Dhubri Phulbari Project RFI-283 - R1
Dhubri Phulbari Project RFI-283 - R1
Dhubri Phulbari Project RFI-283 - R1
Temporary Work
Casting Yard Road Work Batching Plant Walkway
Launching Girder Supports Formwork Pile
Others (Please Specify) :
Road Work
Earthwork Pavement Work Retaining Wall Kerb
Material Testing Plant Equipment Quarrying and Crushing Operations
Bituminous Concrete Production and Transport Cement Concrete Production and Transport
Others (Please Specify) :
Viaduct
Foundation Test Pile Pile cap Substructure
Rebar Work Precast Segments Prestressing Bearing
Expansion joints Temp Prestressing Stitching Work Wearing Coat
Others (Please Specify) :
Navigational Span
Foundation Test Pile Pile cap Substructure
Rebar Work Precast Segments Prestressing Temp Prestressing
Pylon Work Saddle Stay Cable Stay Anchor
Stitching Work Geometry Control Expansion joints Bearing
Wearing Coat
Others (Please Specify) :
Bridge Facilities
Control Room VMS CCTV High Mast
Others (Please Specify) :
Page : 1 of 6
Picture 1:
Page : 2 of 6
Picture 2:
Picture 3:
Picture 4:
Page : 3 of 6
Picture 5:
Picture 6:
Picture 7:
Page : 4 of 6
Picture 8:
Picture 9:
Picture 10:
Page : 5 of 6
Picture 11:
Action taken :
Jointly signed Borehole Log Sheets attached with this RFI.
review/approval and/or convey its observation on any Drawings shall relieve the Contractor of its
obligations and liabilities under this Agreement in any manner nor shall the Authority’s Engineer or the
Authority be liable for the same in any manner; and if errors, omissions, ambiguities, inconsistencies, in
adequacies or other Defects are found in the Drawings, they and the construction works shall be
corrected at the Contractor’s cost.