Bab 2 Gording
Bab 2 Gording
Bab 2 Gording
PERENCANAAN GORDING
• Perhitungan Pembebanan
• Beban Mati
berat gording W = 5.5 kg/m'
berat genteng, reng, dan usuk ( PPIUG 1971 ) wg := 10 1.2 = 12 kg/m'
wt := W + wg = 17.5 kg/m'
berat pengikat 10 % wp := 0.1 wt = 1.75 kg/m'
qd := wt + wp = 19.25 kg/m'
• Beban Hidup
1. Beban hidup terbagi rata ( air hujan )
Wl := ( 40 − 0.8 15) = 28 kg/m2
ql := 1.2 20 = 24 kg/m'
ql cos π 6 2
12
Mxl :=
= 104.32 kgm
8
3
ql sin π 2 2
12
Myl :=
= 3.11 kgm
8
π
cos 6 = 144.89 kgm
100
Mxlp :=
4 12
π
sin 2 = 12.94kgm
100
Mylp :=
4 12
• Beban Angin ( bangunan tertutup ) wa := 25 kg/m2 ( jauh dari pantai )
karena ( D+L) lebih besar daripada beban angin hisap, maka beban angin diabaikan.
• Beban berfaktor ( beban mati + beban hidup P )
Mux := 1.2 Mxd + 1.6 Mxlp = 335.2 kgm
Muy := 1.2 Myd + 1.6 Mylp = 21.91 kgm
4
• Kontrol terhadap geser
Rd := 0.5 qd 6 = 57.75 kg
Rl := 100 kg
ϕ
Vn := 0.9 Vn = 447120 kg > Ru = 229.3 kg OK!!
• Kontrol Lendutan
600
Lendutan ijin : f := = 3.33 cm
180
π
5 qd cos 600 4
fx1 :=
12 = 0.63 cm
6
384 2 10 Ix 100
π
5 qd sin 200 4
fy1 :=
12 = 0.013 cm
6
384 2 10 Iy 100
• Lendutan total