Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Electrical Level 1 Cl. 2 Instructor

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

PROJECT

Project duration: Two (2) weeks

INSTRUCTION TO CANDIDATES

Read the following instructions carefully before you begin. If you have any
questions, direct them to your instructor.

i. Candidates are required to work in groups of two (2).

ii. Examine the material listing for the task you are to perform.

iii. Material selection MUST be done by individual groups.

Tasks

From the list given, you are required to do the following:


• Make a Married

• Make a Tee joint

• Make a straight twist joint

• Solder the joints

• Insulate two (2) of the soldered joints using (PVC) electrical tape.

Note

You are also required to create a video lasting no longer than 15 minutes,
demonstrating the construction, and soldering of the joints, which must be given to
your instructor for uploading.

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2
Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

MATERIAL LISTING

The material listing below is in quantities per group.

TOOLS/MATERIAL/EQUIPMENT

• 2’ Assorted 2.5 mm single wire


• 60/40 tinman solder
• PVC electrical tape
• 1- Combination pliers
• 1- Side cutting pliers
• 1- Measuring tape
• 1- Utility knife
• 1- Digital multimetre

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2
Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

Criteria Sheet

CANDIDATE’S NAME: _____________________________________

CANDIDATE’S NO.: _____________________________________

INSTITUTION NAME: _____________________________________

N/D 1 2 3 4 5
Criteria
1. Joints made with conductors securely anchored
2. Joints are mechanically and electrically sound
3. Joint soldered to standard
4. Correct material used to insulate joint
5. Insulation done to standard
6. Correct materials selected
7. Correct scale selected on first attempt for continuity
8. Correct size wire selected
9. Followed correct safety procedures when making joints
10. Followed correct safety procedures when soldering joints
11. Candidate displayed positive work attitude
12. Correct PPE worn by candidate
13. Insulated joint suitable for display
14. Soldered joint suitable for display
15. Completed tasks within time specified
Sub-Total
Total
Final Average Percentage Score (%)

5. Can perform the task with initiative and adaptability to problem situations.
4. Can perform the task satisfactorily without assistance and/or supervision.
3. Can perform the task but requires periodic assistance and/or supervision.
2. Can perform some parts of the tasks satisfactorily requires considerable assistance.
1. Has some knowledge about the task, but cannot perform the task satisfactorily.
N/D Not demonstrated

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2

You might also like