STRUCTURAL ENGINEERING WORKING DRAWINGS

PROPOSED RESIDENTIAL DEVELOPMENT

AT
PLOT NO. 195C, KWARARAFA RD MARAFA ESTATE-MARAFA, KADUNA
NORTH LGA, KADUNA STATE.

Consultants:

Acute Engineering & Partners Nig. Ltd.


No. 3A, Free Time House, Ali Akilu
Road, KADUNA.
REVISION KEY
GENERAL NOTES AND SPECIFICATIONS
Suffix Date Initials
STRUCTURAL HOLLOW CLAY POT
GENERAL NOTE CONCRETE STEELWORK BLOCKWORK CONSTRUCTION

1. WORK TO FIGURED DIMENSIONS ONLY 1. (a) CONCRETE TO BE GRADE 20N/mm² 1. ALL STRUCTURAL STEELWORK SHALL BE MILD 1. HOLLOW BLOCKWALLS BELOW GROUND 1. ALL CONDUITING WORK IN THE SLAB TOPPING
IN FOUNDATIONS. STEEL TO BS 4360 GRADE 43A EXCEPT SLAB LEVEL ARE TO BE FILLED WITH TO BE LAID PARALLEL TO THE RIBS IN ALL
HOLLOW SECTIONS WHICH SHALL COMPLY MASS CONCRETE. BACK FILLING IS TO HOLLOW CLAY POT FLOORING
2. ALL DRAWINGS ARE TO BE READ IN
(b) CONCRETE TO BE GRADE 20N/mm² WITH GRADE 43c BE CARRIED OUT SIMULTANEOUSLY ON
CONJUCTION WITH ARCHITECTS DRGS, OTHER
IN SUPERSTRUCTURE BOTH SIDES
STRUCTURAL DRGS AND SPECIALISTS DRGS. 2. UNLESS NOTED OTHERWISE, CLASSIC RIB WIDTH
WHERE HOLES, FIXING ETC. ARE REQUIRED, 2. WELDING FABRICATION AND ERECTION OF 2. THE WALL THICKNESS OF THE BLOCKS SHOULD NOT BE LESS THAN 120mm
BARS MAY BE DISPLACED SLIGHTLY TO 2. (a) R = DENOTES MILD STEEL STRUCTURAL STEELWORK SHALL CONFORM SHOULD NOT BE MORE THAN 230mm
ACCOMMODATE THESE BUT THEY MUST NOT REINFORCEMENT ACCORDING TO TO BS 5950
BE CUT OR REMOVED BS 4449 AND IN MILLIMETRE SIZE 3. MESH REINFORCEMENT (AS APPLICABLE)
3. UNLESS WHERE OTHERWISE NOTED, ALL BOLTS 3. THE MINIMUM CRUSHING STRENGTH OF TO BE LAID IN THE MIDDLE OF ALL HOLLOW
SHALL BE BLACK BOLTS TO BS 4190 AND HOLLOW BLOCKS IS TO BE 2.ON/mm. OF CLAY POT FLOOR TOPPING WHICH SHOULD
(b) Y = DENOTES HIGH YIELD, HIGH BOND
3. THE ENGINEERS SHOULD BE NOTIFIED WASHERS TO BS 4320 SHALL BE PROVIDED GROSS AREA OF BLOCK AT 14 DAYS IN ANY CASE NOT BE LESS THAN 50mm THICK.
ROUND REINFORCEMENT TO
SHOULD THERE BE DESCREPANCIES WITHIN, FOR ALL BOLTS
BS 4449 AND 4466
BETWEEN OR AMONG THESE DRAWINGS
AND OTHER DRAWINGS. 4. ALTERNATE CLAY POTS ARE TO BE OMITTED
(c) T = TOP 4. ALL WELDS ARE TO BE 6mm. FILLET WELDS 4. BLOCKWORK TIES BETWEEN BLOCKWORK
AT SUPPORTS TO IMPROVE THE SHEAR Client
TT = TOP TOP CONTINUOUS UNLESS WHERE OTHERWISE WALLS AND COLUMNS/STANCHIONS ARE TO
RESISTANCE OF THE RIBS.
4. THE ENGINEERS SHALL NOT BE LIABLE TB = TOP BOTTOM INDICATED BE PROVIDED AT EVERY OTHER COURSE. TIES
TO BE 6mm BAR STRAPS 700mm LONG
ENGR MICHEAL OLUGBEMIGA
FOR ANY STRUCTURAL DEFECT IF THE
PROJECT IS NOT SUPERVISED BY THEM. 5. UNLESS NOTED OTHERWISE, THE COMPOSITION INTO THE BLOCKWORK 5. CONCRETE MIXES IN ALL CASES ARE ADVISED OLUBODE
(d) B = BOTTOM OF THE PROTECTIVE SYSTEM SHALL BE: TO BE WITH COARSE AGGREGATE SIZE NOT
BT = BOTTOM TOP (a) SURFACE TREATEMENT - D 5. MAXIMUM POUR HEIGHT FOR ALL FILLED EXCEEDING 15mm FOR EASE OF PLACEMENT
5. REMOVE ALL TOPSOIL UNDER SLABS. AND COMPACTION.
BB = BOTTOM BOTTOM (b) METAL COATING - NONE BLOCK WORK TO BE 2 COURSES AT A TIME
PROVIDE 150mm WELL RAMMED AND
(c) PRE - TREATMENT - NONE
CONSOLIDATED NATURALLY OCCURRING
(d) PRIMING PAINT - 1H
HARDCORE MATERIAL OR ROCK LATERITE
(e) AS = ALTERNATELY STAGGERED (e) FINISHING PAINT - 2T 6. MID-SPAN CROSS SPREADER RIB IS TO BE
UNDER ALL GROUND BEARING SLABS WELL
USED FOR BOTH THE "CLASSIC" AND "BASAP"
Project
CONSOLIDATED SELECTED FILL OR MASS AS CLASSIFIED IN TABLE 4 KEY TO TREATMENT
CONCRETE TO BE USED TO MAKE UP LEVELS (f) AP = ALTERNATELY PLACED IN-SITU SYSTEMS TO IMPROVE LOAD
CP 2008 1966
WHERE NECESSARY AS AGREED WITH THE (g) NF = NEAR FACE DISTRIBUTION FOR LONGER SPANS.
ENGINEER. FOR FILL, LAYERS NOT TO
EXCEED 225mm (h) FF = FAR FACE
PROPOSED RESIDETIAL
6. THE FIRST BAY OF ERECTED STEELWORK IS
(i) EF = EACH FACE TO BE LINED AND LEVELLED BY MEANS OF 7. ON NO ACCOUNT SHOULD CLAY POT SYSTEM DEVELOPMENT
6. WHERE BAD GROUND IS ENCOUNTERED TEMPORARY BRACING, BE USED AS A WAFFLE (TWO-WAY) SYSTEM
BELLOW FOUNDATION LEVEL. THE DIFFERENCE BEFORE FURTHER ERECTION SHALL CONTINUE WITHOUT THE ENGINEERS WRITTEN CONSENT.
IN LEVEL BETWEEN APPROVED BEARING 3. ALL BLINDING AND MASS CONCRETE TO
STRATUM AND ORIGINAL LEVEL IS TO BE BE 1: 3: 6 (CEMENT-SAND-COARSE
AGGREGATE) 7. ANTI - SAG RODS ARE TO BE PROVIDED
MADE UP USING MASS CONCRETE 8. FOR VELOX SYSTEMS, IT IS RECOMMENDED
AS SHOWN ON DRGS. WHERE ANTI - SAG
Location AT
4. IN WATER - TIGHT CONSTRUCTION JOINTS RODS ARE NOT SHOWN ON THE DRGS. THAT THE MAXIMUM SIZE OF BOTTOM BARS
IN CONCRETE WORK ARE TO HAVE APPROVED PLOT NO. 195C, KWARARAFA RD
7. THE ALLOWABLE GROUND PRESSURE ASSUMED THEY ARE TO BE PLACED AT MID-SPAN OF SHOULD BE Y16 OR Y20
WATER BAR AND CONTRACTOR IS TO TAKE PURLINS OR TO PURLIN MANUFACTURERS
MARAFA ESTATE-MARAFA,
FOR THE FOUNDATION DESIGN IS 175KN/m²
SPECIAL CARE WITH THE CONCRETE SO AS SPECIFICATION KADUNA NORTH LGA, KADUNA
SOIL TEST SHOULD BE DONE TO ASCERTAIN
TO PRODUCE A WATER-TIGHT CONSTRUCTION.
THE ACTUAL BEARING CAPACITY.
AN ADMIXTURE OF A PROPRIETARY BRAND 9. IT IS ESSENTIAL TO CONTROL AND SUPERVISE STATE.
MAY BE USED IF AGREED BY THE ENGINEER. VERY CLOSELY THE GROUTING-UP OF THE MAIN
8. ALL DIMENSIONS ARE TO BE CHECKED ON IF AN ADMIXTURE IS USED CARE SHOULD
8. ALL STEEL SURFACES IN CONTACT WITH
BARS IN THE PRECAST RIBS. BARS PROTECTION
Consultants
ALUMINIUM SHEETING ARE TO BE GIVEN
SITE BE TAKEN THAT IT IS PLACED STRICTLY IN TWO COATS OF AN APPROVED BITUMASTIC SHOULD ALSO NOT INTERFERE AT THE SUPPORTS.
ACCORDANCE WITH THE MANUFACTURERS PAINT BEFORE FIXING SHEETING
9. EXTERNAL WALL FOOTING TO BE 1.2 METRE INSTRUCTIONS
MINIMUM DEPTH BELLOW EXISTING GROUND 5. ALL CONSTRUCTION JOINT POSITIONS ARE TO
LEVEL OR FINAL GROUND LEVEL BE APPROVED BY THE ENGINEER PRIOR TO
WHICHEVER IS LOWER CASTING BUT THESE SHOULD NOT BE 9. ALL BOLTS IN TENSION SHOULD BE PROVIDED
SPACED MORE THAN 5.0mm APART WITH EITHER DOUBLE COILED SPRING
WASHERS OR LOCK NUTS Acute Engineering & Partners Nig. Ltd.
10. WHERE SELECTED FILL IS USED FOR MAKING 6. CONCRETE ROOF FELTING MATERIAL. No. 3A, Free Time House, Ali Akilu
UP LEVELS TO FORM A PILING PLATFORM, SINGLE PLY OF PARALON NT4 PRE- FABRICATED Road, KADUNA.
THE MAXIMUM SIZE OF AGGREGATE MEMBRANE LAID TO FALLS AND CROSS FALLS ON
IS NOT TO EXCEED 75mm PREPARED BACKGROUND AND BONDED WITH 10. REINFORCEMENTS:-
FIRE GAS TORCH FINISH WITH 3 - COATS OF (a) HIGH YIELD BARS fy = 410N/mm²,
Building
ALUMINIUM REFLECTIVE AND WATER RETARDING
11. ALL DIMENSIONS ARE IN METRES AND (b) MILD STEEL fy = 250N/mm².
PAINT TO ENGINEER`S SPECIFICATION
MILLIMETRES UNLESS NOTED OTHERWISE MAIN BUILDING
12. BASEMENT AND SIMILAR CONSTRUCTION SHALL 7. MAXIMUM SIZE OF AGGREGATE TO BE 20mm
INCORPORATE BASEMENT TANKING COMPRISING UNLESS OTHERWISE SPECIFIED Drawing title
3 LAYERS BITUMINUOUS FELT (SKUDOPLAST
OR SIMILARLY APPROVED) DAMP-PROOF GENERAL ARRANGEMENT
MEMBRANE PROTECTED BY 230mm THICK
BLOCK WORK FILLED SOLID.
3200 3675 2700

REVISION KEY

Suffix Date Initials

5565

5565
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE

Project

14
15 16 17 18 19 20 21
4545

4545
13
PROPOSED RESIDETIAL
12 DEVELOPMENT
11
10
9

Location AT
8 7 6 5 4 3 2 1 PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
Consultants

Acute Engineering & Partners Nig. Ltd.


4700

4700
No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

Building

MAIN BUILDING
Drawing title

G.A. 0F FOUNDATION/
GROUND FLOOR ARRANGEMENT

4230 5345
3200 3675 2700

REVISION KEY

Suffix Date Initials

5565

5565
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE

Project
14
15 16 17 18 19 20 21
4545

4545
13 PROPOSED RESIDETIAL
12
11
DEVELOPMENT
10
9

Location AT
8 7 6 5 4 3 2 1
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
Consultants
4065

Acute Engineering & Partners Nig. Ltd.

4700
No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

Building

MAIN BUILDING
Drawing title

G.A. 0F FIRST FLOOR PLAN

4230 5345
3200 3675 2700

REVISION KEY

Suffix Date Initials

5565

5565
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE

Project
4545

4545
PROPOSED RESIDETIAL
DEVELOPMENT

Location AT
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
Consultants
2330

Acute Engineering & Partners Nig. Ltd.


No. 3A, Free Time House, Ali Akilu

4700
Road, KADUNA.

Building

MAIN BUILDING
2370

Drawing title

G.A. 0F ROOF PLAN

4230 5345
REVISION KEY

Suffix Date Initials

Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE
150

150
Project
450

PROPOSED RESIDETIAL
450

150
DEVELOPMENT

150
450 Location AT
230
1200

PLOT NO. 195C, KWARARAFA RD


MARAFA ESTATE-MARAFA,
230
1200

150 KADUNA NORTH LGA, KADUNA


STATE.
350

Consultants
350

1200
1400 Acute Engineering & Partners Nig. Ltd.
No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

Building

MAIN BUILDING
SECTION 1-1 SECTION 2-2
Drawing title

FOUNDATION SECTION/
BASE SCHEDULE
230 500
REVISION KEY

02 02 02 02 02 Suffix Date Initials


03 03

02 02 02 02 02

SECTION 1-1 SECTION 2-2

230

230
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE
750

750

750
Project
450

450

450
PROPOSED RESIDETIAL
4-Y1602 6-Y1602 4-Y1602 DEVELOPMENT
6-Y0803@225c/c 6-Y0803@225c/c 6-Y0803@225c/c
1200

1200

1200
1 1 2 2 1 1
Location AT
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
01 01 01 01 01 01 04 04 04 STATE.
01 01 04
350

350

350
Consultants

A1-A1 A1-A1 B1-B1


Col.1 Col.3 Col.2
Acute Engineering & Partners Nig. Ltd.
No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

700
8-Y1204@200c/c Building
600

600

7-Y1204@200c/c 7-Y1204@200c/c
MAIN BUILDING
8-Y1204@200c/c

700
7-Y1204@200c/c 7-Y1204@200c/c
600

600

Drawing title

R.C. DETAILS OF BASES


A1 600 600 A1 A2 600 600 A2 B1 700 700 B1

BTA (10 Nos) BTA (01 Nos) BTB (3 Nos)


230 500

02 02 02
01 01
03 REVISION KEY
02

Suffix Date Initials


02 02 02
01 01

SECTION 1-1 SECTION 2-2


230

230
450

450

450

450
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE

Project
3150

3150

3150

3150
4Y1603 4Y1603 6Y1603 4Y1603
17Y1002@225c/c 17Y1002@225c/c 17Y1002@225c/c 17Y1002@225c/c

PROPOSED FARM HOUSE

Location AT
750

750

750

750
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
Consultants
450

450

450

450

450
FFC Acute Engineering & Partners Nig. Ltd.
No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

Building

MAIN BUILDING
3150

3150

3150

3150
4Y1601 4Y1601 6Y1601 4Y1601
17Y1002@225c/c 17Y1002@225c/c 17Y1002@225c/c 17Y1002@225c/c Drawing title

R.C. DETAILS OF COLUMNS

1 1 1 1 2 2 1 1

Cols 1 Cols 2 Cols 3 Cols 1&2


REVISION KEY

Suffix Date Initials

Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE
SECTION 1-1[FLIGHT 1] SECTION 2-2
[FLIGHT 2]
Project

PROPOSED RESIDETIAL
DEVELOPMENT

Location AT
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
Consultants

Acute Engineering & Partners Nig. Ltd.


SECTION 3-3[FLIGHT 3] No. 3A, Free Time House, Ali Akilu
Road, KADUNA.

Building

MAIN BUILDING

STAIR BEAM Drawing title

R.C. DETAILS OF STAIRCASE


REVISION KEY

Suffix Date Initials

3:Y1601 3:Y1601 3:Y1602 3:Y1601 3:Y1602 3:Y1604

3:Y1604 3:Y1605 3:Y1604 3:Y1605


17:R1003:200c/c 19:R1003:200c/c 14:R1003:200c/c 17:R1003:200c/c 19:R1003:200c/c 14:R1003:200c/c

BEAM 1 BEAM 2

Client
3:Y1601 4:Y2002 3:Y1604 3:Y1601 3:Y1601
ENGR MICHEAL OLUGBEMIGA
OLUBODE
3:Y1605 3:Y2006 3:Y2002 3:Y2002
22:R1003:200c/c 27:R1003:200c/c 27:R1003:200c/c 27:R1003:200c/c

BEAM 3 BEAM 4 BEAM 5 Project

PROPOSED RESIDETIAL
DEVELOPMENT

3:Y1601 3:Y1602 4:Y1604 3:Y1605 3:Y1601


Location AT
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
3:Y1606 3:Y1607 3:Y2502 STATE.
21:R1003:200c/c 23:R1003:200c/c 28:R1003:200c/c 26:Y1003:200c/c
Consultants
BEAM 6 BEAM 7 (2 Nos)

Acute Engineering & Partners Nig. Ltd.


No. 3A, Free Time House, Ali Akilu
Road, KADUNA.
3:Y1601 3:Y1602 3:Y2004 3:Y1605 3:Y1601 3:Y1602 3:Y1604 4:Y2005 3:Y1606
Building

MAIN BUILDING
3:Y1606 4:Y1607 3:Y1607 3:Y2008
24:R1003:200c/c 23:R1003:200c/c 24:R1003:200c/c 19:Y1003:200c/c 28:R1003:200c/c Drawing title

BEAM 8 BEAM 9 R.C. DETAILS OF FIRST FLOOR


BEAMS
REVISION KEY

Suffix Date Initials

3200 3675 2700

Client
5565

5565
ENGR MICHEAL OLUGBEMIGA
OLUBODE

Project

PROPOSED RESIDETIAL
DEVELOPMENT

Location AT
14
PLOT NO. 195C, KWARARAFA RD
15 16 17 18 19 20 21 MARAFA ESTATE-MARAFA,
4545

4545
13 KADUNA NORTH LGA, KADUNA
12 STATE.
11
10 Consultants
9

8 7 6 5 4 3 2 1

Acute Engineering & Partners Nig. Ltd.


No. 3A, Free Time House, Ali Akilu
Road, KADUNA.
2330

Building

MAIN BUILDING
4700
Drawing title

R.C. DETAILS OF FIRST FLOOR


2370

SLAB

4230 5345
3200 3675 2700

REVISION KEY

Suffix Date Initials

5565

5565
Client
ENGR MICHEAL OLUGBEMIGA
OLUBODE

4545
Project

PROPOSED RESIDETIAL
DEVELOPMENT

Location AT
PLOT NO. 195C, KWARARAFA RD
MARAFA ESTATE-MARAFA,
KADUNA NORTH LGA, KADUNA
STATE.
2330

Consultants

4700
Acute Engineering & Partners Nig. Ltd.
No. 3A, Free Time House, Ali Akilu
2370

Road, KADUNA.

Building

MAIN BUILDING
Drawing title

R.C. DETAILS OF ROOF DECK

4230 5345