Saudi Aramco Typical Inspection Plan: Fired Heaters - Field Installation Mechanical
Saudi Aramco Typical Inspection Plan: Fired Heaters - Field Installation Mechanical
Saudi Aramco Typical Inspection Plan: Fired Heaters - Field Installation Mechanical
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Page 1 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Material Verification, Visual Inspection Refer to the respective SATIPs for Electrical &
2.3 and Storage/Preservation of Electrical See Remarks See Remarks Instruments (SATIP# P-113-01, P-515-01,
and Instrumentation components J-100-01, J-200-01, J-300-01, J-902-03)
3.0 INSTALLATION
Field Welding
Refer to
a) Heater tubes
3.7 See Remarks See Remarks a) SATIP-W-010-01for heater tubes & heater box
b) Heater Box, frame or enclosure
b) SATIP-W-011-01 for piping
c) Piping (fuel lines)
3.9 NDE PERFORMANCE See Remarks See Remarks Refer to applicable NDE SATIPs
3.13 Refractory Installation See Remarks See Remarks Refer to SATIP-N-110-01, N-120-01or N-140-01
Page 2 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.14 Fire Bricks Installation See Remarks See Remarks Refer to SATIP-N-130-01
4.0 PRE-COMMISSIONING
Punch Listing Clearance / Final Insp SA-6133 SA-6133 Check Contractor's SAIC-F-2008 & SATR-A-2011
4.2
& walkthru for MCC (FEIL) (FEIL) H (Item 4.1) for incomplete punchlist items.
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1
the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4
attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
Page 3 of 3