CONSTRUCT Tension the strand 100%
GIRDERS
76% 25%
58%
Cast the girder
Release the prestressing
Ship the girder to the bridge site
ERECT GIRDERS Erect girders onto permanent bearings 0%
AT THE BRIDGE 0% 0%
SITE Remove temporary strands 0%
Cast diaphragms
Lorem ipsum activity
CAST DECK Cast the bridge deck
Drying and measuring
Deck composite with girders - confirm
Lorem ipsum activity
0% 0% 0% 0%
0%
FINAL CONDITION Controlled load tests
W/O LIVE LOAD
0% 0% 0%
Diagnostic load tests
Compare responses and calculated values
Lorem ipsum activity
FINAL CONDITION Installation of the railing system 0%
WITH LIVE LOAD 0%
0%
Installation of an overlay 0%
Opening the bridge to live load
Any user defined loading test