Workover Calculations PDF Free
Workover Calculations PDF Free
Pressures Volumes
Capacities
Length
If you want to compare obtained data in the table above with other data, or if you do not plan to use calculations
above for further reference, go to => Converter
Date: Well #:
Oilfield: Tbg Size:
Run for: Tallied in:
The controlling criteria for drill string design are collapse, tension, slip crushing, and dogleg severity.
Collapse and tension are used to select pipe weights, grades, and couplings.
Mud Density was measured in units
"metric" or "english"
COLLAPSE
The most severe collapse loading occurs when the evacuated (or partially empty) drill string reaches the
bottom of the well. The load from the annular mud tends to cause pipe collapse.
String Length Mud Weight Net Collapse Pressure Safety Pipe Collapse Strength
ft m ppg kg/m3 psi kPa Factor psi kPa
#VALUE! FALSE FALSE #VALUE! #VALUE! #VALUE! #VALUE!
TENSION
The tension load can be evaluated after the weights, grades, and section length have been established
from the collapse designs.
Average Temperature Stretch due to weight Stretch due to temp. Total Stretch
Mud SG
F C in m in m in m
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
CASING
OD ID Capacity Weight If you would like to look at the
inch mm inch mm bbls/ft lt/m lbs/ft kg/m Specification of selected tubulars, please
FALSE FALSE FALSE select the cell "Casing" , "Tubing" , or
FALSE FALSE FALSE "Drill Pipe" and follow recommenda-
FALSE FALSE FALSE tions given in comments.
Casing
If you need to convert values from English Units to
Metric or back, go to Sheet "Conversions" or open
link to Converter
TUBING
OD ID Weight Capacity Displacement Metal Displacement
inch mm inch mm lbs/ft kg/m bbls/ft lt/m bbls/ft lt/m bbls/ft lt/m
FALSE FALSE FALSE
FALSE FALSE FALSE
FALSE FALSE FALSE
Tubing
DRILL PIPE
OD ID Weight Capacity Displacement Metal Displacement
inch mm inch mm lbs/ft kg/m bbls/ft lt/m bbls/ft lt/m bbls/ft lt/m
FALSE FALSE FALSE
FALSE FALSE FALSE
FALSE FALSE FALSE
Drill Pipe
If you need refer to API Tubulars Dimensions, select one of links below:
Tubing Drill Pipe Drill Collars Casing
Present Table is to help during calculations presented at another sheets. Just copy required parameter from tables above and paste
them to where you need. Workover Calculations©2000, Sergei Tchernenkov
If you have any comments on this Spreadsheet, please contact me on E-mail Address: sergeitchernenkov@hotmail.com
WORKOVER/DRILLING RIG REQUIRED MAST CAPACITY CALCULATIONS BASED ON PIPE WEIGHT
Click on the Hyperlinks, if you need more information on Casing Tubing Drill Pipe Drill Collar
If you have any comments on this Spreadsheet, please contact me on E-mail Address: sergeitchernenkov@hotmail.com
Workover Calculations©2000, Sergei Tchernenkov
WORKOVER/DRILLING RIG DEPTH RATING CALCULATIONS BASED ON PIPE WEIGHT
Safety Mast Max. Hook Max. String Max. Depth, ft Max. Depth, m Max. Pull
String Overpull,
Factor, Capacity Load, with Weight in (with SF and (with SF and Speed,
Option %/100
%/100 with SF OP, lbs Fluid, lbs Overpull) Overpull) ft/min
1 0 0 0 #DIV/0! #DIV/0! #DIV/0!
2 0 0 0 #DIV/0! #DIV/0! #DIV/0!
3 0 0 0 #DIV/0! #DIV/0! #DIV/0!
4 0 0 0 #DIV/0! #DIV/0! #DIV/0!
5 0 0 0 #DIV/0! #DIV/0! #DIV/0!
Click on the Hyperlinks, if you need more information onCasing Tubing Drill Pipe Drill Collar
ease contact me on
Delta Engineering Co. Ltd.
The calculatios of required capacity of the mud pump are based on selected API
Rules of Thumb Guide for Hydraulics as:
To reach recommended Annular Velocity of drilling mud the minimum Flow Rate must
be maintain as shown in the table below:
Hole Size Drill Pipe OD Annular Area Velocity, Min. Pump Rate
2 2 3
inch mm inch mm in m m/min GPM m /min
Required Pressure Rating of the Mud Pump is calculated from expected pressure losses in the
well as shown in the table below:
Circulating Losses Calculations
Outside DC Total Pressure Remark: The Bit Pressure Loss is not included
Pressure Loss, Losses, in calculations above. Approximate value of bit
psi kPa psi kPa loss based on experience is taken of 50%
#DIV/0! #DIV/0! #DIV/0! #DIV/0! of pump pressure. Bit Pressure Loss is included
#DIV/0! #DIV/0! FALSE in final result below.
Result: To perform sufficient cleaning of the bottom of the hole and efficient penetration
rate while drilling, the Mud Pump(s) should has minimum required ratings as:
3
Volumetric Rate at least of m /min
GPM
Workover Calculations©2000, Sergei Tchernenkov
Author:
Sergei Tchernenkov
Delta Engineering Co. Ltd
CIRCULATION PROGRAM
Workover and Well-service
Date: Rig #: Oilfield: Company: If you need to convert values from English
Well #: Pump: Liner, inch: Stroke, inch: to Metric units or back, go to Sheet
"Conversions" or link to Converter
Casing ID Casing OD Csg Length Casing Capacity Casing Volume
inch mm inch mm m bbls/ft lt/m bbls Liters
Total
Pipe OD Pipe ID Pipe Length Tubing Volume Metal Displ. Annular Volume Circulation Volume
inch mm inch mm m bbls liters bbls liters bbls liters bbls liters
Total
Pump Calculations
Pump Rate Pressure Est. Time to pump Actual pumping Time Volume pumped
SPM gal/min BPM lt/min PSI kPa Tbg Volume Anls Vlm Total Vlm w/ rate,min bbls liters
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
Total
Workover Calculations©2000, Sergei Tchernenkov
If you have any comments on this Spreadsheet, please contact me on E-mail Address: sergeitchernenkov@hotmail.com
Author:
Sergei Tchernenkov
FORMATION INJECTIVITY TEST
Company:
Toolpusher:
Driller:
TEST DATA
Time:
Pressure, psi:
Pump Rate, SPM: 0 0 0 0 0 0 0 0 0 0
Injectivity Rate, BPD: 0 0 0 0 0 0 0 0 0 0
PUMP DATA
0.9
1
0.8
0.7
0.8
0.6
Pressure, psi:
0.6 0.5
Injectivity Rate, BPD:
0.4
0.4
0.3
0.2
0.2
0.1
0 0
Delta Engineering Co. Ltd.
Fracture Formation Fracture Shut-in Tubing Initial Maximum Final Maximum Tubing Hydrostatic
Gradient Pressure Pressure Circulating Pressure Circulating Pressure Pressure (if plugged)
kPa/m kPa PSI kPa PSI kPa PSI kPa PSI kPa PSI
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
Author:
Sergei Tchernenkov
SWABBING REPORT
Date: Report #:
WELL: Packer Set or Plugged Tubing Annulus Capacity: Lt/m
Swab in: Tbg. Size, inch: Capacity: l/m Swab to: Ltrs/cm:
Time Fluid LevelSwabbing Depth Level in Tank Theoretical Volume Volume Recovered Inflow Rate
Run# Tag Pull m ft m ft before after Ltr bbls Ltr bbls cu.m/day bbl/day Remarks
1 0 0 0.0 0.0 0 0.0 none
2 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
3 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
4 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
5 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
6 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
7 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
8 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
9 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
10 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
11 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
12 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
13 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
14 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
15 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
16 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
17 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
18 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
19 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
20 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
21 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
22 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
23 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
24 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
25 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
26 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
27 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
28 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
29 0 0 0.0 0.0 0 0.0 #DIV/0! #DIV/0! none
0 Liters 0.0 0.0 0 0.0 #DIV/0! #DIV/0!
Tubing Volume to max Swabbing Depth Total Theoretical Swabbed Volume Total Swabbed Volume Actual Inflow Rate for swabbing period
Remarks
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
none
Well #: Company:
The looses are measured in separated tank with V/H (Volume per Height)
capacity equal to m3/cm
0.00 bbl/in
0 gal/in
m3/min BPM
0.9
0.8
0.7
0.6
Losses Value
0.5
0.4
0.3
0.2
0.1
0
m3/min 000000000000000000000000000000000000000
BPM 000000000000000000000000000000000000000
Time
INJECTION RATE CALCULATIONS
Well: Company:
1.6
1.4
1.2
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
1" DRILL LINE EVALUATION RECORD (for 98' - 110' derricks)
Depth Op. Type D.P. or Tbg Drill Collars Mud Buoyancy D.P.Eff. D.C.Eff. daN-km daN-km Total daN- Rem.daN-
d Notes
# From To (Dr=1;Tr=2) Date Size kg/m Size kg/m Length Density Factor Weight Weight Drilling Short Trip km km
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
1.000 0.00 0 0 0 0.00 0.00 716.00
MILLING PROGRAM