DR-502 - Drainage Tanks Details

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

N

NO UME
AS

RT D
S

H
E: E:

GOOSENECK VENT BESIDE


22 2226
N: 1336 N:
4350 .6 4366 58.0
11.02 26 61.7 03
9 56

730
PROPOSED 40m ROAD

SIDEWALK track extention for 750 LM BOUNDARY WALL

Ø75mm PADDLE FLANGE FOR

12g

12g
MEDIUM DUTY DOUBLE SEAL
12g
12g
PADDOCK
PADDOCK

10

ZIZ
IPH
T.1

T.1

12i

US
12i
PADDOCK

SPI
12f

12f
12h

NA
PHASE-2 (AREA-4)

12h
PADDOCK
PADDOCK

CH
RIS
2

TI

46
ELECTRICAL CABLES

28
ACCESS DOOR (1000mm X 1000mm)

28
E: 22

39

33
N:

20
4348 1377
80.81.507

45
2

ROAD
24

WIDE
PHASE-2 (AREA-4) PHASE-2 (AREA-4)

5M
19

07
32

32
S/S-4 (B9C)

39
PROPOSED PHASE-3

E=222668641.230N=436343525.196
42
WATER BODY
WATER BODY
12300

POLO

POLO

41
PADDOCK

23
Ø150mm TANK VENT MEDIUM DUTY DOUBLE SEAL

28c
41
37e

ROAD
WIDE
5M
PIPE AT U/G 12000 COVER (600mm X 600mm)

ZIZ
SP-02

IPH
US
SPI
NA
CH
RIS
TI
SCREEN LOCATION
SCREEN SELECTION TO BE AS PER CLIENT

PROPOSED PHASE-3
FOUR STAR HOTEL
4M

TRIPLEX SEWAGE SUBMERSIBLE PUMP SET


WIDE
ROAD

PAINTED RUBBER 2

42

S/S-3 (B9A)
N

S/S-5 (B9B)
9.10 FFL
PAINTED RUBBER 2

PAINTED RUBBER 1

PAINTED RUBBER 1 PAINTED RUBBER 2

PAINTED RUBBER 1

PAINTED RUBBER 1 GRASS

GRASS

NORTH
PAINTED RUBBER 1

ASSUME
PAINTED RUBBER 1 PAINTED RUBBER 1

D
PAINTED RUBBER 2

E=222140.492 E=222165.448

ROAD
N=435326.532 N=435357.791
AUDIENCE SEATS AUDIENCE SEATS

‫اييهر ا يعرام‬ ‫اييهر ا يعرام‬

3F
3D

3E

12

3P
Terraces Terraces
E G-20 E G-21

12

12
GS-01

12

3N

WIDE
3Q
PHASE-1 (CLUSTER-A)
OT-03 CAB-04

MALE TOILET SAUNA FEMALE TOILET SCALING ROOM SAUNA


E G-17 E G-36 E G-19 E G-23 E G-35 MALE TOILET
E G-24
CAB-05

13

5M
FEMALE TOILET
E G-16
CAB-07

CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-02

13
ADMINISTRATION STORE LOCKERS

AD
CB-03

CB-01
E G-14 E G-15 E G-18 CAB-06 CB-01

20-BAC CAB-03
TVU-01 CAB-02 20-BAC CAB-03
TVU-01 CAB-02 CSB-02 20-BSC CSB-02 CSB-01 CSB-02 CSB-02 CSB-02

CB-01 CB-01

13
OT-01

10-TO

CB-01 CB-01
OT-02 CSB-02 CSB-02 CSB-02 CSB-01 CSB-02 CSB-02 CSB-02

13
CAB-01 FEMALE JOCKEY CORRIDOR
E G-22 MALE
E JOCKEY
G-26 CAB-01 CB-01 LOCKERS
E G-25

CB-01 CB-01
E G-12 SC-01

HUMAN

CB-01 CB-01
DOCTOR
E G-27 CSB-02 20-BSC CSB-02 CSB-01 CSB-02 CSB-02 CSB-02 AUDIENCE SEATS

ST-01 SC-01 ST-01 CSB-02 CSB-02 CSB-02 CSB-01 CSB-02 CSB-02 CSB-02 CB-01 ‫اييهر ا يعرام‬

31
STAIR HD-01

CB-01
E G-13

3G

3M
AUDIENCE SEATS RT-01 SO-01 SO-01 CB-04

3R
‫اييهر ا يعرام‬ RT-01 CB-06 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01 CB-01CB-05

FUTURE EXPANSION CORRIDOR


PROPOSED EQUESTRIAN BUILDING FUTURE EXPANSION

3C
E G-11 CORRIDOR
E G-28

GR. / 1ST / 2ND

13
KITCHEN PANTRY TEL ROOM ELECT. ROOM STAIR

13

12c
E G-10 E G-09 E G-07 E G-06 E G-29 UP

13

RO
OT-01

13

12c

13
SERVICE CAR CC-01 CC-01 CC-01 MAIN ENTRANCE
EG-02

13
‫تايدخ ةرايس‬

CAFETERIA CORRIDOR RECEPTION ARABIC SECRETARY


E G-08 E G-05 E G-33 E G-30

CT-01 CT-01 RE-01

MT-10

CT-01

12
CONTROL. ROOM SV-01 OT-01

CT-01 CT-01 EG-03 STOREG-34


E

12
PORCH STEWARD ROOM ENGLISH SECRETARY
SERVICE CAR E G-01 E G-32 E G-31

12

12
EQUIPMENT ROOM

05a
E G-04

E=222163.722
E=222185.147
N=435311.600 N=435338.437

m
(TWO ON DUTY & ONE STANDBY)
AUDIENCE SEATS AUDIENCE SEATS

13
‫اييهر ا يعرام‬ ‫اييهر ا يعرام‬

39

12a
13
SU - Single Unit Truck

12a

64
6 M DRIVE WAY 6 M DRIVE WAY 6 M DRIVE WAY 6 M DRIVE WAY 6 M DRIVE WAY

13
12b
13
12b
E=222128.525 E=222139.132
N=435239.968 N=435253.254
P P
METAL ACCESS DOOR

500.5202
GREEN AND INTERLOCK AREA
1 42

78 67 66 55 54 43
2 41

ED
12

12
12
77 68 65 56 53 44
3 40

12
6 M DRIVE WAY

6 M DRIVE WAY

6 M DRIVE WAY

6 M DRIVE WAY
PROPOSED WAREHOUSE BUILDING

18

18
76 69 64 57 52 45
4 39
GR. METAL ACCESS DOOR

06cc
06aa
75 70 63 58 51 46

06a

06c
5 38
STARTING GATE STORE
FWH G-01

13

OS
B
74 71 62 59 50 47

13
W
C

6 37

31
501
73 72 61 60 49 48
7 36

13
T.1

T.1

13
8 35

OP
9 34
METAL ACCESS DOOR METAL ACCESS DOOR

OFFICE
G-02 PANTRY
WH G-03 TOILET
G-04

PHASE-2 (CLUSTER-B)
WH WH

11
F F F
6 M DRIVE WAY 6 M DRIVE WAY

11

PROPOSED PHASE-3
B B

PHASE-2 (CLUSTER-D)
B
C
W C
W W
C
10 33

E=222148.844 E=222159.451
N=435223.746 N=435237.032
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

PR
26a

MULTIPURPOSE
83590

06cc
06c
06aa
PH

06a

11
A

A
AS

12

05
05

12

12
12
E-1

HALL
12d
13
TANK

12d
13
Ø200mm SEWAGE
DIESEL

12e

13
12e

13
WOQOD

EACH 6 L/S , 3 BAR

3L
S/S-2 (B9B)

13
13

12

13
13
10.50 FFL

12
12

12

13
13

3S
3H
3B

13
13
1000

ROAD
3T
3J

3K

WIDE
3A

12
12

12
04
04
12

5M
29

13
13
13

13
37b
37a

35
35

35 11

11
11
44A

31
DRAIN PIPE AT U/G
ASPHALT ROAD

34b

41
(FT-2) (MT-2)
42
PROPOSED
PHASE-3

3CC

23
3U
12
SHOP

43A
12
41

04
C D

13

13
3BB

3V

SS-1 (B9)

ROAD
12

12
ZIZ

13
PROPOSED PHASE-3

13

WIDE
IPH

13

5M
US

13
12e
ADMIN.BUILDING-G+3

QT
25
12d
SPI

42
NA
7.3

12

12
M WIDE

CH

05a

06bb
06b
ROAD

13
RIS
Ø75MM FORCED DRAIN FROM
7.3

HEAVY DUTY DOUBLE SEAL ACCESS

26a
M WIDE

13
TI
ROAD
PHASE-2 (CLUSTER-C)

11
IRRIGATION TANK(B38)

28a

06bb
06b

42
MC

12
26

12
EXISTING PUMP ROOM

18
13
08

42
13
12b
PROCESS

12a
FOUNDATION
TANK

S/S-5 (B9A)

39
38
C3

12
T.2 T.2

C2

12
SLUDGE

C1

12c
13
13
HOLDING
TANK

13

13
3AA

3W
PHASE-2 (STP)
FOG
REMOVAL
BACKWASH &
CHAMBERGRIT
CHLORINE FOUNDATION

13
CONTACT TANK

ROAD
TANK

STP

STORM HOLDING TANK TO FILL


- BUILDING CP-2

WIDE
BREAK

DOOR (1000mm X 1000mm)


FOUNDATIONS
TANK

B-47
36

SDT(1)

3Z

3Y
12

5M
BLOWER
ROOM

12
3X
MCC

PLC

34a
PANELCONTROL

E.L+0.20
ROOM

13

13
1000
SUBMERSIBLE PUMP VALVE

42
37c
THE IRRIGATION WATER TANK
NEW

ZIZ
IPH

42B
8300 CHAMBER

US
SPI

42
NA
42

CH
RIS
TI
42A
Ø150mm TANK VENT RUNNING U/G (1400mm L X 1400mm W X 7.3
7.3

M WIDE
M WIDE
ROAD

ROAD

PADDLE FLANGE
1164.261119540877

8000 1000mm DEPTH)


PROJECT E: 22
N: 43 2975
5382 .169
.39
4

5 M WIDE ROAD
SUBMERSIBLE PUMP VALVE CHAMBER
3 3 LOCATION
1000

AD
RO
G
IN
T.2 1000 T.2

IST
EX
1000
(800mm L X 800mm W X 900mm DEPTH)

800
MEDIUM DUTY DOUBLE SEAL Ø100mm PADDLE FLANGE

1000
1000
SUBMERSIBLE PUMP ACCESS DOOR FOR ELECTRICAL CABLES
(1000mm X 1000mm)
A 1000 800 A 8000
5707 1400
Ø200mm SEWAGE
DRAIN ENTERING THE

600
MEDIUM DUTY DOUBLE SEAL HEAVY DUTY DOUBLE SEAL
COVER (600mm X 600mm) TANK PADDLE FLANGE
R.C.C UNDERGROUND STORM HOLDING TANK ACCESS DOOR (1000mm X

FML
1000mm)

1400
7300
7000

7000

1400
R.C.C UNDERGROUND SEWAGE
TANK AREA = 84 M2 HOLDING TANK

FML
TANK HEIGHT= 5.40 M
WATER LEVEL = 4.05 M TANK DISCHARGE CONNECTION TANK AREA = 48 M2
CHAMBER 1100
TANK CAPACITY = 340 M3 TANK HEIGHT= 5.30 M

FML
6000
6300
6000
(600mm L X 600mm W X 900mm DEPTH) HEAVY DUTY DOUBLE
WATER LEVEL = 3.60 M HEAVY DUTY DOUBLE SEAL
SEAL COVER (1200mm X
Ø150MM OUTLET CONNECTION 1000mm)
TANK CAPACITY = 173 M3 SUBMERSIBLE PUMPS

FML
FOR TANK DRAIN DISCHARGE
EL. -5.40 BY VEHICLE TANKER METAL AXIS DOOR
COVER (1100mm X 1400mm)
S.S.L. Ø150MM TANK SUCTION LINE Ø150MM FORCED DRAIN

FML
UP FROM TANK BOTTOM FOR FROM SEWAGE
TANK DRAIN DISCHARGE BY HOLDING TANK
Ø400mm STORM DRAIN VEHICLE TANKER
ENTERING THE TANK
PADDLE FLANGE
SP-01 B B
DUPLEX STORM
SUBMERSIBLE PUMP SET
(TWO ON DUTY)
EACH 1.5 L/S , 2.5 BAR Ø150mm TANK VENT
T.1

T.1
PADDLE FLANGE
B

B
12000
12300
4 4
Ø400mm STORM DRAIN
T.2 T.2
PIPE AT U/G 8000
T.1

T.1
2

1
8300
Ø150mm TANK VENT PIPE
C AT U/G TILL WATER TANK D
T.2 ROOM ROOF T.2

C * ALL LEVELS HAVE TO BE VERIFIED BY THE D


1 T.2 CONTRACTOR BEFORE START WORK T.2
T.1 * INTERNAL LADDER TO BE PROVIDED INSIDE HEAVY DUTY DOUBLE SEAL
GOOSENECK VENT BESIDE CHAMBER FOR MAINTENANCE ACCESS SUBMERSIBLE PUMPS
SIDEWALK COVER (1100mm X 1400mm)
* STAINLESS STEEL CHAIN TO BE FIXED NEAR
EACH VENT OPENING SHALL BE MEDIUM DUTY DOUBLE SEAL MANHOLE OPENING FOR EASE OF ACCESS .
EQUIPPED WITH WIRE MESH SUBMERSIBLE PUMP ACCESS DOOR
(1000mm X 1000mm)
EL.+0.15
EL.+0.15
Ø150mm TANK VENT CONNECTION PVL.
PVL. EL. 0.00
EL. 0.00 ZERO LVL.
00 ISSUED FOR CONSTRUCTION MAY-2022 A.GAWAD M.MAGDY E.SABER

1000
ZERO LVL.

900
1000

REV. DESCRIPTION DATE DWN CHKD APPD

1700
1400

CONSULTANT ACTION

1700
STORM COLLECTION TANK 800
Ø75mm GATE VALVE A- Approved As Submitted C- Revise /Resubmit
Ø50mm GATE VALVE
SEWAGE HOLDING TANK Ø75mm CHECK VALVE B- Approved as Noted D- Rejected
Ø50mm CHECK VALVE Ø200mm SEWAGE EL. 1.70
DRAIN ENTERING THE WATER LVL.

400
Ø150mm TANK VENT TANK PADDLE FLANGE SIGNATURE: DATE
PADDLE FLANGE
FLOAT SWITCH (TYPICAL)
Ø400mm STORM DRAIN
Ø50MM FORCED DRAIN PIPE UP

5300
ENTERING THE TANK ARCH CIVIL MECH ELEC. OTHERS
FROM EACH PUMP HIGH LEVEL
PADDLE FLANGE
5236

1650
ALARM
5400

Ø75MM FORCED DRAIN PIPE UP


PROJECT
WATER LEVEL GUIDE BARS FROM EACH PUMP
LEVEL -2

3600
PUMP NO. 3
Design and Build for Construction Grandstand
3886

STAINLESS STEEL CHAIN FOR GUIDE BARS


4050

START
LIFTING THE PUMPS
SP-01 STAINLESS STEEL CHAIN FOR
Al-Uqda Equestrian Complex

800
DUPLEX STORM LIFTING THE PUMPS
SUBMERSIBLE PUMP SET
(TWO ON DUTY)
ZONE: 74
EACH 3.8 L/S , 2.0 BAR
BUILDING : 0000

1000
FLOAT SWITCH PUMP 1 & 2 LEVEL -1
CUT OUT PUMP NO. 1
START EL. -5.30 LOCATION: 0000
S.S.L.
CLIENT:
EL. -5.65 EL. -5.70

500
S.S.L. S.S.L.
350

LOW LEVEL
EL. -6.00 PUMP 1 & 2 & 3
EL. -6.05
S.S.L. CUT OUT S.S.L. PROJECT AFFAIRS
Public Work Authority
4495
1111
w.w.w.ashghal.gov.qa
12000
SUPERVISION CONSULTANT

SECTION A-A SECTION B-B SP-02


DUPLEX DUTY SEWAGE SUBMERSIBLE PUMP SET
EACH 6 L/S , 2.0 BAR
SCHEDULE OF OPERATION DURING STORM : SEQUENCE OF OPERATION:
1- AT LOW LEVEL INSIDE IRRIGATION TANK, THE FLOAT SWITCH ACTUATES THE ALTERNATOR, ONE PUMP CUTS IN. 1- AT LEVEL-1 , THE FLOAT SWITCH ACTUATES THE ALTERNATOR, PUMP-1 CUTS IN.
DESIGN CONSULTANT
2- AT HIGH LEVEL INSIDE IRRIGATION TANK, THE FLOW SWITCH ACTUATES THE ALTERNATOR AND THE PUMP IN 2- AT LEVEL-2 , THE FLOAT SWITCH ACTUATES THE ALTERNATOR, PUMP-2 CUTS IN.
OPERATION SHALL CUT OUT.
3- AT HIGH LEVEL, THE FLOAT SWITCH ACTUATES THE ALTERNATOR, AN ALARM SIGNAL
3- THE ALTERNATOR SHALL ALTERNATE THE OPERATING AND STAND-BY PUMPS AT EACH IS INDICATE AT THE CENTRAL PANEL WHEN SPECIFIED.
START TO MAINTAIN EQUAL USE.
4- AT LOW LEVEL, THE FLOW SWITCH ACTUATES THE ALTERNATOR AND THE PUMP IN MAIN CONTRACTOR
4- IF PUMP IN OPERATING POSITION FAILS TO START, THE STAND-BY PUMP WILL CUT IN AUTOMATICALLY.
OPERATION SHALL CUT OUT.
5- THE ALTERNATOR SHALL ALTERNATE THE OPERATING AND STAND-BY PUMPS AT EACH
NOTE: NOTE:
SUBMERSIBLE PUMPS AT STORM HOLDING TANK ARE START TO MAINTAIN EQUAL USE.
STORM TANK EVACUATION WILL BE MANUALLY BY TANKER.
FOR FILLING IRRIGATION WATER TANK ONLY SO IT WILL 6- IF PUMP IN OPERATING POSITION FAILS TO START, THE OTHER PUMP WILL CUT IN AUTOMATICALLY. DATE:
JOB NO:
BE CONTROLLED THROUGH FLOAT SWITCHES INSTALLED D30454 10/05//2022 PIN: 74520005
IN THE IRRIGATION TANK TITLE:
UNDERGROUND DRAINAGE HOLDING TANKS DETAILS
DRAINAGE SYSTEM

STORM HOLDING TANK SEWAGE HOLDING TANK


DRAWING NO:

DRAWN BY: CHECKED BY:


DR-502

SHEET NO;
REV.

SCALE:
00

BASSEM W.HASSAN 1:50