Areas 08/19/2022 17:30:07

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
0+000.00 -7.45 562.77 -2.92 562.87 -0.10 -7.45 562.77 -6.00 561.33 -1.14
-2.92 562.87 1.60 562.65 -0.39 -6.00 561.33 0.00 561.21 -9.45
1.60 562.65 7.33 562.66 -1.10 0.00 561.21 6.00 561.33 -9.45
6.00 561.33 7.33 562.66 -1.13
-1.59 -21.17 19.58
TOTAL AREAS(M2): 19.58 0.00
0+020.00 -9.10 562.65 -1.68 562.81 3.40 -9.10 562.65 -7.70 561.25 -0.45
-1.68 562.81 8.75 562.29 2.91 -7.70 561.25 0.00 561.09 -8.47
0.00 561.09 7.70 561.25 -8.47
7.70 561.25 8.75 562.29 -0.52
6.32 -17.90 24.22
TOTAL AREAS(M2): 24.22 0.00
0+040.00 -12.97 561.61 -9.59 561.53 -0.16 -12.97 561.61 -12.03 560.66 -0.45
-9.59 561.53 3.79 561.93 1.51 -12.03 560.66 0.00 560.42 -12.90
3.79 561.93 12.88 561.52 0.96 0.00 560.42 12.03 560.66 -12.90
12.03 560.66 12.88 561.52 -0.45
2.31 -26.71 29.02
TOTAL AREAS(M2): 29.02 0.00
0+060.00 -17.90 561.05 8.85 560.47 13.55 -17.90 561.05 -16.35 559.50 0.03
8.85 560.47 13.63 560.61 1.38 -16.35 559.50 0.00 559.17 -14.98
13.63 560.61 17.30 560.45 1.01 0.00 559.17 16.35 559.50 -14.98
16.35 559.50 17.30 560.45 -0.26
15.94 -30.19 46.13
TOTAL AREAS(M2): 46.13 0.00
0+080.00 -22.06 560.49 10.14 559.77 26.01 -22.06 560.49 -20.68 559.10 0.65
10.14 559.77 13.14 559.82 1.42 -20.68 559.10 0.00 558.68 -8.92
13.14 559.82 14.90 559.98 1.01 0.00 558.68 20.68 559.10 -8.92
14.90 559.98 17.48 559.99 1.70 20.68 559.10 21.27 559.69 0.04
17.48 559.99 21.27 559.69 1.96
32.11 -17.13 49.25
TOTAL AREAS(M2): 49.25 0.00
0+100.00 -26.23 559.92 -9.24 559.54 20.25 -26.23 559.92 -25.00 558.69 0.94
-9.24 559.54 0.31 559.68 10.26 -25.00 558.69 0.00 558.19 -2.38
0.31 559.68 5.90 560.20 7.84 0.00 558.19 25.00 558.69 -2.38
5.90 560.20 14.09 560.23 13.70 25.00 558.69 25.81 559.50 0.45
14.09 560.23 17.93 559.93 5.90
17.93 559.93 25.81 559.50 9.27
67.22 -3.37 70.60
TOTAL AREAS(M2): 70.60 0.00
0+120.00 -30.66 559.27 -27.61 559.33 2.46 -30.66 559.27 -30.50 559.12 0.11
-27.61 559.33 -13.44 559.55 13.38 -30.50 559.12 0.00 558.51 9.66
-13.44 559.55 -13.39 559.55 0.05 0.00 558.51 30.50 559.12 9.66
-13.39 559.55 -12.41 559.58 1.05 30.50 559.12 30.82 559.44 0.25
-12.41 559.58 0.10 560.41 18.80
0.10 560.41 11.25 560.40 21.33
11.25 560.40 16.86 560.10 9.83
16.86 560.10 23.64 559.83 9.97
23.64 559.83 30.82 559.44 8.17
85.04 19.68 65.36
TOTAL AREAS(M2): 65.36 0.00
0+140.00 -33.27 559.31 -27.28 559.32 4.92 -33.27 559.31 -33.25 559.30 0.01

Página 1
Areas 08/19/2022 17:30:07

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-27.28 559.32 -22.80 559.41 3.89 -33.25 559.30 0.00 558.63 15.67
-22.80 559.41 -17.44 559.49 5.11 0.00 558.63 32.23 559.28 14.87
-17.44 559.49 -14.10 559.91 4.02
-14.10 559.91 -2.27 560.29 19.01
-2.27 560.29 7.46 560.46 18.32
7.46 560.46 14.41 560.41 13.50
14.41 560.41 23.57 559.64 14.06
23.57 559.64 25.29 559.55 1.89
25.29 559.55 32.23 559.28 6.39
91.11 30.55 60.57
32.23 559.28 33.31 559.23 0.82 32.23 559.28 33.25 559.30 0.81
33.25 559.30 33.31 559.23 0.05
0.82 0.85 -0.03
TOTAL AREAS(M2): 60.57 -0.03
0+160.00 -36.10 559.45 -33.08 559.53 3.91 -36.10 559.45 -36.00 559.35 0.12
-33.08 559.53 -18.15 559.55 20.07 -36.00 559.35 0.00 558.63 28.52
-18.15 559.55 -13.87 560.12 7.00 0.00 558.63 36.00 559.35 28.52
-13.87 560.12 2.01 560.38 32.53 36.00 559.35 36.05 559.40 0.05
2.01 560.38 6.87 560.45 10.78
6.87 560.45 26.21 559.72 36.52
26.21 559.72 27.16 559.73 1.44
27.16 559.73 36.05 559.40 12.12
124.37 57.22 67.15
TOTAL AREAS(M2): 67.15 0.00
0+180.00 -40.38 558.54 -33.56 558.94 8.60 -40.38 558.54 -39.50 559.42 1.32
-33.56 558.94 -31.61 559.26 3.17 -39.50 559.42 -31.61 559.26 14.68
11.77 16.00 -4.23
-31.61 559.26 -29.97 559.53 3.14 -31.61 559.26 0.00 558.63 46.29
-29.97 559.53 -17.34 559.85 27.87 0.00 558.63 39.50 559.42 60.97
-17.34 559.85 -12.49 559.86 11.49 39.50 559.42 39.93 559.85 0.92
-12.49 559.86 -11.11 560.04 3.42
-11.11 560.04 -5.95 560.12 13.40
-5.95 560.12 12.92 560.40 52.52
12.92 560.40 21.90 560.07 24.74
21.90 560.07 32.79 560.11 28.43
32.79 560.11 39.93 559.85 17.83
182.85 108.19 74.66
TOTAL AREAS(M2): 74.66 -4.23
0+200.00 -43.93 558.48 -31.16 558.51 19.19 -43.93 558.48 -43.00 559.41 1.81
-31.16 558.51 -29.84 558.59 2.07 -43.00 559.41 -26.82 559.08 36.44
-29.84 558.59 -26.82 559.08 5.57
26.84 38.25 -11.42
-26.82 559.08 -23.58 559.61 7.62 -26.82 559.08 0.00 558.55 48.86
-23.58 559.61 -21.03 559.67 6.76 0.00 558.55 43.00 559.41 85.30
-21.03 559.67 -19.26 559.96 5.00 43.00 559.41 43.68 560.09 1.88
-19.26 559.96 -15.36 560.29 12.22
-15.36 560.29 -13.02 560.32 7.77
-13.02 560.32 18.71 560.36 106.28
18.71 560.36 25.15 560.31 21.54
25.15 560.31 35.34 560.33 33.95
35.34 560.33 41.30 560.10 19.20

Página 2
Areas 08/19/2022 17:30:08

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
41.30 560.10 43.68 560.09 7.39
227.73 136.04 91.69
TOTAL AREAS(M2): 91.69 -11.42
0+220.00 -46.68 558.57 -44.34 558.57 3.87 -46.68 558.57 -46.00 559.25 1.36
-44.34 558.57 -28.91 558.91 28.08 -46.00 559.25 -28.91 558.91 36.87
31.95 38.23 -6.28
-28.91 558.91 -22.07 559.05 14.10 -28.91 558.91 0.00 558.33 49.09
-22.07 559.05 -18.40 559.66 8.95 0.00 558.33 46.00 559.25 85.96
-18.40 559.66 -14.36 560.00 11.76 46.00 559.25 46.24 559.49 0.59
-14.36 560.00 13.26 560.32 89.57
13.26 560.32 22.88 560.34 32.79
22.88 560.34 27.76 560.30 16.59
27.76 560.30 40.69 559.83 40.65
40.69 559.83 46.13 559.50 14.94
46.13 559.50 46.24 559.49 0.27
229.62 135.64 93.97
TOTAL AREAS(M2): 93.97 -6.28
0+240.00 -45.40 558.61 -26.57 558.64 26.52 -45.40 558.61 -45.00 559.01 0.64
-26.57 558.64 -26.49 558.64 0.11 -45.00 559.01 -26.49 558.64 29.80
26.63 30.44 -3.80
-26.49 558.64 -20.19 558.65 9.01 -26.49 558.64 0.00 558.11 30.72
-20.19 558.65 -19.72 558.70 0.68 0.00 558.11 45.00 559.01 60.51
-19.72 558.70 -18.38 558.71 2.00 45.00 559.01 45.51 559.53 1.05
-18.38 558.71 -13.52 559.60 9.43
-13.52 559.60 14.98 559.98 73.31
14.98 559.98 25.34 560.13 29.38
25.34 560.13 28.77 560.18 10.08
28.77 560.18 39.69 559.85 30.59
39.69 559.85 45.51 559.53 14.38
178.87 92.28 86.59
TOTAL AREAS(M2): 86.59 -3.80
0+260.00 -44.09 558.68 -39.16 558.68 7.13 -44.09 558.68 -44.00 558.78 0.14
-44.00 558.78 -39.16 558.68 7.22
7.13 7.36 -0.22
-39.16 558.68 -30.41 558.67 12.59 -39.16 558.68 0.00 557.90 41.21
-30.41 558.67 -18.82 558.69 16.75 0.00 557.90 44.00 558.78 48.43
-18.82 558.69 -12.46 559.34 11.31 44.00 558.78 44.58 559.36 1.07
-12.46 559.34 -8.34 559.37 8.74
-8.34 559.37 -3.86 559.37 9.58
-3.86 559.37 -0.53 559.35 7.06
-0.53 559.35 19.57 559.27 41.69
19.57 559.27 32.77 559.47 28.18
32.77 559.47 35.64 559.51 6.47
35.64 559.51 44.58 559.36 19.66
162.01 90.70 71.31
TOTAL AREAS(M2): 71.31 -0.22
0+280.00 -43.00 558.77 -16.04 558.61 17.37 -43.00 558.77 -43.00 558.77 0.00
-16.04 558.61 -14.18 559.21 1.61 -43.00 558.77 0.00 557.91 12.58
-14.18 559.21 -7.33 559.75 9.79 0.00 557.91 32.41 558.56 6.05
-7.33 559.75 -6.73 559.81 1.03
-6.73 559.81 -6.34 559.81 0.68

Página 3
Areas 08/19/2022 17:30:08

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-6.34 559.81 6.16 559.72 21.46
6.16 559.72 18.57 559.67 20.46
18.57 559.67 32.41 558.56 14.78
87.17 18.63 68.54
32.41 558.56 34.40 558.40 0.86 32.41 558.56 43.00 558.77 6.53
34.40 558.40 40.44 558.54 2.53 43.00 558.77 43.06 558.71 0.04
40.44 558.54 43.06 558.71 1.51
4.90 6.57 -1.68
TOTAL AREAS(M2): 68.54 -1.68
0+300.00 -39.07 558.79 -36.62 558.79 1.82 -39.07 558.79 -39.00 558.73 0.05
-36.62 558.79 -11.62 558.47 14.56 -39.00 558.73 0.00 557.95 11.17
-11.62 558.47 -11.57 558.47 0.02 0.00 557.95 26.84 558.48 4.43
-11.57 558.47 -11.54 558.47 0.01
-11.54 558.47 -8.82 559.73 2.87
-8.82 559.73 -0.34 559.74 14.33
-0.34 559.74 7.28 559.65 12.55
7.28 559.65 20.17 558.86 15.58
20.17 558.86 26.84 558.48 4.15
65.89 15.65 50.24
26.84 558.48 33.19 558.12 1.61 26.84 558.48 39.00 558.73 6.75
33.19 558.12 35.62 557.68 -0.36 39.00 558.73 39.68 558.05 0.23
35.62 557.68 39.68 558.05 -0.75
0.49 6.98 -6.48
TOTAL AREAS(M2): 50.24 -6.48
0+320.00 -24.63 558.77 -21.93 558.77 2.59 -24.63 558.77 -24.00 558.14 0.41
-21.93 558.77 -18.86 558.75 2.91 -24.00 558.14 0.00 557.66 2.24
-18.86 558.75 -17.53 558.69 1.21 0.00 557.66 23.42 558.13 2.05
-17.53 558.69 -7.88 558.36 6.91
-7.88 558.36 -4.96 559.36 3.06
-4.96 559.36 -3.66 559.73 2.26
-3.66 559.73 4.01 559.48 13.78
4.01 559.48 6.57 559.05 3.74
6.57 559.05 10.45 559.17 5.04
10.45 559.17 23.42 558.13 10.90
52.41 4.70 47.71
23.42 558.13 24.06 558.08 0.19 23.42 558.13 24.00 558.14 0.19
24.00 558.14 24.06 558.08 0.02
0.19 0.21 -0.02
TOTAL AREAS(M2): 47.71 -0.02
0+340.00 -21.47 558.78 -13.83 558.79 5.60 -21.47 558.78 -20.00 557.31 -0.01
-13.83 558.79 -6.14 558.57 4.83 -20.00 557.31 0.00 556.91 -18.88
-6.14 558.57 20.74 558.04 6.84 0.00 556.91 20.00 557.31 -18.88
20.00 557.31 20.74 558.04 -0.28
17.26 -38.05 55.31
TOTAL AREAS(M2): 55.31 0.00
0+360.00 -13.54 558.85 -10.60 558.85 1.83 -13.54 558.85 -12.00 557.31 -0.22
-10.60 558.85 -6.14 558.82 2.69 -12.00 557.31 0.00 557.07 -12.42
-6.14 558.82 -3.07 558.74 1.69 0.00 557.07 12.00 557.31 -12.42
-3.07 558.74 2.11 558.59 2.25 12.00 557.31 12.99 558.30 -0.42
2.11 558.59 12.99 558.30 2.34
10.80 -25.47 36.28

Página 4
Areas 08/19/2022 17:30:08

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
TOTAL AREAS(M2): 36.28 0.00
0+380.00 -6.51 558.85 -3.37 558.82 -5.38 -6.51 558.85 -5.00 557.33 -3.72
-3.37 558.82 3.11 558.66 -11.70 -5.00 557.33 0.00 557.23 -16.32
3.11 558.66 4.31 558.48 -2.37 0.00 557.23 5.00 557.33 -16.32
4.31 558.48 6.06 558.40 -3.70 5.00 557.33 6.06 558.40 -2.85
-23.15 -39.21 16.06
TOTAL AREAS(M2): 16.06 0.00
0+391.61 -6.47 558.75 -1.01 558.77 -9.42 -6.47 558.75 -5.00 557.28 -3.63
-1.01 558.77 6.16 558.44 -13.47 -5.00 557.28 0.00 557.18 -16.27
0.00 557.18 5.00 557.28 -16.27
5.00 557.28 6.16 558.44 -3.04
-22.89 -39.21 16.33
TOTAL AREAS(M2): 16.33 0.00

Página 5
Elevaciones 08/19/2022 17:30:08

ELEVACIONES Y ESPESORES DE TERRENO Y SUBRASANTE


Obra: extraccion de material de acarreo huallaga 3 sector el puerto

Autor: lider tineo luna

ELEVACIONES(M) ESPESORES(M)
ESTACION
TERRENO SUBRASANTE CORTE TERRAPLEN
0+000.00 562.72 561.21 1.52
0+020.00 562.72 561.09 1.63
0+040.00 561.82 560.42 1.39
0+060.00 560.66 559.17 1.49
0+080.00 560.00 558.68 1.31
0+100.00 559.68 558.19 1.49
0+120.00 560.40 558.51 1.90
0+140.00 560.33 558.63 1.70
0+160.00 560.34 558.63 1.71
0+180.00 560.21 558.63 1.58
0+200.00 560.34 558.55 1.79
0+220.00 560.17 558.33 1.84
0+240.00 559.78 558.11 1.67
0+260.00 559.35 557.90 1.45
0+280.00 559.76 557.91 1.85
0+300.00 559.74 557.95 1.79
0+320.00 559.61 557.66 1.95
0+340.00 558.45 556.91 1.54
0+360.00 558.65 557.07 1.58
0+380.00 558.74 557.23 1.51
0+391.61 558.72 557.18 1.54

Página 6
ESTACAS LATERALES
A B C D E
1
2
3
4 CAMINO:
5 TRAMO: ESTACION:
6 SUBTRAMO: ORIGEN:
7
8 ESTACION ELEVACION
DISTANCIA
ELEVACIONES
9 IZQ DER
10
11 0+000.000 561.208 0.000 561.208
12 7.445 562.773
13 6.000 561.328
14 6.000 561.328
15 7.328 562.656
16 0+020.000 561.094 0.000 561.094
17 9.104 562.651
18 7.700 561.248
19 7.700 561.248
20 8.746 562.294
21 0+040.000 560.424 0.000 560.424
22 12.967 561.606
23 12.025 560.665
24 12.025 560.665
25 12.880 561.519
26 0+060.000 559.172 0.000 559.172
27 17.898 561.047
28 16.350 559.499
29 16.350 559.499
30 17.297 560.446
31 0+080.000 558.683 0.000 558.683
32 22.064 560.486
33 20.675 559.097
34 20.675 559.097
35 21.269 559.691
36 0+100.000 558.195 0.000 558.195
37 26.226 559.920
38 25.000 558.695
39 25.000 558.695
40 25.807 559.502
41 0+120.000 558.507 0.000 558.507
42 30.657 559.273
43 30.500 559.117
44 30.500 559.117
45 30.820 559.436
46 0+140.000 558.633 0.000 558.633
47 33.266 559.313
48 33.250 559.298
49 33.250 559.298
50 33.313 559.235
51 0+160.000 558.631 0.000 558.631
52 36.104 559.454
53 36.000 559.351
54 36.000 559.351
55 36.045 559.396
56 0+180.000 558.629 0.000 558.629
57 40.381 558.539
58 39.500 559.419
59 39.500 559.419

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
1
2
3
4
5
6
7
8 DESCRIPCION
9
10
11 CL
12 Cero
13 Hombro Subrasante
14 Hombro Subrasante
15 Cero
16 CL
17 Cero
18 Hombro Subrasante
19 Hombro Subrasante
20 Cero
21 CL
22 Cero
23 Hombro Subrasante
24 Hombro Subrasante
25 Cero
26 CL
27 Cero
28 Hombro Subrasante
29 Hombro Subrasante
30 Cero
31 CL
32 Cero
33 Hombro Subrasante
34 Hombro Subrasante
35 Cero
36 CL
37 Cero
38 Hombro Subrasante
39 Hombro Subrasante
40 Cero
41 CL
42 Cero
43 Hombro Subrasante
44 Hombro Subrasante
45 Cero
46 CL
47 Cero
48 Hombro Subrasante
49 Hombro Subrasante
50 Cero
51 CL
52 Cero
53 Hombro Subrasante
54 Hombro Subrasante
55 Cero
56 CL
57 Cero
58 Hombro Subrasante
59 Hombro Subrasante

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
60 39.927 559.846
61 0+200.000 558.545 0.000 558.545
62 43.929 558.476
63 43.000 559.405
64 43.000 559.405
65 43.683 560.088
66 0+220.000 558.329 0.000 558.329
67 46.683 558.566
68 46.000 559.249
69 46.000 559.249
70 46.241 559.490
71 0+240.000 558.112 0.000 558.112
72 45.403 558.609
73 45.000 559.012
74 45.000 559.012
75 45.513 559.525
76 0+260.000 557.896 0.000 557.896
77 44.091 558.685
78 44.000 558.776
79 44.000 558.776
80 44.582 559.358
81 0+280.000 557.911 0.000 557.911
82 43.004 558.775
83 43.000 558.771
84 43.000 558.771
85 43.062 558.709
86 0+300.000 557.946 0.000 557.946
87 39.068 558.793
88 39.000 558.726
89 39.000 558.726
90 39.675 558.050
91 0+320.000 557.663 0.000 557.663
92 24.629 558.773
93 24.000 558.143
94 24.000 558.143
95 24.063 558.080
96 0+340.000 556.906 0.000 556.906
97 21.470 558.776
98 20.000 557.306
99 20.000 557.306
100 20.736 558.042
101 0+360.000 557.074 0.000 557.074
102 13.539 558.853
103 12.000 557.314
104 12.000 557.314
105 12.985 558.299
106 0+380.000 557.233 0.000 557.233
107 6.513 558.845
108 5.000 557.333
109 5.000 557.333
110 6.063 558.395
111 0+391.614 557.179 0.000 557.179
112 6.471 558.750
113 5.000 557.279
114 5.000 557.279
115 6.158 558.437

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
60 Cero
61 CL
62 Cero
63 Hombro Subrasante
64 Hombro Subrasante
65 Cero
66 CL
67 Cero
68 Hombro Subrasante
69 Hombro Subrasante
70 Cero
71 CL
72 Cero
73 Hombro Subrasante
74 Hombro Subrasante
75 Cero
76 CL
77 Cero
78 Hombro Subrasante
79 Hombro Subrasante
80 Cero
81 CL
82 Cero
83 Hombro Subrasante
84 Hombro Subrasante
85 Cero
86 CL
87 Cero
88 Hombro Subrasante
89 Hombro Subrasante
90 Cero
91 CL
92 Cero
93 Hombro Subrasante
94 Hombro Subrasante
95 Cero
96 CL
97 Cero
98 Hombro Subrasante
99 Hombro Subrasante
100 Cero
101 CL
102 Cero
103 Hombro Subrasante
104 Hombro Subrasante
105 Cero
106 CL
107 Cero
108 Hombro Subrasante
109 Hombro Subrasante
110 Cero
111 CL
112 Cero
113 Hombro Subrasante
114 Hombro Subrasante
115 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

NOTA: Los conceptos que se incluirán


SIMBOLOGIA en el cálculo de volúmenes aparecen
DC DESPALME EN CORTE subrayados. Se ha considerado el
DT DESPALME EN TERRAPLEN
terreno ya despalmado al calcular áreas
y volúmenes de corte y terraplén.
C CORTE
T TERRAPLEN

COORDENADA INICIAL DE CURVA


MASA 10,000.00 AREAS VOLUMENES
SECCIONES DE ELEVACIONES ESPESORES DESPALME Factor de DESPALME
TN SEMI-
LEVANTADAS
C T abundamiento DISTANCIA
C
EN CAMPO TN SUBRASANTE C T DC DT en corte DC DT

0+000.000 562.724 561.208 1.52 0.00 0.00 0.00 19.58 0.00


0+020.000 562.723 561.094 1.63 0.00 0.00 0.00 24.22 0.00 1.00 10.00 0.00 0.00 438.00
0+040.000 561.815 560.424 1.39 0.00 0.00 0.00 29.02 0.00 1.00 10.00 0.00 0.00 532.44
0+060.000 560.661 559.172 1.49 0.00 0.00 0.00 46.13 0.00 1.00 10.00 0.00 0.00 751.51
0+080.000 559.997 558.683 1.31 0.00 0.00 0.00 49.25 0.00 1.00 10.00 0.00 0.00 953.77
0+100.000 559.680 558.195 1.49 0.00 0.00 0.00 70.60 0.00 1.00 10.00 0.00 0.00 1198.41
0+120.000 560.404 558.507 1.90 0.00 0.00 0.00 65.36 0.00 1.00 10.00 0.00 0.00 1359.57
0+140.000 560.332 558.633 1.70 0.00 0.00 0.00 60.57 0.03 1.00 10.00 0.00 0.00 1259.27
0+160.000 560.345 558.631 1.71 0.00 0.00 0.00 67.15 0.00 1.00 10.00 0.00 0.00 1277.18
0+180.000 560.212 558.629 1.58 0.00 0.00 0.00 74.66 4.23 1.00 10.00 0.00 0.00 1418.14
0+200.000 560.337 558.545 1.79 0.00 0.00 0.00 91.69 11.42 1.00 10.00 0.00 0.00 1663.46
0+220.000 560.169 558.329 1.84 0.00 0.00 0.00 93.97 6.28 1.00 10.00 0.00 0.00 1856.59
0+240.000 559.780 558.112 1.67 0.00 0.00 0.00 86.59 3.80 1.00 10.00 0.00 0.00 1805.62
0+260.000 559.346 557.896 1.45 0.00 0.00 0.00 71.31 0.22 1.00 10.00 0.00 0.00 1578.95
0+280.000 559.764 557.911 1.85 0.00 0.00 0.00 68.54 1.68 1.00 10.00 0.00 0.00 1398.48
0+300.000 559.738 557.946 1.79 0.00 0.00 0.00 50.24 6.48 1.00 10.00 0.00 0.00 1187.84
0+320.000 559.613 557.663 1.95 0.00 0.00 0.00 47.71 0.02 1.00 10.00 0.00 0.00 979.50
0+340.000 558.446 556.906 1.54 0.00 0.00 0.00 55.31 0.00 1.00 10.00 0.00 0.00 1030.20
0+360.000 558.650 557.074 1.58 0.00 0.00 0.00 36.28 0.00 1.00 10.00 0.00 0.00 915.90
0+380.000 558.739 557.233 1.51 0.00 0.00 0.00 16.06 0.00 1.00 10.00 0.00 0.00 523.38
0+391.614 558.723 557.179 1.54 0.00 0.00 0.00 16.33 0.00 1.00 5.81 0.00 0.00 188.08
VOLUMENES

RESUMEN (ORDENADAS DE LA
T
CURVA MASA)

0+000.000 10,000.00
0.00 0+020.000 10,438.00
0.00 0+040.000 10,970.45
0.00 0+060.000 11,721.96
0.00 0+080.000 12,675.73
0.00 0+100.000 13,874.13
0.00 0+120.000 15,233.70
0.32 0+140.000 16,492.64
0.32 0+160.000 17,769.50
42.27 0+180.000 19,145.36
156.43 0+200.000 20,652.39
176.95 0+220.000 22,332.03
100.83 0+240.000 24,036.82
40.29 0+260.000 25,575.48
19.02 0+280.000 26,954.94
81.60 0+300.000 28,061.18
65.01 0+320.000 28,975.67
0.19 0+340.000 30,005.68
0.00 0+360.000 30,921.58
0.00 0+380.000 31,444.95
0.00 0+391.614 31,633.03