Housekeeping Schedule: Production Ncii
Housekeeping Schedule: Production Ncii
Housekeeping Schedule: Production Ncii
Person
Day Day
1. Segregate and
dispose
garbage Group 1
2. Clean lavatory
and restrooms
Group 1 X
3. Arrange the
baking tools
according to Group 1 X
classification
4. Clean the
refrigerator Group 2 X
5. Clean the
ceiling and Group 3 X
walls
6. Clean and dust
the windows Group 3 X
and cabinets
7. Clean and
check work Group 5 X
shop ventilation
8. Clean and
arrange
working tables Group 5 X
and stools
9. Clean and dry
baking tools
and equipment Group 6 X
from dust
10. Clean sink
Group 6 X
11. Clean the oven
Group 7 X
Day Day
1. Clean the
grill surface
thoroughly
with a grill Students X
pad while the
surface is
still warm
2. Regularly
wipe the
surface with
hot water Students X
and liquid
dishwashing
soap.
3. Check that
gas lock
turns Students X
smoothly.
4. Remove the
burner cap
and clean
with a
suitable Students X
liquid
dishwashing
soap and
warm water.
5. Check the
oven racks Students X
are level.
6. Check the
oven door Students X
close tightly
7. Turn on
oven for 5
minutes and
observe; Students X
report if there
are
abnormalities
HOUSEKEEPING INSPECTION CHECKLIST
Qualification BREAD AND PASTRY PRODUCTION NC II
2. Are the windows and cabinets clean and free from dust?
1. Is the grill surface cleaned thoroughly with a grill pad while still warm?
2. Is the surface wiped regularly with hot water and liquid dishwashing
soap?
4. Is the burner cap removed and cleaned with a suitable liquid dishwashing
soap and warm water?
7. Did you turn on oven for 5 minutes and observe if there are
abnormalities?
Eqpt. Drawing
No. Location Qty Title Description PO No.
No. Ref.
BPP
“3D Brand 24”
Workplace
Industrial blade diameter
1 Area BPP-100 2
electric fan 3 speeds,
220V/60Hz
BPP
Workplace “La Germania
Gas range
2 Area BPP-001 2 w/ oven 3 gas,
with oven
1 electric
BPP KitchenAid
Workplace Heavy duty RRK150IC 5
3 Area BPP-002 1
Dough mixer Qt. Artisan
Series
BPP
Workplace Refrigerator
4 Area BPP-005 1 Refrigerator “Sharp” 7 cu ft.,
four door
BPP
Workplace
5 Area BPP-101 1 Smart TV 55-inch Sony
TAG-OUT BILL
Refrigerator “Sharp” 7 cu
3 02/14/18 Out of Order 08/12/2022
ft., four door
6. Broken items X
9. Egg shells X
Area / Section:
NATURE OF
FACILITY TYPE RECOMMENDATION
BREAKDOWN
Refrigerator “Sharp” 7 cu
Condenser not functioning Replace Condenser
ft., four door
Unit Description:
No. La Germania gas range w/ oven 3 gas, 1 electric
5-20
Observation:
Date Reported:
August 10, 2022
Gas is leaking. The hose and regulator should be replaced
Reported by:
CHRILIE MAE L.
CUARTEROS
Sign:
Spare parts used:
LPG hose and regulator
SALVAGE REPORT
Area / Section:
Refrigerator
Equipment Type
“Sharp” 7 cu ft., four door”
1. Be sure to check good air circulation and provide ample space so that
air can flow through the rear of the unit and should be located no less
than 5 inches from the wall.
4. Plug in and turn on the power switch located on the bottom of the top
grill. The display panel will be lighted. The compressor will begin to
run.
8. The interior light is activated by the door switch when the door is
opened.
9. Evaporator fan motor will run after all doors are completely closed.
INSPECTION REPORT
Refrigerator
Condenser not
“Sharp” 7 cu ft., Replacement Equipment is functional
functioning
four door
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region X-Northern Mindanao
Division of Ozamiz City
GALA NATIONAL HIGH SCHOOL
Gala, Ozamiz City
PURCHASE REQUEST
P6,900.00
Purpose:
Additional equipment.
Requested by: Approved by: