SEWER LINE

WATER LINE

STORM DRAINAGE LINE

F FAUSET
A" A A' B B' C D A" A A' B B' C D
SH SHOWER
2000.00 500.00 3000.00 1500.00 1150.00 2850.00 2000.00 500.00 3000.00 1500.00 1150.00 2850.00 2000.00
HB HOSE BIBB
VSTR
HB SH
1 WC
F 1 CB FD
WC
SD CB WM WATER METER
LAV LAV

GV GATE VALVE

CV CHECK VALVE

2
CB LAV LAVATORY
KS 2 KS

WC WATER CLOSET

2' 2' FD FLOOR DRAIN

CB
SD SHOWER DRAIN

CO CLEAN OUT

LAV
WC
SH
F LAVFD SD VSTR ST SEPTIC TANK
WC

HB
KS KITCHEN SINK
CB
3' 3' DS DOWN SPOUT

SEPTIC TANK
CB
VSTR VENT STOCK THRU ROOF

VSTR GENERAL NOTE:


CB
4 4
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED
IN ACCODANCE TO THE PROVISION OF THE PHILIPPINE
4' GV
4' PLUMBING CODE. THE NATIONAL BUILDING CODE AND THE
WM
CV RULES AND REGULATION OF THE LOCAL MUNICIPALITY.
TAP TO
MAIN WATER LINE 2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWING
AND SPECIFICATIONS. THE ENGINEER SHALL BE NOTIFIED
IMMEDIATELY OF ANY DISCREPANCY FOUND HEREIN.
3. ALL PIPE SHALL BE INSTALLED AS INDICATED, ANY RELOCATION
COLD WATER LAYOUT DRAINAGE LAYOUT REQUIRED FOR PROPER EXECUTION OF THE PLUMBING WORK
SHALL BE WITH PRIOR APPROVAL OF THE ENGINEER.
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE
ACTUAL LOCATION, DEPTH AND INVERT ELEVATIONS OF ALL
EXISTING PIPES STRUCTURE AS VERIFIED BY THE
CONTRACTOR.
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN
ONE PERCENT (0.01) AND ONE HALF PERCENT (0.005)
0.70m
2.50m
0.70m 0.95m
2.50m
MINIMUM UNLESS OTHERWISE SPECIFIED.
6. WATER SUPPLY PIPE TO FIXTURE SHALL BE SIZED IN
ACCORDANCE WITH THE MANUFACTURERS
0.36m
RECOMENDATIONS.
7. ALL BRANCHES OF FIXTURE OR GROUP OF FIXTURES SHALL BE
0.36m

MANHOLE MANHOLE MANHOLE


1.50m

PROVIDED WITH AIR CHAMBER OF CAPPED VERTICAL


1.80m

EXTENSION PIPE.
8. ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT 100
PSI FOR A PERIOD OF TWO (2) HOURS BEFORE BURIED OR
0.70m 0.70m 0.70m
COVERED.
9. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT
SITE AND CORDINATE THE WORKED WITH THE SEWER AND
STORM DRAINAGE LINE EFFLUENT DISPOSAL POINT AND
WATER LINE SERVICE CONNECTING / TAPPING POINT.
SEPTIC TANK PLAN & SECTION 10. ALL PIPE SIZES AND OTHER DIMENTIONS ARE IN MILIMETER
(mm) UNLESS OTHERWISE SPECIFIED AND ARE INDICATIVE OF
INSIDE DIAMETER.

PREPARED BY: SEAL PRC NO.: TITLE & LOCATION: OWNER: SHEET NO.:
TIN:
PTR NO.:
CONSTRUCTION OF RESIDENTIAL HOUSE MR. EDUARD G. EQUE 5
MASTER PLUMBER DATE: DAVAO CITY 6