.
• Provision of wood fuel and generation of energy for industries in order to reduce the dependency on wood, use of solar powered
lanterns, wind energy and biogas technology needs to be promoted. The use of wood as a source of energy for industries is
minimal since there are no major industries within the county.
• Improvement of soil fertility by growing fertilizer trees to sustain agriculture. The planting of nitrogen fixing trees such as
Sesbania, Calliandra and Luecena species which are exotic trees and Acacia species which are indigenous trees needs to be
promoted.
• Growing of fruit trees for improved nutrition both for domestic use and surplus for markets in small scale mostly for domestic
use while others grow naturally in the forests. The fruit trees grown in the county includes oranges, bananas, and mangoes among
others.The lowland areas of the county namely Sigor, Lomut, Chesegon and Kacheliba are favourable for fruit farming. There is
need therefore to upscale fruit farming in these areas.
• Provision of Carbon Sinks such as Carbon Trading to offset greenhouse gas emission that is responsible for global warming and
climate change. Ecological stability and reduction in biodiversity loss is necessary for continued green economy. Opportunities
provided by carbon markets should therefore be explored. However, this needs to be scaled up to attract more stakeholders to
plant more trees for carbon trading.
• Beautification activities in urban centres, highways, schools, homes and other public places. Makutano and Kapenguria
Township have undertaken a beautification programme. This activity however needs upscaling. In addition to providing
environmental beauty these trees and gardens filter pollutants and dust from the air, improve air quality and reduce heat buildup
in towns. Beautification promotes green economy.
• Animal Feeds Production Venturesis practised in the county in small scale and especially by individuals. Some of the animal
feeds produced through agro-forestry in the include hay. This is a venture that the county needs to invest in as way of promoting
green economy.
39
• Growing and processing for medicinal purposes/ value plants and products. A number of trees in the forests are used for their
medicinal values. Most of these trees grow naturally in the forests although some are grown by tree farmers. However, processing
of forest products for medicinal purposes has not been exploited as a venture. The medicinal trees grown include aloevera,
prunus africanum, olea hotstetteri, croton megalocarpus and dombeya
The impact of land degradation has caused poor environmental management, especially Kongelai, Kasei, kiwawa, Riwo and sook.
Charcoal burning is largely prevalent in Kongelai, Marich and Sigor. Human encroachment to forest has adversely Pokot South Sub-
County
Some of the major contributors to environmental degradation in the county include: poor disposal of both solid and liquid wastes,
unsustainable farming methods, charcoal burning, overgrazing, deforestation and human encroachment of the protected areas. The
impact of poor waste disposal is evident in all centres, especially Makutano trading centre, where there is no sewerage system. Charcoal
burning is largely prevalent in Kongelai, Marich and Sigor. Human encroachment to forest has adversely Pokot South Sub-County.
1.16.3: Environmental Hotspots
The county major environmental hotspots include massive soil erosion, unpredictable weather patterns, resource based conflicts water
pollution, air pollution, reduced agricultural outputs/yields, increased drought incidence/desertification, reduced and diminishing
forest products and flooding.
The impact of poor waste disposal is evident in all centres, especially Makutano trading centre, where there is no sewerage system.
Charcoal burning is largely prevalent in Kongelai, Marich and Sigor. Human encroachment to forest has adversely Pokot South Sub-
County.
1.16.5: Invasive Species and Impacts on Health
40
Global warming is the observed increase in the average temperature of earth’s atmosphere and oceans that arise as a result of the
increasing use of fossil fuels and other man’s activities that release excessive greenhouse gases into the atmosphere. The greenhouse
gases include water vapour, carbon dioxide, nitrous oxide, methane and chlorofluorocarbons which has high impact on human health.
The county’s wide ecosystems range from Montane rain forests, savannah woodlands, and dry forests. The broad diversity of the
county’s ecosystems boasts an enormous range of wide species of flora and fauna with unique and biodiversity rich region, Cherangany
hills; forest in the county’s water tower and catchment areas serve to regulate local climate and water, pollution and carbon sinks. In
addition, they provide erosion control, natural hazard and disease regulation. However, soil erosion and consequent degradation of the
soil continues to be a major challenge. In addition, adverse climate change has a major impact on forest resources and ecosystems,
mainly through droughts, flooding and landslides
The greenhouse effect has caused variation in weather patterns and intensity resulting in climate change. Temperatures have risen
throughout the county. Rainfalls have become irregular and unpredictable, and when it rains, downpour is more intense. The impact of
climate change in the county is mostly manifested by flooding, prolonged drought and landslides.
The impact of climate change in the county is mostly manifested by flooding, prolonged drought and landslides. Parts of Kongelai and
Sigor divisions have experienced adverse soil erosions with huge gulley erosion, while landslides and flooding frequently affects parts
of Muino, Sondany and Ptirap in Pokot Central Sub-County. Due to rising demand for forest products as well as poverty and
urbanization, there has been an upsurge in encroachment in forest and water catchment areas, charcoal burning and deforestation. This
has in effect led to increased desertification.
Water sources in the county include streams, wells, boreholes, dams, roof catchment and piped water. The households with access to
borehole/spring/well water stands at 26,259 which translate to 28 percent of the population. There are also 8,563 households with access
41
to piped water while 1,210 households have access to piped water into their dwellings. However, majority of the households, 54,977
which is 59 percent of the population still use rivers/streams as their source of water. The average distance to nearest water point is 5
km. The main water supplies in the county are Makutano-Kapenguria, Tartar–Keringet, Karas, Kabichbich and Chepareria Water supply
systems and are largely gravity propelled. These schemes are nonetheless inadequate to serve the general population of the county. It is
worth noting that the county does not have a water treatment to ensure that the county’s population accesses clean drinking water.
The number of households with latrines stands at 30,449 representing 33 percent of the population. There are 156 households connected
with septic tanks, 1,922 households with VIP latrines, 28,527 households using pit latrines and a massive 62,901 households representing
67 percent of the population using bushes especially in the rural areas.
The Health Sector has a critical role in the attainment of Vision 2030 which requires a healthy working population to enhance
productivity. Lack of equitable access to health services across the county due to historical marginalization remains a challenge.
However devolution has been a game changer although more resources need to be allocated to the sector.
The county has numerous gaps in most of the health system blocks. Most notably in Human Resources for Health an In terms of levels
of care under Tier One (community health services) there have 60 community units spread across the sub counties. Under Tier Two
(dispensaries and health centres) we have 105 health facilities 10 being Health Centres. We also have five county hospitals under Tier
Four. Currently there are no Tier five facilities but plans are underway to upgrade the county referral hospital to level five. In addition
we have 6 private clinics and one mobile clinic under the Beyond Zero initiative.
The health worker (doctor, nurses and midwives) population ratio stands at 1:1563 as compared to the 1:400 ratio recommended by the
World Health Organization. This coupled with the average distance of 25Km to the nearest Health facility makes access to quality health
services a challenge in the county.
42
1.18.2: Morbidity
The leading causes of outpatient morbidity in the county include diseases of respiratory system (30.9%), Malaria (15.2%), Diarrheal
diseases (7.9%), diseases of the skin (including wounds)(5.0%), Pneumonia(4.1%), Typhoid fever (3.0%), Accidents-Fractures and
injuries ( 2.7%), Urinary Tract Infections ( 2.4%), Eye infections( 1.4%) and Ear infections ( 0.9%) The drivers of these conditions
include low latrine coverage, poor utilization of long lasting insecticide treated nets (LLITNs), poor hygiene, low levels of education
and negative socio-cultural beliefs.
1.18.3: Nutrition
Undernutrition is a major public health concern in the county. According to the 2014 Kenya Demographic and Health Survey stunting
was at 45.9%, those underweight stood at 38.5% and wasting were at 14.3%. All these levels were above the WHO thresholds. The
SMART survey done in June 2017 revealed a slight decrease in stunting rate to 39.9% with those underweight being 40.6%. This puts
the county’s future at a risk since malnutrition is associated with diminished mental abilities and low productivity.
Focussed antenatal and perinatal care is critical for the health of both the mother and the baby. The WHO recommends at least four
antenatal care (ANC) visits during a woman’s pregnancy. The percentage of women who attended four ANC visits dropped from 21.3%
in 2016 to 13.0% in 2017.This was also associated with a drop in delivery by skilled birth attendants (SBA) from 45.3% to 32.0% over
the same period. This drop was also witnessed nationally. The Maternal mortality rate also stood at 434 per 100,000 live births as
estimated the National Council for Population and Development (NCPD) 2014. This compared poorly to the national estimate of 362
per 100,000 live births as per KDHS 2014.
The immunization coverage for the fully immunised child under one year dropped from 58.1% in 2016 to 43% in 2017. This was way
below the national target of 85%. All these were attributable to the protracted industrial action by nurses in 2017. Other notable
challenges include inadequate cold chain facilities, inadequate power, staff shortage and a difficult terrain.
43
1.18.5: Family Planning
The County has the second highest Total Fertility Rate (TFR) in the country. It stands at 7.2 births as compared with the national estimate
of 3.9 births per women. However the contraceptive prevalence rate (CPR any method) dropped from 14.2% as per KDHS 2014 to
12.2% in 2017 in DHIS 2. This remains a major challenge due to cultural beliefs, religion and low levels of education. A multi-sector
approach is therefore key in realising meaningful change.
There are 1,032 pre-primary schools centres in the county with 838 ECD teachers. ECDE enrolment currently stands at 77,679 giving
teacher pupil ratio of 1:92. This enrolment represents approximately 51 percent of the total eligible number of ECD school age children
under this age bracket. Low enrolment is contributed by nomadic lifestyle, long distances to schools and lack of enough feeding
program. The priority areas under early childhood development include construction of additional classrooms, recruitment of more
ECD teachers, provision of school feeding programme and installation of water tanks to ECDE schools.
There are 554 primary schools with total enrolment of 186,708 pupils in the county. There are 3005 teachers giving teacher pupil ratio
of 1:52. The county has a gross primary school enrolment of 89 percent and a transition rate of 66 percent to secondary schools. Issues
affecting primary school going school children in the county include lack of sanitary pads, inadequate teaching staff, early marriages,
female genital mutilation, child labour, sexual abuse, inadequate learning and reading materials, inadequate access to water and
healthcare, insecurity, high household poverty levels, inadequate parental care and lack of electricity connections in some schools.
There are 120 secondary schools with total enrolment of 156,272 students in the county. There are a total of 3005 teachers giving
Teacher pupil ratio of 1:52. The county has a gross secondary school enrolment of 75 percent. Staffing and school infrastructure needs
to be proved to enhance the learning environment and ensure quality education.
44
1.19.4: Youth Polytechnics
There are six youth polytechnics in the County namely; Kapenguria, Chepareria, Ortum, Sigor, Sina and Kodich. Enrolment in county
polytechnics is very low.Huge gender disparities also exist in enrolment in favor of males. As at December 2017, the total enrolment in
the county stood at 588, posting a low average of 98 trainees per institution.Commitment by the new county government administration
to offer bursaries for vocational trainees raised the enrolment by more than double in the first term of 2018. In order for the county to
register milestones in this sector, the focus should deliberate and directed towards four distinctive strategic areas : quality and relevance,
Equity and access, Governance and Management, and financing. This tremendous increase in enrolment calls for county government’s
interventions in the areas of: VTcs’ staff recruitment and employment, infrastructure development, provision of tools and equipment,
support in governance and management, and enhanced community sensitization. The sensitization component will be vital since the
current enrolment caters for only about 30% of youth leaving the mainstream education system between primary and secondary levels
(over 3,500 annually).
There is also need for the county to put up more vocational training centres, especially in expansive wards with high population to
increase access and equity. This trend has led to the sorry state that the existing vocational training centres (VTCs) are in: dilapidated
infrastructure, grossly understaffed, and low enrolment, access, transition and equity.
There are eleven tertiary institutions in the county of which five are polytechnics, extra mural centre of Nairobi University, Kisii
University, Elgon View Training Institute, Kitale technical branch, Kenya Institute of Professional Studies, Teachers training colleges
(Chesta TTC and Murpus TTC), ECDE Teachers College, Kapenguria and Ortum Nursing Schools. These tertiary institutions remain
insufficient and there is need to put up more institutions in the county.
The united international action plan for implementing resolution 56/116 states that the literacy for all is at the heart of basic education
for all creating literate environment and societies is essensial for achieving goals of eradicating poverty ,reducing mortality ,curbing
population growth ,achieving gender equality and ensuring sustainable development peace and democracy(UN ,2000).Skills needed
45
for lifelong learning not only prepare citizens for competition in the global market but it improves their ability to function as members
of the community and thus,increase social cohesion,reduce crime and improve the distribution of national resources.
Today adults and youths need a broader and stronger skills and knowledge to adapt to the ever evolving technologies and competitive
environment .West Pokot county has low literacy level of 30% compared to the national literacy level of 62% (KNBS 2007) .It is
ranked 38 out of 47 counties in poverty (W0RLD BANK 2013) .West Pokot county with a population over 515,690(KNBS,2009) Has
an illiterate population of 317,144 people .This people are limited in their operations due to illiteracy .According to database (2008)
.Adult education literacy should be a part of many approaches to reducing poverty as multiple initiatives needed to lift people out of
poverty
SUB-COUNTY WARD ENROLMENT DAILY AVARAGE ATTANDANCE
MALE FEMALE TOTAL MALE FEMALE TOTAL
WEST-POKOT Kapenguria 15.0 45.0 60.0 10.0 32.0 42.0
Mnagei 29.0 101.0 130.0 13.0 63.0 76.0
Siyoi 22.0 54.0 76.0 3.0 14.0 17.0
Sook 5.0 6.0 11.0 2.0 3.0 5.0
Riwo 3.0 32.0 35.0 1.0 15.0 16.0
SOUTH POKOT Chepareria 133.0 336.0 469.0 52.0 130.0 182.0
Lelan 148.0 202.0 350.0 52.0 66.0 118.0
46
TOTAL 906.0 1,390.0 2,296.0 336.0 565.0 901.0
From the above data ,the average daily attendance of those enrolled is still very low.This hinders the county’s goal of reducing adult
illiteracy as an approach in curbing absolute poverty.Similarly, there is a wide disparity in enrolment distribution among the sub conties
with South Pokot having the highest enrolment and West Pokot having the lowest enrollment .To increase enrolment rates in adult
education, there is need to recruit additional adult teachers,carry out sensitization programmes on the importance of adult
education,providing lunch meals for those attending adult classes and motivating teachers.
The Community sensitization on the need to embrace vocational skills training as a mainstream career line has resulted to increase in
enrollment from 550 to the current 630 in the public Vocational training centers.The total enrolment in 6 public VTCs in west Pokot
County has more or less remained steady at low levels. Due to limited places available in VTCs, only a small proportion of eligible
school leavers are absorbed (at most 30%). Every year less than a half of those graduating from primary schools either join the VTCs
for artisan training or enroll directly for apprenticeship training within the county
47
Cooperative societies will play a critical role in the development of the county by providing a better interaction between savings and
investment. The County has 83 registered cooperative societies. However, only 36 are active. The rest are either dormant or have
collapsed/bee liquidated. The societies are distributed as follows: North Pokot has 7, West Pokot 36, Central Pokot 6 and South Pokot
29. The active cooperatives deal with a variety of activities which include marketing, savings, consumers and housing, mining,
multipurpose and unions. SACCOs have enormous potential to mobilize additional savings and to provide credit, especially to sections
of the population that do not use banking services and the low income groups
The establishment of Government devolved funds as well as grants have led to registration of a number of Self Help Groups, Women,
Men, Youth and Community Based Organizations (CBOs). These groups and CBOs undertake economic activities such as mixed
farming, table banking, capacity building, environmental conservation and other small and medium enterprises. Through these groups
the county hopes to increase its human and social capital.
A total number of 4,297 groups have been registered since 1973 (SHG 2204, women group 992, youth groups 935,men 5, PWD
35,community projects 117,CBO 6, Older persons groups 3). Self Help Groups continue to serve as avenues for accessing the Women
Enterprise Fund (WEF), Youth Enterprise Fund (YEF) as well as other devolved funds and grants. A total of 127 groups have benefited
from the YEF while 80 groups have benefited from WEF. A total of Kshs. 4.05million has so far been disbursed for both WEF and
YEF.
The county has a number of Non-Governmental Organizations working in their various capacities to complement the development
initiatives of the Government. The notable NGOs in the county include: FAO, World Vision, UNICEF, ACF, USAID, Red Cross, and
Health Right International. There are also local NGOs working with the communities such as Yangat, SIKOM, Maendeleo Ya
Wanawake and others. These NGOs are expected to continue supporting rural communities in the areas of agriculture, nutrition, water,
disaster relief, health and education.
48
1.22: Security, Law and Order
1.22.1: Number of police Stations and Posts by Sub County
West Pokot county has …..police stations and….. police posts. The county also has only one high court based in county
headquarters.County policing authority has not been established.
Fish farming which is also refered to as aquaculture has been practiced in West Pokot for along time as a subsistence farming mainly
to provide protein to familes engaged in the venture.The coming of devolution has however changed the industry and given incentives
to prospective farmers. A total of 150 fish farmers have been assisted with 150,000 pieces of mono-sex tilapia in the last five years.
Six schools were also supported with pond liners to promote fish farmings. Further, the county government financed the construction of
a tilapia and catfish hatchery athough it is not operational due to lack of equipment. So far, 100 ponds have patially been harvested and
have realized a total output of 15,000kgs worth approximately ksh.3 million.The department priority is to upscale the enterprise from
the current 200 fish farmers to 800 farmers and target to produce an estimated 960 tonnes of pond fish by 2022.
Capture fisheries is practiced mainly in Turkwel hydro-electric power dam.Seasonal fishing are also carried out in River Muruny, River
Suam and Weiwei River.The Turkwel dam fishery has an enormous potential and can transform lives of those living around the dam.The
county government stocked the dam with 100,000 pieces of mixed sex tilapia.The current harvest stands at 5.4 tonnes of fish per
49
annum.The dam has a potential of producing an annual estimate of 20 tonnes but due to illegal fishing and understocking these potential
cannot be achieved. The fish species harvested is dominated by tilapia and few catches of catfish.The department has constituted a
management committee and now the dam is now fully managed.The co-management team comprises of fishermen, traders, and
transporters .The department targets to restock the dam with 2 million mixed sex tilapia,purchase 3 motor boat over the plan period to
support the fishery .There is only one landing site at Turkwel Dam and the department is planning to build a landing site in Riting .
50
CHAPTER TWO: LINKAGES WITH VISION 2030 AND OTHER PLANS
2.1 Overview
This chapter highlights the linkages between the County Integrated Development Plan(2018-2022), with the national development blue
print, Kenya Vision 2030 and its Third Medium Term Plan, the Sustainable Development Goals, the Constitution and other legal
frameworks.
2.2 Implementation of Kenya Vision 2030 and Medium Term Plan III (2018-2022)
The Kenya Vision 2030 is the long-term development blue print that aims to transform the country into a newly industrializing middle
income country providing high quality of life to its citizens in a clean and secure environment by 2030.
The Vision is being implemented through a series of five year Medium Term Plans (MTPs). The vision is in the third phase of its
implementation through MTP III which covers the period 2018 to 2022. Vision 2030 and the MTP III have integrated Sustainable
Development Goals (SDGs).
This County Integrated Development Plan is the Second Medium Term Plan of the County covering 2018-2022. It espouses the National
vision as provided by the Vision 2030, National MTP III and other national goals as well as global visions like the SDGs.This will be
accomplished through programmes and projects to be prioritized in the yearly Medium Term Expenditure Framework (MTEF) budget
consultative process. .
53
The County has planned several programs to revamp it. The investment by the National Government through some of the proects
programs as enumarted below will spur the sector to increase the income of the county and creating employment to the youth. Some of
the proects/programs from the National Government include:
I. Underutilized Parks Initiative – renovation and refurbishment of tourism facilities to attract more visitors and reduce pressure on premium
parks
II. Promote destination Marketing to market Kenya as a leading tourism destination
III. Financing of Tourism Investments through increased investment for development of tourism facilities
This sector is expected to be the main driver to sustainably achieve 10 per cent annual economic growth rate and reduction of poverty
to 25 per cent by 30 per cent by the year 2030.
This sector is faced with maor challenges such as animal disease outbreaks, low adoption of technology, over reliance of rain fed
agriculture, unreliable markets and regular price fluctuations, low level of extension agent farmer ratio, inadequate credit facilities for
farmers, post-harvest losses and high rate of environmental degradation.
During the plan period, apart from the projects and programs outlined by the County Government, the National Government will
undertake the following within the County;
I. Fertilizer Subsidy Programme aimed at facilitating access to affordable and quality fertilizer
II. Irish Potato Support Project To increase production and reduced peak season wastage
III. Strategic Food Reserve Trust Fund (SFRTF) - To maintain sufficient stocks of food commodities
IV. Strategic feed reserve - To improve availability of fodder in ASAL areas
V. Pastoral Resilience Building Program - To build resilience for pastoral and agro-pastoral communities in drought prone areas as well as to
improve Natural resources management, market access and trade, livelihood support to pastoralist management, market access and trade,
livelihood support to pastoralist
VI. Agricultural Inputs Access Project - To improve access to farm inputs for enhanced agricultural production through increased use of
fertilizer and certified seeds, Cereal and grain legume yields increased.
54
VII. Farmer Registration Project To develop a National Farmer Register disaggregated to County level (Farmers database established,
Reliable information for appropriate policy formulation and capacity building captured)
VIII. Traditional High Value Crops (THVC) Programme - To improve farmers access to quality seed and planting materials of drought
tolerant Traditional High Value Crops in the Arid and Semi-Arid Areas
IX. National Agricultural Mechanization Project - 1,500 tractors and accessory equipment procured and distributed to improve agriculture
production
In the MTP III, the following has been envisaged to address some of the challenges in the county;
I. Universalization of ECDE - Increase the coverage of ECDE in the country by 20% (All children transiting to primary have at
least two years of ECDE);
II. Education in ASALs - Enhance access to basic education in ASAL’s communities;
III. Universal secondary education - Ensure 100% transition from primary to secondary so that all pupils completing KCPE
examination get a place in secondary schools;
55
IV. Loans,Bursaries and Scholarships for TVET - To increase access and equity at TVET;
V. TVET Infrastructure and Equipping - To create more space for trainees in TVET;
VI. Digital Literacy Programme (DLP) - To integrate ICT in Institutional management and curriculum delivery in pre-primary and
primary schools
VII. To enhance science, technology and innovation existing village polytechnics will be equipped, 4 new polytechnics in each sub
county to be established and a technical training institute also established.
VIII. ICT Integration in Secondary Education To integrate ICT in Institutional management and curriculum delivery in secondary
schools
Health
This sector has a goal of providing equitable, affordable and quality health care to all citizens. It’s the gate way to the enjoyment of right
to health as enshrined in the constitution. The national health policy framework 2012-2030 has six policy objectives and seven strategic
objectives that aim towards attainment of vision 2030 goal of “equitable, affordable and quality health care of the highest standard”.
The six policy objectives include; eliminating communicable diseases, half and reverse the burden of Non communicable diseases,
reduce the burden of violence and injuries, provide essential care, and minimize the exposure to health risk factors and strengthen
collaboration with providers. These will be achieved through health financing, leadership, product and technologies, health work force,
infrastructure, information and service delivery systems.
The following interventions have been proposed through the MTP III;
I. Digital Health Flagship Project - Transform the health care delivery system through digital health
II. Scaling up of nutrition program - Reduction in incidences of stunting
III. Immunization Program To reduce prevalence of vaccine preventable illnesses
IV. To improve maternal health care access in Kapenguria Hospital trough rehabilitation of wards.
56
This sector is faced with poor sanitation and environmental degradation due to low latrine coverage, lack of sewarege facility in Major
Township, lack of a dumping site, poor farming techniques, encroachment of water catchment areas and deforestation. The county is
also faced with poor access to potable water both for drinking and animal use.
To achieve the goal of this sector, the following shall be implemented at the county through the MTP 2018-2022;;
I. Sewerage Programme - To increase access to safe water and sanitation
II. Rehabilitation and Protection of Water Towers - To improve Water Towers Ecosystem Health and resilience
III. Irrigation and drainage infrastructure - To enhance capacity and expand area under irrigation.
IV. Water Harvesting for Irrigation and Land Reclamation -To increase water storage and availability
V. Biodiversity, Forests and Wildlife Resources Management and Conservation -to enhance management and conservation of
Biodiversity, forests and wildlife resources.
57
Youth forms majority of the population in the county and are faced with unemployment challenges. There are also vulnerable groups
like the older persons, orphans and vulnerable children, the disabled and women who needs special attention.
This category faces a lot of challenges that prevent them from attaining their goals and also from opportunities in life. The National
Government has put in place some affirmative action to address the challenges facing this group which include;
I. Women Enterprise Fund - To enhance equitable access and effective utilisation of WEF
II. AGPO - To enhance uptake and effective delivery of AGPO
III. Uwezo Fund - To enhance equitable access and effective utilisation of UWEZO fund
IV. National Government Affirmative Action Fund - To improve women, youth and vulnerable persons for socio-economic
empowerment
V. Bursary and cash transfer program for the orphans and the vulnerable older persons.
4.2.4 Political Pillar
The political pillar has a mission of ensuring Kenyans move to the future as one nation. It envisages a democratic political system that
is issue based, people centred, and result oriented and accountable to the public.
The projects and programmes under this pillar aims at strengthening national cohesion and integration, judicial transformation,
promoting transparency, leadership and integrity in the conduct of public affairs and entrenching the rule of law.
To achieve the visionof the pillar, the National Gvernment plans to implement the following within the County in the medium term;
I. Enhancing provision of National and County Government services - improve accessibility of national services to the county and
sub-county levels
II. County performance management - review and implement county performance management framework
III. Rationalization and retention of county staff - develop policies on rationalization and retention of county staff
IV. Inclusivity in county public service - implement the 30% affirmative action in county public service
V. M&E systems for the National and County Governments - harmonize and implement M&E systems for the National and
County Governments.
VI. Framework for County data management - develop a framework for county data management
VII. Government Asset and Liabilities management - develop asset and Liabilities inventory/ register for National and County
Government
VIII. Civic education and public participation - roll out civic education and public participation programmes
IX. Sustain Nationwide Anti-Corruption Awareness campaign - establishment and operationalisation of County Anti-Corruption
Civilian Oversight Committees
58
X. Operationalise the National Legal Aid Scheme - Conduct nation-wide phased community legal awareness outreach programme
in 47 counties
59
Figure 3: CIDP Linkage with Other Plans
Inputs
60
To give life to new structures of governance, a number of laws were enacted to guide governance at both levels and their modalities of
cooperation. Therefore, the Development Planning in the County is being guided by the following legal framework: County
Governments Act (2012), the Public Finance Management Act (2012), the Urban Areas and Cities Act (2011), the Intergovernmental
Relations Act (2012) and the National Government Coordination Act (2012).
61
• A County Spatial Plan; - A 10 year GIS based database system also a component of CIDP.
• A City and Urban Areas Plan - for every city and municipalities
Urban planning process shall also be done for every settlement with a population of at least 2,000 persons. Section 107(2)) explains
that these plans “shall be the basis for all the budgeting and planning in a county”. A county planning unit has been established by this
Act to coordinate integrated development planning and to ensure that county planning is linked to national planning frameworks.
62
The CIDP take cognizance of the country’s international commitments on the achievement of these Sustainable Development Goals
(SDGs). The development agenda and strategies at the county level therefore needs to be in harmony with the national development
agenda which contributes to the overall well-being at national level. Therefore, in pursuit of the betterment of the society, improved
quality of life and higher standards of living, the proposed county interventions aims at fulfilling the Country’s Commitment to the
world through the United Nations’ accord of Sustainable Development Goals.
Goal 1: Ending poverty in all its forms everywhere – this goal aims at eradicating extereme poverty for all people (those living below
$1.25 a day), implement social protection systems and measures of the poor, ensuring equal rights to economic resources as well as
access tobasic services, control over land, build resilience of the poor to reduce vulnerability over extreme climate change events,
developing pro-poor development strategies and policies by the year 2016.
Goal 2:End hunger, achieve food security and improved nutrition and promote sustainable agriculture – this goal target access
to safe, nutritious and sufficient food all year through in particular the poor and those in vulnerable situations, end all forms of
malnutrition and achieving the internationally agreed targets on stunting and wasting in children under 5, ensure sustainable food
production systems and resilient agricultural practices, increase investments in rural infrastructure and facilitation of timely access to
market information.
Goal 3:. Ensure healthy lives and promote well-being for all at all ages – reduce maternal mortalilty raio to less than70 per 100,000
still births, end preventab;e deaths of new borns and children under 5, end the epidemics of AIDs, Tuberculosis, Malaria and other
neglected diseases, ensure universal access to sexual and reproductive health care services, achieve universal healthcoverage, reduce
number of deaths as a result of water and air pollution, increase health financing and retention of health workforce
Goal 4:. Ensure inclusive and equitable quality education and promote lifelong learning opportunities for all – under this goal,
the targets include ensuring that all girls and boys complete free, equitable and quality primary and secondary education, all girls and
boys have access to quality early child hood development, ensure equal access for all women and men to affordable and quality technical,
vocational and tertiary education including university, increase the number of youths and adults with relevant skills for employment,
eliminate gender disparities in education, build and upgrade education facilities that are child, disability and gender sensitive,
63
Goal 5:. Achieve gender equality and empower all women and girls – to achieve the goal, the following targets have been given
preference; end all forms of discrimination against women and girls, eliminate all forms of violenceagainst all women and girls, eliminate
all harmful practices such as child, early and forced marriages and FGM, ensure women’s full and effective participation and equal
opportunities for leadership at all levels of decision making in political, economic and public life, ensure universal access to sexual
reproductive health and reproductive rights, undertake reforms to to give women equal rights to economic resources and control over
land and other forms of property,
Goal 6: Ensure availability and sustainable management of water and sanitation for all – some of the targets under this goal
include achieving universal and equitable access to safe and affordable drinking water for all, achieve access to adequate and equitable
santiation and hygiene for all, improve water quality, increase water use efficiency across all sectors, protect water related ecosystems,
strengthen participation of the local communities in water and sanitation management.
Goal 7:. Ensure access to affordable, reliable, sustainable and modern energy for all - some of the targets here include; ensuring
universal access to affordable, reliable and modern energy services, increase share of renewable energy,
Goal 8:. Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for
all – targets for this goal include; sustaining per capita economic growth of atleast 7 percent GDP growth, promote development oriented
policies that support productive activities, decent job creation, entrepreneurship, creativity and innovation, formalization and growth of
micr-small and medium sized entreprises, reduce the proportion of youth not in employment, devise and implement policies to promote
sustainable tourism that creates jobs an promote local culture,
Goal 9:. Build resilient infrastructure, promote inclusive and sustainable industrialization and
foster innovation – ths goal has the following targets to be met by year 2030; develop quality, reliable, sustainable and resilient
infrastructure to support economic development, promote inclusive and sustainable industrialization to raise industry’s share of
employment and GDP, promote access of small scale industrial entreprises to financial services for affordable credit, support domestic
technology development as well as to increase access to information and communication technology.
Goal 10: Reduce inequality within and among countries – this goal targets to progressively achieve and sustain income growth,
empower and promote the social, economic and political inclusion for all irrespective of age, sex, religion, ethnicity, race, origindisability
or other status, eliminiating discriminatory laws and practices.
64
Goal 11: Make cities and human settlements inclusive, safe, resilient and sustainable – the targets for this include ensuring access
for all to adequate, safe and affordable housing and slum upgrading, provide access to safe, affordable, accessible and sustainable
transport systems for all, enhance inclusive and sustainable urbanizationand capacity for participatory, integrated and sustainable human
settlement planning, protect natural heriatges, reduce adverse per capita environmental impact of cities and waste management, provide
universal access to safe, inclusive and accessible green and public spaces in particular for women, children, oler persons and people
with disabilities, increase the number of human settlements adopting and implementing integrated policies and plans towards inclusion,
resource efficiency, adaptation to climate change and resilience in disasters
Goal 12: Ensure sustainable consumption and production patterns – this goal has the following targets; efficient use of natural
resources, halve per capital food waste at retail and consumer levels and reduce food losses along production and supply chains including
post harvest losses, substantially reduce waste generation through prevention, reduction, recycling and reuse, promote public
procurement practices that are sustainable,.
Goal 13: Take urgent action to combat climate change and its impacts – targets here include strengthening resilience and adaptive
capacity of climate related hazards and naturaldisasters, integrate climate change measures into national policies and planning, improve
on awareness raising on climate change mitigation, adaptation , impact reduction and early warning,
Goal 14: Conserve and sustainably use the oceans, seas and marine resources for sustainable development – some of the targets
include; reducing marine pollution, sustainably manage and protect marine and coastal ecosystems, regulation of fishing to end illegal,
overfishing and destructive fishing practices. ,
Goal 15: Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat
desertification, and halt and reverse land degradation and halt biodiversity loss – this goal targets the following; ensure
conservation, restoration and sustainable use of terrestrial and inland freshwater ecosystems and their services, promote sustainable
management of forests, halt deforestation, restore degraded forests and substantially increase afforestation and reforestation, combat
desertification restore degraded land and soil, end to poaching and and trafficking of protected species of fauna and flora, halt the loss
of biodiversity and promote fair and equitable sharing of the benefits arising from utilization of genetic resources.
Goal 16: Promote peaceful and inclusive societies for sustainable development, provide access to justice for all and build
effective, accountable and inclusive institutions at all levels - some of the targets include; significantly reducing all forms of violence
and related deaths everywhere, end abuse, exploitation, trafficking and all forms of violence against and turture of children, promote the
rule of law and ensure equal access to ustice, combat all forms of organized crimes, reduce corruption and bribery in all forms, develop
65
accountable and transparent institutions at all levels, ensure responsive, inclusive, participatory abd representative decision making at
all levels, provide legal identity for all including birth registration, ensure access to public information, protection of fundamental
freedoms and promotion and enforcement of non discriminatory laws and policies for sustainable development.
Goal 17: Strengthen the means of implementation and revitalize the Global Partnership for Sustainable Development – Targets
include; strengthening domestic resource mobilization, assisting developing countries in attaining long term debt sustainability and
adoption and implementation of investment promotion regimes for least developed countries.
The SDG goals, targets have been mainstreamed into the identified programmes and projects.
66
A prosperous Africa based on inclusive growth and sustainable development;
An integrated continent, politically united, based on the ideals of Pan Africanism and
the vision of Africa’s Renaissance;
An Africa of good governance, respect for human rights, justice and the rule of law;
An Africa with a strong cultural identity, common heritage, values and ethics;
Africa as a strong, united, resilient and influential global player and partner.
67
CHAPTER THREE: REVIEW OF IMPLEMENTATION OF THE PREVIOUS CIDP
3.1 Introduction
This chapter provides a brief review on implementation of the County Integrated Development Plan for the period 2013-2017.The West
Pokot CIDP (2013-2017) was the first in a series of five year medium term plans produced under the devolved system of government.
The plan was prepared and implemented under the Kenya Constitution 2010 which significantly altered the governance structure of the
country by creating a two tier government; a national government along with 47 county governments.
Equitable Share 3,155,124,840 3,155,124,840.00 3,763,444,079 3,836,031,027 4,313,692,404 4,138,293,328.00 4,654,529,143.00 4,654,529,143.00
Own Revenue Analysis; The total local revenue collected amounted to Kshs 341.7 million against a target of Ksh. 400 million in the
plan. This was below the target by KShs 58.3 representing an underperformance of 14.6 percent of the target.
Equitable Share;The total receipts from county equitable share amounted to Kshs 15.78 billion against a target of Ksh. 15.89 billion
in the plan. This was below the target by KShs 0.11 billion representing an underperformance of 0.7 percent of the target.
68
Equalization Fund: The Equalization Fund is a Constitutional national revenue fund. This fund is allocated to specific counties to
improve the basic infrastructure services in those areas and regions categorized as marginalized. This fund was expected to generate an
estimated Ksh 2 billion over the plan period for financing priority programmes and projects in the CIDP. No money under this fund has
been released to date.
Conditional Allocations; The total receipts from conditional allocations amounted to Kshs 244.8 million against a target of Ksh 331.7
million in the plan. This was below the target by KShs 87.00 million representing an underperformance of 26.23 percent of the target.
Development Partners and Donor Support; The total amount received from Development Partners and Donor Support in FY
2013/2014- FY 2016/17 amounted to Kshs 37.98 million against a target of Ksh.475.8 million in the plan. This was below the target by
KShs 437.82 representing an underperformance of 92.02 percent of the target.Other development partners implemented programmes
and projects directly with community and hence was difficult to document due to lack of a coordinating framework at the county level.
69
Land,Physical Planning and Urban
Development 225.44 228.54 219.74 220.12 97.47 96.32
Water development,Environment
&Natural Resources 263.12 635.73 249.85 430.03 94.96 67.64
Tourism,Culture,Sports,Youth and
Gender Development 164.01 298.83 159.04 236.56 96.97 79.16
The total expenditure for the FY2013/14 to FY2016/2017amounted to Ksh.16.23Billion .This comprises of Kshs. 10.32 Billion recurrent
Expenditure and Kshs.5.8 Billion development expenditure representing 98.10 % and 80.91% absorption rates respectively and an
overall absorption rate of 91.20 % of the total budget allocation.
70
In Health Sector, there was increase in the number of doctors from 14 in 2012 to 39 in 2017.The number of nurses also increased from
269 in 2012 to 412 in 2017. Improved hospital equipment (ultra sound, oxygen plant, incubators) were also acquired and 10 ambulances
were also purchased to support referral and emergency response. The number of dispensaries increased from 52 in 2012 to 94 in
2017.Kapenguria MTC was also constructed and operationalized.
To increase access and availability of adequate water resources, 19 small gravity water supplies schemes were completed, 8 gravity
water supply schemes were rehabilitated, 69 boreholes were drilled and equipped and 100 Boreholes were rehabilitated. In addition, 20
sand dams and 44 Water pans were constructed, 22 springs were conserved and protected and 88 Ha of degraded land reclaimed for
agricultural use.
Summary of Progress under the Economic Pillar
To improve agricultural productivity, food security and household income and promote market linkages, the department of agriculture
and irrigation produced and distributed 20,000 Tissue culture Bananas and 5,000 grafted Avocadoes to farmers at a subsidized price,
conducted annual county agricultural show and established 5 Irrigation Schemes at Mrel, Mokuwo, Ngrokal, Kariamangole and Orwa.
In roads, a total of 1,566 Km of new roads was opened up to improve road network connectivity.
To improve Livestock health, Productivity and Marketing; 32 new cattle dips were constructed and 62 others rehabilitated, and 35
metallic crushes were constructed. 136 camels, 374 Galla goats and 20 dopper sheep were also purchased and distributed to support
breed improvement. Further, 187,378 cattle, 446,539 goats, 116,584 sheep, 931 dogs, and 4,500 poultry were vaccinated. Under
fisheries, 100,000 mixed tilapia fingerlings were stocked at Turkwel dam and other 100,000 mono-sex tilapia fingerlings were distributed
to farmers. One fisheries hatchery was constructed and 300 fish farmers recruited county wide.
To provide enabling business environment for Trade and Investments within the County, 16 market stalls were rehabilitated /constructed,
2 Coffee Factory renovated/ Constructed, ,7 milk chillers purchased were purchased and provided to farmers’ cooperatives . 400 beehives
purchased were also purchased and distributed to farmers.
The county government also installed 20m high mast security lights at Makutano, Chepareria, Ortum, Kacheliba, Kabichbich and Sigor
towns. Paved parking and storm water drainage was also constructed at Makutano.
71
development. Key devolution institutions were also established including the county budget and economic forum and the decentralized
offices for subcounty and ward administrations.
During the period under review, several laws to implement the constitution under schedule four were passed, including County Disaster
Management Act,2015, County Ward Development Act,2014,county car loans & mortgages act,2015, county village delineation
act,2016 several county finance acts and county appropriations acts. Capacity assessment and rationalization of the county public service
was also carried out.
Summary of Notable Challenges and Lessons Learnt
This section highlight the key challenges encountered during the entire period of implementing county policies, programmes and projects
for the period 2013-2017.It also touches on the key lessons learnt during the implementation period.
Challenges
• Inadequate equitable share funding for financing development programmes in the CIDP. Late release of funds by the national
treasury was another challenge that affected programme implementation.
• Limited internal revenue base due to underdevelopment, low investment and historical marginalization of the county.
• Many incomplete projects due to initiation of too many new projects and variation of contracts and inadequate funding .This
led to accumulation of huge pending bills.
• Rapidly rising wage bill. The county wage bill has risen rapidly from 22 percent in 2013 to 37 percent in 2017.
• Weak institutional structures, systems and staff capacity gaps due to the new devolved system of government.
• Governance and oversight challenges, poor leadership in some departments and competition between the two levels of
government, the senate and the national assembly
• Lack of Development coordination framework between the national & county governments and other development players at
the county level.
72
• Lack of m & e structures in line departments, inadequate projects documentation, low levels of monitoring and evaluation in
departments, data collection and utilization in decision making
• Cross cutting issues; Security, HIV/AIDS, Disaster Risk Reduction, Climate change adaptation and mitigation programmes and
gender issues were not sufficiently factored /mainstreamed during sectoral resource allocation and programmes implementation.
Lessons Learnt.
• There is need to strengthen county performance management framework, civic education and public participation
• There is also need to establish a county development planning and coordination framework to bring together all development
players at the county level.
• The county government should establish an external resource mobilization unit to assist in mobilizing resources to finance
priority programmes and projects in the CIDP (2018-2022)
• There is need to strengthen county monitoring &evaluation system and ensure that M&E reports are utilized in decision making.
• Future programmes and projects should put more emphasis on sustainability measures.
• There is need to strengthen equitable distribution of resources based on accurate and reliable data.
73
CHAPTER FOUR: COUNTY DEVELOPMENT PRIORITIES AND STRATEGIES
4.1 Introduction
This chapter provides an analysis of county spatial development framework, key county development priorities, strategies, programmes
and projects identified by stakeholders in the county.
Thematic Area Overview/ Current Status Policy Strategy Potential Lead Agencies/
Geographical Areas Departments
Industrializatio Industrial development in the county is still low. -Establish industrial Sebit, Ortum and Trade, investments &
n Currently, there are no industrial plants for manufacturing zones/parks with supporting Lomut,Sekerr and cooperative
purposes within the county. However, there is huge mining infrastructures (water, Muino in Central Development ,Lands
potential that can attract industrial development. Plans are electricity, road network,) pokot and Physical Planning
at advanced stages to establish a limestone processing -Zoning and planning of Lelan and Tapach in department
industry in Sebi in Kipkomo Sub-county. The county has industrial parks South Pokot Energy, Agriculture
not harnessed potential of agro processing plants. Future -Create and promote an Alale in North Pokot, and Livestock,
industrial plants to be established include milk-processing enabling business
plant, mangoes processing plant and commercial maize environment for investors
processing plants. -Sourcing of industrial
markets both locally and
regionally
Conserving the Protection and conservation of environmentally sensitive -Establish tree planting County wide Land Reclamation
natural areas (degraded lands, protected areas, water catchments, programmes in dept.
environment hilly terrains etc.) has been undertakenby both environmentally sensitive areas Forest dept.
government agencies and NGOs. However, this efforts -Promotion of land reclamation Natural resource
have not been very successful techniques and technologies management dept.
due to;insufficientand untimely funding for conservation -Training and capacity Water dept.
initiatives,the impacts of climatechange on the natural building of communities on KVDA,
environment, the high population pressure leading topoor conserving the natural Agriculture dept.
disposal of both solidand liquid wastes, environment KFS,NEMA,KWS,
unsustainablefarming methods, deforestation CBOs
,humanencroachment of the protected areasleading FBOs,NGOs
toenvironmental degradation.The effects of environmental Local communities
74
degradation witnessed include; Severe soil
erosionunpredictable weather patterns, resource based
conflicts, water and air pollution, reduced
agriculturaloutputs/yields, increased flooding and drought
incidence/desertification, reduced and diminishing forest
and grazing resources,landslides and flooding.
Resource The main growth area in the County is Kapenguria town. -Preparation of Physical Sebit, Ortum, Marich Lands and Physical
potential growth However, the county has several service/rural centres development plans for all pass, Sigor, Chesta, Planning department
areas whichif developed can be growth potential zones. This is growth centres Lomut and Chesegon Energy, Agriculture
because they are along the major transport corridor i.e. -Delineate and respect urban in central Pokot sub and Livestock,
Kapenguria-Lodwar A1 road, the areas have favorable fringes to control urban sprawl county, Kacheliba, Public health
climatic conditions, high agricultural productivity and -Provision of basic Orolwo, Konyao, Trade and industry
mineral deposits. infrastructure e.g. water, Kodich, Alale and
electricity, security,road Amakuriat in North
network Pokot sub county,
Kabichbich, Lelan
and Tapach in Pokot
south sub county
County -The County has a competitive advantage about its -Enhancement of PPPs Whole County County Government
Competitivenes geographical position. This gives the County an opportunity engagements in programmes and National
to do business with its neighbors and projects Government
-The County has many development partners -Promotion of conflict
NGOs,CBOs,FBOs willing to work and fund projects in the resolution mechanisms and
County security with its neighbors
-Provision of enabling support
-Competent human resource with relevant knowledge, infrastructure to enhance
experience and skills county competitiveness
-promoting environmental
-The County is rich in minerals, fertile soils, livestock protection and conservation
production potential and tourism related activities
Modernizing Huge agricultural potential exists the county. Development of agro Pokot Central ,west County
agriculture processing industries & Pokot and south Government,
strengthening market linkages Pokot subcounties Development partners
Redesigning subsidies to ensure
they target improvements in
food yields and production
quality; facilitating large scale
commercial agriculture;
75
expansion of irrigation schemes
and securing water catchment
and river ecosystems.
Tourism Tourism sites have largely remained unexploited. Tourism -Create one major tourism Nasolot, Mt Mtelo, • KWS
attraction sites in the County include Nasolot game reserve, circuit in the county i.e to Masol and Orwa, • Development
Marich escarpments, Mtelo and Koh hills,Turkwel dam and connect conservancies with Kaisagat View point, partners
Kaisagat viewpoint other touristic sites Marich • National Museums
Other tourism attractions include the rich Pokot culture and -Marketing of destinations escarpment,Kapengu of Kenya
artefacts in Kapenguria museum curio shops and wildlife sites and attractions ria Museum • Kenya Forest service
The County has rich history. The famous Kapenguria -Establish a tourist • Conservancies-west
Six(major tourism attraction) information centre pokot
-Development of a tourism
strategic plans
-Improvement of road
network connecting the tourist
circuit
-Establish county cultural
centre
-Create an enabling
environment for hotel industry
investment
-Hold Pokot cultural week
annualy
Human Human settlements patterns are classified between rural • Provision of basic • County wide • Lands , Housing
Settlement and urban settlements. infrastructure in rural centres and Urban
Settlements pattern varies with the livelihood zones with to control rural –urban Development
the pastoral zones having very scattered settlements Migration • Ministry of
patterns while the mixed farming zone having a nuclear • decentralization of resources Culture,
settlement pattern. to village level
Due to provision of basic infrastructure in urban centres , • Encourage PPP initiatives to
there is an influx of rural –urban movement promote investment in
housing sector
Transportation The general status of the road network in the county is poor. Bridges across Suam Ministry of roads,
Network The earth and graveled roads becomes impassable during -Tarmac roads to facilitate river, Nakwijit, Transport, public
the rainy seasons. A rugged and hilly terrain within the flow of goods and services cherangany and works,Ministry of
county poses another challenge in road connectivity. The -Establish track bays in Tapandany lands, NEMA, Water
county has no rail network, ports and airports. The airstrips strategic centres like Foot bridges over dept.
are completely inactive. Kapenguria Muruny river,
76
-Construction of bridges across Cheptya, Ortum,
rivers and lagers Kabichbich
-Establish county roads
maintenance unit
-Establish a functional airstrip
Infrastructure Infrastructure development is not well developed in the -Develop interconnected, Countywide Department of finance
County. the County has no sewer system and designated efficient, reliable, adequate, & economic Planning,
dumping site accessible, safe, sustainable Department of health,
and environmentally-friendly Department of urban
systems of infrastructure development,
(water; energy; education, Ministry of roads,
training and research facilities; Transport, public
health; ICT; sewer; sports) works
Land All sectors -Unplanned settlement schemes and -Reclamation of degraded -Law levels of -Climate change mitigation and
town centres lands awareness on land adaptation measures put in place
-Is affected by effects of climate -Establishment of group use laws & policy -Ensuring the carrying capacity of land
change such as drought and floods as ranches - Effects of climate is not exceeded
well as anthropogenic factors. - civic education on land change such as floods -Spatial plans for the county and urban
- continued Land subdivision use laws and policy ,unpredictable development plans for the major urban
-Digitization of land weather pattens and centres prepared
records drought -Rehabilitate degraded areas
-preparation of county -Severe soil erosion
spatial plan -Land pollution as a
- Provision of title deeds result of poor waste
management
77
Name of Dependent Status, Level of Utilization & Opportunities for Constraints to optimal Sustainable Management strategies
Natural Sectors Scenarios for future optimal utilization utilization
Resource
Natural forests -Health -Encroachment of natural forests -Afforestation and re -Illegal logging. -Promotion of appropriate and
-Agriculture -Deforestation mainly due to increase afforestation programmes -Deforestation sustainable wood fuel conservation and
-Livestock in population pressure creating demand -Training opportunities for -Forest fires management
- for settlement areas raw materials. community environment -promote participatory forest
Water&Envi committees and CFAs on management and conservation through
ronment environmental CFAs
-Lands management
-Trade -Community cooperation
Wildlife -Tourism -Currently conserved within Nasolot -creation of more game -Poaching -Legal and policy enforcement
-Education game reserve and Masol conservancy reserves and ranches -Human –wildlife -Active community involvement and
-Culture conflicts participation.
- Human
encroachment on
wildlife corridors
Minerals; gold, -Mining -Under exploitation of minerals due to Can support livelihoods Lack of appropriate Development of mining and extractive
gemstone,rubie lack of appropriate technology and lack and generation of technology for mining. industries such as the proposed cement
s of enabling environment revenues industry in Sebit
Limestone Building & Under exploitation of minerals due to
construction lack of enabling environment
industry
River Wei wei -Fisheries -Declining water levels – expected to Can support more food -Potential for Water levels -Monitoring of water levels and quality.
-Tourism further decline with expansion of production through declines -Establishing appropriate species of
-Irrigation irrigation sector irrigation and fish farming -Potential for water quality flora along riverbanks and conservation
-Agriculture -Water quality expected to decline due deterioration because of of riparian vegetation.
-Livestock to increased farming activities agriculture. -Creating awareness through WRUAs
-Water -Rapidly growing competing demands on riparian land protection
for water -Sustainable farm water management
-Source and catchment protection
River Suam -Fisheries -Declining water levels – expected to Can support more food -Water levels declined -Monitoring of water levels and quality.
-Tourism further decline with expansion of production through small- -Water quality deteriorated -Establishing appropriate species of
- Irrigation irrigation sector scale irrigation; Fish because of agriculture. flora along riverbanks and conservation
- -Water quality expected to decline due farming and energy of riparian vegetation.
Agriculture to increased farming activities generation. -Creating awareness through WRUAs
- Energy -Rapidly growing competing demands Funding for sustainable on riparian land protection
- Livestock for water agriculture within the -Sustainable farm water management
- Water -Source and catchment protection
78
Name of Dependent Status, Level of Utilization & Opportunities for Constraints to optimal Sustainable Management strategies
Natural Sectors Scenarios for future optimal utilization utilization
Resource
River Atacha, -Mining -Rampant sand harvesting; -Can support livelihoods -Unregulated and haphazard -Legal and policy enforcement
Serewo, - -Support of tree nurseries and kitchen and trade through sale of sand harvesting -Strengthening WRUAs oversee sand
Konyanga and Environmen gardens sand harvesting
Mtembur, t -Can support the - Monitoring of water levels and
Chesra establishment of more tree quality.
nurseries -Establishing appropriate species of
flora along riverbanks and conservation
of riparian vegetation.
-Creating awareness through WRUAs
on riparian land protection
-Sustainable farm water management
-Source and catchment protection
Biodiversity All sectors -Diminishing numbers within the -Can support all sectors. -Illegal extraction of -Biodiversity conservation
(flora and endangered species e.g. the wild plants such as
fauna) Lammergeyer, Aloe vera
-Low awareness on
the impact of
destruction of natural
resources
-Drought
-Overgrazing
Escarpments -Tourism -These are tourist attraction sites. They -Creation of hotels and -poor road -Creation of good road network
(Marich and -water generate revenue and create restaurants and around the infrastructure
Turkwel) - employment. They are underutilized areas to attract more
Hills (Koghow environment due to poor road infrastructure and tourists
and Mtelo marketing
hills)
79
4.4 Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, and revenue generation. They
have been derived from the Kenya Vision 2030 and the county transformative Agenda. Projects cutting across county borders (cross-
county and country projects) have also been indicated in this section.
Completion of Chepareria To contribute to economic -Complete construction of the Completion 2018-2022 Dep’t of 181,000,00
Nasukuta Export growth, wealth creation and abattoir &operationalizati Pastoral 0
abattoir development through -Procure and install slaughter and on of meat export economy,
processing high quality processing equipment’s and abbatior Development
livestock products for local and refrigerated truck partners
export markets -Installation of electricity and power
backups and water supply system
Establish Livestock County- -To increase livestock -600,000 cattle vaccinated against -Quantity of 2018-2022 County and 600 M
Disease-free zone wide productivity and health all diseases per year doses procured national
-1.5 million goats/sheep vaccinated -No of livestock governments;
-To create a sustainable per year vaccinated Vaccine
livestock market -1,200 camels treated per year production
-500,000 poultry vaccinated per year agencies/supplie
-5,000 dogs vaccinated per year rs and other
-2,610,000 doses of vaccines partners
purchased per year
Establishment of Keringet To improve access to constituent public university No. of students 2018-2022 County 500,000,00
constituent public affordable & quality higher college enrolled
Gov’t,CUE 0
university college education No. of courses on
offer
Limestone Extraction Sebit To add value to limestone Cement plant set up Tonnes of 2018-2022 PPP 200m
&Processing /Create employment Cement produced
per year
Number of jobs
created
80
Project Name Location Objective Output /Outcome Performance Timefram Implementing Cost
indicators e Agencies (Ksh.)
Kapenguria Sewerage Kapenguria To ensure proper liquid waste 10,000 households connected to No of households 2018-2022 Department of 4 billion
system and its management sewerage system connected with Water
environs water
Milk processing plant Lelan or To process milk to yoghurt, Milk Plant set up Quantities Dairy 2018-2022 Coop/Industry 310 m
Siyoi Ward Ghee, butter and other products Products
Cereals Milling plant Mnagei Add value to Milling Plant Quantities of 2018-2022 Coop/Industry 100 m
cereals/Employment Flour (whole
Meal), Animal
Feeds
Oil Exploration & Central & Revenue /Employment Exploration reports/ Rigs Signed MOUs/ 2019-2021 PPP 500m
Drilling North Pokot site identification
Tarmacking of Urban Kapenguria Improved business 50km tarmacked Number of km 2018-2022 Department of 400M
Roads Municipality environment and security tarmacked
Lands & Urban
, Chepareria
town, Ortum Development,K
town,
URA
Kacheliba
town
Tarmarking County Pokot South Link farmers / traders to main Chepareria –Chepnyal road, No. of Kms of 2018-2022 KENHA,,KERR 4Billion
Strategic Roads / Kapenguria road Marich-Sigor-Lomut-chesegon road otarmacked A,County gov’t
Sub- county road,
Kapenguria-Alale road,
Keringet-Tartar road
Kapsait- Sekution Road
Installation of street Kapenguria Improved business No. of functional street lights in Improved 2018-2022 Department of 10,000,000
lights Municipality environment and security place business Lands & Urban
,Chepareria, envirnment development
Ortum,Kach
eliba,Sigor,
Alale,Kabic
hbich
County dumpsite/Solid All urban Clean and healthy environment Purchase land Healthy 2018-2022 Department of 10,000,000
Waste Management centres Construct,operationalize & population and Lands & Urban
System maintain county dumpsite environment Development
81
Project Name Location Objective Output /Outcome Performance Timefram Implementing Cost
indicators e Agencies (Ksh.)
Investment in new In all sub- Create better housing 60 new houses built annually Motivated staff 2018-2022 Housing 300M
housing units counties condition and improved
department and
revenue.
Public works.
Establish Mango Lomut/Sigor Value addition/Income Plant Quantities of 2018-2022 Trade/Coop/Ind 20 m
processing generation mango Products ustry
Establish industrial Ortum To provide necessary Industrial Park established Number of 2018-2022 Industry/ 20m
park/ Special Economic infrastructural facilities to enterprises investor
Zone entrepreneurs/investor started
Development of County Hq Improve services delivery, Equipping and furnishing youth Installed ICT 2018-2022 County 40,000,000
Information Access to information empowermrnt centres to create infrastructure Government,M
Communication platform for youths and women get OICT,ICTA and
Tecnology basic ICT skills. Trained staff on Service
infrastructure Establishment of County Data ICT providers
Center
Embrace use of
ICT
Automation of County County HQ Improve visibility, automatic -Implementation of proper fibre Improved 2018-2022 County 100M
Services offices and coherent work flow, unify connectivity, structured cabling and revenue Government and
single reporting , advance in e- telephony across county collection Service
commerce integration, provide departments. providers
centralized storage and backup, -Revenue Collection and Licensing Improve internal
better and faster departmental system communication
collaboration across between
departments, vehicle tracking, departments
inventory tracking and
document tracking, standardize
HR information
82
Project Name Location Objective Output /Outcome Performance Timefram Implementing Cost
indicators e Agencies (Ksh.)
Develop Nasolot Game Sekerr Enhance tourist attraction -Infrastructure development, Operational/funct 2018-2022 GoK. County 100M
Reserve -Conserve wildlife and -Educational tours, & Exposure uional national Government of
environment tours, reserve WP
-Create Employment -Training of rangers, Private Partners
-Establish cottages,
-Establish sanctuaries in the park,
-Rangelands rehabilitation &
management
Develop community Lomut, Promote peace & security, Masol ,Orwa ,Nguruch, Operational/funct 2018-2022 GoK, County 150M
conserrvancies Masol, Conserve fauna and flora, Kositei,Ombolion and POMA ional community Government,
Sekerr & Create employment, Safeguard community conservancies conservancies Development
Enduw,Kase historical migratory routes & partners, PPP,
i wards wildlife dispersal areas, Community
Construction of Modern Kapenguria -To promote sports disciplines -Sports disciplines promoted . No. of 2018-2022 County 200M
Sports Stadium sportsmen/wome Government of
n nurtured WP
Honey Processing Kodich Increased income for Processing plant operationalized Tonnes of Honey 2018-2022 Coop/Industry 22 M
Konyao farmers/Create employment processed and
Alale sold
Masol
Chepkopegh
Establishment/Expansio Central,Wes Increase food security and Put 1,750 hectares of land under hectares of land 2018-2022 Department of 100M
n of Irrigation projects t & North household income irrigation under irrigation Agriculture &
Pokot irrigation/Nat.
Govt
Sunflower processing Keringet in Increased sunflower Functional processing plants Functional plant 2018-2022 County 10 M
plant Mnagei production, marketing and job
ward creation by 2019
Promotion of Cash 12 wards Increased acreage and various -100Ha coffee planted Acreage under 2018-2022 County and 50 M
crops development farmers growing cash crops -2000Ha of Pyrethrum established cash crops specific national
:coffee, pyrethrum, Tea, both in high altitude and lower -120Ha of Tea established No. of farmers parastatals
Sisal, cotton and Aloe altitude areas by 2020 and -220Ha sisal established trained on dealing with
vera improve planted different specific cash
-300Ha of cotton planted technologies, crops
-50Ha of Aloe vera established good agricultural
practices and
value addition
83
Project Name Location Objective Output /Outcome Performance Timefram Implementing Cost
indicators e Agencies (Ksh.)
Agriculture 20 wards To improve access to farm Improved productivity and access Number of Tons 2018-2022 County, national 200M
Inputs,Fertilizer, Seed inputs, Fertilizer, to farm inputs by farmers, of subsidized programs and
and Seedling subsidy Seed and seedlings by inputs. partners
farmers,
Muruny-Siyoi Chepareria, To ensure safe and clean water 7,000 households No of households 2018-2022 Department of 1 Billion
Extension Water Kacheliba, to the residents connected with Water
Project Cheptuya water
and Serewo
Muruny-Chepareria Kipkomo To ensure safe and clean water 3,000 households No of households 2018-2022 Department of 80 million
Water Project to Chepareria Township connected with Water
water
Kacheliba Water Supply Kacheliba To ensure safe and clean water 1,250 households No of households 2018-2022 Department of 100 million
to Kacheliba town and its connected with Water
environs water
County Tree Planting County wide To increase tree cover from 50,000 Hectares of land planted No. of ha. of land 2018-2022 Department 1 Billion
/Reforestation and 3.9% to 7% by 2022 and 15% with trees reforested/Plante Forestry
Afforestation by 2030 d
Conservation and Pokot To increase forest cover in 10,000 hectares of land reforested No. of hectares 2018-2022 Forestry and 580
Management of South/Pokot Cherangany Hills W for of land reforested Land Million
Cherangany Hills Water Central/Wes livelihood improvement Reclamation
Tower t Pokot
Preparation of urban Kapenguria Having controlled Approved plans Approved urban 2018-2022 Physical 10M
development plans Municipality developments development planning,
,Chepareria, plans Survey and
Ortum,Kach Urban
eliba,Sigor, Development
Alale
84
Project Name Location Objective Output /Outcome Performance Timefram Implementing Cost
indicators e Agencies (Ksh.)
Preparation of County County Controlled development Approved plan Approved County 2018-2022 Physical 50 M
spatial plan spatial plan planning,
Survey and
Urban
Development
This section gives a summary of the development priorities identified in the sectors from the spatial plan, sectoral plans and during
stakeholder’s consultative fora. The development priorities, programmes and projects are linked to the Kenya Vision 2030, MTP III,
County sectoral and strategic plans, as well as strategies identified in the spatial development framework. Emphasis has also been given
to programmes and projects aimed at fulfilling Article 56 of Constitution of Kenya 2010, achieving the aspirations of Sustainable
Development Goals (SDGs) and African Union Agenda 2063.
Vision
Literate and skilled population for county social, economic, and political development
Mission
85
To provide, promote, coordinate pre-primary education and vocational training while embracing technology to mould individuals into competent
and responsible citizens
The sector priorities for the plan period 2018-2022 include; Construction of model ECDE classrooms and provision of water storage facilities,
Employment of additional qualified ECDE teachers and supervisors, Recruitment of qualified instructors for VTCs, and support staff, Provision of
instructional materials for ECDE , provision of vehicles for field operations,Equipping (furniture and outdoor play items) of ECDE centres,Feeding
of needy ECDE learners,Training and development of ECDE teachers and staff, Construction of border boarding primary schools, Infrastructure
support to primary and secondary schools, Support adult education training.
Others are Construction of model Vocational and Training Centres (VTCs),Expansion and rehabilitation of existing VTCsEquipping and provision
of training materials for VTCs, Training and development of VTCs’ instructors and staff, Mainstreaming of ICT in VTCs training programmes,
disbursement of bursary and scholarships to needy students, trainees and staff, Operationalize Business start-up kit fund, establish business start-up
incubation centre for VTC graduates, Collaboration with strategic partners and national government , Formulation and enactment of County ECDE
and County Vocational education and Training Bills, Support adult education with teaching-learning materials and adult education teachers, provide
infrastructure support to primary schools (classrooms, teaching-learning materials) and support primary schools with boarding facilities.
The priorities and strategies for post primary education over the plan period include; Support secondary, tertiary & university education through
bursary fund, support secondary schools’ infrastructure by providing classrooms, teaching-learning materials, and equipment.
86
Table 12:Sector Programmes
ECDE centres benefiting with No. of ECDE institutions supported 600 800 1000 1000 1000 50M
instructional materials with instructional materials
Water tanks distributed and No. of water tanks distributed to 50 300 300 300 50 30M
installed to ECDE Centres ECDE centers
ECDE feeding Provision of milk to ECDE % of ECDE centers provided with 50% 95% 96% 97% 98% 100M
program centers milk
ECDE centres benefit from No. of ECDE centres under school 600 700 800 800 800 60M
nutritional supplements feeding programme
ECDE capacity ECDE teachers recruited No. of new ECDE teachers recruited 300 50 50 50 50 350M
development
ECDE teachers and staff trained No. of ECDE teachers and staff 339 300 400 50 50 15M
on new curriculum developed/Trained on new curriculum
87
infrastructural VTCS rehabilitated No. of VTCS rehabilitated 200M
development 4 4 4 4 4
VTCs supplied with modern No. of VTCs supplied with modern 50M
training tools and equipment training tools and equipment 6 9 14 18 22
Staff VTC instructors employed No. of new VTCs instructors employed 38M
Recruitment & and deployed 5 6 6 25 20
development
No. of VTCs instructors trained and / or 15M
developed 32 38 42 42 37
County Bursary 100,000 secondary school No. of secondary school 20,000 20,000 20,000 20,000 20,000 1.6B
Fund beneficiaries beneficiaries
25,000 tertiary No. of tertiary level 5,000 5,000 5,000 5,000 5,000 375M
beneficiaries beneficiaries
88
10,000 VTC beneficiaries No. of vocational 2,000 2,000 2,000 2,000 2,000 150M
Training centers’
beneficiaries
School Infrastructure Primary schools supported No. of primary schools 110 107 107 107 107 161.4M
development with new classrooms supported with new
classrooms
Secondary schools No. of secondary 54M
supported with new schools with new
classrooms classrooms 22 22 22 21 21
Adult education centers No. of adult education 75M
supported centres supported 3 3 3 3 3
Girl Child Support Provision of Sanitary pads No. of school going 25,000 32,000 38,000 43,0000 46,000 30M
Program girls supported with
sanitary pads
Vision
A clean, healthy, safe and sustainably managed water, environment and natural resources.
Mission
To promote good governance in the protection, conservation, and development of water, environment and natural resources for equitable
and sustainable development in West Pokot County
89
Sector /subsector development needs, priorities and strategies
The County’s department water priority shall include programmes that will lead to increased access to safe, adequate and reliable water
supply and sustainably managed environment. To achieve this initiative, the department will invest in borehole drilling, gravity schemes
and rainwater harvesting technologies and integrating the community in the management the projects. In order, to promote sanitation in
the County, priority will be given in constructing a sewerage system for two major towns (Kapenguria and Chepareria). Environmental
priority will be given to programmes that will contribute to Climate Change Adaptation and Mitigation. These shall include programmes
to increase forest cover, conserving the natural forest and woodlands, protecting the water catchment areas, enhancing participatory
forest management and promoting land reclamation. In addition, there will be continuous sensitization of the community on the benefits
of forests and clean environment. To achieve these objectives, however, these respective departments shall have to further train the
existing staff, recruit additional staff, purchase additional field vehicles and expand the office space.
Sector Programmes
Water Supply Boreholes drilled and No. of boreholes drilled and equipped 25 30 30 20 15 150M
Infrastructure operationalized
development Boreholes upgraded to solar power No. of Boreholes Upgraded to solar 15 15 10 10 5
power
Water Pans constructed/desilted No. of water pans excavated or 2 3 2 2 3 137.5M
desilted and working
Sand/ sub-surface dams No. of new sand/ sub-surface dams 25 25 15 15 10 45M
Constructed constructed and working
90
Water supply systems rehabilitated No. of water supply systems 3 2 1 1 1 50M
rehabilitated
New roof water catchment systems No. of new roof water catchment 50 60 60 80 80 33M
installed systems installed
Gravity Water supply schemes No. Gravity Water supply schemes 5 4 4 2 2 200M
developed completed and operational
Shallow wells dug No. of shallow wells dug and 15 20 25 25 15 3M
operational
Springs Protected No. of springs protected 10 15 15 12 10 62M
91
Programme Name: Forest Conservation and Management
Objective: To sustainably manage County forestry resources for livelihood improvement.
Outcome; Increased tree cover and sustainably managed Forest Resources.
Sub programme Key Outputs Key performance Targets
Indicators Year 1 Year 2 Year 3 Year 4 Year 5 Budget
Forestry 7,500,000 seedlings No. of Tree seedlings 500,000 1,000,000 2,000,000 2,000,000 2,000,000 50M
development planted and 250Ha of planted
program land planted with trees
No. of Ha of Green 25Ha 5 5 5 5 10M
Schools plant with
trees
92
Programme Name: Environmental Conservation and Wildlife Management Planned Targets
Objective: To minimize environmental Pollution and Conserve wildlife
Outcome: a quality living environment and reduced human-wildlife conflict
Sub programme Key Outcome Key performance Year Year 2 Year 3 Year 4 Year 5 Budget
Indicators 1
Environment Environmental policies and No. of policies and laws 1 1 1M
conservation and laws formulated and formulated and implemented
management implemented
Trainings conducted on No. of trainings conducted 30 40 50 50 30 20M
environment management
and conservation
Regions mapped and zoned No. of regions mapped and zoned 5 15 15 10 5 3M
against air/ noise pollution against air/ noise pollution
Wildlife conservancies (Masol, No. of conservancies managed 4 4 4 4 4 10M
conservation Nasolot, Ompolion, Orwa) and conserved
managed and conserved
93
Land 1,550 Ha of Ha of land reclaimed 150 350 450 350 250 100M
Reclamation degraded land
reclaimed for crops
pasture, fruit trees
and indigenous tree
production
94
Acquire mobile data No. of mobile Data from community
collection tools observers collected 10 20 20 30 30 2M
95
4.5.3 GENERAL ECONOMIC & COMMERCIAL AFFAIRS SECTOR
Vision
The preferred commercial hub for a competitive and sustainable industrial and enterprise sector
Mission
To facilitate access to markets through development and promotion of commerce, Cooperative, creation of an enabling Investment
environment for a vibrant, globally competitive, sustainable and innovative commercial and industrial enterprises
Sector Priorities and Strategies
This sector covers private sector and Micro, Small and Medium Enterprises (MSMEs) development. Manufacturing sector’s
contribution to the GDP has remained static at 10 per cent over the last 5 years. This is attributed to inadequate and costly infrastructure,
low technology adoption, high cost of doing business, high fuel costs, and recurring droughts. At the county, trade sub-sector is faced
with inadequate utilities (especially water and electricity) and limited access to capital for MSMEs. The manufacturing sector has a
potential of spurring technology and innovation as it’s a major conduit for diffusion of new technologies into the other sectors of the
economy. This sector also has a high potential of employment creation with strong forward and backward linkages and spill over effects
that can stimulate demand for agricultural products.
Trade and Industry; to revitalize this sub-sector, the following shall be given priority over the plan period; Undertake a resource
endowment mapping in the county to establish Quantities and location of both natural and man-made resources in the county to facilitate
identification and prioritization of bankable industrial projects in the county,Develop and support of capacity building and training
programmes on technology and value addition,Conduct annual investment Fora to show case products and investment Opportunities in
96
the County, Expand the Joint Loans Board scheme to reach many traders, Enhance Licensing with a view to Rolling out an E – registry
for online licence applications and payments, Improve public private partnerships with NGO and Kenya National Chamber of Industries
(KNCCI),Develop 1 industrial park and enhance collaboration between the County Department of Vocation training to enhance skills
development for industrial purpose for the Youth.Other priorities include; Establish a technical institution for the county to strengthen
MSMEs, Establish Micro and Small Enterprise (SMEs) centres of excellence, Support Sebit Cement manufacturing plant as a Public
Private Partnership Model,Support value addition to Milk, Wool, Mangoes, Sunflower, Aloe vera and other products from the county
,Support Establishment of recreational facilities in each of the four Sub Counties so as to generate revenue as well as providing
recreational facilities to the town residents
Cooperative Development; Over the plan period, the following will be undertaken in order to unlock growth within this sub- sector;
establish County Cooperative Development Fund to help SMEs access capital, promote retail banking and expansion of agent banking
to the unbanked, promote the establishment of more deposit taking Societies and Micro Finance Services ,promote FOSA establishments
and SACCOs that take withdrawal deposits and Promote vibrant sustainable marketing Cooperative Movement
Oil, Mineral Resources and Renewable Energy: To upscale the development of this subsector in a more sustainable and organized
manner the county will undertake the following over the plan period: establish a Mineral/ Natural Resources database through Geo
spatial mapping of mineral resources, regulation of Sand harvesting, engage Tullow oil cooperation for exploration of petroleum with a
view to exploiting in Central Pokot and invite investors to support the generation of energy by use of Solar and Wind in various parts
of the County.
98
Cooperative Promotion of No. of awareness 20 25 30 35 40 25M
Development Cooperative creation/Trainings conducted on
movement cooperative societies
No. of new cooperatives 5 6 3 2 1 10M
registered
Capacities of No. of trainings to existing 20 30 40 45 50 15M
established cooperatives societies
cooperative
societies
enhanced
Cooperative No. of Cooperatives supported 3 3 2 1 1 100M
societies with Coolers & housing units
supported No. of cooperatives supported 2 1 1 1 1 30M
with honey processing
equipment/ coffee store
No. of Cooperatives societies 50 50 50 50 50 25M
supported with milk Gallons
Cooperative No. of cooperatives /groups 350M
Development supported with capital through 100 200 250 280 300
Fund the cooperative Development
Fund
Revival of No. of cooperatives societies 2 2 2 2 1 10M
dormant coops. revived
Cooperative No. of audit services carried out 15 25 30 35 40 25M
Audit Advisory
Services offered
Investment Investment No. of new investments 4 2 2 2 1 25M
Promotion forum attracted to the county
99
4.5.4 AGRICULTURE, RURAL & URBAN DEVELOPMENT SECTOR
This sector comprises of the following departments: Agriculture and Irrigation, Pastoral Economy, Lands, Physical Planning and Urban
Development.
Vision: A secure and a wealthy County anchored by an innovative, commercially oriented and competitive agricultural sector
Mission: To improve livelihoods of the West Pokot county residents and ensure food security through creation of an enabling
environment, provision of effective support servises and sustainable land resource management.
West Pokot County is endowed with high agricultural potential for crops and livestock. Agriculture is a fundamental pillar for sustainable
development that seeks to meet the needs of present generation without compromising those of future generation. The department of
agriculture contributes immensely to the economy of West Pokot County. There is need to empower and change the lives of communities
of West Pokot to secure right of food, contribute to reduced poverty, increase household incomes, increase bio-diversity, and adopt
agricultural methods which mitigate climate change.
The department will mainly focus on its priorities and needs in the Governor’s manifesto, public participation report and vision 2030
and creating facilitative laws, regulations and policies. The priorities will target food security, improving the communities’ household
incomes and improvement of farmers’ knowledge and skills. These priorities and needs will be addressed through establishment of
irrigation infrastructure, purchase of water pumps, promotion of traditional high value crops, promotion of cash crops, post-harvest
management(cold stores for onions and Irish potatoes, cereal produce stores),fertilizer and seed subsidy, pest and disease surveillance
100
and control(fall armyworm and maize lethal necrosis disease etc.), establishment of agricultural mechanization unit, establishment of
demonstration plots, promotion of greenhouse farming, soil and water conservation and capacity building of staff and farming
communities. The legal framework needed to support the proposed development initiatives will also be put in place.
Indicators
Year 1 Year 2 Year 3 Year 4 Year 5 Budget
101
2400 Ha of Ha of sunflower established and 30M
Sunflower number of farmers planting
established sunflower. 200 400 600 600 600
Food Crops 3000 ha of Ha of traditional crops increased 300 500 700 800 700 15M
Development traditional crops
established
1,000 Ha of Irish Bulking of Irish potato seed 100 300 300 200 100 18M
Potato seed
supplied to farmers
102
Value addition Keringet sunflower Sunflower factory 1 0 0 0 0 5M
promotion project-Mnagei operational
Mango Fruit Mango factory 0 1 0 0 0 5M
processing plant operational
Construct cereal cereal storage facilities 1 1 1 1 1 5M
stores established
Construct Potato potato cold store 1 1 0 0 5M
cold stores constructed
Agribusiness Youth in Number of youth in 100 250 500 750 1000 10M
Extension Agribusiness agribusiness
Family farming Number of families 10M
becoming:
Food secure 50 50 50 50 50
Financially stable 50 50 50 50 50
Farm inputs subsidy Fertilizer subsidy Tons of fertilizers 360 500 500 500 500 100M
distributed to farmers
Market Development Market surveys Number of market 10 20 30 40 50 5M
surveys conducted
farmers linked to Number of farmers 1000 1500 2000 2500 3000 3M
markets linked to markets
103
Agricultural Soil and water Soil and water 1200 1400 1600 1800 2000 8M
engineering conservation conservation
services(Land structures laid and structures laid and
Development) implemented implemented
Number of staff 64
promoted
Extension Service Farmers trainings on Number of farmers 2M
delivery technical and trained 3600 4000 4000 4000 4000
crosscutting issues
Purchase and No. of utility vehicles 30M
maintain motor purchased 1 1 1 1 1
vehicles and
M/cycles No. of utility Motor 2 5 3 1 1 2.4M
cycles purchased
104
LIVESTOCK, VETERINARY& FISHERIES SUB-SECTOR
Vision: To be the leading sub sector in livestock productivity and protection of animal health
Mission: To promote livestock production through value addition, enhanced productivity and sustainable development of fisheries
The strategies to be adopted by the sub-sector to achieve the needs and priorities include: Provision of A.L. services, provision/introduction of
superior breeds for livestock improvement; provision of pasture seeds and hay stores; provision of modern/improved hives; capacity building of
staff and farmers; disease surveillance, control and prevention; provision of monosex tilapia fingerlings; resource mobilization ( collaboration,
partnership
105
Programme Name: Livestock Production
Objective; To increase productivity and access to markets
Outcome; Increased food security and income
Sub programme Key Outcome Key performance Planned Targets
Indicators
Year 1 Year 2 Year 3 Year 4 Year 5 Budget
Dairy cattle breeds supplied -No of breeds supplied 2,000 2,000 2,000 2,000 2,000 500M
to farmers
Sahiwals breeds supplied to No of breeds supplied 100 400 400 400 300 80M
farmers
Boran cattle breeds supplied No of breeds supplied 200 200 100 25M
to farmers
camels breeds supplied to No of breeds supplied 500 500 500 500 160M
farmers
Dorper sheep breeds No of Dorper breeds 250 250 250 250 6M
supplied to farmers supplied
Galla goats breeds supplied No of Gala breeds 250 500 500 500 500 13.5M
to farmers supplied
106
Wool sheep breeds supplied No of wool sheep 100 200 200 100 3.6M
to farmers supplied
Pasture lands Reseeded Acres reseeded 30 1,240 1,240 1,250 1,240 25M
1,000 beehives supplied to No of beehives 200 200 200 200 200 20M
farmers
Honey refineries constructed No of refineries - 1 1 1 1 1M
22,000 modern poultry No of poultry breeds 2,000 5,000 5,000 5,000 5,000 11M
breeds supplied to farmers
dairy goats supplied to No of dairy goats - 200 300 150 100 5M
farmers
5,000 indigenous chicken No of indigenous chicken - 2,000 1,500 1,000 500 2.5M
supplied to farmers
107
2 motorcycles Number of motorcycles 0 2 0 0 0 0.4M
purchased purchased
NASUKUTA 2 tractors purchased Number of tractors purchased 0 2 0 0 0 16M
LIVESTOCK
IMPROVEMENT 8 sets of farm Number of farm implement 0 4 4 0 0 0.8M
CENTRE implements sets purchased
Rear200 Sahiwal cattle No of Sahiwal cattle reared - 60 50 50 50 12.6M
Rear 300 Galla goats No of Galla goats reared - 70 80 80 70 1.8M
Establish 1,000 acres of Number of pasture acres 30 370 250 250 200 10M
pasture established
2 boreholes drilled No of boreholes - 1 - 1 3M
1 water pan No of water pans - - 1 0.5M
2 new hay sheds - 1 1 6M
constructed
108
Programme Name: Livestock Disease Management and Control
Objective; To increase Livestock Productivity and Health
Outcome; Improved livestock productivity and health
Sub Key Outcome Key Planned Targets
programme.. performance
Indicators Year 1 Year 2 Year 3 Year 4 Year 5 Budget
Veterinary offices completed and Number of 0 3 0 0 0 15M
services equipped offices
completed and
equipped
Ward offices Number of 0 2 1 0 0 15M
constructed and offices
equipped constructed and
equipped
new staff recruited Number of staff 0 30 0 0 0 75.6M
recruited
new dips Constructed No of new dips 12 9 8 8 8 112.5M
dips repaired No of dips 12 14 12 12 12 49.6M
repaired
New metallic crushes No of metallic 9 24 24 24 24 105M
constructed crushes
Foot spray pumps No of foot - 500 400 345 300 2.5M
provided to farmers spray pumps
provided
5 class B abattoirs No of abattoirs - 2 1 1 1 25M
developed
A.I. schemes No of A.I. - 3 2 1 - 30M
Established schemes
cattle vaccinated No of cattle 600,000 600,000 600,000 600,000 600,000 144M
vaccinated
Sheep/Goats No of 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 75M
vaccinated sheep/goats
vaccinated
poultry vaccinated No of poultry 500,000 500,000 500,000 500,000 500,000 12.5M
vaccinated
camels vaccinated No of camels 1,200 1,200 1,200 1,200 1,200 0.06M
vaccinated
dogs vaccinated No of dogs 5,000 5,000 5,000 5,000 5,000 2.5M
vaccinated
109
Programme Name: Fisheries Development and Management
Objective;To increase house hold income and food security
Outcome;Increased Fish Production and food security
Sub programme Key Outcome Key performance Planned Targets
Indicators
Year 1 Year 2 Year 3 Year 4 Year 5 Budget
FISHERIES
DEVELOPMENT ward offices Number of ward 0 2 1 0 0 15M
constructed and offices constructed
equipped and equipped
Utility vehicles Number of vehicles 0 1 1 0 0 8M
purchased purchased
Utility motorcycles Number of 0 5 5 0 0 2M
purchased motorcycles
purchased
1,000,000 Fingerlings No of fingerlings - 250,000 250,000 250,000 250,000 5M
for Turkwel dam
500,000 Fingerlings No of fingerlings 50,000 112,500 112,500 112,500 112,500 2.5M
for farmers
Equipping one No of hatcheries 1 1 - - - 3M
hatchery equipped
pond liners provided No of pond liners - 50 50 50 50 251M
to farmers
cold store established No of cold stores - 1 - - - 3M
fish feeds for farmers No of bags - 625 625 625 625 5M
Fish banda No of fish bandas - 1 - - - 5M
constructed constructed
A competitive organization in sustainable management of land and the built environment in West Pokot County
Mission
110
To facilitate efficient land management, access to adequate and affordable housing, social and physical infrastructure for the development of the
County
The subsector priorities for the plan period 2018-2022 include; fast racking the preparation of Kapenguria town integrated Development plan,
Development of a County Urban development control Bill and Construction of an Appropriate Building Technology Centre in Makutano. Other
medium term priorities for the sub-sector comprises of: completion of county spatial plan, mapping of projects, land adjudication
programmes, cadastral surveys of public land, resolution of boundary disputes, preparation of part development plans for public
institutions/offices, civic education and public sensitization on land laws and land use policies, town beautification, construction of
public toilets, street lighting, maintenances of town roads, and promoting traditional/alternative dispute resolution .
SubSector Programmes
Inventory of plots in urban No of plots identified 250 500 500 400 200 2M
areas undertaken
50KmRoad network opened No of Kms of roads maintained 10 10 10 10 10 200M
up, tarmacked and
maintained
Public toilets constructed No. of public toilets constructed 5 5 6 7 8 31M
Urban centers beautified No of trees planted 1,000 2,000 3,000 3,500 4,000 7M
Number of flower beds established 3 50 50 55 60 5M
111
dumpsites No. of dumpsites established 1 1 2 2 3 45M
developed,operationalized &
maintained
Urban drainage system for Kms of drainage system for storm 5 5 10 15 15 200M
storm water. water developed
Refuse trucks purchased No of refuse trucks purchased 1 1 1 - - 45M
Purchase 1shovel truck Shovel truck purchased 1 1 - - - 15M
Fire extinguishers No of fire extinguishers installed - 40 10 5 5 5M
purchased and installed
Purchase of fire Engines No of fire engines purchased - 1 - - 1 100M
fire station Constructed Fire station fully equipped in 1 - - - - 10M
place
112
GIS lab established GIS Lab established and - 1 - - 25M
operational
Title deeds issued` Nof of title deed issued 3,000 4,000 6,000 6,000 6,000 10M
113
Kapenguria Kapenguria Municipal No committee meetings held 12 12 12 12 12 6M
Municipality board and town
committees established
A healthy population is a key pillar for enhanced economic growth and development. It is also precursor for realization of the social
goals for Kenya Vision 2030. The Constitution guarantees the rights to adequate health care to every Kenyan. Against this background,
Health Sector in West Pokot County has strategically been positioned to fulfil the expectations of Kenyans through improved health
infrastructure countywide, service delivery systems and promoting access to universal health care.
Vision
A disease-free Community
Mission
To build a well-established progressive, responsive, affordable and sustainable technologically-driven, accessible and client-centered
health system for accelerated attainment of highest standards of health for all West Pokot residents.
The sector priorities over the plan period 2018-2022 include; the elimination of communicable conditions especially diarrheal diseases
through eradication of open defecation through the Community Led Total Sanitation program and strengthening of the preventive and
114
promotive health activities through community strategy. The focus will be on disease prevention and control through community
participation and involvement. This will entail health promotion through strategic advocacy, communication and social mobilization
(ACSM), strengthening the referral system and community strategy.
Under curative and rehabilitative health services, focus will be on improving access and quality to universal healthcare at all levels. This
will be done through provision of adequate support to all the health system components ranging from health supplies to human resources
for health, provision of administrative support and establishment of a robust monitoring and evaluation system.
The enhancement of essential services through the upgrading of the county referral hospital to level 5 and also improvement of the
Chepareria, Sigor, Kacheliba, Kabichbich sub district hospitals and Alale and Makutano hospitals will increase the range and quality of
services available to county residents, prevent avoidable deaths, costly referrals and leverage on information technology through
telemedicine and use of EMR thereby enhancing efficiency and effectiveness in service delivery. Other key components of the upgrade
include targeted trainings and the construction and equipping of ICU and the Renal Unit. The completion, equipping and
operationalization of the blood bank will further prevent avoidable morbidity, mortality and referrals.
The sector is also aware of the need to restructure infrastructure investments to target tier 3 facilities i.e. the county hospitals namely
Kapenguria County Referral Hospital, Chepareria, Sigor, Kacheliba, Kabichbich Sub district hospitals and Alale and Makutano
hospitals. The health sector is also keen to invest in tier 1 or the community level by setting up six (6) community units in each sub
county. This should provide a backbone for community health services (CHS) and a platform for building capacity of community health
volunteers (CHVs) and other key resource persons. This investment in the community strategy signals the appreciation of this level of
care as a key entry point for program implementation. Furthermore the provision of the monthly stipend will go a long way in motivating
these CHVs to be more productive. In this regard, an improvement in CHS characterized by a robust, efficient and effective community
based health information system (CBHIS), disease surveillance, and hygiene and health promotion activities is being given priority.
115
Other priorities over the plan period include; Purchase of 8 additional ambulances, recruitment and provision of incentives to specialized
health workers, ensuring timely and adequate procurement and distribution of drugs and supporting provision of universal health care
by promoting enrolment to NHIF.
HIV/AIDS 90% of the eligible population Numbers of client tested for HIV 115092 126601 139261 153187 168505 25M
prevention tested
and control Reduction of HIV related No. of eligible HIV clients on ARVs 2965 3558 4270 5124 6149 10M
mortality and new infections % HIV pregnant women receiving preventive 100 100 100 100 100 10M
ARVs
116
Youths and community No. of family planning champions trained 30 30 30 30 30 1M
family planning champions
recruited & trained
One inter-ministerial/ No. of inter-ministerial/departmental 1 0 0 0 0 0.5M
departmental coordinating coordinating committee on mainstreaming of
committee on mainstreaming population issues across the sectors
of population issues across
the sectors established
80% of youths access RH /FP No. of youths accessing information and 16 16 16 16 16 1M
information and services services on RH/FP
stakeholders and key line No. of stakeholders sensitized on RH /FP 100 100 100 100 100 1.5M
ministries sensitized on RH /
FP
key partners trained on data No. of partners trained on data collection , 100 100 100 100 100 1.5M
collection, analysis and analysis and reporting
reporting
Support county-based socio- No. of county based socio- economic studies 1 1 1 1 1 2.5M
economic studies in in population, health and environment carried
population, Health and out
environment
info sheets on population No. of info sheets on population projects 1000 1000 1000 1000 1000 1M
projects developed & developed & diseminated
diseminated
Carry out partner mapping No. of FP/RMNCAH TWGs formed 1 1 1 1 1 0.5M
For the formation of
Technical Working Groups
(TWG) in
FP/RMNCAH/PMTCT
Women of reproductive age ( Proportion of women of reproductive age 18.7 23 27 32 36 25M
15-49 years) receiving family accessing family planning services
planning services
Pregnant women receiving Proportion of pregnant women attending 4th 21.3 27 33 38 45 10M
ant natal care services ANC visit
Skilled deliveries Promotion Proportion of deliveries conducted by skilled 45.3 50.5 55.5 60 65 25M
attendants
Women accessing postnatal % of mothers attending 1st post-natal care 27 33.4 39.0 44.0 49.0 4M
services visit
Effective and efficient Proportion of newborns with low birth 448 342 297 213 190 10M
maternal child Health weights (<2500 gms)
services
117
Children 12-59 months % of children 12-59 months receiving VIT A 35.0 40 50 70 80 10M
receiving Vitamin A
supplementation twice in a year
supplement
Reduced under 5’s with % of children under 5’s stunted 33.4 30.1 26.2 19.0 14.1 15M
stunted growth % of children under 5 underweight 33.3 26.1 21.8 19.0 16.4 -
Pregnant women receiving No. of pregnant women receiving iron 16914 18901 19201 20198 21788 10M
iron supplement
folate
Children under 5 years Number of Children under 5 years attending 36675 40332 44365 48802 53682 8M
attending Child Welfare Child Welfare Clinics for growth monitoring
Clinics for growth monitoring (new cases)
(new cases)
Health Sub county Health No. of health management teams and health 102 120 - 200 - 3M
information
management teams and care workers trained on revised monitoring
program , CHMTs managers reporting tools
and 200 health care workers
trained on Revised MOH
tools
EMR sites scaled up No. of health facilities with Electronic 8 11 14 19 5M
Medical Records established.
Data collection , No. of copies of data collection and reporting 1827 2600 3100 3600 4600 10M
documentation and reporting tools printed and distributed to health
improved facilities
Health Social behavior change in No. of health messages designed distributed 10 10 10 10 10 5M
promotion health issues and disseminated
No. of stakeholders meetings held 4 4 4 4 4 2M
Radio Health Talks Air Time 48 48 48 48 48 10M
School Health Talks per ward 20 20 20 20 20 1M
No. of health advisory meetings held 4 4 4 4 4 0.9M
Scientific conference held No of Workshop/scientific conference 1 1 1 1 1 5M
118
World health days No. of world health days commemorated 8 8 8 8 8 5M
Commemorated
Community Scale up community health No. of community units established 64 70 76 12 8 15M
health services
strategy
Cancer screening done for age No. of women of reproductive age screened 103 134 230 300 450 10M
reproductive women for cervical cancer
Clients treated for diabetes No. of clients treated for diabetes 1200 1100 975 773 558 10M
Environmen Conformity with public No. of building plans vetted and approved 20 25 27 30 35 5M
tal and health standards of safety No. of premises inspected and meet 898 950 1110 1129 1135 5M
public health minimum requirements on hygienic and
sanitation
No. of households with access to safe water 85235 87900 93430 95500 99439 10M
No. of households with functional latrines 131,50 134,85 138,900 142,945 146,990 15M
5 5
No. of outlets with designated smoking zones 0 1 1 1 1 2M
Malaria Malaria and other No,. of treated nets supplied to households 10,000 10,000 10,000 10,000 10,000 40M
control communicable diseases
controlled
Epidemiolog Enhanced diseases % of health facilities supervised 50 70 80 90 95 1M
ical diseases surveillance % of suspected cases screened and 8 30 50 70 90 1.5M
control investigated promptly as per guidelines
% of health care workers trained on disease 10 20 40 50 90 10M
surveillance and response
% of premises fumigated for vector control 0 10 20 30 40 4M
119
Programme : CURATIVE SERVICES AND DEVELOPMENT
Rural health New dispensaries No. of new dispensaries constructed and 20 20 16 14 - 420M
infrastructure constructed operationalized
development New Health staff No. of health staff houses constructed 5 5 5 5 5 75M
houses constructed
Land Security No. of public hospitals with title deeds 15 95 0 0 0 2M
County Provision of No. of level 4 health facilities with X- 1 2 2 1 0 10M
Referral specialized curative rays services
Hospital diagnostic
interventions
No. of new fully equipped ambulances in 2 5 - - - 70M
the county
Trained specialized No. of health workers trained, updated on 100 100 100 100 100 5M
health personnel emergency and trauma care services skills
Human Ratio of health personel Number of Nurses recruited and retained - 200 100 50 - 84M
Resource increased in relation to
developemnt patients Number of medical doctors recruited and 2 15 40 - - 34.2M
retained
120
Number of Health Administrative Officers - 10 - 10 -
(HAOs) recruited and retained
121
4.5.6 PUBLIC ADMINISTRATION AND INTERGOVERNMENTAL RELATIONS SECTOR
This sector includes the following sub-sectors: County Public Service, Department of Finance and economic planning, office of the
Governor, Ministry of Interior and Coordination of National Government, National Police Service, National Drought Management
Authority and the County Assembly. The goals of the Public Administration and Intergovernmental Relations sector are to provide
leadership and policy direction in the governance of the county; coordinate and supervise Government affairs; Promote sound public
financial and economic management for county development; Promote policy formulation, implementation, monitoring and evaluation;
and promote efficient and effective human resource management and development for improved Public Service delivery; Promote
accountability and efficient utilization of public resources.
Sector Vision
A leading sector in public policy formulation, implementation, coordination, supervision and prudent resource management
Sector Mission
To provide overall leadership and policy direction in resource mobilization, management and accountability for quality public service
delivery
122
community security early warning system,Construction of more security posts with adequate personnel and Implementation of joint
projects with neighbouring communities.
Under county public service management, the priorities for the plan period 2018-2022 include;provision of adequate office space,furniture
and office equipment for all its staff,introduce performance management systems, developing a strong, effective and efficient
administrative system across the county through procurement of office equipment and staff uniforms, conduct staff education and
training for effective service delivery in all county departments, strenghening civic education and promote public participation to achieve
an informed citizenry.Other priorities are Development of policies ( HR Manual Policy, Code of Regulations, Skills Inventory
Framework, Discipline Procedure Manual, Schemes of Service),Staff Promotion, Welfare and Motivation, training of county
government security personnel, provision of security equipment, vehicles and motorcycles,provision of ICT equipment and software
and ICT staff trainings.
Finance and Economic Planning subsector needs additional technical staffs for procurement and accounts section and trainings to
improve staff capacity to enable it deliver on its mandate. There is also need to promote private investments in order to address the
challenge of low investment and underdevelopment in the county.The priorities for the sub-sector during the plan period 2018-202
include; providing leadership & technical backstopping to county departments in the development of the sectoral plans, ensuring
efficient internal resource mobilization through , effective and equitable public spending through , strengthening internal revenue and
internal staff capacity through training and promotions, strengthening monitoring and evaluation through capacity building and
implementing the equity pillar of new government Manifesto. The sector priority also include providing leadership in the mainstreaming
and implementation of sustainable development goals, climate change adaptation and mitigation measures, gender and persons with
disability concerns at the county level.
The strategic direction during the plan period for disaster risk management will include: mainstreaming of disaster risk reduction into
county policies, plans, budgets and programs, strengthening institutional framework for disaster management through staff recruitment
123
and capacity building, improving disaster early warning communication , building partnerships with stakeholders, strengthening support
to County Steering Groups, county contingency planning and ending drought emergency (EDE) framework in line with MTP III and
Sendai Framework.
Disaster Risk Disaster Approved - Establish County -Hold -Hold -Engage -Completed 5M
Reduction management disaster disaster risk capacity consultative partner on all the Risk
and plan management management policy building meetings DRM policy management
Management plan -Carry out county meeting and with implementation, programs
hazard mapping and worship and stakeholders on DRR, and
Risk analysis seminars and Resilience and evaluation
communities livelihood of the
exposed to programmes
hazards
Drought Updated Train 600 Train 600 Tran 600 Train 600 Train 600 5M
contingency Drought community member community community community community
plan contingency for 6 Ward on member for 5 member for member for 3 member for 2
plan drought Ward on 4 Ward on Ward on Ward on
contingency plan drought drought drought drought
contingency contingency contingency contingency
plan plan plan plan
126
and County supported by county and county and in county and county and
Disaster directorate sub-county sub-county sub-county sub-county
management
committee
127
Programme; West Pokot Security and Peace building Integrated Development Programme
Objective; To promote peace and coexistence among communities living along the borders of Pokot ,Turkana, marakwet ,Tugen , Sebei and Karamonjaong of Uganda
Outcome; Peaceful coexistence among the border communities
Sub programme Key Outcome Key performance Planned Targets
Indicators
Objective:To develop, sustain and safeguard a transparent and accountable system for the management of public finances
Outcome: A transparent and accountable public finance management system for accelerated community socio-economic transformation.
Percentage increase in 10 15 30 35 45 -
revenue collected
130
Supply Chain Consolidated County 1 No. of consolidated 1 1 1 1 1 5M
Management Services procurement plan procurement plans prepared
and approved
Sensitization forums held No. of Women, PWDs 100 110 130 150 200 3M
on access to public trained on access to public
procurement opportunities procurement opportunities
(affirmative action policy)
(affirmative action policy)
Percentage reservations of 30 34 38 39 40 -
the county procurement to
youth, women and People
With Disabilities led
Enterprises
110 Officers No. of officers Train 30 Train 25 Train 20 officers Train 20 officers Train 15 officers 17M
trained on trained on Senior officers on officers on on senior on senior on senior
senior management senior senior management management management
management management management
75 officers No. of officers Train 15 Train 15 Train 15 officers Train 15 officers Train 15 officers 12M
trained on trained on officers on officers on on strategic on strategic on strategic
strategic strategic strategic strategic leadership leadership leadership
leadership leadership leadership leadership development development development
development development development programme programme programme programme
programme programme programme
Public and Public Service Hold 1 Public Hold 1 Hold 1 Public Hold 1 Public Hold 1 Public 10M
county staff week Service Week Public Service Week Service Week Service Week
partipate in Service
public Week
service week
Departmental Office Block 1 70M
office block constructed
ICT Services Public and ICT Innovative Hold 1 ICT Hold 1 ICT Hold 1 ICT Hold 1 ICT Hold 1 ICT 10M
county staff week Innovation Innovation Innovation week Innovation week Innovation week
participate in week week
ICT
Innovative
week
Outcome; Improved staff and community members capacity on the devolved system of government and their rights.
132
Sub programme Key Key Planned Targets
Outcome performance
Indicators
Year 1 Year 2 Year 3 Year 4 Year 5 Budget
Devolved Hold civic No. of civic Hold 4 civic education Hold 4 civic Hold 4 civic Hold 4 civic Hold 4 civic 20M
/Decentralized education education forums forums per year per ward education education education forums education
services forums per held per year per forums per year forums per per year per ward forums per
year per ward ward per ward year per ward year per ward
Hold public No. of public Hold 4 public Hold 4 public Hold 4 public Hold 4 public Hold 4 public 20M
participation participation participation on forums participation on participation participation on participation
on forums on forums on on service delivery per forum s service on forum forum service on forum
service service delivery year per ward delivery per service delivery per ward service
delivery per per year per ward delivery per delivery per
year per ward ward ward ward
133
Sub sector Mission.
To provide reliable infrastructure through construction,rehabilitation of roads, bridges and offer quality technicalservices for sustainable
socio- economic development.
Sector Programmes
Roads development New roads opened kilometers of new 900km of new 600km 300km of new 200km of new 100km of 500M
up roads opened up roads opened up of new roads roads opened roads opened new roads
opened opened
Road graded/ Kms of road graded/ 350Kms of road 390 Kms of road 410Kms of 430Kms of 220Kms of 580M
murramed/ gravelled murramed/graveled graded/ graded/ road graded/ road graded/ road
murramed/grave murramed/gravel murramed/grav murramed/grav graded/
lled led elled elled murramed/
gravelled
County roads kilometers of road 2000km 1200km 1200km 1200km 1200km 300M
maintained/ maintained
Rehabilitated
County roads kilometers of road 40kilometers of 45kilometers of 50kilometers 50kilometers of 70kilomete 1.83B
tarmacked tarmacked road tarmacked road tarmacked of road road tarmacked rs of road
tarmacked tarmacked
134
Boda boda riders No. of Boda boda 100 135 150 168 190 2.5M
trained on road use riders trained on road
&safety use & safety
Public Works Major bridges No. of Major bridges 1 2 1 1 1 100M
constructed constructed
Footbridges Construction of foot - 4 4 4 0 60M
constructed bridge
Transport Road construction Equipment purchased - 3 motor graders 2 tippers, 1 2 lorries, 1 1 tractor 329M
plant and equipment and 1 excavater dozer and excavator,1
1grader roller,1 water
tanker
135
4.5.8 SOCIAL PROTECTION, CULTURE & RECREATION SECTOR
Vision
To be a leader in nurturing diversity, empowered and responsible youth, inclusive and sustainable development for all
Mission
To maximize the full potential of the youth through participatory engagements that serves their needs and aspirations in building a better
Kenya, increase the contribution of tourism in the development of the county as well as promote women empowerment and culture.
There is also need to develop the sector plan for the department. The sector priorities in the plan period 2018-2022 include: completion
and operationalization of the ongoing projects ,ensuring gender equity in county appointments and promotions is considered,
136
empowerment of PLWDs, gender, youth and disability mainstreaming in county policies, programs and projects, marketing women
cottage industries products such as Pokot traditional ornaments, bracelets and clothing, develop the youth talents through sports and
cultural exhibition, document and market the Pokot culture and cultural artifacts, Liquor licensing and sensitization on the dangers of
drugs and substance abuse.
137
Objective; To co-ordinate, review and implement gender and social development policies as well as promote youth development by designing policies and programmes that
build young people’s capacity
Outcome; An informed society on gender issues and empowered youth
Sub programme Key outputs Key performance Planned Targets
Indicators
Year 1 Year 2 Year 3 Year 4 Year 5 Budget
Social protection County Social Protection No of Cash transfer 400 600 750 1,000 1,200 15M
&Gender Fund established beneficiaries(Widows)
mainstreaming. No of Cash transfer 150 180 200 350 520 5M
beneficiaries(Orphans)
No of Cash transfer 350 500 600 700 1,000 10M
beneficiaries(Old people)
An informed citizenry on No. of training, campaigns, 20 20 20 20 103 15M
gender issues sensitizations.
PWDs assisted with support No. of PWDs assisted with 250 300 350 400 500 40M
devices support devices
Youth Youth Empowerment centres No of New Youth Empowerment 1 1 1 1 1 10M
Empowerment Equipped and Centres operationalized
Operationalized
No of youth hosted per year per 1,000 5,000 1,0000 15,000 10,000 20M
YEC
Youth exhibitions and Trade No. of trade fairs held 1 1 1 1 1 4M
Fairs held
No. of Youth groups exhibiting 40 50 60 80 100 -
their skills and wares
Youth trained on No of youth trained 200 500 700 900 1,200 5M
entrepreneurial skills
Youth Empowerment No. of youth beneficiaries - 500 700 1000 1500 70M
Fund(YEF) established
No. of sensitization forums held 1 4 4 4 4 5M
138
County Community No. of citizens engaged under 3,600 4,000 5,000 5,500 6,000 500M
Services(CCS) Programme CCS per year
established
No. of sensitization forums held 20 20 20 20 20 3M
Objective: To improve heritage and culture awareness, knowledge, appreciation and conservation
Outcome: Preserved Cultural Heritage for County’s Prosperity and Posterity
Sub programme Key outputs Key performance Planned Targets
Indicators
139
Development and Cultural artefacts No. of cultural artefacts 50 100 100 100 100 5M
Promotion of preserved. preserved.
Culture. Mapping and No. of troupes - 50 50 50 50 1M
registration of registered.
organized
traditional dancers’
troupes.
Artists supported No. Of active artists 10 10 10 10 10 10M
supported
Pokot Annual No of participants 800 1500 2500 4500 10000 100M
Cultural Week
No of exhibitions 10 25 30 35 45 -
registered or entered
Programme Name Sector Cross-Sector Impact Measures to Harness or mitigate the impact
Synergies Adverse impact
Water and sanitation Department of water Spread of communicable ● Provision of safe water
and Environment diseases ● Proper waste disposal
● Functional sewer systems and timely repair of leakages
● Enforcement of hygienic laws
Food and Nutrition Agriculture, social, Poor nutrition due to poverty ● School feeding programs
cultural and ● Expand kitchen garden program for affordable local
Education growth foods
Sexual Gender Based Education, social, High rate of unreported cases ● Gender empowerment
Violence culture and law of Sexual Gender Based ● Creation of awareness on Sexual Gender Based
enforcement agencies Violence Violence and available shelters.
● Empower children on laws rights
● Linkage of sexual Gender Based Violence survivors to
health and legal services
140
● Improve on Gender mainstreaming policy guidelines
for workplaces
Adolescent and school Education , Social and School Health ● Train students on age appropriate sexual education
Health culture ● Screening for Non –Communicable diseases
● Nutrient supplementation and deworming programs
Infrastructure Finance , Public Incomplete health projects, in ● Renovation and repair, paining
works , planning and adequate space for services ● Improve road networks especially in informal
Roads provision, poor road settlements to enable access to for ambulance services
networks hindering ● Completion of existing/stalled projects.
ambulance services
Human Resource Health County public service Demotivated staff due to ● Scheme of service/harmonized remuneration and
Board and Finance delayed promotions and benefit schemes
salaries ● Promotions and resignation to be implemented or
effected
● Consider management teams for government approved
courses-kenya school of Government
● Recruit health care workers in all cadres considering
their need.
Emergency and Referral Finance and Fire Inadequate ambulance ● Set up an emergency response funds.
department services ● Improve collaboration with fire and disaster
management unit
● Strengthen the disaster management unit
County policy , Health County Assembly and Health Bills and Act not ● Provide technical support
Bills and Acts Legal department completed ● Advocacy to MCAs
141
5.0 CHAPTER FIVE: IMPLEMENTATION FRAMEWORK
5.1 Introduction
This chapter identifies and examines the various institutions and structures put in place to
facilitate implementation of this plan, resource requirement and mobilization strategies,
estimated resources gap and measures for addressing it.It also seeks to inform and guide the
County government efforts towards sustainable financing of its programmes and operations.
The chapter also contains a snapshot of the resources that are available for capital projects in
order to attain citizen socioeconomic transformation. It also outlines the strategies for raising
revenue and their projections for the plan period. It reviews funding sources, provides guiding
principles, and proposes strategies for mobilizing resources to support the implementation of
the integrated Plan and the ultimate fulfillment of its vision and mission.
Article 185 of the Constitution 2010 states that the County Government shall consist of a
County Assembly and a County Executive. The roles of these institutions are critical to the
implementation of this plan. The organizational structure for West Pokot county government
is shown below;
142
5.2.1 The County Executive Committee
The County Executive Committee has been established vide Article 176 (1) of the Constitution
2010. The County Executive comprise of the Governor and the County Executive Members,
will be providing a lead role in shaping the strategies and policies to be implemented in a yearly
basis.
The County government has the following ten executive offices; Education and Technical
Training; Agriculture, Irrigation and Pastoral Economy; Finance and Economic Planning;
Public Service,ICT & Decentralized Units; Water, Environment and Natural resources;
Youths,Sports,Tourism,Gender and Social Services; Trade, Industrialization,Investments &
Cooperative Development; Health, Sanitation and Emergency Services; Roads, Public Works,
Transport and Infrastructure; and Lands,Housing, Physical Planning and Urban Development.
In summary, the County Executive role in the Plan implementation will be to;
143
1. provide leadership in the county’s development agenda in setting the overall goal,
mission and vision of the County;
2. Facilitate the coordination and alignment of integrated development plan with other
county plans, strategies and programmes of national and county governments;
3. monitor the process of planning, formulation, adoption and review of the integrated
development plan by relevant county units;
4. facilitate approval of the county plan and submit it to the county assembly for approval;
5. supervise the implementation, administration and delivery of services in the county and
all decentralized units and agencies in the county as per the dictates of the plan;
6. submit to the county assembly an annual report on the implementation status of the
county plan;
7. Take appropriate steps to resolve any disputes or differences in connection with the
planning, formulation, adoption or review of an integrated development plan.
5.2.2 The County Assembly
In line with the Constitution and the County Government Act, the County Assembly will responsible
for approval of the Plan, monitoring its implementation and funding through its oversight role to the
County Executive as well approving the county budget/expenditures. The County Assembly also has a
role in approving the borrowing and overall debt management that is supposed to finance any budget
deficit for development programmes. Therefore, this organ is crucial in ensuring that the executive is
effective and resources are used efficiently.
144
a) Preparation of county plans, the County Fiscal Strategy Paper and the Budget Review
and Outlook Paper for the county; and
b) Matters relating to budgeting, the economy and financial management at the county
level.
The village will be the lowest level of decentralizing the county activities. Each village will
establish a village council which will coordinating the participation of the respective village in
governance of the county, monitor implementation of policies at village level and advising the
ward as well as sub county administrator in matters relating to that village.
To facilitate decentralization, democracy and good governance in the county, the following
sub-structures have been put in place to ensure popular participation in the development and
county governance processes. The table below provides detailed information on the sub
structures;
145
Name of Sub county Name of Wards Name of No. of
Headquarters Headquarters Villages
(Sub-county) (Ward)
Kapenguria Sub county Kapenguria Riwo Kitelakapel 6
Kapenguria Kapenguria 5
Mnagei Kishaunet 5
Siyoi Siyoi 5
Endugh Ptoyo 5
Sook Tamugh 5
Sigor Sigor Sekerr Chepkondol 5
Masool Tikit 5
Lomut Lomut 5
Weiwei Sigor 5
Kacheliba Alale Suam Kacheliba 5
Kodich Kodich 5
Kasei Kasei 5
Kapchok Konyao 5
Kiwawa Kiwawa 5
Alale Amakuriat 6
Pokot South Kabichbich Chepareria Chepareria 6
Batei Ortum 5
Lelan Kabichbich 5
Tapach Tapach 5
Total 20 103
This Act also calls for promotion of equality and equity in service delivery, consultation and
cooperation and promotion of accountability in decision making. The criteria for transferring
146
powers, functions and competencies between the two levels of governments have also been
provided by this Act. Dispute resolution mechanisms are also provided.
This county intergovernmental forum will strive to harmonize all the services rendered in the
county by the two governments. It will also be coordinate development activities and
intergovernmental functions in the county.
• Share information on the existing development partners working within the county.
• Integrating National plans and other national goals into the county plans;
• Building a spatial database system for projects/programs within the county using GIS.
• Collection, collation, storage and updating of data and information suitable for the
planning process.
147
• Prepare and market investment profiles to different stakeholders.
Monitoring aims to provide managers, decision makers and other stakeholders with regular feedback on
progress in implementation of activities specified in the development plans. Evaluation informs whether
whether project/programme activities are moving toward, or away from project/programme objective
or management goals, and why. It provides lessons learnt and recommendations for future improvement.
Monitoring and Evaluation thus helps in providing data on program progress and effectiveness,
helps keep the implementation process on track and identify and resolve implementation
problems of the CIDP.
148
5.3 Amendment of the Plan
The County Government Act (2012) outlines steps to be taken in order to amend this Plan. The
proposal to amend the Plan shall be undertaken by the County Executive committee by a
resolution. The amendment will then be subjected to the County Assembly for approval or
rejection. A proposal to emend the Plan will be supported by a memorandum explaining the
reasons for the proposal. In amending the Plan, the county governments as well as urban
centres to be affected by the proposal, shall be consulted. For the amendment to be considered
by the county assembly, all the members will have been given adequate notice. The proposed
amendment will also be published for public comment for a period not less than three weeks.
This is to allow the public an opportunity to provide input on the said proposal.
In order to implement the Plan effectively, a robust framework for resource mobilization is
needed. There is need for the county government to diversify its resource base. The
diversification should consider various types of investments, donor sources and conditions they
attach to the funding so as to reduce the risk of losing funding. This plan lists several resource
mobilization strategies, ranging from long-term, short term, new and potential revenue sources
and donors that could potentially enhance funding to the county government priorities.
Equitable Share
This shall be the main source of revenue for the county government of West Pokot for financing
both recurrent and development expenditure. It is the equitable share of the revenue raised
nationally that is allocated to county governments. It is expected that Ksh 30.2 billion revenue
will be realized over the plan period from this allocation.
149
Equalization fund
This fund is allocated to specific counties to improve the basic infrastructure services in those
areas and regions categorized as marginalized. It finances basic services including water, roads,
health facilities and electricity to marginalized areas to the extent necessary to bring the quality
of those services in those areas to the level generally enjoyed by the rest of the nation. This will
fund a significant proportion of the identified priority projects. This fund will generate an
estimate of Ksh 1.5 billion over the plan period for project financing.
Internal revenue is all money derived by or on behalf of the county government from levies,
rates, fees, charges or any other source as authorized by the Constitution or an Act of
Parliament. The county government will expand its revenue base by sealing existing leakages
and loopholes in the collection and administration of internal revenue, revenue automation,
strengthening enforcement unit and collection of land rates.
It will also explore investments in housing, tourism, mining, agriculture and livestock
subsectors. The county will also boost road infrastructure, provide an enabling business
environment to improve trade and economic integration as an indirect means of boosting
revenue generation for the county.
The county government will also promote private investments by providing an enabling
environment. This will accelerate socioeconomic development and boost revenue generation.
A revenue forecast of Ksh 779 million is expected and the revenue generated would support
priority programmes and projects identified for implementation over the plan period.
The county government will take loans within and outside Kenya mainly to finance capital
projects. This will be done with the approval of the County Assembly and guarantees from the
national government. While raising these loans either for cash management purposes or for
project financing, it will ensure that the loans, the terms and conditions for the loan are set out
150
in writing and are in accordance with; Article 212 of the Constitution, Sections 58 and 142 of
the public finance management act (2012), the fiscal responsibility principles and the financial
objectives of the county government set out in its most recent County Fiscal Strategy Paper and
the debt management strategy of the county government over the medium term.
In borrowing money, the county government will also ensure that it’s financing needs and
payment obligations are met at the lowest possible cost in the market that is consistent with a
prudent degree of risk, while ensuring that the overall level of public debt is sustainable.
This comprise voluntary contributions/grants to finance the priority projects and programmes
of West Pokot County by governments, UN Agencies, Multi-Donor Trust Funds, Inter-
Governmental Organizations, International Financial Institutions (IFIs) and private donors,
including private sector entities and foundations.
Funds received in the form of grants or donations from development partners/donors will only
be spent in accordance with Articles 221 and 223 of the Constitution. Regulations approved by
Parliament provides for the administration, control and management of grants, including;
a) Procedures to ensure that grants are spent on the basis of the integrated national
development plan;
c) Requiring that grants be used only to finance programmes within the integrated
development plan;
e) Requiring specific terms and conditions in agreements to which grant recipients are
subjected;
f) Procedures for the budgeting, financial management, accounting and reporting of grants
by grants recipients;
151
g) Procedures under which a third party may be authorized to receive, control or pay public
money as a grant; and
h) Measures to ensure that a third party authorized to receive control or pay public money
as a grant, or responsible for any other aspect of administration of a grant, is subject to
the same obligations as a public officer.
The county government will support its service departments on proposal development
initiatives with the aim of securing development support from donors. It will also ensure public
participation, transparency and accountability in the utilization of donor funds.
This is an arrangement between a contracting authority (county government) and a private party
under which a private party
-Charges or fees collected by the private party from users or consumers of a service
provided to them; or
-Is generally liable for risks arising from the performance of the function in accordance
with the terms of the project agreement
Public private partnerships provide for the participation of the private sector in the financing,
construction, development, operation, or maintenance of capital intensive infrastructure or
development projects of the government through concessions and other contractual
arrangements.
152
Particular interest will be put on Build and Transfer (BoT) model where the County will build
infrastructural projects and transfer the running of the institutions to other interested parties but
within some agreed principles and agreements.
This includes the constituency development fund, social protection fund, women fund,
HIV/AIDS fund, youth fund, uwezo fund among others. These funds will finance a significant
proportion of the priority projects identified for implementation. They will also finance
economic empowerment group projects. All these grants will play an important role in socio
economic empowerment of the community.
Corporate companies will continue to offer support in the areas of health, education,
environment, entrepreneurship, water and sanitation, welfare and sports. The county
government believes corporate institutions in west Pokot and other areas will continue to be a
caring partner for all our communities, and at branch levels this will be exhibited through their
support for a number of local needy institutions, school events, charity walks and sponsorship
towards deserving causes.
To implement this plan, the total amount required as per each sector is shown in the table below;
Table 14: Summary of Proposed Budget by Sector
4. Health Sector
153
Public Administration and Intergovermental Relations
6.
sector 1.13B
Total
Type of
2018/19 2019/20 2020/21 2021/22 2022/23 Total
Revenue
a)Internal
122,370,188.60 134,607,207.46 148,067,928.21 170,278,117.44 204,333,740.92 779,657,182.63
revenue
b)Equitable 5,120,712,000.0 5,530,368,960.0 5,972,798,476.8 6,510,350,339.7 30,230,511,646.8
7,096,281,870.29
share 0 0 0 1 0
c)Conditional
235,324,840.57 242,384,585.79 254,503,815.08 279,954,196.58 321,947,326.07 1,334,114,764.09
grants
d)Equalization
250,325,695.00 270,351,750.60 291,979,890.65 315,338,281.90 346,872,110.09 1,474,867,728.24
fund
e)Developmen
t Partners 150,000,000.00 195,050,890 252,900,500 300,000,100 519,069,720 1,417,021,210.00
f)National
Gov't
Decentralized 1,125,235,080.0
Funds 0 1,181,496,834 1,299,646,517 1,494,593,495 1,569,323,170 6,670,295,096.17
g) Other
sources 0 0 34,980,000 50,000,000 59,890,050 144,870,050.00
(Borrowings)
7,003,967,804.1 7,554,260,227.8 8,254,877,128.1 9,120,514,530.6 10,117,717,987.1 42,051,337,677.9
Total
7 5 4 4 3 3
154
5.4.3 Estimated Resource Gap and Measures of Addressing It
Over the plan period, the county is expected to spend Kshs 30 billion from the county equitable
share, 1.3 billion from conditional allocations, Kshs 779 million from internal revenue, Kshs
1.5 billion from equalization fund and an estimated Ksh 144.8million from other sources.
The total projected resource requirement to implement the plan as shown in the table is
KShs……. .The resource gap is estimated at Ksh…………
To finance the deficit, other development partners will be rallied to support the implementation
of some of the development programmes and projects in the CIDP.The following priorities will
be pursued by the county government during the plan period to support mobilization of external
resources:
• Develop resource mobilization policy framework to strenthern coordination of donor
funding in the county;
• Build the capacity of county departments in proposal development for funding;
• Develop county resource mobilization strategy
• Carry out donor mapping and strengthen monitoring, evaluation, accounting and
reporting of donor funds.
155
CHAPTER SIX: MONITORING AND EVALUATION FRAMEWORK
6.1 Introduction
This chapter seeks to outline the Monitoring and Evaluation institutional arrangements that will
track and report on CIDP implementation progress. The section describes county monitoring
and evaluation structure, data collection analysis, reporting and information sharing.
The County framework and procedures on Monitoring and Evaluation shall apply to all
programmes and projects supported by the County Government,non–state actors and the
National government projects implemented within the county. The County Monitoring and
Evaluation System will feed into the National Integrated Monitoring and Evaluation (NIMES)
to track the national goals and Vision.
156
The county M&E framework establishes six (6) M&E committees for proper functioning of
M&E at all level in the County administrative structures. The following are the committees
which will make the system operational;
County M&E Committee (CoMEC); This Committee shall be chaired by Chief Officer for
Economic Planning. Members shall be the Chief Officers, representatives from national
government and Non-governmental actors at the county level. The M&E unit shall provide
secretariat.
Technical Oversight Committee (TOC); this committee shall be Co- chaired by; Chief
Officer, Economic Planning and County Commissioner. Members comprise of County
Directors for County government Departments, Heads of Departments from the National
Government at the county level and one representative from the Non State Actors. The M&E
unit shall provide secretariat.
Ministerial M&E Committees (MMEC);All the county departments shall have M&E
Committee that will spearhead M&E activities within the department.The Committee will be
chaired by Chief Officer .Membersare directors within the department, department sub-county
heads, national government directors and non- state actors’ representatives in the sector.
Sub County M&E Committee (SMEC);Sub- County M&E committees shall be Co- Chaired
by Sub-County Administrator and Deputy County Commissioner .Membership shall comprise
of all Sub-County Departmental Heads, ward administrators and non- state actors operating
within the sub-county
Ward M&E Committee (WMEC); the committee shall be Co-Chaired by Ward
Administrator, and Assistant County Commissioner. Members comprise of all departmental
officers in the Ward, village administrator, Chiefs and assistant chief and non- state actors.
Village M&E Committee (VMEC);The committee shall be chaired by village administrator
and members will comprise all Departmental Officers in the village, assistant chief and Non-
state actors operating within the village.
The M&E committee at each level shall ensure continuous tracking of policies, programmes
and projects and ensure accurate flow of information on implementation progress to inform
decision making. The county M&E unit will take a lead role in coordinating the county M&E
committees and ensuring for regular monitoring and reporting during the implementation
period.
157
6.3 Data collection, Analysis, and Reporting
Monitoring and evaluation will be done using the expected outcomes, indicators, and targets
for gauging performance instruments outlined inTable 16.Data will be collected and analysed
on the progress of projects/programmes implementation of CIDP in coordination of county
M&E unit and County M&E committees, data collection instruments will be developed to
capture the outputs and outcomes indicated in the implementation framework.
The plan will be subjected to two evaluations; Mid-term evaluation and review and final
evaluation. The Mid-term evaluation and review will be conducted at the third year of
implementation; to assess how the plan is meeting its objectives and implementation timelines,
identify and document key lessons learnt and best practices that can be adopted and also to give
recommendation on ways of addressing identified gaps and advise on possible areas to be
changed for the remaining Plan period. Final evaluation will be conducted at the end of the
project to establish the extent to which the CIDP has realized the planned objectives and
expected results outcomes.
Reporting
The report will outline projected targets, achievements, and challenges. The report will be
prepared by County Monitoring and evaluation unit in collaboration with M&E committee at
all levels, which will be submitted to county M&E committee for consideration and adoption
by county executive.
Information sharing and reporting will be key in assessing implementation of CIDP. Various
M&E committees will be meeting quarterly to share progress implementation and report
emerging challenges.The validated reports adopted by the executives will be submitted to
County Assembly to inform progress on CountyCIDP implementation. The adopted reports on
implementation status will be made available quarterly and annually through various
dissemination forums and through the county website.
158
6.4 M&E Outcome Indicators
This section provides the monitoring and evaluation of outcome Indicators by sector. This will allow
implementers and decision-makers alike to assess progress towards the achievement of county
development priorities.
Table 16: Summary of M&E Outcome Indicators
159
Sector Program Outcome Baseli Source of Reporting Situatio Mid- End-
me indicators ne Data Responsi n in term term
bility 2018 Targe Targe
t t
(2020 (2022
) )
Environ Water No. of households 8,910 Departmenta Department 8,910 9,110 12,910
mental Resources with access to piped l annual of Water
Protecti Manageme water Report
on,Wat nt
er & Departmenta
Natural No. of households 93,240 l annual Department 93,240 105,24 130,24
Resourc with access to a Report of Water 0 0
es clean, safe and
reliable source of
drinking water
Departmenta
No. of households 0 l annual Department 0 2,200 5,000
connected to Report of Water
sewerage system
No. of Trees
seedlings planted
Acreage of land
Land reclaimed under
Reclamatio crop ,trees, and
n pasture production
160
Transition rates to 90% Departmenta Chief 90% 95% 98%
Pry schools l monthly Officer
report
Primary Enrolment
Education
Completion rate
Transition rates to
secondary schools
Secondary Enrolment
Education
Completion rates
Adult enrolment(No)
Nurse: Population
ratio
161
Health Doctor: Population
Services ratio
162
% of mothers 17.4 DHIS2 County 17.4 27.2 37.4
attending 1st post- HMIS
natal care visit
Road and
Energy, Transport Km of New roads 1,566 Department Public 1,566 3,366 3,666
Infrastr Infrastruct Constructed al Annual works,
ucture ure report transport
& ICT Developm and
ent infrastructu
re
163
Km of Roads 1915 Department Public 1915 3415 3966
Maintained al Annual works,
report transport
and
infrastructu
re
Km of Roads
Tarmacked
% Electricity
Energy Connections to
households
% Connections to
pry schools
% Connections to
Sec. schools
% Connections to
Health facilities
% Connections to
markets
No. of Wind energy
Installations
No. of Solar
installations
No. of Energy
Saving Jikos
distributed to
households
No. of Title deeds
Lands and issued
urban
developme
nt
Percentage of titles
issued to Women led
households/Women
Acreage of Irrigation
Agricul schemes established
ture Tonnes of Maize
,Rural Produced annualy
&
Urban Tonnes of Beans
Develo Produced
pment
Tonnes of Irish potatoes
Produced
164
Tonnes of Pyrethrum
Produced
Tonnes of Cassava
Produced
Tonnes of Sorghum
Produced
Tonnes of Mangoes
produced
Tonnes of Passion
fruits produced
County
Public Policy & % County Poverty 68.7 Economic 68.7
adminis Planning level Surveys
tration County Proportion of gender
& Policy & representation in the
Intergo Planning County Assembly &
vernme County Executive
ntal Committee
Relatio County Proportion of gender
ns Policy & representation in
Planning recruitment and
promotions
County Proportion of gender
Policy & representation in
Planning recruitment and
promotions at Job
group P and above
Public % Development
Finance expenditure
Manageme allocation
nt % change in
internal Revenue
collected
% Reservations of
the county
procurement to
youth, women and
People With
Disabilities led
Enterprises
165
166
ANNEX I: SECTOR PROJECTS DERIVED FROM PROGRAMMES
Sector: Education
Sub-sector: Education and Technical Training
Table 17: New Project Proposals
Project Objective Target Key Cost (Kshs.) Source of Timeframe Implementing Remark
Name/location Description of funding Agency
Activities
Construction -To improve the Completion of -Preparation of 4,000,000.00 County 2017-2018 Department of
Renovation / physical image of the renovation BQs Government of Education and
rehabilitation of the VTC works -Renovation West Pokot Technical Training
Ortum VTC (Hostel works
and workshop)
Renovation / -To improve the Completion of -Preparation of 2,000,000.00 County 2017-2018 Department of
rehabilitation of physical image of the renovation BQs Government of Education and
Chepareria VTC the VTC works -Renovation West Pokot Technical Training
(Kitchen and CJ works
workshop)
Renovation / -To improve the Completion of -Preparation of 2,500,000.00 County 2017-2018 Department of
rehabilitation of physical image of the renovation BQs Government of Education and
Sigor VTC (Hostel the VTC works -Renovation West Pokot Technical Training
and Toilets) works
Completion / -To improve the Completion / -Preparation of 3,000,000.00 County 2017-2018 Department of
Construction of physical image of Construction BQs Government of Education and
stalled 3-Twin the VTC and of the renovation -Renovation West Pokot Technical Training
workshop block at hence increase works works
Kodich VTC access, retention
and completion
rates
Construction of a -To improve the Construction and -Preparation of 4,049,000.00 County 2017-2019 Department of
multi-purpose hall physical image of Completion BQs Government of Education and
at Kapenguria VTC the VTC and of the multi- -Construction West Pokot Technical Training
(Dinning hall and hence increase purpose hall works
Kitchen access, retention
and completion
rates
167
Construction of a -To improve the Construction and -Preparation of 2,000,071.00 County 2017-2018 Department of
girls hostel at Sina physical image of Completion BQs Government of Education and
VTC the VTC and of the girls’ -Construction West Pokot Technical Training
hence increase hostel works
access, retention
and completion
rates
Upgrading of To provide Upgrade power -Preparation of 4,000,000.00 County 2017-2022 Department of
electricity power adequate electric supply in 3 No. BQs Government of Education and
supply from single power supply to VTCs -Procurement West Pokot Technical Training
phase to 3-phase run heavy (Kapenguria, and award of
supply machinery and Chepareria, and project works
equipment foe Ortum) -Supervision of
effective training works
Construction of -To improve the Construction and -Preparation of 4,000,000.00 County 2017-2018 Department of
Alale VTC (Admin. physical image of Completion BQs Government of Education and
Block and three the VTC and of Alale VTC -Construction West Pokot Technical Training
classrooms) hence increase works
access, retention
and completion
rates
Construction of -To improve the Construction and -Preparation of 4,000,000.00 County 2017-2018 Department of
Endough VTC physical image of Completion BQs Government of Education and
(Admin. Block and the VTC and of Endugh VTC -Construction West Pokot Technical Training
three classrooms) hence increase works
access, retention
and completion
rates
Construction of -To improve the Construction and -Preparation of 4,000,000.00 County 2017-2018 Department of
Totum VTC physical image of Completion BQs Government of Education and
(Admin. Block and the VTC and of Totum VTC -Construction West Pokot Technical Training
three classrooms) hence increase works
access, retention
and completion
rates
Sector: Environmental Protection, Water and Natural Resources
Sub-sector: Water, Environment and Natural resources
Project ID Objective Target Cost (Kshs.) Timeframe Remark
168
Project Name Project Key Description of Source of Implementing
Location Activities funding Agency
(Ward)
DRILLING, EQUIPING, REPAIR AND UPGRADE OF BOREHOLES
Water resource Countywide To guide in All Carry out GPS 5,000,000 National/ 2018-2022 Water
mapping new project boreholes, location and produce County Department
allocation sand dams, an inventory map Govt/ CDF,
water pans, Donors
gravity NGOs/FBOs
schemes
Management, Countywide To ensure 100 Water Carry out training to 10,000,000 National/ 2018-2022 Water
operations and sustainability management community County Department
Maintenance of new of water committees, management Govt/ CDF,
and existing water project 10 staffs committees on issues Donors
systems affecting sustainability NGOs/FBOs
Carry out staff training
on use of modern
survey and design
equipment
Construction of County and To ensure All sub- Carry out design, 100,000,000 National/ 2018-2022 Water
Office Block Sub-County work counties tendering and County Department
HQS efficiency of construction Govt/ CDF,
the staff Donors
NGOs/FBOs
GRAVITY SCHEMES
Rehabilitation of Suam To supply 5,000 Drill 2 boreholes, 10,000,000 National/ 2018-2022 Water
Kacheliba Water the residents households Equipping of borehole county Department
Project with safe, with electricity mains, Govt/ CDF,
clean and pipeline extension and Donors
reliable repairs, minor NGOs/FBOs
drinking rehabilitation of
water existing tanks and
construction of 3 more
water kiosks
Lopirchich gravity Alale To supply 50 Survey, design and 5,000,000 National/ 2018-2022 Water
water the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
169
drinking
water
Munarer, Amachar Alale To supply 60 Survey, design and 4,500,000 National/ 2018-2022 Water
gravity water the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
drinking
water
Kochomil water Alale To supply 35 Survey, design and 4,000,000 National/ 2018-2022 Water
supply the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
drinking
water
Lengorok-Oron Alale To supply 50 Survey, design and 4,200,000 National/ 2018-2022 Water
water supply the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
drinking
water
Chepluch gravity Alale To supply 50 Survey, design and 5,000,0000 National/ 2018-2022 Water
water the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
drinking
water
Rurupogh-Kodich- Alale To supply 500 Survey, design and 15,000,0000 National/ 2018-2022 Water
Konyao the households construction of intake, County Department
community pipeline and tanks Govt/ CDF,
with clean Donors
and reliable NGOs/FBOs
drinking
water
Kodich Water Kodich To supply 150 Survey, design and 10,000,000 National/ 2018-2022 Water
Supply the residents households pipeline extension County Department
with safe Govt/ CDF,
170
drinking Donors
water NGOs/FBOs
Empokaptalax – Wei Wei To supply 80 Survey, design and 4,000,000 National/ 2018-2022 Water
Psimat water supply the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Solion-Asar Piped Wei Wei To supply 200 Survey, design and 10,000,0000 National/ 2018-2022 Water
Water the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Yayaw- Yoton Wei Wei To supply 300 Survey, design and 10,000,0000 National/ 2018-2022 Water
Water project the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Takar-Ptokou Water Wei Wei To supply 250 Survey, design and 10,000,0000 National/ 2018-2022 Water
Supply the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Chesir Water Project Wei Wei To supply 350 Survey, design and 10,000,0000 National/ 2018-2022 Water
the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Chepnyaril- Perkau Wei Wei To supply 300 Survey, design and 4,000,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with safe pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Tukoy –Kerong Sekerr To supply 400 Survey, design and 3,000,000 National/ 2018-2022 Water
water supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Pkechir water supply Sekerr To supply 350 Survey, design and 3,500,000 National/ 2018-2022 Water
the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
171
drinking Donors
water NGOs/FBOs
Karembana water Sekerr To supply 200 Survey, design and 4,000,000 National/ 2018-2022 Water
supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Sichot water supply Sekerr To supply 80 Survey, design and 5,000,000 National/ 2018-2022 Water
the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Empoghat water Sekerr To supply 100 Survey, design and 4,000,000 National/ 2018-2022 Water
supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
St. John water Sekerr To supply 90 Survey, design and 6,000,000 National/ 2018-2022 Water
supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Mtelo –Sostiin water Sekerr To supply 1000 Survey, design and 50,000,000 National/ 2018-2022 Water
supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
drinking Donors
water NGOs/FBOs
Lomut -Nyang’aita Masol To supply 1050 Intake and pipeline 40,000,0000 National/ 2018-2022 Water
the residents households rehabilitation County Department
with clean Govt/ CDF,
domestic Donors
water NGOs/FBOs
Toghomo water Lomut To supply 600 Survey, design and 15,000,000 National/ 2018-2022 Water
project the residents households construction of County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Krongon –Nyinyot Lomut To supply 300 Survey, design and 5,000,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
172
domestic Donors
water NGOs/FBOs
Amset – Sororo Lomut To supply 200 Survey, design and 5,500,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Nach – Chemalei Lomut To supply 250 Survey, design and National/ 2018-2022 Water
water project the residents households construction of intake, 6,500,000 County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Kokwomeses - Lomut To supply 100 Survey, design and 2,000,000 National/ 2018-2022 Water
Chesombur spring the residents households construction of intake, County Department
water with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Kokwo Poghin- Lomut To supply 100 Survey, design and 2,000,000 National/ 2018-2022 Water
Annet spring water the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Annet dispensary- Lomut To supply 350 Survey, design and 5,000,000 National/ 2018-2022 Water
ELCK Annet the residents households construction of intake, County Department
Secondary water with clean pipeline and tanks Govt/ CDF,
project domestic Donors
water NGOs/FBOs
Sororo –Lomut Lomut To supply 80 Survey, design and 3,000,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Cheromol spring Lomut To supply 100 Survey, design and 4,000,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Klemnguiro-Sasach Lomut To supply 100 Survey, design and 4,500,000 National/ 2018-2022 Water
–Chemutlokotyo- the residents households construction of intake, County Department
Cheptiya/Taingwan with clean pipeline and tanks Govt/ CDF,
173
–Chepemoi water domestic Donors
supply water NGOs/FBOs
Ka-mwayom –Otiot Lomut To supply 80 Survey, design and 2,000,000 National/ 2018-2022 Water
dispensary spring the residents households construction of intake, County Department
water with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Kapatet - Chesta Lomut To supply 500 Survey, design and 30,000,000 National/ 2018-2022 Water
gravity supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Kamjaror - Sintai Lomut To supply 350 Survey, design and 8,000,000 National/ 2018-2022 Water
water project the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Rehabilitation of Kapenguria To supply 2,000 Survey, design and 50,000,000 National/ 2018-2022 Water
Kapenguria Water the residents households construction of County Department
Supply with clean pipeline, pumps, Govt/ CDF,
domestic treatment plant and Donors
water tanks NGOs/FBOs
Kapkoris-Makutano Kapenguria To supply 320 Survey, design and 4,,000,0000 National/ 2018-2022 Water
water supply the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Mtirilwo –Kaprom Kapenguria To supply 300 Survey, design and 4,200,000 National/ 2018-2022 Water
water gravity the residents households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
domestic Donors
water NGOs/FBOs
Tantana Area-Spring Kapenguria To supply 200 Intake and pipeline 2,000,0000 National/ 2018-2022 Water
community households construction County Department
with clean -Spring protection and Govt/ CDF,
and reliable conservation with Donors
drinking appropriate plant spp. NGOs/FBOs
water.
Emboghat – Kapenguria To supply 150 Intake and pipeline 2,000,000 National/ 2018-2022 Water
Chepapechak community households construction County Department
with clean Govt/ CDF,
174
primary school- and reliable - Spring protection and Donors
Spring drinking conservation with NGOs/FBOs
water. appropriate plant spp.
Karas –Alimaris pr Kapenguria To supply 150 Survey, design and 3,000,000 National/ 2018-2022 Water
and its environs community households construction of intake, County Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water.
Chemwochoi Kapenguria To supply 200 Survey, design and 2,000,000 National/ 2018-2022 Water
secondary school community households construction of intake, County Department
spring with clean pipeline and tanks Govt/ CDF,
and reliable Spring protection and Donors
drinking conservation with NGOs/FBOs
water. appropriate plant spp.
Cheposumai village Kapenguria To supply 200 Survey, design and 3,500,000 National/ 2018-2022 Water
water project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water.
Kamuino water Mnagei To supply 350 Survey, design and 5,000,000 National/ 2018-2022 Water
project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Keringet-Pser- Mnagei To supply 800 Tanks and Pipeline 14,000,0000 National/ 2018-2022 Water
Cheptuya Water community households construction, county Department
Supply with clean installation of pumping Govt/ CDF,
and reliable units & powerlines Donors
drinking NGOs/FBOs
water
Kanyamora gravity Mnagei To supply 100 Survey, design and 2,000,000 National/ 2018-2022 Water
springs community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable - Spring protection and Donors
drinking conservation with NGOs/FBOs
water appropriate plant spp.
175
Chepangang water Mnagei To supply 200 Survey, design and 3,000,000 National/ 2018-2022 Water
supply community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Taruru –Tukuny Siyoi To supply 200 Survey, design and 2,000,000 National/ 2018-2022 Water
water project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Tach-Asis water Siyoi To supply 150 Survey, design and 2500,000 National/ 2018-2022 Water
project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kipkorinya water Siyoi To supply 250 Survey, design and 3,000,000 National/ 2018-2022 Water
project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kaplain Siyoi To supply 800 Survey, design and 2,500,000 National/ 2018-2022 Water
gravitational water community households construction of intake, county Department
project with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Chemwaana Siyoi To supply 100 Survey, design and 3,000,000 National/ 2018-2022 Water
Gravitational water community households construction of intake, county Department
project with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Talau water Project Siyoi To supply 500 Survey, design and 3,500,000 National/ 2018-2022 Water
Repair community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
NGOs/FBOs
176
drinking
water
Lolopoy –Rongo Endough To supply 150 Survey, design and 6,000,000 National/ 2018-2022 Water
Tilak water supply community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kechir –Chewarany Endough To supply 200 Survey, design and 4,000,000 National/ 2018-2022 Water
water supply community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Sarmat – Endough To supply 120 Survey, design and 10,000,000 National/ 2018-2022 Water
Chemororoch water community households construction of intake, county Department
supply with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kriich –Karar Endough To supply 150 Survey, design and 6,000,000 National/ 2018-2022 Water
dispensary- Karar T. community households construction of intake, county Department
Centre water supply with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Tlulu –Ptoyo Endough To supply 200 Survey, design and 7,000,000 National/ 2018-2022 Water
dispensary water community households construction of intake, county Department
supply with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Empororon-Kochar Sook To supply 120 Survey, design and 3,200,000 National/ 2018-2022 Water
water supply community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kaghot to Sessimwo Tapach To supply 150 Survey, design and 3,000,000 National/ 2018-2022 Water
centre water project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
177
and reliable Donors
drinking NGOs/FBOs
water
Chebon, Tapach To supply 500 Survey, design and 5,000,000 National/ 2018-2022 Water
Chepunguny community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kokwopsis water Tapach To supply 400 Survey, design and 7,000,000 National/ 2018-2022 Water
project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Tapach secondary & Tapach To supply 600 Survey, design and 10,000,000 National/ 2018-2022 Water
primary school, community households construction of intake, county Department
Tapach dispensary, with clean pipeline and tanks Govt/ CDF,
Tapach trading and reliable Donors
centre and Tapach drinking NGOs/FBOs
ward office water
Karupogh, Tapach To supply 200 Survey, design and 3,800,000 National/ 2018-2022 Water
Kokwomuruny community households construction of intake, county Department
water project with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kitakes-Sina water Tapach To supply 350 Survey, design and 10,000,000 National/ 2018-2022 Water
project community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kamologon-Tapach- Tapach To supply 1000 Survey, design and 60,000,0000 National/ 2018-2022 Water
sekution gravity community households construction of intake, county Department
water supply with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
178
Plalkwenda to Batei To supply 400 Survey, design and 7,000,000 National/ 2018-2022 Water
Kongtarit water community households construction of intake, county Department
supply with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Kochy(Chemnyarilta Batei To supply 600 Survey, design and 3,000,000 National/ 2018-2022 Water
springs ) to Sebit community households construction of intake, county Department
Town with clean pipeline and tanks Govt/ CDF,
and reliable - Spring protection and Donors
drinking conservation with NGOs/FBOs
water appropriate plant spp.
Parua-Ortum Water Batei To supply 2000 Survey, design and 75,000,000 National/ 2018-2022 Water
Project community households construction of county Department
with clean pipeline, tanks and Govt/ CDF,
and reliable distribution Donors
drinking NGOs/FBOs
water
Koituwut Plalang Lelan To supply 450 Survey, design and National/ 2018-2022 Water
Kapsangar community households construction of intake, 10,000,000 county Department
Murkwisian with clean pipeline and tanks Govt/ CDF,
Ptunyony and reliable Donors
Psukunowater drinking NGOs/FBOs
project water
Kapsangar, water Lelan To supply 450 Survey, design and National/ 2018-2022 Water
projects community households construction of intake, 8,000,000 county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Krengoi- Kaikon , Lelan To supply 800 Survey, design and 8,000,000 National/ 2018-2022 Water
Kansis, Chorwai community households construction of intake, county Department
water projects with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Chepkono Lelan To supply 650 Survey, design and 7,500,000 National/ 2018-2022 Water
Koropelow community households construction of intake, county Department
Kanyanguru with clean pipeline and tanks Govt/ CDF,
Tonoyon Chemaltin and reliable Donors
water project NGOs/FBOs
179
drinking
water
Kabichbich Lelan To supply 400 Survey, design and 6,000,000 National/ 2018-2022 Water
Amrireng Pusilelon community households constructiosn of county Department
water project with clean intake, pipeline and Govt/ CDF,
and reliable tanks Donors
drinking NGOs/FBOs
water
Kabichbich- Chorok Lelan To supply 400 Survey, design and 4,500,000 National/ 2018-2022 Water
gravity water supply community households construction of intake, county Department
with clean pipeline and tanks Govt/ CDF,
and reliable Donors
drinking NGOs/FBOs
water
Cheparten-Tombul- Lelan To supply 300 Survey, design and 10,000,000 National/ 2018-2022 Water
Kapkunyuk- community households construction of intake, county Department
Kapsebat water with clean pipeline and tanks Govt/ CDF,
project and reliable Donors
drinking NGOs/FBOs
water
Porowo pr-Sakar- Lelan To supply 350 Survey, design and 7,500,000 National/ 2018-2022 Water
Chelopotwo-Lain- community households construction of intake, county Department
kapkoriorio water with clean pipeline and tanks Govt/ CDF,
project and reliable Donors
drinking NGOs/FBOs
water
DRILLING, EQUIPING, REPAIR AND UPGRADE OF BOREHOLES
Purchase borehole County HQ To reduce 2 drilling Production of 120,0000,000 National/ 2018-2022 Water
drilling rig cost and time rigs specification, county Department
spend on tendering and Govt/ CDF,
procuring procuring. Donors
borehole NGOs/FBOs
drilling
services
Drill and equip 120 Alale, To supply 120,000 Hydrogeological 420,000,000 National/ 2018-2022 Water
boreholes Kiwawa, community people survey, Drilling, water county Department
Kasei, with clean quality testing, test Govt/ CDF,
Kapchok, and reliable pumping and Donors
Kodich, drinking equipping NGOs/FBOs
180
Suam, Riwo, water and to
Kapenguria, reduce
Mnagei, distances
Chepareria, and time
Sook, taken in
Endough, search of
Sekerr, Wei water
Wei, Lomut,
Masol, Batei
Upgrading of Alale To increase 5,000 Upgrading with 5,500,000 National/ 2018-2022 Water
Amakuriat B/hole access to people electricity mains, county Department
safe and construction of Govt/ CDF,
clean s Pipeline network, Donors
drinking storage tanks and NGOs/FBOs
water water kiosks
Upgrading of Alale To increase 5,000 Upgrading with 4,500,000 National/ 2018-2022 Water
Lolepon B/hole access to people electricity mains, county Department
safe and construction of Govt/ CDF,
clean Pipeline network, Donors
drinking storage tanks and NGOs/FBOs
water water kiosks
Upgrade 2 boreholes Alale To increase 2,100 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Chepareria To increase 4000 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Riwo To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Kiwawa To increase 4,000 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
181
Upgrade 2 boreholes Suam To increase 3,200 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Sekerr To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Lomut To increase 2,000 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Masol To increase 2,200 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Batei To increase 3,600 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Wei Wei To increase 4,200 people Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Endough To increase 2,800 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Sook To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
182
Upgrade 2 boreholes Kapenguria To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Kiwawa To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
Upgrade 2 boreholes Kasei To increase 2,500 Solar panels, pumps 4,000,000 National/ 2018-2022 Water
to solar access to people and water tanks county Department
sustainable Govt/ CDF,
water supply Donors
NGOs/FBOs
WATER PANS, SAND/SUB-SURFACE DAMS AND SHALLOW WELLS
Construct / desilt Alale, To supply 22 water Site identification and 88,000,000 National/ 2018-2022 Water
water Pans Kiwawa, the pans verification county Department
Kasei, surrounding targeting planning and design, Govt/ CDF,
Kapchok, community 22,000 production of tender Donors
Kodich, with water people and documents NGOs/FBOs
Suam, Riwo, both for 100,000 Excavation of dam
Kapenguria, domestic and cattle reservoir
Mnagei, livestock Construction of
Chepareria, embankment wall
Sook, Construction of
Endough, spillway
Sekerr, Wei Fencing of reservoir
Wei, Lomut, Construction of
Masol, Batei auxiliary works (draw
off system and cattle
trough)
Renovation of Earth
Dams
Construct 90 sub- Alale, To provide 20, 000 Site identification 126,000,000 National/ 2018-2022 Water
surface/ Sand dams Kiwawa, clean people survey, design and county Department
Kasei, portable construction Govt/ CDF,
Kapchok, water to the Donors
Kodich, residents NGOs/FBOs
Suam, Riwo,
Kapenguria,
183
Mnagei,
Chepareria,
Sook,
Endough,
Sekerr, Wei
Wei, Lomut,
Masol, Batei
Construct 100 Alale, To provide 32,000 Site identification 112,000,000 National/ 2018-2022 Water
shallow wells Kiwawa, clean people survey, design and county Department
Kasei, portable construction Govt/ CDF,
Kapchok, water to the Donors
Kodich, residents NGOs/FBOs
Suam, Riwo,
Kapenguria,
Mnagei,
Chepareria,
Sook,
Endough,
Sekerr, Wei
Wei, Lomut,
Masol, Batei
SPRINGS
Spring protection
Siyoi, Tapach, To provide 17 springs to Survey, design and 5,100,000 National/ 2018-2022 Water
and construction Lelan, clean support construction county Department
Mnagei, portable 1,500 Govt/ CDF,
Kapenguria, water to the Donors
Sook, Mnagei, residents NGOs/FBOs
Chepareria,
Lomut
ROOF WATER HARVESTING
Roof catchment Countywide To promote 30,000 Enact rainwater 20,000,000 National/ 2018-2022 Water
Water harvesting rain water people harvesting policy to county Department
project harvesting ensure all county Govt/ CDF,
and supply structures and ECDs Donors
residents have water harvesting NGOs/FBOs
with safe structures, purchase
water and supply of plastic
tanks
Sub-sector-Forestry Department
184
Project Name/location Objective Target Key Description Cost (Kshs.) Source of Timeframe Implementing Remark
of Activities funding Agency
Recruitment of staff To increase effectiveness in 16 Foresters Employment of 120,000,000
service provision and 53 Forest Rangers Foresters and
implementation of forest guards
activities
Formulation of county To minimize charcoal 6 laws legislated: Drafting, Printing, 20,000,000 National/ 2018-2022 Forestry
specific Forestry burning and illegal Charcoal Burning, Enactment, and county Department
laws/legislations harvesting of timber Sand harvesting, Enforcement Govt/ CDF,
Forestry Donors
conservation, NGOs/FBOs
Riparian
conservation,
Institution based
Afforestation,
Climate Change
Support Youth and To increase forest cover in 80 groups Trainings, 25,000,000 National/ 2018-2022 Forestry
Women Group with the county Support with county Department
Tree Nurseries tubes, seed, water Govt/ CDF,
establishment tanks, chain Donors
wires, fencing NGOs/FBOs
pots
Establish County Tree To increase forest cover in 46 county Tree Raising bamboo 100,000,000 National/ 2018-2022 Forestry
Nurseries the county nurseries seedlings and tree county Govt Department
Nurseries(6 seedlings, / CDF,
Bamboo Green Purchasing chain Donors
Houses Nurseries , wires, posts, NGOs/FBOs
40 Trees seeds, water
Nurseries) tanks, nursery
tools, construction
of stores, land
acquisition
Forest Park To preserve Kamatira Kamatira Forest -Construction of 50,000,000 National/ 2018-2022 Forestry
Establishment Forest and connect people Park houses, trails, county Department
with nature watch towers Govt/ CDF,
Donors
NGOs/FBOs
Tree Planting To increase tree cover from 50,000 Ha of land Raise 12,000,000 640,000,000 National/ 2018-2022 Forestry
3.9% to 7% by 2022 planted with trees seedlings from county Department
county tree Govt/ CDF,
nurseries,
185
Purchase 18 Donors
million seedlings NGOs/FBOs
from groups
supported with
nurseries
Forest extension/ To provide forest extension 200 Trainings Training CFAs, 40,000,000 National/ 2018-2022 Forestry
Trainings services and knowledge communities, county Department
dissemination women and youth Govt/ CDF,
groups iin each Donors
ward NGOs/FBOs
Mapping and To protect the county 20 county forests Survey and 50,000,000 National/ 2018-2022 Forestry
Gazettement of County forests against gazettement county Govt Department
Forest encroachment and illegal / CDF,
logging Donors
NGOs/FBOs
Boundary realignment To align boundaries of Kamatira, Sekerr, Installing beacons 38,000,000 National/ 2018-2022 Forestry
of encroached forests encroached forests Chepnyal, and evicting county Department
Kapushen, illegal Govt/ CDF,
Kamologon, Kper, encroachments Donors
Chesuko, NGOs/FBOs
Protection of Water To protect riverbanks, Muruny,Weiwei, Conduct 40 40,000,000 National/ 2018-2022 Forestry
Catchments Riverbanks catchment areas and fragile Sighya, Parua, Community county Department
and fragile lands lands against erosion and Kotoruk, Suam, sensitization Govt/ CDF,
agricultural activities Kaibos/Siyoi, meetings, Donors
To increase water volumes Kabolet, Planting bamboo NGOs/FBOs
in the rivers Kanyangareng, and other water
Paraywa, Kapchila friendly trees,
rivers, Marich,
Murpus, Kaisakat,
Tapach, Muino
Forest /Farm Produce To minimize illegal All forests (Both Procure 20,000,000 National/ 2018-2022 Forestry
Movement Regulation deforestation, illegal county and movement county Department
and protection logging and settlement National), and permits books Govt/ CDF,
Private farms from Government Donors
Printer, Issue NGOs/FBOs
licenses to saw
millers
- Movement of
security officers
and foresters
186
Urban Beatification To create green Makutano, Plant along roads, 20,000,000 National/ 2018-2022 Forestry
environment in urban areas Chepareria, create urban green county Department
and reduce pollution Kabichbich, spaces, Govt/ CDF,
Kacheliba, Alale, Donors
Sigor NGOs/FBOs
Support, WRUAs To protect the water Countywide Trainings, 40,000,000 National/ 2018-2022 Forestry
catchments Support with county Department
tubes, seed, water Govt/ CDF,
tanks, chain Donors
wires, fencing NGOs/FBOs
pots
Climate Change To minimize effects of County wide Plant drought 30,000,000 National/ 2018-2022 Forestry
Mitigation and climate change tolerant timber county Department
Adaptation trees Govt/ CDF,
Plant Drought Donors
Tolerant fruit NGOs/FBOs
trees
Supply farmers,
women groups
and youth groups
with bee hives
Project ID Objective Target Key Description of Cost Source of Timeframe Implementing Remark
Activities (Kshs.) funding Agency
Project ID Objective Target Key Description of Activities Cost Source of Timeframe Implementing Remark
(Kshs.) funding Agency
Project Location
Name
Reclamation Kiwawa To reclaim 200 Ha Survey and design of the project 20 National/ 2018-2022 Land
of degraded ward; degraded lands reclaimed sites, community mobilization and million county Reclamation
188
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in flood prone areas use gully control interventions , NGOs/FBOs
Mogen, and ASALs into construction of water harvesting
Katuda, vibrant economic structures, construction of retention
lowoi, development ditches/COD, ploughing, harrowing,
Kalulucho, areas. compaction of land, Planting of
Amam drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Kodich ward To reclaim 20 Ha Survey and design of the project 2 National/ 2018/2019 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in flood prone areas use gully control interventions , NGOs/FBOs
Chematichor and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Masol Ward To reclaim 100 Ha Survey and design of the project 10 National/ 2018-2022 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in Tikit flood prone areas use gully control interventions , NGOs/FBOs
and and ASALs into construction of water harvesting
Nyang’aita vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
189
of community on reclamation
initiatives
Reclamation Suam ward To reclaim 20 Ha Survey and design of the project 2 National/ 2019/2020 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in flood prone areas use gully control interventions , NGOs/FBOs
Tapadany and ASALs construction of water harvesting
intovibrant structures, construction of retention
economic ditches/COD, ploughing, harrowing,
development compaction of land, Planting of
areas. drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Alale ward To reclaim 10Ha Survey and design of the project 1 National/ 2018-2022 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in Nasal flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Chepareria To reclaim 100 Ha of Survey and design of the project 9 National/ 2018-2022 Land
of degraded ward degraded lands lands sites, community mobilization and million county Reclamation
lands in wastelands, affected by sensitization, Fencing of reclaimed Govt/ CDF,
Cheptapesha, unutilized lands, gullies land, gully control interventions , Donors
Senetwo, flood prone areas reclaimed construction of water harvesting NGOs/FBOs
Korellach and ASALs into for structures, construction of retention
vibrant economic economic ditches/COD, Planting of drought
use tolerant grass/vertiver and trees,
190
development training and capacity building of
areas. community on reclamation initiatives
Reclamation Riwo ward To reclaim 10 Ha Survey and design of the project 2 National/ 2018-2022 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands in wastelands, for sensitization, selective bush Govt/ CDF,
Kitalakapel unutilized lands, economic clearing, Fencing of reclaimed land, Donors
flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Kapenguria To reclaim 10 Ha Survey and design of the project 1.5 National/ 2018-2022 Land
of degraded ward degraded lands reclaimed sites, community mobilization and million county Reclamation
lands for wastelands, for sensitization, selective bush Govt/ CDF,
economic unutilized lands, economic clearing, Fencing of reclaimed land, Donors
use in flood prone areas use gully control interventions , NGOs/FBOs
Emboasis and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Kasei ward To reclaim 20 Ha Survey and design of the project 3 National/ 2018-2022 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands in wastelands, for sensitization, selective bush Govt/ CDF,
Kamketo unutilized lands, economic clearing, Fencing of reclaimed land, Donors
flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
191
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Endough To reclaim 50 Ha Survey and design of the project 5 National/ 2018-2022 Land
of degraded Ward degraded lands reclaimed sites, community mobilization and million county Reclamation
lands in wastelands, for sensitization, selective bush Govt/ CDF,
Nakwijit unutilized lands, economic clearing, Fencing of reclaimed land, Donors
flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Lomut ward To reclaim 50 Ha Survey and design of the project 5 National/ 2018-2022 Land
of degraded degraded lands reclaimed sites, community mobilization and million county Reclamation
lands in wastelands, for sensitization, selective bush Govt/ CDF,
Nyorpotwo unutilized lands, economic clearing, Fencing of reclaimed land, Donors
flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas. compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Reclamation Nasukuta, To reclaim 500 Ha Survey and design of the project 40 National/ 2018-2022 Land
of degraded kacheliba, degraded lands reclaimed sites, community mobilization and million county Reclamation
Kopoch, wastelands, for sensitization, selective bush Govt/ CDF,
192
holding Masol, unutilized lands, economic clearing, Fencing of reclaimed land, Donors
grounds Mtembur flood prone areas use gully control interventions , NGOs/FBOs
and ASALs into construction of water harvesting
vibrant economic structures, construction of retention
development ditches/COD, ploughing, harrowing,
areas compaction of land, Planting of
drought tolerant grass, trees and
crops ,training and capacity building
of community on reclamation
initiatives
Training the Countywide To equip the 2000 Community mobilization, 8 National/ 2018-2022 Land
community community with community sensitization, Training million county Reclamation
members on skills on members Field visits/ tours Govt/ CDF,
land reversing land Field demonstrations Donors
reclamation degradation and NGOs/FBOs
techniques sustainable
utilization of
reclaimed lands
Construction Countywide To reverse land 10 Excavation of dam reservoir 40 National/ 2018-2022 Land
of water pans degradation and Construction of embankment wall million county Reclamation
provide water for Construction of spillway Govt/ CDF,
Fencing of reservoir
livestock Donors
Construction of auxiliary works
(draw off system and cattle trough)\ NGOs/FBOs
environmental conservation
Construction Countywide To conserve 20 Survey, design, construction and 16 National/ 2018-2022 Land
of sand/sub- riparian environmental conservation million county Reclamation
surface dams vegetation and Govt/ CDF,
provide water for Donors
domestic & NGOs/FBOs
livestock use
Springs Countywide To conserve 15 Survey, design, construction and 6 National/ 2018-2022 Land
protected water catchment environmental conservation million county Reclamation
areas and Govt/ CDF,
provide water for Donors
domestic, NGOs/FBOs
livestock use &
193
tree nursery
establishment
Construction Countywide To provide water 25 Survey, design, construction and 12.5 National/ 2018-2022 Land
of shallow for domestic, environmental conservation million county Reclamation
wells livestock use & Govt/ CDF,
tree nursery Donors
establishment NGOs/FBOs
Construction Masol, To provide 5 Hay Survey, design, tendering, 7.5 National/ 2018-2022 Land
of hay stores Kiwawa, storage for hay in stores construction and handing over million county Reclamation
Chepkopegh, order to mitigate Govt/ CDF,
Kapchok, against drought Donors
Kase and climate NGOs/FBOs
change
Purchase of HQS To assist the 1 tractor, 2 Tendering and procuring National/ 2018-2022 Land
tractor, harvest of hay mower and county Reclamation
Mower and from reclaimed 2 baler Govt/ CDF,
Baler areas Donors
NGOs/FBOs
194
Land for West Pokot Climate services to 1 Procurement of 6 .0 County 2018-2022 County
County Synoptic station aviation industry 3 acres Government Meteorological
(observatory )at Kishaunet. and entire county. services
Automatic Weather Station Improved data For 1 Acquire & 6.0 National 2018-2022 County
(AWS) for surface research, climate install one Government & Meteorological
observations at Kishaunet services, climate AWS County services
change monitoring Government
& for policies
Plot for West pokot county Improved services 0.25 acres Procurement of 2.0 County 2018-2022 County
climate information the land or Government Meteorological
centre(Headquarters) public land services
Kapenguria acquired
Instruments inspections & To ensure reliable 200 Inspections, 2.0 National 2018-2022 County
calibrations data & standards calibrations & Government Meteorological
instruments Maintenance of services
all instruments
195
Acquire and Install Accurate data 60 Procurement of 6.0 County 2018-2022 County
Automatic rain gauges at acquired the rain gauges Government Meteorological
least 3 per ward services
Acquire and install river Accurate Hydro- 20 Procurement & 1.0 County 2018-2022 County
gauges meteorological data installation at Government Meteorological
for climate change the major rivers: services
monitoring Suam, Muruny,
Wei-wei, Water & WRMA
Lomut, Siyoi,
Sebit river
Acquire and Install Manual 160 Procurement and 3.2 National & 2018-2022 County
Rain gauges at least 8 per To supplement installation at County Meteorological
ward Rainfall data from designated areas Government
automatic ones
196
Acquire Data collection One Data collection 1 Materials of 1.5 County 2018-2022 County
workstation (for a data workstation collecting data Government Meteorological
exchange) and available & data services
disseminate of rainfall data transmission
from CCMs
Acquire High speed One high speed 1 Procurement of 0.75 County 2018-2022 County
Internet connection for internet connection the cables & Government Government
county offices installation
Acquire Forecast Forecast 5 Procurement & 1.0 National & 2018-2022 County
Interpretation Tools interpretation tools installation of County Meteorological
(software) the tools government services
Town Lighting Provide Security and promote 4 Construction of Light 12M WPC/GOK 2018-2022 Trade
Lomut, Tapach, Alale trade Mast
&Konyao
197
Recreational facilities Provide recreational facilities and 4 Construction & 20 M WPC 2018-2022 Trade
in major centres per generate revenue landscaping
subcounties
Fresh Produce storage Provide storage to fresh produce 2 Construction 20 WPC 2018-2019 Trade
facilities
Limestone Processing To add value to limestone /Create 1 Coordinating, MOU 20 M WPC 2018-2020 Trade
employment preparation and
infrastructure
development
Honey Processing Increased income for farmers 6 Construction of plant 20M WPC 2018-2022 Coop
M& E
Set up Aloe Vera Value addition for increased 4 Purchase of 10M WPC 2018-2022 Coop
Processing unit income Construction
equipment and
Intallation
Milk processing plant To processed milk to yoghurt, 1 Purchase of 300M WPC 2018-2022 Coop
Ghee, butter and other products Equipment, land,
construction and
installation
Cereals Milling plant Add value to cereals 1 Purchase of 30M Investor/Co 2018 Industry/Coop
Equipment, land, unty
construction and
installation
Water Bottling plant Income Generation 2 Coordination, facilitate 10M Investor 2018 Investor
access roads and water
Oil Exploration Revenue /Employment 3 Identify investor, 30M Investor 2018 Investor
MOU preparation,
infrastructure support
Harnessing Environmental conservation/ 3 Identify investor, 30M Investor 2018 Investor
Renewable Energy Revenue generation MOU preparation,
infrastructure support
Fresh Produce storage Value addition to 3 Construction of stores 15M WPC 2018-2022 Trade
facilities Onion/Mangoes/ potatoes
Mango processing Value addition/Income 1 Construction, Purchase 20M WPC 2018-2022 Coop
generation of Equipment and
installation
Develop industrial To provide necessary 5 Identify investor, 50 M WPC/Invest 2018-2022 Industry/Trade
parks in every sub- infrastructural facilities to MOU preparation and or
county entrepreneurs/investors Coordination
Construction of To provide market sheds to 20 Construction 100 M 2018-2022 Trade
markets businesses and generate Revenue WPC
198
Set up County To provide financial Loans 1 Bill preparation, 200M WPC 2018-2022 Coop
Cooperative services to MSEs/employment establishment of
development Fund Creation Board, Approval of
loans
Provision of Revenue Generation 5 Facilities established 20M WPC 2018-2020 Trade
recreational facilities
in major towns
Value addition to Income generation/ provision of 1 Herbal medicine plant WPC 2020-2022 Coop/Industry
natural/medicinal alternative medicine established 5m
plants
Street lighting in 4 Facilitate trade & security 4 Street light masts 10M WPC 2018-2020 Trade
major centers erected and operational
Kotney Coffee Facilitate Value addition 1 Store constructed 5M WPC 2018-2019 Coop
store/Office
Cereal storage Reduced post- 6 cereals stores Development of 60M County gov’t 2018-2022 County gov’t
facilities - 5 sub- harvest losses constructed BQs
counties through proper 300,000 bags of Awarding
storage of grains by cereal grains and Tendering
2021 pulses stored Contractor on
site
Site meeting
Indigenous crops To positively change 10,000 tons of 20 M County gov’t/ 2018-2022 County gov’t/
development: the attitude of people sorghum Raise quotations National gov’t National gov’t
sorghum, millet, growing traditional Award projects projects
cassava and sweet
199
potatoes -Entire crops and to create 5,000 tonnes of Identify
county market for the same millet beneficiaries
10,000 tonnes of
cassava and 10,000
tonnes of sweet
potatoes
Food crops Increased household Increase Development of 200M Aug 2018 June County, national
Development-20 incomes and food productivity of BQs 2022 programmes and
wards security through maize, beans, finger Awarding partners
irrigation millet, sorghum, Tendering
sweet potatoes by 5 Contractor on
per cent site
Site meeting
Agricultural Increased Ha under 8,400 Hectares of Raise quotations 110 M County and 2018-2022 County and national
mechanization crops and reduced land ploughed in Award Purchase national government
services-10 wards cost of farming difficult areas under of tractors, government
farming develop policy
guideline,
15 tractors ploughing
purchased and being
utilized
Soybei micro Improved food 300Ha irrigated Construction of 30 M County /National 2018-2022 County ,NIB
irrigation – Riwo security the intake, main gvt
ward line and
distribution lines
Turkwell To improve food 350 Ha of crop Develop BQS 100M County/National 2018-2022 Irrigation engineer
irrigation project security and irrigated Construction of government Chief officer
household income by the intake, main procurement
increasing acreage line and Contractor
under irrigation distribution lines
Kokwositet To improve food 200 Ha of crop Construction of 10M County 2018-2022 Irrigation engineer
irrigation security and irrigated the intake, main Chief officer
household income line and procurement
through irrigation distribution lines Contractor
Tepatukei- To improve food 100 Ha of crop Construction of 10M County 2018-2022 Irrigation engineer
Saramach security and irrigated the intake, main Chief officer
irrigation project household income line and procurement
through irrigation distribution lines Contractor
Cherangan To improve food 300Ha of crop Damming of the 35M County 2018-2022 Irrigation engineer
irrigation project security and irrigated river, Chief officer
200
household income construction of procurement
through irrigation the main line and Contractor
distribution lines
Karameri-Konyao To improve food 500Ha of crop Construction of 80M County 2018-2022 Public works
solar farm security and irrigated solar system, Procurement
irrigation project household income installation of the Chief officer
through irrigation panels and Contractor
piping
Wowo furrow To improve food 50 ha Construction of 10M County 2018-2022 Public works
irrigation project security and intake and piping Procurement
household income Chief officer
through irrigation Contractor
Kapkiris farrow To improve food 80ha Construction of 12M County 2018-2022 Public works
irrigation project security and intake and piping Procurement
household income Chief officer
through irrigation Contractor
Chepnyaril To improve food 100ha Construction of 14M County 2018-2022 Department of
Kaporon security and intake and piping Agriculture and
irrigation project household income Irrigation, Contractor
through irrigation
Pest and disease To prevent and 35000Ha under Field visits, 15M County 2018-2022 Department of
surveillance and control crop pest and maize purchase, Agriculture and
control(Fall diseases distribution and Irrigation,
armyworm, application of
Maize Lethal pesticides
Necrosis Disease)
Purchase of water To increase land 15 Ha Procurement of 32M County Sept -2018- Department of
pumps under irrigation water pumps June 2020 Agriculture and
Irrigation,
Irish potato cold To reduce post- 2 cold stores Preparation of 30M County Aug 2018- Department of
storage harvest losses by constructed & the Bill of Oct 2020 Agriculture and
30% operational quantities, Irrigation,
procurement,
and Construction
of the cold stores
Irish potato cold To reduce post- 1 cold store Preparation of 15M County Feb 2018- Department of
storage harvest losses constructed and the Bill of June 2019 Agriculture and
operational quantities, Irrigation, Contructor
procurement and
construction of
the cold store
201
Cereal stores To improve 5 cereal stores Preparation of 120M County Sept 2018- Public works
accessibility and constructed and the Bill of Nov 2020 Procurement
availability to food in operational quantities, Chief officer
West Pokot County procurement and Contractor
construction
Works
Aloe Vera Value addition for Establish 2 aloe Preparation of 10 m 2018-2022 Coop/Industry
Processing unit increased income Vera processing theBQs,
units procuremen,
construction
Works
Irish Potato To improve 1000 acres of seed Recruitment of 50M County and Aug2019- Department of
multiplication accessibility to clean potato established farmers, partners June2022 agriculture,
planting material sourcing for seed KALRO
potato
Cotton promotion To reintroduce and 250HA Community 60M County and Aug2019-
promote cotton mobilization, partners June2022
production Purchase and
distribution of
cotton seed to
farmers
Sisal promotion To promote Sisal 100 HA planted
production
Reclaiming Arid Increasing vegetative 5000 HA of Arid Planting drought 50M County and October Department of
lands for cover and crop land reclaimed tolerant fruit partners 2018-June Agriculture and
Agriculture production by trees and crops, 2022 partners
planting drought construction of
tolerant fruit trees/ water harvesting
crops hence structures and
providing alternative insitu water
livelihoods for harvesting
pastoralists technologies
such as Semi-
circular bands, Zi
pits etc.
Family farming Supporting small 2000 farmers Purchase and 100M County and October Department of
scale farmers with supported distributing farm partners 2018-June Agriculture and
technology, farm inputs to farmers 2022 partners
input subsidies and such as small
providing markets at water pumps,
farm level Solar water
202
pumps, irrigation
kits, Green
houses,
Fertilizers, seeds
and
seedlings,etc.
Mango Fruit Increase farm 1Plant established in Planting 80M County and October Department of
processing plant incomes through the County at a improved fruit partners 2020-June Agriculture and
value addition suitable location trees, 2022 partners
construction of
Fruit processing
plant
Soil mapping for To identify soil types All the county Carry out soil 100M County and October Department of
crop zoning and in the county for covered survey, soil partners 2018-June Agriculture and
specialization proper choice of crop analyses, 2022 partners
enterprises mapping.
Countywide Contingency 100M County and October Department of
plan in place partners 2018-June Agriculture and
2022 partners
Construction of Train staff and 1 Center Buy land, 30M County and October Department of The
Agriculture farmers on new Construct ATC partners 2018-June Agriculture and constructed
training agricultural 2022 partners one has been
center(ATC) technologies and taken by Kisii
practices University
Establishment of To generate new 1 Center established Buy land, 80M National October National A request has
Agricultural and improved Construct Government 2018-June Government been made
Livestock appropriate Research center 2022 for
Research technologies and construction
center(Masol) innovations.
Construction of Provide office space 4 offices Construct offices 100M Department of October Department of
Sub County to staff in sub Agriculture and 2018-June Agriculture and
Agriculture counties partners 2022 partners
offices(Pokot
North, Pokot
South, Pokot
Central,
Kipkomo)
Purchase of Provide mobility for 2 Double gaps Purchase 9M Department of October Department of
Motor vehicles staff during Agriculture and 2018-June Agriculture and
supervisions and partners 2022 partners
203
backstopping field
staff.
Greenhouse Promote intensive 20 Greenhouses for Construct 12M Department of October Department of
Development production of high Demonstrations(1 Greenhouses at Agriculture and 2018-June Agriculture and
value crops per Ward) strategic sites in partners 2022 partners
the Wards
Operationalize Effective 20 Stakeholder Facilitating 1.2M Department of October Department of
agriculture sector coordination of meetings held quarterly Agriculture and 2018-June Agriculture and
act agricultural activities stakeholder partners 2022 partners
in the County meetings
Strategic Food Promote food 100,000bags of Purchase and 32m Department of October Department of
reserve security at household maize grains store strategic Agriculture and 2018-June Agriculture and
level reserved. grain reserves partners 2022 partners
Domesticate Promote 1 Strategy in place Tailoring the 200,000 Department of October Department of
National commercialization of National Agriculture and 2018-June Agriculture and
Agribusiness agriculture in the Agribusiness partners 2022 partners
strategy county strategy to suit
the unique
circumstances of
West Pokot
county and
adoption
Post-harvest Reduce post-harvest 100 Demonstrations Conduct field 2M Department of October Department of
Management losses of crop conducted demonstrations Agriculture and 2018-June Agriculture and
produce partners 2022 partners
Market Survey Maximize farm 20 Market surveys Planning and 800,000 Department of October Department of
and Linkages incomes through and Linkages done implementing Agriculture and 2018-June Agriculture and
strengthened market the market partners 2022 partners
linkages surveys and
linkages
204
livestock
feeds by 2022
One household 10 wards To improve -10,000 highly Raising 2018- 600 M 2018- -County
one dairy cow household productive dairy cows quoations,tendering,i 2022 2022 -Partners
project incomes distributed dentification of
through beneficiaries,
increased
milk
production
Establishment of 6 sub-counties To improve 1,500 Sahiwal cattle; Acqiusition of 300 M 2018- -County
6 livestock livestock 500 Boran cattle; 2,000 land,raising 2018- 2022 -Partners e.g.
breeding centers breeds ( camels; 1,000 Dorper quoatations and 2022 ADS, Heifer
and enhancing Sahiwal and sheep; 500 wool sheep purschase of international,
livestock Boran cattle and 2,000 Galla goats breeding stock. Bayer Ltd
upgrading breeds; distributed to breeding
Camels; centres/ farmers
Dorper and
wool sheep
and Galla
goats)
Establishment of -Kanyikeny in To increase - One beekeeping and Raise quoatations for 200 M 2018- County
Bee keeping and Chepareria ward honey apiculture research bee hives,prepare 2018- 2022
Apiculture production in centre established BQS for offices and 2022
Research Centre the county -1,000 modern/ houses for
at Kanyikeny improved beehives staff,awarding
Livestock Farm purchased for contracts and
Kanyikeny and contractor moving to
installed site.
-Construct and equip
necessary offices,
houses, beehives
making workshop
Completion and Kapenguria To provide a -One(1) building -Finish the periphery 9M -County Jan Pastoral
equipping of conducive fence, parking 2018- Economy-
MIFUGO House working sheds/area, - June Livestock
facility Finishing and 2019 Production
equipping inside the
building
Construction and Chepareria – To provide 1 office -Complete pending 13M County July Pastoral
equipping of Kipkomo sub- office space works equip the 2018- Economy-
county office
205
sub-county June Livestock
offices 2022 Production
Construction and -Kodich, To provide 4 ward offices -Allocate funds for 34M -County July Pastoral
Equipping of Tapach, Sekerr, office space the works 2018- Economy-
ward offices Masol -Construct and equip Jine General Admin
offices 2022 and Planning
Motor vehicles Sectionwide To enhance 4 motorvehicles -Purchase motor 24M County 2018- Pastoral
service vehicles 2022 Economy-
delivery Livestock
Production
Lorry Sector wide To enhance 1 lorry -Purchase a lorry 10M County 2018- Pastoral
service 2022 Economy-
delivery Livestock
Production
Motorcycles Sector wide To enhance 28 motorcycles -Purchase 11.2 County 2018- Pastoral
service motorcycles M 2022 Economy-
delivery Livestock
Production
Development of Sector wide To facilitate -6 Livestock Production -Drafting the bills 3M County 2018- Pastoral
Policies and Bills formulation bills -Submission to the 2022 Economy-
and County Attorney and Livestock
implementati County Assembly Production
on of -Assenting by the
programmes Governor
Pokot Countywide To improve 5,000 acres reseeded -Purchase pasture 30M -County July Pastoral
Accelerated availability of seeds -Partners 2018- Economy –
Pasture livestock -Sell/Distribute the June Livestock
Production feeds pasture seeds to 2022 Production
(Reseeding) farmers at a
subsidized price
5,000 acres selective -Sensitize 25M -County January Pastoral Done
bush clearing community -Partners 2018- Economy – allow
-Do selective bush -Community June Livestock natural
clearing 2022 Production regrowt
-Enclose cleared h
areas
Pasture/Fodder Countywide To improve 1,000 acres -Prepare bulking site 15M -County January Pastoral
Bulking (Demonstration availability of for pasture/fodder -Partners 2018 – Economy –
plots/Holding planting -Purchase the June202 Livestock
grounds/Farmer material for planting materials 2 Production
group lands)
206
livestock -Plant/distribute the
feeds planting materials
-Harvest the
product/seed and
distribute to the
farmers.
Commercial Kapenguria To improve One (1) processing -Identify/ purchase 80M -County July Pastoral
Livestock and on availability plant land space within -Partners 2018- Economy –
Fish Feeds of livestock Kapenguria urban June Livestock
Processing Plant commercial centre 2022 Production
feeds within -Construct and equip
the county the plant
-Identify a
group/Cooperative/A
ssociation to run the
facility
Supply of 12 wards: To improve 24 -Procurement 1,44 County 2018- Pastoral
portable feed -Kapenguria on availability process M 2022 Economy –
processing -Siyoi, Mnagei of livestock -Identify beneficiary Livestock
machines/choppe -Chepareria commercial groups Production
r -Lelan,Riwo feeds within
-Tapach the county
-Batei, Sook
-Weiwei
-Sekerr, Suam
Poultry Countywide To improve 20,000 improved -Purchase one-day- 50 M -County Sept Pastoral
improvement poultry poultry reared and old chicks -Partners, e.g 2018- Economy –
production distributed to farmers -Raise chicks for 2-3 Kukuchick, etc. 2022 Livestock
and household months at Production
incomes Kapenguria and
Nasukuta LIC
poultry units
-Distribute
cockerels/pullets to
farmers
Strengthening Countywide To enhance 10,000 modern/ -Purchase hives 20M -County 2018- -Department of
Beekeeping alternative improved bee hives -Distribute to -Partners 2022 Pastoral
Industry livelihoods distributed to farmers beekeepers/groups Economy –
for livestock (500 per ward over a Livestock
keepers period of 5 years) Production
207
Promotion of Countywide To increase Dairy goats – 750 ( 50 -Purchase dairy goats 15M -County July2018 Pastoral Wards
dairy goats milk per ward for 15 wards -Distribute to -partners - Economy – covered
production within 5 years. Wards: - livestock keepers June,202 Livestock are
Lelan, Tapach, Batei, 2 Production those
Lomut, Chepareria, having
Siyoi, Kapenguria, areas
Mnagei, Riwo, Endugh, with
Sook, Alale, Kasei, suitable
Sekerr, Weiwei, climatic
conditio
ns
Promotion of Countywide To increase 10,000 rabbits within 5 -Purchase of rabbits 10M -County July2018 Pastoral
Rabbit keeping household years -Develop designs of -Partners - Economy –
incomes and hutches June202 Livestock
nutrition -Construct 20 2 Production
hatches for
demonstration
-Distribution to
wards, targeting
youths and schools
Promotion of Pig -Urban centres To diversify 500 pigs within 5 years -Purchase pigs 5M -County July,201 Pastoral
farming -Learning livestock -Develop pig sty -Partners 8-June Economy –
institutions enterprises designs 2022 Livestock
-Distribute to Production
selected farmers and
institutions
Extension Countywide To increase -Hold 30 pastoral field 73.6 2018- Pastoral
Services skills, days per year M 2022 Economy –
knowledge -3 educational tour for Livestock
and adoption farmers within and Production
of new outside county per year
livestock -500 on-farm
technologies demonstration
among -300 radio talks services
livestock -holding 5 livestock
actors stakeholders meetings
Livestock Countywide To improve Six(6) livestock -Sensitize 90M -County January -Department of
Marketing and livestock Saleyards: community so that -Partners 2018- Pastoral
Value addition market access Chepareria,Lomut, they provide land for June Economy –
Chepkono, Chemwapit, saleyard 2022 Livestock
-Produce designs Production
208
Sigor Chemwapit, -Construct the -Partners
Kamketo saleyard
Four (4) honey -Sensitize 40M -County July2018 Pastoral
refineries established: beekeepers -Partners -June Economy –
Alale, Kacheliba, groups/Co- 2022 Livestock
Sigor, Chepkopegh operatives Production
-Identify refinery site
-Purchase honey
refinery equipment
-Install the machines
Support 20 livestock -Identify and register 40M County 2018- Pastoral
marketing groups to beneficiary groups 2022 Economy –
buy and fatten steers -Capacity build on Livestock
entrepreneurship Production
-Funding
Staff/Stakeholder -Identify destination 18M County 2018- Pastoral
Exposure Tours to a (preferably Israel and 2022 Economy –
foreign countries – 2 (1 Botswana) Livestock
dairy and 1 beef) -Identify participants Production
-15
-Travel
Rehabilitation of Kacheliba To create land 8 holding grounds -Sensitize 100 County 2018- Department of
Livestock (Suam ward), space for rehabilitated community M 2022 Pastoral
Holding Grounds/ Kitelakapel disease-free -Repossess Economy –
Lands (Riwo ward), zones, feeds encroached areas Livestock
Pkopoch reserves, -Demarcate and Production
(Mnagei ward), livestock fence the holding
Keringet breeding, ground
(Mnagei ward), value -Construct
Kabichbich addition, offices/houses in the
(Lelan ward), research and holding
Kanyikeny other grounds/plots
(Chepareria activities that -Cultivate some
ward), Runo promote portion and establish
(Weiwei ward), livestock pastures.
Lotongot production
(Masol ward) and health.
Legalizing -All livestock To safeguard All existing lands and -Demarcate all the 4M -County January Pastoral
Livestock Land lands/plots all livestock those yet to be acquired lands 2018- Economy –
Ownership land for – 15 parcels -Register the lands June Livestock
proper -Acquire title deeds 2022 Production
209
planning and
use
Livestock Countywide To increase 10,000 animals bought -Sensitize livestock 100 -County July Pastoral
Emergency resilience of from farmers during keepers M -Partners 2018- Economy –
Interventions livestock severe drought -Purchase weak June Livestock
keepers (Emergency off-take) animals from most 2022 Production
against hit areas for slaughter
disasters
10,000 animals bought -Sensitization of 100 -County July Pastoral
from farmers by traders livestock traders and M -National 2018- Economy –
(Commercial off-take) community Government June Livestock
-Livestock trader -Partners 2022 Production
groups are assisted
with funds ( 50% of
the total purchase
price)
-Purchase of animals
by traders
5,000 metric tones of -Sensitize livestock 300 -County January Pastoral
livestock keepers M -National 2018- Economy –
feeds/supplements -Recruit Government June Livestock
beneficiaries -Partners 2022 Production
-Distribute feeds
Nasukuta Chepareria -To make the -Rear/stock: -Purchase more 60M County 2018- Pastoral
Livestock ward, Pokot LIC a centre - 200 sahiwal cattle livestock 2022 Economy –
Improvement South /Kipkomo of excellence -300 galla goats -Breed the livestock Livestock
Centre sub-county for provision -300 dorper sheep -Sell livestock to Production
of superior -50 dairy goats deserving farmers
livestock -40 camels -Sell surplus hay to
breeds and -5,000 poultry farmers
practical -200 modern hives
technical -60,000 bales of hay
skills/knowle
dge
Administration block -Construct and equip 36M County 2018- Pastoral
Accommodation and administration block 2022 Economy –
Learning/Conferencing Livestock
facilities,purchase I Production
motor vehicle
Hay shades – 4 -Complete works for 17M County 2018- Pastoral
two incomplete hay 2022 Economy –
210
sheds, -Construct 2 Livestock
new hay sheds Production
Livestock bomas Construct livestock 5M County 2018- Pastoral
bomas 2022 Economy –
Livestock
Production
Periphery fence Put up metal posts 200 County 2018- Pastoral
and chain link fence M 2022 Economy –
Livestock
Production
Electricity and water -Connect electricity 5M County 2018- Pastoral
supply and piped water 2022 Economy –
-Drill two boreholes Livestock
-One water pan Production
Improve -1,000 acres of pasture Raise quatations for 5M Pastoral
pasture established seeds ,tractors and Economy –
production -2 Tractors purchased farm implements. Livestock
-8 sets of farm Production
implements (plough,
harrow, mower, rake,
baler, trailor, water
boozer) purchased
Project Name Location Objective Targets Key Description Cost Source of Time Implementing Remar
of Activities (KSh) Funding Frame Agency ks
Dip construction Wards -Reduce tick borne 33 -Land acquisition 82.5 County 2018- Department of commu
diseases. -Construction million government of 2022 pastoral nity to
-improve livestock -Hand over to West Pokot economy contrib
-increase livestock community for use through ute land
productivity division of vet
services
-community
Dip Repairs Wards -Reduce tick borne 50 -Identification and 25 million County 2018- -Department of Commu
diseases. assessment of dips 2022 Pastoral nity to
-improve livestock -Generation of Economy – contrib
health BQs Veterinary ute land
-Repaires -Community
211
-increase livestock
productivity
Purchase of foot Countywide -Reduce tick borne 1,545 within -Procurement of 17 M County 2018- -Department of
spray pumps diseases. 103 villages pumps 2022 Pastoral
-improve livestock -Distribution to Economy –
health groups Veterinary
-increase livestock -Train
productivity beneficiaries
Construction of Countywide -improve livestock 96 -Land acquisition 115.2M County 2018- -Department of Commu
metallic crushes health -Construction 2022 Pastoral nity to
-increase livestock -Hand over to Economy- contrib
productivity community for use Veterinary ute land
-Community
Construction of 5 Sub-counties -To improve vet 5 -Land acquisition 60 M County 2018- -Department of County
Medium-sized public health -Construction 2022 Pastoral Govern
(class B )Abattoir hygiene -Veterinary Economy- ment to
-improve food Division to run the Veterinary provide
safety of animal facilities land
origin
Equipping Kapenguria -improve disease 1 -Identify required 8M -County 2018- Department of To be a
veterinary detection & equipment -National 2022 Pastoral satellite
laboratory confirmatory -Tendering and Government Economy - lad for
diagnosis supply of Veterinary Eldoret
equipmrnt RVIL
Artificial -Kapenguria To improve 6 -Procurement of 20M County 2018- -Department of Service
Insemination -Siyoi livestock AI Equipment 2022 Pastoral s are
Schemes -Mnagei productivity -Train Economy – subsidiz
-Kabichbich inseminators Veterinary ed by
-Tapach -Community -Partners County
-Chepareria Sensitization (Private animal Govern
health service ment
providers)
Establishment of Wards To improve 100 -Sensitize 30M -Department of 2018- -Department of
Veterinary livestock health community Pastoral 2022 Pastoral
Clinics -Identify clinic Economy – Economy –
sites Veterinary Veterinary
-Procure -Partners -Partners
drugs/equipment (Private animal (Private animal
health service health service
providers) providers)
212
Completion and -Alale To provide office 3 offices -Procurement 6M Department of 2018- -Department of
Equipping of -Kabichbich space process Pastoral 2022 Pastoral
Sub-county -Sigor -Construction and Economy – Economy –
offices equipping Veterinary Veterinary
Services -Partners
(Private animal
health service
providers)
Construction and -Kasei To provide office 3 offices -Procurement 20M Department of 2018- -Department of
Equipping Ward -Kapchok space process Pastoral 2022 Pastoral
Offices -Endugh -Construction and Economy – Economy –
equipping Veterinary Veterinary
Services
Purchase of Sectorwide To facilitate service 4 -Procurement 25M Department of 2018- -Department of
Motor vehicles delivery process Pastoral 2022 Pastoral
-Purchase Economy – Economy –
Veterinary Veterinary
Services
Purchase of Sectorwide To facilitate service 20 -Procurement 8M Department of 2018- -Department of
Motorcycles delivery process Pastoral 2022 Pastoral
-Purchase Economy – Economy –
Veterinary Veterinary
Services
Staff Training Sectorwide To enhance service -3 Long-term -Nomination 1.8M Department of 2018- -Department of
delivery courses -Training Pastoral 2022 Pastoral
-7 Short term Economy – Economy –
courses Veterinary Veterinary/Tra
Services/ ining
Training Committee/CP
Committee/CPS SB
B
Generation of Sectorwide Enhance Service 5 -Drafting 2.5M Department of 2018- -Department of
Policies /Bills Delivery policies/bills Pastoral 2022 Pastoral
-Public Economy – Economy –
Participation Veterinary Veterinary
-Submit to County Services
Attorney and
County Assembly
-Governor’s assent
213
Livestock Countywide Increase Resilience 500,000 doses -Sensitize 25M Department of 2018- -Department of
Emergencies of Livestock and of assorted livestock keepers Pastoral 2022 Pastoral
Pastoralists vaccines -Vaccinate animals Economy – Economy –
Veterinary Veterinary
Services -Partners
Assorted -Sensitize 10M Department of 2018- -Department of
veterinary livestock keepers Pastoral 2022 Pastoral
drugs -Traet animals Economy – Economy –
(Dewormers, Veterinary Veterinary
Acaricides, Services -Partners
injectables)
Project Name Location Objective Targets Key Description of Cost Source Time Implementing Remar
Activitie (KSh of Frame Agency ks
) Fundin
g
Restocking one Turkwel Dam To increase -Five tonnes of fish -Quantity of fish 12 M County 2018- County gov’t
million and sustain produced in turkwel produced gov’t 2022
fingerlings in fish dam per month
Turkwell dam and production -Increased revenue -Amount of revenue
purchase of 3 from fish and fish generated from fish and
motorboats for products fish products
dam fishery. -No of motorboats
purchased
Fish cold storage Turkwel To reduce 1 cold storage facility Functional cold storage 15 M County 2018- County gov’t
facility losses due to purchased gov’t 2022
poor storage
of fish
Completion and Kapenguria To provide 1 milion tilapia No of fingerlings 15 M County 2018- County gov’t
operationalization sustainable fingerlings produced produced and gov’t 2022
of tilapia hatchery production of per year distributed to farmers
tilapia
fingerlings
Construction of Turkwel Dam To improve 1 -Procurement process 5M County 2018- -Department of
Fish Banda fish quality -Construction of Banda 2020 Pastoral Economy –
Fisheries
214
Construction of -Riwo To provide 3 -Procurement process 24M County 2018- -Department of
Ward Offices -Batei office space -Construction of offices 2022 Pastoral Economy –
-Lomut Fisheries
Purchase of Sector wide To improve 2 Procurement 12M County 2018- -Department of
Motorvehicles service 2022 Pastoral Economy –
delivery Fisheries
Purchase of Sector wide To improve 10 Procurement 4M County 2018- -Department of
Motorcycles service 2022 Pastoral Economy –
delivery Fisheries
Sector: Agriculture, Rural and Urban Development
Sub-sector: Lands, Housing, Physical Planning and Urban Development
Project Objective Target Key Cost Source Timeframe Implementing Remark
Name/location Description of (Kshs.) of Agency
Activities funding
Purchase of land for Improved sanitation KapenguriaMunicipality, Chepareria, Acquisition of County Jan 2018- Urban
dumpsites Ortum,Kacheliba,Sigor,Alale,Kabichbich land and Gov. of June-2022 dev/Public
developing it West Works
to dumpsite Pokot
Construction of Improved drainage KapenguriaMunicipality, Chepareria, Construction County Jan 2018- Urban
drainage system for system Ortum,Kacheliba,Sigor,Alale,Kabichbich of tunnels Gov. of June-2022 dev/Public
storm water. and culverts West Works
Pokot
Tarmacking and Improved business Kapenguria Municipality,Chepareria, Tarmacking County Jan 2018- Urban
opening major towns competitiveness Ortum,Kacheliba,Sigor,Alale,Kabichbich, and opening Gov. of June-2022 dev/Public
roads Amakuriat up more roads West Works
Pokot
Establish GIS lab Improved efficiency Survey and physical planning departments Purchase GIS County Jan 2018- Survey/Physical
in service delivery softwares, Gov. of June-2022 Planning
and storage of computers West
maps/data and servers Pokot
Mapping of all public To have inventory The whole county Survey and County Jan 2018- Survey/Physical
lands of all public land preparation of Gov. of June-2022 Planning
Part West
Development Pokot
Plans
215
Construction of low To improve living Kapenguria Municipality,Chepareria, Construction County Jan 2018- Urban dev,
cost housing units conditions Ortum,Kacheliba,Sigor,Alale,Kabichbich of houses Gov. of June-2022 Public Works
West and Housing
Pokot
Purchase of modern Clean urban centers Kapenguria Munipality,Chepareria, Purchase of County Jan 2018- Urban
refuse trucks Ortum modern refuse Gov. of June-2022 Development
trucks West
Pokot
Acquire survey To improve Survey office Purchase of County Jan 2018- Survey
equipments efficiency in data Differential Gov. of June-2022 department
collection GPS West
Pokot
Purchase of Shovel Clean urban centers Kapenguria Munipality Chepareria, Purchase of County Jan 2018- Urban
truck for refuse Ortum, Kacheliba, Sigor, Alale, Shovel truck Gov. of June-2022 Development
collection Kabichbich West
Pokot
Purchase and To put out fire All public buildings and offices Purchase of County Jan 2018- Ministry of lands
installation of fire accidents in fire Gov. of June-2022
extinguishers buildings extinguishers West
Pokot
Purchase of field To improve service Survey, Adjudication, Physical Planning Purchase of County Jan 2018- Ministry of
vehicles delivery and Urban Development vehicles Gov. of June-2022 Lands
West
Pokot
Purchase of 6 fire To put out fire Kapenguria Munipality, Chepareria, Purchase of 2 County Jan 2018- Urban
Engines accidents in urban Ortum, Kacheliba, Sigor, Alale, Lorries and 4 Gov. of June-2022 Development
centers Kabichbich Land Rovers West
Pokot
Construct fire station To manage fire Kapenguria Munipality Purchase land County Jan 2018- Urban
accidents and Gov. of June-2022 dev/Public
construction West Works
of fire station Pokot
Purchase land for Burrial site for the Kapenguria Munipality Chepareria, Purchase of County Jan 2018- Urban
cemeteries dead people Ortum, Kacheliba, Sigor, Alale, land Gov. of June-2022 Development
Kabichbich West
Pokot
216
ICT Networking To enhance service Ardhi house and Urban Dev. House in Installation of County Jan 2018- Ministry of
delivery Makutano cables Gov. of June-2022 Lands
West
Pokot
Purchase land for To enhance town Kapenguria Munipality Purchase of County Jan 2018- Urban
holding ground for beautification land Gov. of June-2022 Development
impounded livestock West
and vehicles Pokot
Purchase, equip and To enhance service Ardhi house and Urban Dev. House in Purchase of County Jan 2018- Ministry of
furnish of offices delivery Makutano office Gov. of June-2022 Lands
furniture and West
computers Pokot
Purchase of Power backup Ardhi house and Urban Dev. House in Purchase of County Jan 2018- Ministry of
Generator at Ardhi Makutano generators Gov. of June-2022 Lands
house West
Pokot
Construction of Murkwijit, Makutano, Bendera Junction Erection of County Jan 2018- Urban
signage’s signs Gov. of June-2022 dev/Public
West Works
Pokot
Mapping of informal Slum upgrading. Kapenguria Municipality Building low County Jan 2018- Urban
settlement Planning purposes cost housing Gov. of June-2022 dev/Public
units West Works
Pokot
Documentation of Resettlement of County Purchase of County Jan 2018- Ministry of
settlement schemes landless land Gov. of June-2022 Lands
people/squatters. West
Pokot
Purchase of 1 For improved Kapenguria Municipality Purchase of County July 2018- Urban
breakdown vehicle traffic control breakdown Gov. of June 2019 Development
vehicle West
Pokot
Construction of car Beautification of Ardhi house Planting of County July 2018- Ministry of
park and land the compound flowers and Gov. of June 2019 Lands and Public
scapping at Ardhi construction West Works
house of car park Pokot
217
Construction of Improve sanitation Ardhi house County July 2018- Ministry of
Toilet in Ardhi house Gov. of June 2019 Lands and Public
West Works
Pokot
Construction of Provide market Kapenguria Municipality Construction County Jan2018- Urban
storied market unit stalls. of building. Gov. of June 2022 dev/Public
West Works
Pokot
Construction fresh Provide market Konyao, Sebit, Chepnyal, Chesegon, Construction County Jan2018- Urban
produce markets stalls. Keringet, Cheptuya, Murkwijit, of markets Gov. of June 2022 dev/Public
Kapenguria(Aramaket), Siyoi, Tapach. West Works
Pokot
Sector: Health
Sub-sector: Health, Sanitation And Emergency services
Project Objective Target Key Description of Activities Cost Source of Timefra Implement Rema
Name/locatio (Kshs.) funding me ing Agency rk
n
Renovation of To renovate A functional solid Unblocking and renovation of all the lagoons 15,0000, County 2018- CDoH
Kapenguria the KCRH waste management including purchase and installation of manhole 000 Gov't 2022
County lagoon system covers
Referal
Hospital solid
waste
management
system
Construction To enhance CDoH administration Develop drawings, BOQs 110,000, County 2018- CDoH
and equipping coordination block constructed Tendering & Construction works 000 Gov’t/Part 2022
of the CDoH of health care ners
Headquarters( services
Afya house)
218
ICT system To support -Electronic Medical Develop Ict system specifications, preparation of 20,000,0 County 2018- CDoH
Upgrade provision of Records BOQs,tendering, installation, testing & 00 Gov’t/Part 2022
Kapenguria quality,afford -Telemedicine commissioning ners
county referral able infrastructure in place
Hospital healthcare -Biometric Clocking
system
-logistics/ Drug
management
information system
-CCTV
Construct To improve Complete & Develop drawings, BOQs 30,000,0 County 2018- CDoH
Amenity the quality of functional Amenity Tendering & Construction works 00 Gov’t/Part 2022
wing-KCRH care and wing ners
patient
management
Construct and To improve Functional mortuary Develop drawings, BOQs 20,000,0 County 2018- CDoH
equip modern the quality of Tendering & Construction works 00 Gov’t/Part 2022
mortuary- mortuary ners
KCRH services
County Blood -Blood bank Construction works, purchase of lab equipment, staff 50,000,0 County 2018- CDoH
bank services construction recruitment 00 Gov’t/Part 2022
support completed ners
-Lab equipment
purchased
-12 lab techs
recruited
-Complete &
functional Blood
bank
Sub county To enhance Construct 5 Develop drawings, BOQs 110,000, County 2018- CDoH
administration coordination subcounty Tendering & Construction works 000 Gov’t/Part 2022
block of health care administration blocks ners
services
Construction To provide construct Doctor’s Develop drawings, BOQs 50,000,0 County 2018- CDoH
of a doctors accommodati plaza Tendering & Construction works 00 Gov't 2022
plaza-KCRH on for
medical
specialists
219
Critical care …….beds set up in Procurement of beds, Training on critical care 17,120,0 County Manageme
services KCRH 00 Gov't, nt
upgrade 24 HCWs trained in National Equipment
critical care across Gov’t & Service
the county partners program
-6 medical officers /KNH, East
trained on critical African
care Kidney
Institute,
County
Governme
nt
Community To promote -6 sensitization Trainings, Support supervision, procurement & 400 CDoH/ 2018- CDoH/
Led total best hygiene meetings held/ distribution of prefabricated slaps Million Partners 2022 Partners
Sanitation practices in Advocacy p.a
(CLTS) the -80 CLTS inspectors
project community trained
-2,000 CHVs/
CHEWs/ CHCs
trained on CLTS
-1,000 prefabricated
slabs distributed to
the community
-Setting up of a
multispectral steering
group
Community To strengthen …….CUs set up Training & setting up of CUs 777.6 County 2018- County
strategy health …….CHVs/CHCs/C million Gov’t and 2022 Gov’t and
program services at the HEWs trained in Partners Partners
community Community strategy
level
Nutrition Reduced Reduce current -Early detection and management of malnutrition 8,000,00 County County
Support stunting stunting level from -Foster utilization of available foods and balanced 0 Gov’t and Gov’t and
Program ….% to ….% diets through health promotion Partners Partners
-Setting up of baby friendly health facilities and
communities
-Early detection and management of malnutrition
Administrative To enhance Purchase 7 utility Develop specifications, Tendering & supply of 35,000,0 County 2018- CDoH
support coordination vehicles vehicles 00 Gov't 2022
220
vehi of health care
cles services
Sub county To improve Upgrading of 6 Construct and operationalize theatres, 180,000, County 2018- CDoH
Hospitals access to county Construct/provide diagnostic laboratories 000 Gov't 2022
Upgrading quality, hospitals(Kacheliba Increase inpatient capacity by constructing additional
project affordable Sigor, Chepareria, wards and provision of beds & textiles
universal Alale
healthcare Kabichbich,
Makutano)
Construct and To improve Construct staff houses and maternity wing in 10,000,0 County 2018- CDoH
improve health access to kaprom dispensary 00 Gov't 2022
facilities and quality,
infrastructure affordable
in Kapenguria universal
Ward healthcare
Purchase more land and construct a maternity wing 7,000,00 County 2018- CDoH
in komol dispensary 0 Gov't 2022
221
Construct staff health centre and fence for 5,000,00 County 2018- CDoH
Emboasis Dispensary 0 Gov't 2022
construct new To improve New and functional Purchase land Tartar Dispensary 10,000,0 County 2018- CDoH
health access to health facilities 00 Gov't 2022
facilities and quality,
upgrade affordable Construction of toilets at Lityei trading centre 500,000 County 2018- CDoH
existing health universal Gov't 2022
facilities in healthcare
mnagei ward Construct Tambalal Dispensary 10,000,0 County 2018- CDoH
00 Gov't 2022
Purchase and construct land for Makutano Sub- 50,000,0 County 2018- CDoH
county hospital 00 Gov't 2022
222
Purchase land for Murkwijit and upgrade it to Health 15,000,0 County 2018- CDoH
centre 00 Gov't 2022
Construct and To improve Complete and Construct a laboratory in Kaprech dispensary 4,000,00 County 2018- CDoH
improve health access to functional health 00 Gov't 2022
facilities in quality, facilities
Siyoi Ward affordable
universal
healthcare
Purchase of more land for paraywa and Sokomoko 4,000,00 County 2018- CDoH
dispensary 0 Gov't 2022
Purchase of facility land for Kaibos Health centre 2,000,00 County 2018- CDoH
0 Gov't 2022
Construct and To improve Complete and Construct 2 toilet and staff houses in Chepotarama 7,000,00 County 2018- CDoH
improve health access to functional Health dispensary 0 Gov't 2022
facilities in quality, facilities
Riwo Ward affordable
universal
healthcare
Construct maternity wing at Kreswo dispensary 5,000,00 County 2018- CDoH
00 Gov't 2022
223
Construct 2 latrines and a perimeter fence at 3,000,00 County 2018- CDoH
Auskion dispensary 0 Gov't 2022
Provide water supply for Nachecheyet dispensary 3,000,00 County 2018- CDoH
0 Gov't 2022
Construct and To improve complete and construct maternity wing at Chepnyal dispensary in 10,000,0 County 2018- CDoH
improve health access to functional health Chepnyal 00 Gov't 2022
facilities in quality, facilities
Sook ward. affordable
224
universal
healthcare
construct and equip maternity wing at Tamough 5,000,00 County 2018- CDoH
dispensary in Tamough 0 Gov't 2022
Construct and To improve complete new and Construct Chepungun dispensary in Kapsangar , 10,000,0 County 2018- CDoH
improve health access to functional health 00 Gov't 2022
facilities in quality, facilities
Lelan ward. affordable
universal
healthcare
225
Construct Chemaltin dispesary in Tonoyo 10,000,0 County 2018- CDoH
00 Gov't 2022
Construct and To improve complete new and Construct dispensary at cheptulel 10,000,0 County 2018- CDoH
improve health access to functional health 0 Gov't 2022
facilities in quality, facilities
Lomut ward affordable construct Chepkokogh dispensary in Chepkokogh 10,000,0 County 2018- CDoH
universal Gov't
00 2022
healthcare
Construct toilets arpolo trading centre 500,000 County 2018- CDoH
Gov't 2022
construct staff houses at Otiot dispensary in Marus, 5,000,00 County 2018- CDoH
0 Gov't 2022
Construct staff houses Lomut dispensary in Ptiasis, 5,000,00 County 2018- CDoH
0 Gov't 2022
226
Construct and To improve Complete and Purchase land and construct Tororo, Kaipawis 24,000,0 County 2018- CDoH
improve health access to functional dispensaries 00 Gov't 2022
facilities and quality, Dispensary
infrastructure affordable
in Tapach universal
Ward healthcare
Construct staff houses at Telo, Nyarpat dispensary, 20,000,0 County 2018- CDoH
OPD department 00 Gov't 2022
Purchase 3 acres of land for construction of Tapacg 10,000,0 County 2018/20 CDoH
dispensary 00 Gov't 22
Construction To improve Completed and Completion of the paediatric ward and the 5,000,00 County 2018- CDoH
of new and access to functional health maternity wing in Chepkopegh 0 Gov't 2022
improve of quality, facilities
existing health affordable
facilities in universal
Chepareria healthcare
Ward
Construction of a staff house and 3 pit latrines on 6,500,00 County 2018- CDoH
Senetwo dispensary 0 Gov't 2022
227
Construction of a maternity wing in Chemotong 5,000,00 County 2018- CDoH
dispensary in Shalpough 00 Gov't 2022
Purchase of land for Priokwo, Kopulwo and Psimat 6,000,00 County 2018- CDoH
dispensaries 0 Gov't 2022
Construction To improve Completion and Construct Amaler dispensary in Karia 10,000,0 County 2018- CDoH
of new and access to functional health 00 Gov't 2022
improving the quality, facilities.
existing affordable
health universal
healthcare
228
facilities in
Masol ward
Construction To improve Completed and construct paroo dispensary in kitiyo sub location 5,000,00 County 2018- CDoH
of new and access to functional health 0 Gov't 2022
improving the quality, facilities.
existing health affordable
facilities in universal
Weiwei ward. healthcare
purchase land and construct Endow dispensary 7,000,00 County 2018- CDoH
Ptalam sub location 0 Gov't 2022
Construction of blood bank sigor health centre 10,000,0 County 2018- CDoH
00 Gov't 2022
229
Construction of ptokou dispensary 10,000,0 County 2018- CDoH
00 Gov't 2022
Construction To improve completed and Construction and equipping theatre at Sigor sub 30,000,0 County 2018- CDoH
of new and access to functional health county hospital in Korellach 000 Gov't 2022
improving the quality, facilities.
existing health affordable
facilities in universal
Weiwei ward. healthcare
construction To improve Complete and upgrading and expansion of marich dispensary to 10,000,0 County 2018/20 CDoH
of new and access to functional health centre 00 Gov't 22
improving the quality, Dispensary
existing affordable
health universal
facilities in healthcare
Sekerr ward
Construction To improve Complete and Construction of maternity wing at Kodich in Kodich 5,000,00 County 2017/18- CDoH
of new and access to functional health 0 Gov't 2021/20
improving the quality, facilities 22
existing health affordable
facilities in universal
Kodich ward. healthcare
230
Construction of maternity at Cherangan dispensary in 5,000,00 County 2017/18- CDoH
Cherangany 0 Gov't 2021/20
22
Construction To improve Complete and Construct Chepurwo dispensary in Kamunono 10,000,0 County 2017/18- CDoH
of new and access to functional health 00 Gov't 2021/20
improving the quality, facilities 22
existing health affordable
facilities in universal
Kasei ward healthcare
231
Construction Sankakai dispensary in Katumkale, 10,000,0 County 2018- CDoH
00 Gov't 2022
Construction To improve complete and Construct a maternity wing and a fence at Kauriong. 5,000,00 County 2018- CDoH
of new and access to functional health 0 Gov't 2022
improving the quality, facilities.
existing health affordable
facilities in universal
Kiwawa ward. healthcare
Construction To improve Complete and Construction of Kariamawoi and Chepkirony 20,000,0 County 2018/20 CDoH
of new and access to functional dispensaries in Kapyen 00 Gov't 22
improving the quality, Dispensary
existing health affordable
facilities in universal
Kapchok ward healthcare
232
Construction of Kamokongwo dispensary in Kameris 10,000,0 County 2018- CDoH
00 Gov't 2022
Upgrading, Renovation and fencing of Konyao H/C 15,000,0 County 2018- CDoH
in Konyao 00 Gov't 2022
Construct and To improve Complete and Construct dispensary at chepkoring 5,000,00 County 2018- CDoH
improve health access to functional 0 Gov't 2022
facilities in quality, Dispensary
Batei ward affordable
universal
healthcare
purchase land and construct model health centre at 27,000,0 County 2018- CDoH
Ortum 00 Gov't 2022
purchase land and construct staff house at kerelwa 7,000,00 County 2018- CDoH
dispensary 00 Gov't 2022
233
construct staff house at Sebit dispensary 5,000,00 County 2018- CDoH
0 Gov't 2022
Construct and To improve Complete and construct dispensaries at Nakuyen, Karon, 60,000,0 County 2018- CDoH
improve health access to functional health Chepurich, Chepuroch kagh, Shongan and 0 Gov't 2022
facilities in quality, facilities Morwongar dispensaries
Suam ward affordable
universal
healthcare
Construct and To improve Complete and Upgrading dispensary to health centres at 30,000,0 County 2018- CDoH
improve health access to functional health kasitot,lengorok, 00 Gov't 2022
facilities Alale quality, facilities
ward affordable
universal
healthcare
Construct public toilet at amakuriat trading centre 700,000 County 2018- CDoH
Gov't 2022
Construct and To improve Complete and Construct dispensaries 60,000,0 County 2018- CDoH
improve health access to functional health at,merur,tunoyochewarany,kapkata,tamarukwo,chep 00 Gov't 2022
facilities quality, facilities okachim,rukei,
endough ward affordable
234
universal
healthcare
Construct and equip dispensary atwonyoi dispensary 20,000,0 County 2018- CDoH
00 Gov't 2022
Construct and To improve Complete and Construct dispensaries at chepungon,chemaltin, 20,000,0 County 2018- CDoH
improve health access to functional health ringring, 00 Gov't 2022
facilities Lelan quality, facilities
ward affordable
universal
healthcare
236
Tendering,
installation of
equipment
Sub-County and Installation of Sub-County Develop 40,000,000 County 2018/2022 Public service, ICT
Ward Offices electricity, and Ward specifications, Government and Devolved Units
construction of Offices Tendering,
external pit construction and
latrines, installation installation
of water tanks
237
Katikomor,kanyerus,O Tendering
mpolion, and
sapulmoi, awarding
akulo, nauyapong
1.To promote wealth Construct 6 Cross Preparation National 2018-2022 West pokot county
creation among boarder fresh produce of BQs gvt,county gvt
boarder communities market at Tendering GVT and
2.To improve access Katikomor,kanyerus,O and partners
of livestock and farm mpolion, awarding
produce to the cross sapulmoi,
border communist akulo, nauyapong
To enhance food Establish 2 Cross Preparation National 2018-2022 Turkana county gvt
security among the boarder irrigation of BQs, gvt,county
boarder communities scheme at Ompolion, Tendering gvt and
Cheranga and partners
awarding
To improve security Construct 3 police post Preparation National 2018-2022 West pokot county
response at Chesegon, Cheratak of BQs gvt,county gvt
and Kapatet Tendering gvt and County/National
and partners Gov, NGOs and
awarding Other partners
Communication To increase network Lomut(otiot,kasamugh, Preparation National 2018-2022 West pokot county
coverage access for sukuk),mnagei(mortom of BQs, gvt,county gvt
communication e) Tendering gvt and
and partners
awarding
Town security To improve security Alale,sebit,ortum,Lomu Preparation National 2018-2022 County/National
lighting project t,Chesta,Kishaunet of BQs, gvt,county Gov, NGOs and
trading Tendering gvt Other partners
centre,lityei,Murkujit,r and
oponyo,tapach,cheparer awarding
ia,
Office of the County Improve coordination Construct a new county Preparation National 2018-2022 County/National
Commissioner of government affairs commissioner of BQs gvt,county Gov’t
Administration and intergovernmental administration office Tendering gvt
Block Relations Block and
awarding
Sub-sector:County Assembly
238
Project Objective Target Key Cost (Kshs.) Source of Timeframe Implementing Remark
Name/location Description of funding Agency
Activities
Completion of County 2018-2022 County Assembly
modern County Assembly
assembly
Construction of County 2018-2022 County Assembly
speakers Residence Assembly
239
Construction of Strategic grain Construct 5 Preparation of 50 million County 2018-2022 Disaster
cereal stores in reserves to Cereal stores BQs, Gov’t Management
each Sub county enhance food tendering, Unit, Agriculture
security Construction & Irrigation
works
Installation of Disaster risk Installation of Preparation of 10 million County 2018-2022 Disaster
lightning Arresters reduction 50 lighting BQs, Gov’t Management Unit
arrestors tendering,
Construction
works
Sector: Energy, Infrastructure and ICT
Sub-sector: Public Works, Transport And Infrastructure
Project Objective Target Key Description Cost (Kshs.) Source of Timeframe Implementing Remark
Name/location of Activities funding Agency
Opening up of new Improved Opening up of Opening using 600M County 2018-2022 County Identified from
roads access to new roads in 20 equipment Government/ Government/ public
schools, Wards National National participation
markets, health Government Government
centres
Gravelling of existing Improved To have an all Gravelling 1B County 2018-2022 County Identified from
roads access to weather road Government/ Government/ public
schools, National National participation
markets, health Government Government
centres
Erecting structures on Improved To improve Culverts, drifts, 800M County 2018-2022 County Identified from
newly opened roads access to drainages and gabions Government/ Government/ public
schools, lifespan of our National National participation
markets, health roads Government Government
centres
Erecting structures on Improved To improve Culverts, drifts, 800M County 2018-2022 County
newly opened roads access to drainages and gabions Government/ Government/
schools, lifespan of our National National
markets, health roads Government Government
centres
Construction of Improved Linking Steel decks on 200M County 2018-2022 County Identified from
footbridges access to communities concrete columns, Government/ Government/ public
schools, and social approaches National National participation
markets, health facilities Government Government
centres
240
Project Name/location Objective Target Key Description Cost (Kshs.) Source of Timeframe Implementing Remark
of Activities funding Agency
Kasei-ApetaKour- Improved To have an all 36M County 2018-2022 County It is an
Ombolion (kasei ward) access to weather road Government/ Government/ important
schools, KRB KeRRA security link
markets, health road
centres
Kalapata-Lodwar( Alale Improved To have an all Opening using 42M County 2018-2022 County It is an
ward) access to weather road equipment, Government/ Government/ important
schools, structures and National National security link
markets, health gravelling Government Government road
centres
Emboasis-Marcha( Improved To have an all Opening using 15M County 2018-2022 County Identified from
Kapenguria ward) access to weather road equipment, Government/ Government/ public
schools, structures and KRB KeRRA participation
markets, health gravelling
centres
Kamolokon- Improved To have an all Opening using 110M County 2018-2022 County Identified from
kapushen(tapachawrd) access to weather road equipment, Government/ Government/ public
schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
Kacheliba-muruebong- Improved To have an all Opening using 20M County 2018-2022 County Identified from
uganda border(suam ward) access to weather road equipment, Government/ Government/ public
schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
Kabichbich-simotwo- Improved To have an all Opening using 30M County 2018-2022 County Identified from
motpokor(lelan ward) access to weather road equipment, Government/ Government/ public
schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
Kokwochaya- Improved To have an all Opening using 15M County 2018-2022 County Identified from
lokales(suam ward) access to weather road equipment, Government/ Government/ public
schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
241
Talau-Kapchila- Improved To have an all Opening using 20M County 2018-2022 County Identified from
paraywa(mnagei/siyoi access to weather road equipment, Government/ Government/ public
ward) schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
Kaptabuk-kaghmu- Improved To have an all Opening using 50M County 2018-2022 County Identified from
kotopngwiny-kaptum- access to weather road equipment, Government/ Government/ public
water point(lelan ward) schools, structures and KRB KeRRA participati
markets, health gravelling On
centres
Ortum-sobukwo- Improved To have an all Opening using 70M County 2018-2022 County Identified from
embough-psapai-kriich- access to weather road equipment, Government/ Government/ public
riting(batei/embough) schools, structures and National KeRRA participati
markets, health gravelling Government On
centres
Chesupet-riring-manian- Improved To have an all Opening using 40M County 2018-2022 County Identified from
kapchila access to weather road equipment, Government/ Government/ public
schools, structures and National KeRRA participati
markets, health gravelling Government On
centres
Subsector: Public Works
Project Name/location Objective Target Key Cost Source of Timeframe Implementing Remark
Description (Kshs.) funding Agency
of Activities
Construction of Bridges Improved Construct 6 major Develop 500M County 2018-2022 County Identified from
access to bridges (Kimpur specifications, Government/ Government/ public
schools, bridge, river Iyon tendering, National KeRRA participati
markets, health bridge, Ortum- Construction Government On
centres Empough bridge, Ritit works
–Marus bridge,
Nakwijit-Endough
bridge &Akiriamet
bridge
Construction of Improved Patiew footbridge, Steel decks on 86M County 2018-2022 County Identified from
footbridges access to Omtimim- concrete Government/ Government/ public
schools, muinofootbridge, columns, National KeRRA participati
markets, health Chepkechir approaches Government On
centres footbridge,
Adoket-pokoghin
footbridge,
242
Kapatet-marus
footbridge,
chepkoghin footbridge
(river muruny),
kanyangareng
footbridge (
kanyangareng river),
Koopulio
footbridge(across
river suam)
Materials testing Quality Ensure quality control Single storey 20M County 2018-2022 County Identified from
Laboratory building of construction building Government Government public
materials materials and works participati
On
Administrative Office Improved House the roads Double storey 20M County 2018-2022 County Identified from
block work department building Government Government public
environment to participati
workers On
243
Construction of a To promote tourism development in Complete Develop 70,000,0 County 2018- Department of
resort at Riting the county and specifications 00 Government, 2022 Tourism, Culture,
Beach(Turkwel) operational Tendering National Govt, Sports and Social
tourist Construction Partners Services
resort works
Construction of To promote tourism development in Complete Develop 150,000, County 2018- Department of
Tourist Hotel at the county and specifications 000 Government, 2022 Tourism, Culture,
Nasolot Game operational Tendering National Sports and Social
Reserve tourist Construction Govt,Partners Services
Hotel works
Construction of To promote sports development in the Complete Develop 15,000,0 County 2018- Department of
sport and social county and specification 00 Government 2022 TOURISM,culture,
office operational tendering National sports and social
construction Govt.,partners services
works
Construction and To exhibit the unique pokot culture -Pokot Develop 100,000, County 2018- Department of
operationalization -Create employment culture specifications 000 Government of 2022 Tourism, Culture,
of Mega Cultural -To attract tourists showcased Tendering WP Sports and Social
Centre -Kapenguria and Construction Services
promoted works
-Job
opportuniti
es created
Establishment of To promote tourism development in Complete Develop 40,000,0 County 2018- Department of
animal sanctuary at the county and specifications 00 Government, 2022 Tourism, Culture,
Nasolot operational Tendering National Govt, Sports and Social
animal Construction Partners Services
sanctuary works
Stocking of
sanctuary
Construction and To promote tourism development in Complete Develop 110,000, County 2018- Department of
equipment of 20 the county and specifications 000 Government, 2022 Tourism, Culture,
Pokot Cultural operational Tendering National Govt, Sports and Social
Libraries cultural Construction Partners Services
libraries works
Equipping of
Library
244
Construction of a To promote tourism development in Complete Develop 80,000,0 County 2018- Department of
resort at Murkorio the county and specifications 00 Government, 2022 Tourism, Culture,
Island and Tipet operational Tendering National Govt, Sports and Social
lodge . tourist Construction Partners Services
resort works
Develop Aqua Promote water sports tourism and Operationa Develop 50,000,0 County 2018- Department of
Sports at recreation l Water specifications 00 Government, 2022 Tourism, Culture,
Turkwel(surfing,bo Sports Tendering National Govt, Sports and Social
ating) For water sports Partners Services
equipment
Construction of a To promote tourism development in Complete Develop 50,000,0 County 2018- Department of
resort at Mt.Mtelo the county and specifications 00 Government, 2022 Tourism, Culture,
operational Tendering National Govt, Sports and Social
tourist Construction Partners Services
resort works
Construction of To promote tourism development in 6 Complete Develop 80,000,0 County 2018- Department of
Cultural Centres the county and specifications 00 Government, 2022 Tourism, Culture,
operational Tendering National Govt, Sports and Social
cultural Construction Partners Services
Centres works
Equipping
Cultural Centres
Construction and To promote youth empowerment in 4 Complete Develop 60,000,0 County 2018- Department of
equipping of new the county and specifications 00 Government, 2022 Tourism, Culture,
Youth operational Tendering National Govt, Sports and Social
Empowerment Youth Construction Partners t Services
Centres Empowerm works
ent Centres
County Tourism To safeguard tourist sites and cultural Safeguarde Develop 20,000,0 County 2018- Department of
and cultural artifacts d tourist specifications 00 Government, 2022 Tourism, Culture,
resource mapping sites and Tendering(consult National Govt, Sports and Social
cultural ancy) Partners Services
artifacts
Pokot Historical To document Pokot historical and Documente Comprehensive 50,000,0 County 2018- Department of
Documentation cultural heritage d Pokot Study 00 Government, 2022 Tourism, Culture,
Culture Tendering(consult National Govt, Sports and Social
Partners Services
245
ancy
Documentation
Production of To enhance preservation of Pokot Pokot Design 6,000,00 County 2018- Department of
Pokot Cultural traditional cultural performances traditional Production 0 Government, , 2022 Tourism, Culture,
Costumes culture Dissemination Partners Sports and Social
preserved Services
Identification, To preserve Pokot traditional culture Pokot Study 50,000,0 County 2018- Department of
conservation and cultural Documentation 00 Government, 2022 Tourism, Culture,
management of resources Storage Partners Sports and Social
Pokot tangible and preserved Services
intangible cultural
resources
Music industry kapenguria Provide Annual beauty and County govt 2018- County govt social
promotions recreation musig industry 50,000,0 2019 corp0rate
and job promotion county 00 responsibility
creation for song of the year NGOS
youths
Expansion of Social To empower vulnerable members of Social Policy and Legal 50,000,0 County 2018- Department of
Protection Fund society in the Protection Framework 00 Government/Nat 2022 Tourism, Culture,
county(women,widows,widowers,orp Fund Disbursement ional Govt Sports and Social
hans,older persons,PWDs) Established Services
Establishment of To empower the youth in the county Social Policy and Legal 80,000,0 County 2018- Department of
Youth Protection Framework 00 Government/Nat 2022 Tourism, Culture,
Empowerment Fund Disbursement ional govt Sports and Social
Fund(YEF) Established Services
Establishment of To support talent development in the Talent Policy and Legal 500,000 County 2018- Department of
Talent county Developme Framework Government 2022 Tourism, Culture,
Development nt Board Sports and Social
Board Established Services
Establishment of To nurture soccer talents County Policy and Legal 20,000,0 County 2018- Department of
County Football Football Framework 00 Government 2022 Tourism, Culture,
Team Team Sports and Social
Established Services
Annual inter- To promote sports development in the Sports Preparation of 100,000, County 2018- Department of
disciplinary Sports county competitio playgrounds 000 Government, 2022 Tourism, Culture,
Competitions ns Held for Identification of Development Sports and Social
(Ball games, Ball teams/managers Partners Services
athletics, games, Officiating
paralympics, Sports athletics, Co-ordination
equipment) Paralympic Awards
246
s every
year
Annual Pokot To enhance preservation of Pokot Cultural Preparation of 100,000, County 2018- Department of
Cultural Week culture week held venue 000 Government, , 2022 Tourism, Culture,
every year Identification of Partners Sports and Social
troupes/managers Services
Adjudication
Co-ordination
Awards
Annual Cultural To nature and nurture youth talent in Cultural Preparation of 50,000,0 County 2018- Department of
Music and Drama the county Music and venue 00 Government, 2022 Tourism, Culture,
Festival Drama invitations National Govt, Sports and Social
Festival Identification of Partners Services
held every troupes/managers
year Adjudication
Co-ordination
Awards
Annual Youth To encourage creativity and Youth Preparation of 30,000,0 County 2018- Department of
Exhibition Week innovativeness among the youth in week held venue 00 Government, 2022 Tourism, Culture,
the county Invitations National Govt, Sports and Social
Identification of Partners Services
youth groups
Adjudication
Co-ordination
Awards
Levelling of Promote athletics development in the Athletics Planting grass in 2,0000,0 County Govt 2018- Department of
running track at county talent the playground 00 2022 Tourism, Culture,
Kaptabuk High nurtured Sports and Social
altitude traning Services
centre
EQUIPPING of Promote sports development in the Sports Tendering 20,000,0 County 2018- Department of
High Altitude county talent Equipping of 00 Government, 2022 Tourism, Culture,
Training Camp at identified centre National Govt, Sports and Social
Lelan and Partners Services
nurtured
247
248